Select By Waste Area Group (WAG)

For WAG 7

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
06-AUG-18 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY2017 RPT-1635 0
01-MAY-18 NOT SPECIFIED LONG-TERM MONITORING STUDY FOR OPERABLE UNIT 7-13/14 DOE/ID-11568 0
18-APR-18 NOT SPECIFIED REGULATORY AGENCY MEETING TO DISCUSS COMMENTS ON THE 30% DESIGN REPORT FOR THE WAG 7 PHASE 3 REMEDIAL DESIGN OF AN EVAPOTRANSPIRATION COVER ON THE SDA AT THE RWMC, INL CCN 322153 0
13-MAR-18 JEWETT, MARC A. TRANSMITTAL OF THE LIMITATIONS AND VALIDATION REPORTS FOR ANNUAL AQUIFER SAMPLING CONDUCTED IN NOVEMBER 2017 FOR WASTE AREA GROUP 7 CCN 321833 0
01-MAR-18 JEWETT, MARC A. TRANSMITTAL OF THE LIMITATIONS AND VALIDATIONS REPORTS FOR ANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN NOVEMBER 2017 FOR WASTE AREA GROUP 7 CCN 321832 0
18-DEC-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 10
01-NOV-17 CRESAP, DALE FISCAL YEAR 2017 ANNUAL LETTER REPORT FOR OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE RPT-1609 0
01-SEP-17 SHANKLIN, DEAN E. OPERABLE UNIT 7-13/14 PHASE 3 SOIL BORROW SOURCE REPORT RPT-1524 0
01-SEP-17 MAHNAMI, DANIEL D. OPERABLE UNIT 7-13/14 PHASE 3 SOIL BORROW SOURCE REPORT RPT-1524 0
01-SEP-17 FORBES, JEFFREY R. OPERABLE UNIT 7-13/14 PHASE 3 SOIL BORROW SOURCE REPORT RPT-1524 0
31-JUL-17 WITKOWSKI, ELIZABETH C. BORROW EXPANSION IN SPREADING AREAS A AND B (OS-ESD-17-083) / SHPO REVIEW NO.: 2017-1130 OS-ESD-17-083 0
13-JUN-17 BROCHU, ROBERT A. DEPARTMENT OF THE ARMY APPROVED JURISDICTIONAL DETERMINATION REGARDING INL SPREADING AREAS CCN 320963 0
01-MAY-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY2016 RPT-1543 0
30-MAR-17 NOT SPECIFIED OPERABLE UNIT 7-13/14 PHASE 3 PAD A FOCUSED FEASIBILITY STUDY DOE/ID-11541 0
28-MAR-17 NOT SPECIFIED REGULATORY AGENCY MEETING TO DISCUSS WORK SCOPE FOR THE WAG 7 PHASE 3 REMEDIAL DESIGN OF AN EVAPOTRANSPIRATION COVER ON THE SUBSURFACE DISPOSAL AREA AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX, IDAHO NATIONAL LABORATORY SITE 5776749 0
22-MAR-17 CRESAP, DALE A. OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 2
02-MAR-17 JEWETT, MARC A. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORT FOR ANNUAL AQUIFER SAMPLING CONDUCTED IN NOVEMBER 2016 FOR WASTE AREA GROUP 7 CCN 320439 0
15-FEB-17 JEWETT, MARC A. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORT FOR ANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN OCTOBER 2016 FOR WASTE AREA GROUP 7 CCN 320361 0
26-JAN-17 KOCH, DARYL F. DEQ CONCURRENCE TO ADDENDUM TO TABLES 1 AND 3 OF THE GENERAL ACTION MEMO FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 3) (EM-FMDP-17-001) 5661786 0
26-JAN-17 FAULK, DENNIS EPA CONCURRENCE TO ADDENDUM TO TABLES 1 AND 3 OF THE GENERAL ACTION MEMO FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 3) (EM-FMDP-17-001) 5661787 0
18-JAN-17 WHITHAM, KENNETH ADDENDUM TO TABLES 1 AND 3 OF THE GENERAL ACTION MEMO FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 3) (EM-FMDP-17-001) EM-FMDP-17-001 0
01-JAN-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2015 RPT-1503 0
01-NOV-16 CRESAP, DALE FISCAL YEAR 2016 ANNUAL LETTER REPORT FOR OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE RPT-1528 0
25-OCT-16 JENSEN, NOLAN R. CONSIDERATION OF ACCELERATING THE DATE FOR SUBMITTAL OF THE INTERIM REMEDIAL ACTION REPORT FOR PHASE 1 OF THE REMEDIAL ACTION FOR OPERABLE UNIT 7-13/14 (WDP-RWMC-16-029) WDP-RWMC-16-029 0
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JUN-16 NOT SPECIFIED QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 9, 10, AND REMOVAL ACTIONS DOE/ID-10587 11
01-MAY-16 NOT SPECIFIED OPERABLE UNIT 7-13/14 PHASE 3 BORROW SOURCE FIELD SAMPLING PLAN DOE/ID-11542 0
03-MAR-16 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORT FOR ANNUAL AQUIFER SAMPLING CONDUCTED IN NOVEMBER 2015 FOR WASTE AREA GROUP 7 CCN 318880 0
18-FEB-16 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORT FOR ANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN OCTOBER 2015 FOR WASTE AREA GROUP 7 CCN 318822 0
08-FEB-16 FAULK, DENNIS EPA CONCURRENCE ON THE IDAHO NATIONAL LAB 5 YEAR REVIEW 5282268 0
31-DEC-15 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2010-2014 DOE/ID-11513 0
01-AUG-15 NOT SPECIFIED INL SITE COMMUNITY INVOLVEMENT PLAN DOE/ID-11518 0
01-JUN-15 NOT SPECIFIED ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT DOE/ID-11293 3
01-MAY-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2014 RPT-1361 0
01-APR-15 NOT SPECIFIED ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT DOE/ID-11293 2
31-MAR-15 BROWN, M. E. TRANSMITTAL OF THE REVISED LETTER REPORT FOR ANNUAL AQUIFER SAMPLING CONDUCTED IN NOVEMBER 2014 FOR WASTE AREA GROUP 7 CCN 317608 0
31-MAR-15 BROWN, M. E. TRANSMITTAL OF THE REVISED LETTER REPORT FOR ANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN NOVEMBER 2014 FOR WASTE AREA GROUP 7 CCN 317609 0
11-MAR-15 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORT FOR ANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN NOVEMBER 2014 FOR WASTE AREA GROUP 7 CCN 317528 0
05-MAR-15 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORT FOR ANNUAL AQUIFER SAMPLING CONDUCTED IN NOVEMBER 2014 FOR WASTE AREA GROUP 7 CCN 317508 0
01-MAR-15 KIMBRO, VALERIE M. OPERABLE UNIT 7-13/14 FIVE-YEAR OPERATIONS AND MAINTENANCE REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11516 0
01-MAR-15 CRESAP, DALE A. OPERABLE UNIT 7-13/14 FIVE-YEAR OPERATIONS AND MAINTENANCE REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11516 0
01-MAR-15 FORBES, JEFFREY R. OPERABLE UNIT 7-13/14 FIVE-YEAR OPERATIONS AND MAINTENANCE REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11516 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
30-OCT-14 BROWN, M. E. TRANSMITTAL OF FINAL PHASE 1 INTERIM REMEDIAL ACTION REPORT FOR OPERABLE UNIT 7-13/14 TARGETED WASTE RETRIEVALS, DOE/ID-11396, REV.3 CCN 317051 0
06-OCT-14 FAULK, DENNIS EPA CONCURRENCE FOR ADDENDUM TO TABLE 1 OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 1) 4747805 0
01-OCT-14 KOCH, DARYL F. DEQ CONCURRENCE FOR ADDENDUM TO TABLE 1 OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 1) 4747806 0
01-OCT-14 NOT SPECIFIED PHASE 1 INTERIM REMEDIAL ACTION REPORT FOR OPERABLE UNIT 7-13/14 TARGETED WASTE RETRIEVALS DOE/ID-11396 3
30-SEP-14 JENSEN, NOLAN R. REQUEST FOR CONCURRENCE FOR ADDENDUM TO TABLE 1 OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 1) (WDP-RWMC-14-021) WDP-RWMC-14-021 0
01-AUG-14 HOLDREN, K. JEAN FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 AQUIFER MONITORING DOE/ID-11492 1
01-AUG-14 FORBES, JEFFREY R. FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 AQUIFER MONITORING DOE/ID-11492 1
01-AUG-14 FORBES, JEFFREY R. OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 1) 0
01-AUG-14 ALBERICO, KRISTINA M. OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 1) 0
01-AUG-14 HOLDREN, K. JEAN OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 1) 0
01-AUG-14 HOLDREN, K. JEAN OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 2) 0
01-AUG-14 ALBERICO, KRISTINA M. OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 2) 0
01-AUG-14 FORBES, JEFFREY R. OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 2) 0
01-AUG-14 HOLDREN, K. JEAN OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 3) 0
01-AUG-14 FORBES, JEFFREY R. OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 3) 0
01-AUG-14 ALBERICO, KRISTINA M. OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 3) 0
01-MAY-14 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2013 RPT-1268 0
01-APR-14 HOLDREN, K. JEAN OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 1
01-APR-14 CRESAP, DALE A. OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 1
01-APR-14 LOPEZ, STEVE L. OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 1
01-APR-14 HOLDREN, K. JEAN FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 VADOSE ZONE MONITORING DOE/ID-11503 0
05-MAR-14 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR ANNUAL AQUIFER SAMPLING CONDUCTED IN NOVEMBER 2013 FOR WASTE AREA GROUP 7 CCN 316170 0
05-MAR-14 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR ANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN NOVEMBER 2013 FOR WASTE AREA GROUP 7 CCN 316173 0
04-FEB-14 LIVIERATOS, TED REQUEST FOR CONCURRENCE TO REDUCE VADOSE ZONE MONITORING FREQUENCY AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX BEGINNING IN FISCAL YEAR 2014 (WDP-RWMC-14-002) AND TRANSMITTAL OF THE DRAFT NEW SITE IDENTIFICATION FORM FOR SITE CFA-11 4489367 0
04-FEB-14 FAULK, DENNIS EPA CONCURRENCE REGARDING REDUCING THE FREQUENCY OF VADOSE ZONE MONITORING AT THE RWMC FROM SEMI-ANNUAL TO ANNUAL SAMPLING 4489368 0
28-JAN-14 JENSEN, NOLAN R. REQUEST FOR CONCURRENCE TO REDUCE VADOSE ZONE MONITORING FREQUENCY AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX BEGINNING IN FISCAL YEAR 2014 WDP-RWMC-14-002 0
20-NOV-13 BROWN, M. E. TRANSMITTAL OF THE FISCAL YEAR 2013 ANNUAL LETTER REPORT FOR OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE CCN 315816 0
01-NOV-13 HOLDREN, K. JEAN OPERABLE UNIT 7-13/14 PHASE 3 REMEDIAL DESIGN WORK PLAN DOE/ID-11482 0
01-NOV-13 MEAGHER, BRANDT G. OPERABLE UNIT 7-13/14 PHASE 3 REMEDIAL DESIGN WORK PLAN DOE/ID-11482 0
01-SEP-13 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 8
01-SEP-13 HOLDREN, K. JEAN FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 AQUIFER MONITORING DOE/ID-11492 0
01-SEP-13 FORBES, JEFFREY R. FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 AQUIFER MONITORING DOE/ID-11492 0
26-AUG-13 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN APRIL AND MAY 2013 FOR WASTE AREA GROUP 7 CCN 315392 0
01-JUN-13 NOT SPECIFIED PHASE 1 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 DOE/ID-11389 2
01-JUN-13 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2012 RPT-1196 0
23-MAY-13 BUELOW, LAURA C. REQUEST FOR CONCURRENCE TO REDUCE AQUIFER MONITORING FREQUENCY AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX BEGINNING IN FISCAL YEAR 2013 CCN 315061 0
10-APR-13 KOCH, DARYL REQUEST FOR CONCURRENCE TO REDUCE AQUIFER MONITORING FREQUENCY AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX BEGINNING IN FISCAL YEAR 2013 (WDP-RWMC-12-025) 4242177 0
02-APR-13 JENSEN, NOLAN R. REQUEST FOR CONCURRENCE TO REDUCE AQUIFER MONITORING FREQUENCY AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX BEGINNING IN FISCAL YEAR 2013 WDP-RWMC-13-025 0
13-MAR-13 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN NOVEMBER 2012 AND WASTE AREA GROUP 7 CCN 314773 0
04-MAR-13 KOCH, DARYL F. REVIEW AND COMMENT PERIOD FOR PHASE 1 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 (DRAFT) DECEMBER 2012 DOE/ID-11389 REV 2, DRAFT C 4210681 0
06-DEC-12 BROWN, M. E. TRANSMITTAL OF THE FISCAL YEAR 2012 ANNUAL LETTER REPORT FOR OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE CCN 314439 0
09-AUG-12 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN APRIL AND MAY 2012 FOR WASTE AREA GROUP 7 CCN 313924 0
01-JUL-12 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2011 RPT-1001 0
30-APR-12 KOCH, DARYL R. DEQ CONCURRENCE TO DEPARTMENT OF ENERGY OPERABLE UNIT 7-13/14 ACCELERATED RETRIEVAL PROJECT V ENCLOSURE TERMINATION OF COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION AND LIABILITY ACT STATUS (WDP-RWMC-12-018) 4102460 0
30-APR-12 FAULK, DENNIS EPA CONCURRENCE - REQUEST TO REMOVE ARP V ENCLOSURE FROM CERCLA 4102461 0
30-APR-12 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 7
24-APR-12 COOPER, JAMES R. DEPARTMENT OF ENERGY OPERABLE UNIT 7-13/14 ACCELERATED RETRIEVAL PROJECT V ENCLOSURE TERMINATION OF COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION AND LIABILITY ACT STATUS (WDP-RWMC-12-018) WDP-RWMC-12-018 0
01-APR-12 NOT SPECIFIED PHASE 1 INTERIM REMEDIAL ACTION REPORT FOR OPERABLE UNIT 7-13/14 TARGETED WASTE RETRIEVALS DOE/ID-11396 2
06-FEB-12 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN OCTOBER 2011 FOR WASTE AREA GROUP 7 CCN 313098 0
09-NOV-11 PHAM, HA ARP IV: STRUCTURAL STEEL DISPOSAL ANALYSIS AR-25311 0
09-NOV-11 REIMBOLD, MIKE ARP IV: STRUCTURAL STEEL DISPOSAL ANALYSIS AR-25311 0
07-NOV-11 FAULK, DENNIS ADDENDUM TO TABLE 1 OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 1) (EM-FMDP-11-097) AR-25310 0
03-NOV-11 SHAW, R. MARK ADDENDUM TO TABLE 1 OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 1) (EM-FMDP-11-097) AR-25308 0
03-NOV-11 KOCH, DARYL ADDENDUM TO TABLE 1 OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 1) (EM-FMDP-11-097) AR-25309 0
17-AUG-11 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN APRIL 2011 FOR WASTE AREA GROUP 7 CCN 312303 0
10-FEB-11 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN OCTOBER 2010 FOR WASTE AREA GROUP 7 CCN 311435 0
07-FEB-11 OPALSKI, DANIEL D. U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE ON THE FIVE-YEAR REVIEW FOR IDAHO NATIONAL LABORATORY FISCAL YEARS 2005-2009 4544925 0
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
03-FEB-11 NOT SPECIFIED FIELD SAMPLING PLAN FOR THE ACCELERATED RETRIEVAL PROJECT VI PLN-3690 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 1) DOE/ID-11429 (PART 1) 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 2) DOE/ID-11429 (PART 2) 0
19-JAN-11 NOT SPECIFIED INTERIM COMPLETION REPORT FOR PHASE 2 OPERABLE UNIT 7-13/14 IN SITU GROUTING (PART 1) DOE/ID-11436 (PART 1) 0
19-JAN-11 NOT SPECIFIED INTERIM COMPLETION REPORT FOR PHASE 2 OPERABLE UNIT 7-13/14 IN SITU GROUTING (PART 2) DOE/ID-11436 (PART 2) 0
13-JAN-11 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2010 RPT-759 0
16-DEC-10 BROWN, M. E. TRANSMITTAL OF THE FIRST FISCAL YEAR 2010 ANNUAL LETTER REPORT FOR OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE CCN 311202 0
13-DEC-10 BROWN, M. E. TRANSMITTAL OF THE FIRST FISCAL YEAR 2011 ANNUAL LETTER REPORT FOR OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE CCN 312845 0
21-SEP-10 SALOMON, HOPI FIELD SAMPLING PLAN FOR THE ACCELERATED RETRIEVAL PROJECT V PLN-3500 0
08-SEP-10 NOT SPECIFIED PHASE 1 INTERIM REMEDIAL ACTION REPORT FOR OPERABLE UNIT 7-13/14 TARGETED WASTE RETRIEVALS DOE/ID-11396 1
17-AUG-10 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN APRIL 2010 FOR WASTE AREA GROUP 7 CCN 310623 0
09-AUG-10 NOT SPECIFIED PHASE 1 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 DOE/ID-11389 1
27-JUL-10 NOT SPECIFIED HEALTH AND SAFETY PLAN FOR THE ACCELERATED RETRIEVAL PROJECT ICP/EXT-04-00209 15
22-MAR-10 NOT SPECIFIED PHASE 1 INTERIM REMEDIAL ACTION REPORT FOR OPERABLE UNIT 7-13/14 TARGETED WASTE RETRIEVALS DOE/ID-11396 0
24-FEB-10 FULTON, JOHN C. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN OCTOBER 2009 FOR WASTE AREA GROUP 7 CCN 309898 0
23-FEB-10 NOT SPECIFIED TRANSITIONAL REMEDIAL ACTION STATUS REPORT FOR THE OPERABLE UNIT 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE RPT-686 0
27-JAN-10 NOT SPECIFIED PHASE 2 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 DOE/ID-11405 PART 1 0
27-JAN-10 NOT SPECIFIED PHASE 2 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 DOE/ID-11405 PART 2 0
08-DEC-09 ARENAZ, MARK R. DOCUMENTATION OF A NON-SIGNIFICANT CHANGE TO THE RECORD OF DECISION FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-13/14, IDAHO NATIONAL LABORATORY SITE, IDAHO AR-25271 0
03-DEC-09 KOEPPEN, L. DON FISCAL YEAR 2009 ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) RPT-683 0
17-NOV-09 CRESAP, DALE A. OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 0
17-NOV-09 HOLDREN, K. JEAN OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 0
17-NOV-09 NOT SPECIFIED OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 0
17-NOV-09 LOPEZ, STEVE L. OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 0
17-NOV-09 JORGENSEN, MICHAEL D. OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 0
09-NOV-09 NOT SPECIFIED HEALTH AND SAFETY PLAN FOR THE ACCELERATED RETRIEVAL PROJECT ICP/EXT-04-00209 14
22-OCT-09 NOT SPECIFIED HEALTH AND SAFETY PLAN FOR THE ACCELERATED RETRIEVAL PROJECT ICP/EXT-04-00209 13
21-SEP-09 NOT SPECIFIED FIELD SAMPLING PLAN FOR THE ACCELERATED RETRIEVAL PROJECT IV PLN-3144 0
16-SEP-09 HOLDREN, K. JEAN VADOSE ZONE FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 PLN-3224 0
16-SEP-09 KOEPPEN, L. DON VADOSE ZONE FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 PLN-3224 0
31-AUG-09 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 10, AND REMOVAL ACTIONS DOE/ID-10587 10
19-AUG-09 NOT SPECIFIED PHASE 1 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 DOE/ID-11389 0
20-APR-09 BECHTOLD, THOMAS E.. FISCAL YEAR 2008 ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX RPT-620 0
11-MAR-09 NOT SPECIFIED FIELD SAMPLING PLAN FOR LYSIMETER, VAPOR PORT, AIR, AND TENSIOMETER MONITORING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX ACTIVE LOW-LEVEL WASTE DISPOSAL FACILITY ICP/EXT-05-01060 1
04-MAR-09 CRESAP, DALE A. ENVIRONMENTAL AND OPERATIONAL DATA REPORT FOR THE OPERABLE UNIT 7-08 ORGANIC RPT-574 0
09-JAN-09 RENO, SCOTT L. ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (ICP) DOE/ID-11293 1
17-DEC-08 MEAGHER, BRANDT G. REMEDIAL DESIGN/REMEDIAL ACTION SCOPE OF WORK FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX OPERABLE UNIT 7-13/14 DOE/ID-11377 0
30-OCT-08 NOT SPECIFIED REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT I, II AND III DOE/NE-ID-11178 4
06-OCT-08 SOLOMON, HOPI FIELD SAMPLING PLAN FOR THE ACCELERATED RETRIEVAL PROJECT III PLN-2815 0
02-OCT-08 NOT SPECIFIED HEALTH AND SAFETY PLAN FOR THE ACCELERATED RETRIEVAL PROJECT ICP/EXT-04-00209 12
01-OCT-08 NOT SPECIFIED OPERABLE UNIT (OU) 7-13/14 - IDAHO NATIONAL LABORATORY (INL) ADMINISTRATIVE RECORD (AR) INDEX FOR WASTE AREA GROUP (WAG) 7 COMPREHENSIVE RI/FS AR.INDEX.OU.7-13/14 0
01-OCT-08 NOT SPECIFIED RECORD OF DECISION FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX OPERABLE UNIT 7-13/14 DOE/ID-11359 0
23-SEP-08 PROVENCHER, RICHARD B. ACTION MEMORANDUM FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) III WITHIN PIT 6 OF THE SUBSURFACE DISPOSAL AREA (SDA) DOE/ID-11363 0
23-SEP-08 CETO, NICHOLAS ACTION MEMORANDUM FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) III WITHIN PIT 6 OF THE SUBSURFACE DISPOSAL AREA (SDA) DOE/ID-11363 0
23-SEP-08 KOCH, DARYL F. ACTION MEMORANDUM FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) III WITHIN PIT 6 OF THE SUBSURFACE DISPOSAL AREA (SDA) DOE/ID-11363 0
07-JUL-08 NOT SPECIFIED FISCAL YEAR 2007 ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX RPT-512 0
03-JUL-08 NOT SPECIFIED AGREEMENT TO IMPLEMENT, U.S. DISTRICT COURT ORDER DATED MAY 25, 2006 91-0035-S-EJL 0
24-JUN-08 NOT SPECIFIED HEALTH AND SAFETY PLAN FOR THE ACCELERATED RETRIEVAL PROJECT ICP/EXT-04-00209 11
08-APR-08 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-2000-00029 04
21-MAR-08 GREEN, O. D. AGREEMENT TO EXTEND DEADLINES 25199 00
05-FEB-08 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS DOE/ID-11042 04
03-DEC-07 NOT SPECIFIED AGREEMENT-IN-PRINCIPLE BETWEEN THE SHOSHONE-BANNOCK TRIBES AND THE UNITED STATES DEPARTMENT OF ENERGY AR-25223 0
06-NOV-07 CITIZENS ADVISORY BOARD CAB RECOMMENDATION #135 -- IDAHO NATIONAL LABORATORY (INL) SITE ENVIRONMENTAL MANAGEMENT CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION TO THE WASTE AREA GROUP (WAG) 7 PROPOSED PLAN 25172 00
02-NOV-07 ARENAZ, M. R. RESPONSE TO SNAKE RIVER ALLIANCE REQUEST TO EXTEND THE COMMENT PERIOD ON THE PROPOSED PLAN FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-13/14 WDP-RWMC-07-049 00
17-OCT-07 HOLDREN, K. J. PROPOSED PLAN FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-13/14 DOE/ID-11288 00
04-OCT-07 DOORNBOS, M. H. REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT FOR A DESCRIBED AREA WITHIN PIT 4 DOE/NE-ID-11178 03
26-SEP-07 BECHTOLD, T. E. FIELD SAMPLING PLAN (FSP) FOR LYSIMETER AND PERCHED WATER MONITORING OF OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-2000-00714 04
13-SEP-07 MCKENZIE, M. D. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR VAPOR VACUUM EXTRACTION WITH TREATMENT (VVET) FOR OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) - SUPERSEDES INEL-96/0119, REVISION 5 (REV.05) INEEL/EXT-03-00467 01
04-SEP-07 CRESAP, D. A. BIENNIAL REMEDIAL ACTION (RA) STATUS REPORT FOR THE OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) PROJECT 2007 RPT-386 00
15-AUG-07 PROVENCHER, R. B. APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION/ COST ANALYSIS (EE/CA) FOR THE IDAHO NATIONAL LABORATORY (INL), ACCELERATED RETRIEVAL PROJECT (ARP) III IN THE SUBSURFACE DISPOSAL AREA (SDA) WPD-RWMC-07-030 00
30-JUL-07 GREEN, O. D. AGREEMENT TO EXTEND DEADLINE FOR SUBMISSION OF THE OPERABLE UNIT (OU) 7-13/14 PROPOSED PLAN TO AUGUST 7, 2007 25123 00
17-JUL-07 MEAGHER, B. G. PUBLIC PARTICIPATION PLAN FOR WASTE AREA GROUP (WAG) 7 OPERABLE UNIT (OU) 7-13/14 AT THE IDAHO NATIONAL LABORATORY (INL) SITE DOE/ID-11308 00
30-JUN-07 GURNEY, L. W. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00209 10
27-JUN-07 GREEN, O. D. AGREEMENT TO EXTEND DEADLINE FOR SUBMISSION OF THE OPERABLE UNIT (OU) 7-13/14 PROPOSED PLAN TO JULY 31, 2007 25114 00
25-JUN-07 MEAGHER, B. G. FISCAL YEAR 2006 (FY-06) ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) RPT-339 00
29-MAY-07 HOLDREN, K. J. FEASIBILITY STUDY (FS) FOR OPERABLE UNIT (OU) 7-13/14 DOE/ID-11268 00
09-APR-07 GURNEY, L. W. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00209 09
28-MAR-07 HARDESTY, T. AGENCIES AGREE TO EXTEND DEADLINES FOR SUBMISSION OF THE OPERABLE UNIT (OU) 7-13/14 PROPOSED PLAN 25088 00
26-MAR-07 BUTLER, J. LANE ELIMINATION OF SELECTED SUBSURFACE DISPOSAL AREA MONITOROING EVENTS CCN 304602 0
20-MAR-07 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II RPT-204 01
16-MAR-07 HARDESTY, T. AGREEMENT TO EXTEND DEADLINES FOR THREE OPERABLE UNITS (OU) 7-13, 7-14 AND OU 7-10 DELIVERABLES 2474048 00
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
22-JAN-07 MARTIAN, P. VERIFICATION AND BENCHMARK TESTING OF THE TETRAD SIMULATOR, - VERSION 12.7MS RPT-335 00
19-DEC-06 GURNEY, L. W. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00209 08
18-DEC-06 GEOTRANS, INC. BENCHMARKING VERIFICATION OF TETRAD SIMULATOR VERSION 12.7MS 2313772 00
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
29-NOV-06 O'NEILL, K. C. PAD-A ANNUAL REPORT FOR OPERABLE UNIT (OU) 7-12 WDP-RWMC-06-064 00
22-NOV-06 MAGNUSON, S. O. SUBSURFACE FLOW AND TRANSPORT MODEL DEVELOPMENT FOR THE OPERALBE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION AND FEASIBILITY STUDY (RI/FS) ICP/EXT-05-01016 01
22-NOV-06 ANDERSON, D. L. SOURCE RELEASE MODELING REPORT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 ICP/EXT-05-01039 01
09-NOV-06 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) I ICP/EXT-04-00516 07
29-AUG-06 CRESAP, D. A. STUDY OF CURRENTLY OPEN BOREHOLES IN WELLS DRILLED INSIDE AND OUTSIDE SUBSURFACE DISPOSAL AREA (SDA) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) RPT-177 00
22-AUG-06 BURTON, B. N. REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 DOE/NE-ID-11178 02
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
09-AUG-06 DICK, J. R. ENGINEERING DESIGN FILE (EDF) - CHEMICAL COMPATIBILITY AND INVENTORY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) AND THE ACCELERATED RETRIEVAL PROJECT II EDF-5307 01
01-AUG-06 CRESAP, D. A. ENVIRONMENTAL AND OPERATIONAL ANNUAL REPORT FOR THE OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) PROJECT - JULY 2005 (07/05) THROUGH JUNE 2006 (06/06) RPT-229 00
27-JUL-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN DOE/ID-11042 03
20-JUN-06 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II RPT-204 00
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
13-JUN-06 KOEPPEN, L. D. FISCAL YEAR 2005 (FY-05) ENVIRONMENTAL MONITORING REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) RPT-171 00
31-MAY-06 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) I ICP/EXT-04-00516 06
19-MAY-06 HOLDREN, K. J. REMEDIAL INVESTIGATION AND BASELINE RISK ASSESSMENT (RI/BRA) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 DOE/ID-11241 00
01-MAY-06 HANEY, T. J. LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2006 ICP/EXT-06-01130 00
25-APR-06 GURNEY, L. W. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00209 07
17-APR-06 PROVENCHER, R. B. ACTION MEMORANDUM FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II WITHIN PITS 4 AND 6 OF THE SUBSURFACE DISPOSAL AREA (SDA) DOE/NE-ID-11238 00
07-APR-06 WHELDON, N. M. SHORT TERM RISK ASSESSMENT FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 FEASIBILITY STUDY (FS) RPT-188 00
24-MAR-06 ANDERSON, D. L. SOURCE RELEASE MODELING REPORT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 ICP/EXT-05-01039 00
22-MAR-06 MAGNUSON, S. O. SUBSURFACE FLOW AND TRANSPORT MODEL DEVELOPMENT FOR THE OPERALBE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION AND FEASIBILITY STUDY (RI/FS) ICP/EXT-05-01016 00
22-MAR-06 DANIELS, K. W. INDEPENDENT INVESTIGATION REPORT OF THE NOVEMBER 2005 (11/05) DRUM FIRE AT THE IDAHO NATIONAL LABORATORY (INL) SITE RPT-190 00
13-MAR-06 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) I ICP/EXT-04-00516 05
21-FEB-06 KOEPPEN, L. D. FIELD SAMPLING PLAN (FSP) FOR LYSIMETER AND PERCHED WATER MONITORING OF OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-2000-00714 03
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
21-FEB-06 O'NEILL, K. C. ORGANIC CONTAMINATION OF THE VADOSE ZONE (OCVZ) PROJECT SEMIANNUAL REPORTING WDP-RWMC-06-015 00
15-FEB-06 VARVEL, M. D. ENGINEERING DESIGN FILE (EDF) - MASS ESTIMATES OF ORGANIC COMPOUNDS IN 743 SERIES WASTE BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-08 AND 7-13 & 7-14 INEEL/EXT-01-00277 02
24-JAN-06 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) EXTENDING REVIEW AND COMMENT OF OPERABLE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) TWENTY (20) DAYS 24927 00
24-JAN-06 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00209 06
18-JAN-06 HAMPTON, N. L. BIOLOGICAL DATA TO SUPPORT OPERABLE UNIT (OU) 7-13 AND 7-14 MODELING OF PLANT AND ANIMAL INTRUSION AT BURIED WASTE SITES INEEL/EXT-01-00273 01
22-DEC-05 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-2000-00029 03
16-DEC-05 VAIL, J. A. ESTIMATED RADIOLOGICAL INVENTORY SENT FROM IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 (1952 - 1993) INEEL/EXT-03-00967 01
29-NOV-05 POLLITT, D. B. FIELD SAMPLING PLAN (FSP) FOR LYSIMETER, TENSIOMETER, AND VAPOR PORT MONITORING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ACTIVE LOW LEVEL WASTE (LLW) PIT ICP/EXT-05-01060 00
23-NOV-05 PERRY, J. N. RESPONSE TO OCTOBER 19, 2005 (10/19/05) COMMENTS ON REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) - DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) CLARIFICATION OF POSITION ON THE PRESENTATION OF RISK FOR ALL PATHWAYS WDP-RWMC-05-075 00
18-NOV-05 LOPEZ, S. L. ESTIMATED RADIOLOGICAL INVENTORY SENT FROM TEST AREA NORTH (TAN) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1960 THROUGH 1993 (1960 - 1993) INEEL/EXT-03-00997 02
10-NOV-05 CARBONEAU, M. L. ESTIMATED RADIOLOGICAL INVENTORY SENT FROM ARGONNE NATIONAL LABORATORY WEST (ANL-W) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 INEEL/EXT-02-01385 01
04-NOV-05 MCKENZIE, M. D. WASTE INFORMATION AND LOCATION DATABASE UPDATE FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 PROJECT ICP/EXT-04-00271 00
01-NOV-05 CISE, C. A. ENGINEERING DESIGN FILE (EDF) - CRITICALITY SAFETY EVALUATION FOR THE ACCELERATED RETRIEVAL AND TARGETED WASTE REMOVAL AND DISPOSITION PROJECTS (ARP/T-RAD) WITHIN THE SUBSURFACE DISPOSAL AREA (SDA) AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) EDF-4494 03
26-OCT-05 HUBBELL, J. M. MOISTURE MONITORING PROGRAM AT THE SUBSURFACE DISPOSAL AREA (SDA) FOR FISCAL YEAR 2004 (FY-04) ICP/EXT-05-00829 00
19-OCT-05 KOCH, D. F. OPERABLE UNIT (OU) 7-13 AND 7-14 DRAFT BASELINE RISK ASSESSMENT (BRA) 24928 00
05-OCT-05 SEBO, D. E. COLLOCATED FACILITIES ANALYSIS FOR WASTE AREA GROUP 7 (WAG-7) , OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-01-00027 01
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
29-SEP-05 MATTHERN, G. E. PREREMEDIAL DESIGN REPORT OF REMEDIATION OPTIONS FOR OPERABLE UNIT (OU) 7-13 AND 7-14 ICP/EXT-04-00330 00
28-SEP-05 HANSON, D. J. EVALUATION OF THE DURABILITY OF PORTLAND CEMENT BASED GROUT FOR SUBSURFACE APPLICATIONS AT OPERABLE UNIT (OU) 7-13 AND 7-14 ICP/EXT-05-00798 00
28-SEP-05 KOEPPEN, L. D. FIELD SAMPLING PLAN (FSP) FOR LYSIMETER AND PERCHED WATER MONITORING OF OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-2000-00714 02
27-SEP-05 SONDRUP, A. J. BIENNIAL REMEDIAL ACTION (RA) STATUS REPORT FOR THE OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) PROJECT ICP/EXT-05-00983 00
27-SEP-05 HOUSLEY, L. T. ENVIRONMENTAL AND OPERATIONAL MID-YEAR DATA REPORT FOR THE OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) PROJECT - 2005 ICP/EXT-05-00985 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
07-SEP-05 WENDT, D. S. ENGINEERING DESIGN FILE (EDF) - RADIOLYTIC HYDROGEN GAS GENERATION IN IDC 003 AND IDC 004 WASTE FORMS FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 EDF-5223 00
30-AUG-05 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT I (ARP I) ICP/EXT-04-00516 04
24-AUG-05 SEBO, D. E. BERYLLIUM WASTE TRANSURANIC (TRU) INVENTORY IN THE SUBSURFACE DISPOSAL AREA (SDA), OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-01-01678 03
10-AUG-05 BURTON, B. N. REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 DOE/NE-ID-11178 01
13-JUL-05 PERRY, J. N. RESPONSE TO CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #121 ON THE OVERALL APPROACH TO CLEANUP AND CLOSURE OF THE SUBSURFACE DISPOSAL AREA (SDA) WDP-RWMC-05-037 00
09-JUN-05 PERRY, J. N. TRANSMITTAL OF WASTE AREA GROUP 7 (WAG-7) DOCUMENTS - ICP/EXT-05-00784 FINAL REPORT FOR WAG-7 PROBING PROJECT WDP-RWMC-05-035 00
07-JUN-05 FLYNN, S. C. OPERATIONS AND MAINTENANCE (O&M) PLAN FOR THE PAD-A LIMITED ACTION OPERABLE UNIT (OU) 7-12 AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-04-00732 01
01-JUN-05 HARVEGO, L. A. DATA QUALITY OBJECTIVES (DQO) SUMMARY REPORT FOR OPERABLE UNIT (OU) 7-08 POST RECORD OF DECISION (ROD) SAMPLING INEEL/EXT-2000-00814 02
31-MAY-05 BRYAN, J. D. ENGINEERING DESIGN FILE (EDF) - WASTE INVENTORY ESTIMATE FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II EDF-5447 01
26-MAY-05 FLYNN, S. C. OPERATIONS AND MAINTENANCE (O&M) PLAN FOR THE PAD-A LIMITED ACTION OPERABLE UNIT (OU) 7-12 AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-04-00732 00
09-MAY-05 PERRY, J. N. TRANSMITTAL OF WAG-7 DOCUMENTS - QUARTERLY MONITORING REPORTS FOR AQUIFER SAMPLES AND LYSIMETER AND PERCHED WATER SAMPLES AT RWMC AND SURFACE GEOPHYSICS AND DOWNHOLE GEOPHYSICAL LOGGING RESULTS FOR 2003 AND 2004 WMD-RWMC-05-026 00
09-MAY-05 PERRY, J. N. TRANSMITTAL OF WAG-7 DOCUMENTS - OU 7-13 AND OU 7-14 QUARTERLY MONITORING REPORTS FOR AQUIFER SAMPLES AND LYSIMETER AND PERCHED WATER SAMPLES AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) WMD-RWMC-05-027 00
05-MAY-05 KOEPPEN, L. D. FISCAL YEAR 2004 (FY-04) OPERABLE UNIT (OU) 7-13 AND 7-14 ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-05-00795 00
03-MAY-05 ST. MICHEL, W. D. ENGINEERING DESING FILE (EDF) - AREA BASED APPROACH TO IDENTIFY TYPE IV (TYPE 4) WASTE FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) I EDF-5601 00
01-MAY-05 MEYER, T. J. FINAL REPORT FOR THE WASTE AREA GROUP 7 (WAG-7) PROBING PROJECT ICP/EXT-05-00784 00
28-APR-05 PROVENCHER, R. B. ACCELERATED RETRIEVAL PROJECT (ARP) DEPARTMENT OF ENERGY (DOE) MEMORANDUM - MULTI-SOURCE LEACHATE AT PIT 4 AND THE SUBSURFACE DISPOSAL AREA (SDA) AND PAPER DISCUSSING APPLICABILITY TO THE F039 HAZARDOUS WASTE NUMBER TO CERCLA REMEDIATION ACTIVITIES 1808137 00
28-APR-05 BRYAN, J. D. ENGINEERING DESIGN FILE (EDF) - WASTE INVENTORY ESTIMATE FOR THE DESCRIBED AREA WITHIN PIT 4 FOR THE ACCELERATED RETRIVAL PROJECT (ARP) WITHIN THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) EDF-4478 03
28-APR-05 GROENEWOLD, G. S. ACTINIDE ANALYSIS AND LEACHING OF SAMPLES COLLECTED FROM THE GLOVEBOX EXCAVATOR METHOD PROJECT FOR OU 7-13 AND 7-14 ICP/EXT-04-00439 00
28-APR-05 VEJVODA, E. SUMMARY OF ROCKY FLATS PLANT WASTE BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) ICP/EXT-04-00717 00
28-APR-05 GILES, J. R. SUPPLEMENT TO EVALUATION OF NAVAL REACTORS FACILITY (NRF) RADIOACTIVE WASTE DISPOSED OF AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) FROM 1953 TO 1999 ICP/EXT-05-00833 00
27-APR-05 JOSTEN, N. E. TYPE A NUCLEAR LOGGING DATA ACQUISITION AND PROCESSING FOR OPERABLE UNIT (OU) 7-13, 7-14 AND 7-10 INEEL/EXT-02-00558 02
12-APR-05 OLSON, G. L. FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-2000-00029 02
07-APR-05 PERRY, J. N. TRANSMITTAL OF DRAFT SUPPLEMENT TO EVALUATION OF NAVAL REACTORS FACILITY (NRF) RADIOACTIVE WASTE DISPOSED OF AT RADIOACTIVE WASTE MANAGMENT COMPLEX (RWMC) FROM 1953 TO 1999 - ENCLOSURES NOT AVAILABLE WDP-RWMC-05-018 00
06-APR-05 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT I (ARP I) ICP/EXT-04-00516 03
04-APR-05 VARVEL, M. D. ENGINEERING DESIGN FILE (EDF) - MASS ESTIMATES OF ORGANIC COMPOUNDS BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-08 AND 7-13 & 7-14 INEEL/EXT-01-00277 01
29-MAR-05 NORTH WIND ENVIRONMENTAL HISTORICAL BACKGROUND REPORT FOR ROCKY FLATS PLANT WASTE SHIPPED TO THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) AND BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1954 THROUGH 1971 ICP/EXT-04-00248 01
21-MAR-05 LIVIERATOS, T. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REQUEST TO KEEP PIT 9 SAMPLES 1784126 00
17-MAR-05 RITTER, P. D. NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) RADIOLOGICAL MONITORING PLAN FOR PHASES I AND II OF THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00389 01
10-MAR-05 PROVENCHER, R. B. RESPONSES TO CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #119 ON CLEANUP AND CLOSURE OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) EM-WM-05-015 00
09-MAR-05 JOSTEN, N. E. SURFACE GEOPHYSICS AND DOWNHOLE GEOPHYSICAL LOGGING RESULTS FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), 2003-2004 ICP/EXT-04-00702 00
01-MAR-05 ICP COMMUNITY RELATIONS PUBLIC ENCOURAGED TO ATTEND MEETINGS ON BURIED WASTE PROJECT 24894 00
01-MAR-05 BURTON, B. N. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II DOE/NE-ID-11223 00
01-MAR-05 HOUSLEY, L. T. ENVIRONMENTAL AND OPERATIONAL END-YEAR DATA REPORT FOR THE OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) PROJECT - 2004 ICP/EXT-05-00779 00
03-FEB-05 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00209 05
01-FEB-05 USGS U.S. GEOLOGICAL SURVEY (USGS) REVIEW OF TRANSPORT OF SELECTED RADIONUCLIDES IN INTERIM RISK ASSESSMENT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), WASTE AREA GROUP 7 (WAG-7), OPERABLE UNIT (OU) 7-13 & 7-14, INEEL - VOLUMES I & II (VOL.01 & VOL.0 DOE/ID-22192 00
01-FEB-05 PROVENCHER, R. B. APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE INEEL ACCELERATED RETRIEVAL PROJECT (ARP) PROJECT PHASE II IN THE SUBSURFACE DISPOSAL AREA (SDA) EM-WM-04-083 00
25-JAN-05 KNIGHT, L. INEEL CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #119 ON CLEANUP AND CLOSURE OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 05-CAB-016 00
20-JAN-05 BRYAN, J. D. ENGINEERING DESIGN FILE (EDF) - WASTE INVENTORY FOR PHASE II OF THE ACCELERATED RETRIEVAL PROJECT (ARP) EDF-5447 00
18-JAN-05 LOPEZ, S. L. SUMMARY REPORT FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT ICP/EXT-04-00646 01
17-DEC-04 PROVENCHER, R. B. AUTHORIZATION TO PERFORM PHASE I (PHASE 1) OPERATIONS AT THE ACCELERATED RETRIEVAL PROJECT (ARP) EM-WM-04-085 00
13-DEC-04 MCILWAIN, B. A. DATA QUALITY OBJECTIVES (DQO) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00515 01
08-DEC-04 SHAW, P. G. ENGINEERING DESIGN FILE (EDF) - GROUT SELECTION CRITERIA AND RECOMMENDATION FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT EDF-5333 00
06-DEC-04 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00516 02
08-NOV-04 BRYAN, J. D. REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - TO VIEW ATTACHMENT 1 SEE ICP/EXT-04-00126 - TO VIEW ATTACHMENT 2 SEE 1564435 DOE/NE-ID-11155 00
03-NOV-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00209 04
27-OCT-04 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00516 01
26-OCT-04 DICK, J. R. ENGINEERING DESIGN FILE (EDF) - CHEMICAL COMPATIBILITY AND INVENTORY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 EDF-5307 00
08-OCT-04 BURTON, B. N. REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 DOE/NE-ID-11178 00
04-OCT-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00209 03
30-SEP-04 ANKENY, M. PRELIMINARY DESIGN FOR AN ENGINEERED SURFACE BARRIER AT THE SUBSURFACE DISPOSAL AREA (SDA) ICP/EXT-04-00216 00
30-SEP-04 JOHNESEE, J. A. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (CUSTOMER, PROJECT, AND SYSTEM) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 1 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 TFR-267 00
30-SEP-04 HOLDER, R. B. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (SUBSYSTEM) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 2 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 TFR-269 00
30-SEP-04 JOHNESEE, J. A. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (ASSUMPTIONS) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 3 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 TFR-280 00
29-SEP-04 SENTIERI, P. J. ENGINEERING DESIGN FILE (EDF) - CRITICALITY SAFETY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 EDF-4494 02
29-SEP-04 BUNNELL, P. J. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT MEASUREMENT AND CONTROLS - ATTACHMENT 12 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-4933 00
29-SEP-04 STEPHENS, D. L. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT FOUNDATION GROUTING STUDY - ATTACHMENT 5 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5028 00
29-SEP-04 CLARK, D. W. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT FIRE PROTECTION - ATTACHMENT 15 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5054 00
29-SEP-04 CRAM, A. J. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT DELIVERY SYSTEM - ATTACHMENT 10 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5102 00
29-SEP-04 GRAFF, K. E. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ELECTRICAL UTILITIES - ATTACHMENT 13 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5122 00
29-SEP-04 CRAM, A. J. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT STORAGE AND MIXING - ATTACHMENT 9 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5135 00
29-SEP-04 BLAKELY, B. L. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT FACILITIES - ATTACHMENT 11 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5144 00
29-SEP-04 JENSEN, S. A. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT SELECTION BASIS - ATTACHMENT 4 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5146 00
29-SEP-04 JENSEN, S. A. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUBSURFACE DISPOSAL AREA (SDA) SITE CONDITIONS - ATTACHMENT 6 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5147 00
29-SEP-04 EASTMAN, R. L. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT SYSTEMS - ATTACHMENT 14 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5150 00
29-SEP-04 THOMPSON, E. B. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ENVIRONMENTAL, SAFETY, AND HEALTH (ES&H) - ATTACHMENT 17 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5152 00
29-SEP-04 RAIVO, B. D. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT HYDRAULIC EXCAVATOR AND DRILL INJECTION RIG - ATTACHMENT 7 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5153 00
29-SEP-04 THOMPSON, E. B. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT OPERATIONS, MAINTENANCE, AND LOGISTICS - ATTACHMENT 8 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5155 00
29-SEP-04 RAIVO, B. D. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT VEHICLES - ATTACHMENT 16 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5162 00
29-SEP-04 SHROPSHIRE, K. L. ENGINEERING STUDIES REPORT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ICP/EXT-04-00525 00
28-SEP-04 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00516 00
16-SEP-04 LEECASTER, M. K. FISCAL YEAR 2004 (FY-04) GEOSTATISTICAL MODELING OF LITHOLOGIC CHARACTERISTICS IN THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 ICP/EXT-04-00494 00
10-SEP-04 PERRY, J. N. SUPPLEMENTAL RESPONSIVENESS SUMMARY FOR THE ACTION MEMORANDUM FOR ACCELERATED RETRIEVAL OF A DESCRIBED AREA WITHIN PIT 4 FMDP-FFA/CO-04-011 00
09-SEP-04 HOUSLEY, L. T. ENVIRONMENTAL AND OPERATIONAL MID-YEAR DATA REPORT FOR THE OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) PROJECT - 2004 ICP/EXT-04-00509 00
19-AUG-04 PROVENCHER, R. B. ACTION MEMORANDUM FOR ACCELERATED RETRIEVAL OF A DESCRIBED AREA WITHIN PIT 4 DOE/NE-ID-11179 00
18-AUG-04 HOLDREN, K. J. METHODOLOGY FOR DEVELOPING PRELIMINARY REMEDIATION GOALS FOR OPERABLE UNIT (OU) 7-13 & 7-14 SUBSURFACE DISPOSAL AREA (SDA) ICP/EXT-03-00047 00
18-AUG-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT ICP/EXT-04-00210 03
17-AUG-04 HOLDREN, K. J. SECOND ADDENDUM TO THE WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-11039 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
17-AUG-04 NALLA, G. NEAR FIELD SIMULATION OF CARBON-14 AND TRITIUM MIGRATION FROM BURIED BERYLLIUM BLOCKS IN THE SUBSURFACE DISPOSAL AREA (SDA) ICP/EXT-04-00321 00
13-AUG-04 HARVEGO, L. A. OPERATIONS & MAINTENANCE (O&M) PLAN FOR OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) INEEL/EXT-01-00016 01
11-AUG-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00209 02
09-AUG-04 BLACKWOOD, L. G. VALIDATION OF THE ROCKY FLATS PLANT RADIONUCLIDE INVENTORY IN THE HISTORIC DATA TASK USING STORED WASTE EXPERIMENTAL PILOT PLANT (SWEPP) ASSAY DATA, VOLUME 1 (VOL.01) AND VOLUME 2 (VOL.02) ICP/EXT-04-00211 01
22-JUL-04 WRIGHT, K. E. AN EVALUATION OF TRACERS FOR USE IN VADOSE ZONE INVESTIGATIONS AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ICP/EXT-04-00334 00
19-JUL-04 SONDRUP, A. J. ESTIMATING CARBON TETRACHLORIDE AND TOTAL VOLATILE ORGANIC COMPOUND (VOC) MASS REMAINING IN SUBSURFACE DISPOSAL AREA (SDA) PITS ICP/EXT-04-00396 00
15-JUL-04 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) PROPOSAL FOR SEMIANNUAL AQUIFER MONITORING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 24871 00
08-JUL-04 SNOOK, J. G. PROPOSAL FOR SEMIANNUAL AQUIFER MONITORING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) EM-ER-04-144 00
08-JUL-04 LOPEZ, S. L. ESTIMATED RADIOLOGICAL INVENTORY SENT FROM TEST AREA NORTH (TAN) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1960 THROUGH 1993 (1960 - 1993) INEEL/EXT-03-00997 01
01-JUL-04 LOPEZ, S. L. ACTION MEMORANDUM FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT DOE/NE-ID-11162 00
30-JUN-04 KOCH, D. F. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO THE EXTENSION REQUEST FOR THE OPERABLE UNIT (OU) 7-10 REMEDIAL ACTION (RA) REPORT 24875 00
29-JUN-04 SNOOK, J. G. EXTENSION REQUEST FOR THE OPERABLE UNIT (OU) 7-10 REMEDIAL ACTION (RA) REPORT EM-ER-04-137 00
25-JUN-04 ALLRED, C. S. AGREEMENT TO EXTEND DEADLINES RELATED TO OPERABLE UNIT (OU) 7-13 AND 7-14 24868 00
18-JUN-04 SENTIERI, P. J. ENGINEERING DESIGN FILE (EDF) - CRITICALITY SAFETY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 EDF-4494 01
15-JUN-04 ANSLEY, S. L. UPDATED STRATIGRAPHIC SELECTIONS FOR WELLS IN THE VICINITY OF THE SUBSURFACE DISPOSAL AREA (SDA) ICP/EXT-04-00207 00
15-JUN-04 WHITAKER, C. A. STRATIGRAPHIC AND GEOPHYSICAL DATA FOR WELLS IN THE VICINITY OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-04-00208 00
03-JUN-04 HANSON, D. J. EVALUATION OF THE DURABILITY OF WAXFIX FOR SUBSURFACE APPLICATIONS ICP/EXT-04-00300 00
02-JUN-04 STALEY, C. S. ENGINEERING DESIGN FILE (EDF) - AIR EMISSIONS EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 EDF-4692 00
01-JUN-04 RILEY, R. G. RECOMMENDED PARAMETER VALUES FOR IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) SUBSURFACE DISPOSAL AREA (SDA) SOURCE RELEASE MODELING PNNL-14742 00
26-MAY-04 CLOUGH, M. K. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) GLOVEBOX EXCAVATOR METHOD FACILITY FINAL INSPECTION 24859 00
24-MAY-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT ICP/EXT-04-00210 01
24-MAY-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT ICP/EXT-04-00210 02
14-MAY-04 LUKE, D. E. PRELIMINARY DETERMINATION OF HAZARDOUS WASTE FROM OTHER GENERATORS COLLOCATED WITH ROCKY FLATS PLANT TRANSURANIC (TRU) WASTE IN THE OPERABLE UNIT (OU) 7-13 AND 7-14 SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-03-01139 00
12-MAY-04 ICP COMMUNITY RELATIONS COMMUNITY RELATIONS NOTICE - COMMENT PERIOD ON THE REMOVAL ACTION AT PIT 4 - KETCHUM MEETING ADDED 24854 00
12-MAY-04 MCELROY, D. L. FISCAL YEAR 2003 (FY-03), OPERABLE UNIT (OU) 7-13 AND 7-14 ADVANCED TENSIOMETER MONITORING RESULTS FROM THE DEEP VADOSE ZONE AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-04-00241 00
12-MAY-04 ABBOTT, C. HISTORICAL BACKGROUND REPORT FOR ROCKY FLATS PLANT WASTE SHIPPED TO THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) AND BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1954 THROUGH 1971 ICP/EXT-04-00248 00
12-MAY-04 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR MONITORING TYPE B PROBES FOR OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) INEEL/EXT-2000-01435 02
11-MAY-04 BATCHELLER, T. A. COLLOIDAL PLUTONIUM AT THE OPERABLE UNIT (OU) 7-13 AND 7-14 SUBSURFACE DISPOSAL AREA (SDA) - ESTIMATE OF INVENTORY AND TRANSPORT PROPERTIES ICP/EXT-04-00253 00
10-MAY-04 DOE PUBLIC NOTICE - DEPARTMENT OF ENERGY (DOE) ANNOUNCES PLANS TO RETRIEVE BURIED WASTE AN THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) 24849 00
10-MAY-04 ICP COMMUNITY RELATIONS COMMUNITY RELATIONS NOTICE - COMMENT PERIOD ON THE REMOVAL ACTION AT PIT 4 24852 00
29-APR-04 ICP COMMUNITY RELATIONS IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) INFORMATION FAIR ON COMPLETING CLEANUP AND STRENGTHENING OUR NUCLEAR LEGACY 24846 00
29-APR-04 ICP COMMUNITY RELATIONS ATTEND AN INFORMATION FAIR ON COMPLETING CLEANUP AND STRENGTHENING OUR NUCLEAR LEGACY 24847 00
29-APR-04 BURTON, B. N. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE ACCELERATED RETRIEVAL OF A DESIGNATED PORTION OF PIT 4 DOE/NE-ID-11146 00
21-APR-04 KOEPPEN, L. D. FISCAL YEAR 2003 (FY-03) ENVIRONMENTAL MONITORING (EM) REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-04-00259 01
19-APR-04 MYERS, D. R. FISCAL YEAR 2003 (FY-03) SUMMARY REPORT FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 PROBING PROJECT ICP/EXT-04-00189 00
12-APR-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE CLEAN CLOSE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) PROJECT ROUTINE MONITORING INEEL/EXT-01-01538 01
12-APR-04 CARBONEAU, M. L. ESTIMATED RADIOLOGICAL INVENTORY SENT FROM ARGONNE NATIONAL LABORATORY WEST (ANL-W) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 INEEL/EXT-02-01385 00
09-APR-04 ABBOTT, D. G. FEASIBILITY STUDY (FS) PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU GROUTING (ISG) IN SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-03-00316 01
08-APR-04 KOEPPEN, L. D. FISCAL YEAR 2003 (FY-03) ENVIRONMENTAL MONITORING (EM) REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-04-00259 00
06-APR-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00209 01
01-APR-04 DRESEL, P. E. EVALUATION OF XENON GAS DETECTION AS A MEANS FOR IDENTIFYING BURIED TRANSURANIC (TRU) WASTE AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) PNNL-14617 00
31-MAR-04 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS INEEL/EXT-02-01117 07
29-MAR-04 VAIL, J. A. ESTIMATED RADIOLOGICAL INVENTORY SENT FROM IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 (1952 - 1993) INEEL/EXT-03-00967 00
26-MAR-04 NICHOLS, T. T. ENGINEERING DESIGN FILE (EDF) - REVISED RADIOLOGICAL DOSE AND NONRADIOLOGICAL EXPOSURE FACTORS FOR IN SITU VITRIFICATION (ISV) LOSS OF CONFINEMENT AND MELT EXPULSION ACCIDENT SCENARIOS AT OPERABLE UNIT (OU) 7-13 AND 7-14 EDF-4527 00
23-MAR-04 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10587 08
18-MAR-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 EARLY ACTIONS BERYLLIUM PROJECT ICP/EXT-04-00210 00
16-MAR-04 EBERLINE FINAL VALIDATION REPORT - MOBILE NONDESTRUCTIVE ASSAY (NDA) TRAILER FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - ATTACHMENT 2 TO REMEDIAL ACTION (RA) REPORT - DOE/NE-ID-11155 1564435 00
14-MAR-04 DOE NOTICE OF AVAILABILITY - DEPARTMENT OF ENERGY (DOE) ANNOUNCES PLANS TO REDUCE RISK AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) 24830 00
12-MAR-04 SHROPSHIRE, K. L. MISSION NEED STATEMENT FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ICP/EXT-03-00084 00
12-MAR-04 HOUSLEY, L. T. ENVIRONMENTAL AND OPERATIONAL END-YEAR DATA REPORT FOR THE OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) PROJECT - 2003 ICP/EXT-04-00188 00
11-MAR-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00209 00
10-MAR-04 INEEL COMMUNITY RELATIONS AGENCIES SEEKING PUBLIC COMMENT ON A PROPOSAL TO COAT BERYLLIUM BLOCKS AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 24833 00
10-MAR-04 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS - DOCUMENT ID NUMBER ERRONEOUSLY APPEARS ON COVER PAGE AS ICP/EXT-02-01117 INEEL/EXT-02-01117 06
03-MAR-04 LOPEZ, S. L. ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 EARLY ACTIONS BERYLLIUM PROJECT DOE/NE-ID-11144 00
25-FEB-04 GREEN, L. A. APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ACCELERATED RETRIEVAL PROJECT (ARP) IN PIT 4 OF SUBSURFACE DISPOSAL AREA (SDA) EM-ER-04-032 00
24-FEB-04 KOCH, D. F. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO LETTER REGARDING COMPLETION OF EXCAVATION OPERATIONS AT THE GLOVEBOX EXCAVATOR METHOD PROJECT 24831 00
24-FEB-04 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO LETTER REGARDING COMPLETION OF EXCAVATION OPERATIONS AT THE GLOVEBOX EXCAVATOR METHOD PROJECT 24832 00
24-FEB-04 SNOOK, J. G. COMPLETION OF EXCAVATION OPERATIONS AT THE GLOVEBOX EXCAVATOR METHOD PROJECT EM-ER-04-042 00
23-FEB-04 WHITAKER, C. A. SAMPLING AND ANALYSIS PLAN (SAP) FOR ANALYSES OF HYDROLOGIC PROPERTIES, GEOCHEMISTRY, AND RADIONUCLIDES FROM INTERBED CORES DRILLED AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-04-00143 00
12-FEB-04 SHAW, P. G. ENGINEERING DESIGN FILE (EDF) - GROUT SELECTION CRITERIA AND RECOMMENDATION FOR OPERABLE UNIT (OU) 7-13 & 7-14 IN SITU GROUTING (ISG) EARLY ACTION PROJECT EDF-4397 00
11-FEB-04 GREEN, L. A. NON TIME CRITICAL REMOVAL ACTION (NTCRA) - APPROVAL TO PROCEED WITH PREPARATION OF ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR INEEL, IN SITU GROUTING (ISG) EARLY ACTION PROJECT IN SUBSURFACE DISPOSAL AREA (SDA) EM-ER-04-018 00
03-FEB-04 HULL, L. C. SPATIAL DISTRIBUTION OF NEPTUNIUM AND URANIUM PARTITION COEFFICIENTS (KD) FOR INTERBED SEDIMENTS AT A RADIOACTIVE WASTE SUBSURFACE DISPOSAL AREA (SDA) ICP/EXT-03-00088 00
02-FEB-04 HAIN, K. E. ADDITIONAL IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REVIEW COMMENTS AND DOE RESPONSES ON OPERABLE UNIT (OU) 7-13 AND 7-14 DRAFT FINAL SECOND ADDENDUM TO THE WORK PLAN FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EM-ER-04-023 00
28-JAN-04 ROGERS, N. K. CONCEPTUAL DESIGN PLAN FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - PHASE TWO (PHASE II OR PHASE 2) ICP/EXT-03-00039 00
27-JAN-04 KOCH, D. F. AUTHORIZATION FOR RELEASE OF $2 MILLION DOLLARS IN DEPARTMENT OF ENERGY (DOE) FUNDS 24825 00
26-JAN-04 CETO, N. COMMENCEMENT OF WASTE RETRIEVAL AT GLOVEBOX EXCAVATOR METHOD PROJECT 24824 00
26-JAN-04 SNOOK, J. G. COMMENCEMENT OF WASTE RETRIEVAL AT GLOVEBOX EXCAVATOR METHOD PROJECT EM-ER-04-004 00
21-JAN-04 BRYAN, J. D. PRE-FINAL INSPECTION REPORT FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - ATTACHMENT 1 TO REMEDIAL ACTION (RA) REPORT - DOE/NE-ID-11155 ICP/EXT-04-00126 00
20-JAN-04 OLSON, G. L. OPERABLE UNIT (OU) 7-13 AND 7-14 FIELD REPRESENTATIVE GLOVEBOX EXCAVATOR METHOD LOGBOOK - JANUARY 20, 2004 - FEBRUARY 20, 2004 (01/20/04 - 02/20/04) - GLOVEBOX BOOK ER-038-2004 00
12-DEC-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR VAPOR VACUUM EXTRACTION WITH TREATMENT (VVET) FOR OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) - SUPERSEDES INEL-96/0119, REVISION 5 (REV.05) INEEL/EXT-03-00467 00
11-DEC-03 SNOOK, J. G. APPROVAL OF CRITICAL DECISION 4 (CD-4) FOR THE GLOVEBOX EXCAVATOR METHOD PROJECT EM-ER-03-300 00
11-DEC-03 SNOOK, J. G. TRANSMITTAL OF APPROVAL OF CRITICAL DECISION 4 (CD-4) FOR THE GLOVEBOX EXCAVATOR METHOD PROJECT EM-ER-03-307 00
11-DEC-03 SELLERS, E. D. AUTHORIZATION TO COMMENCE RETRIEVAL OPERATIONS AT THE GLOVEBOX EXCAVATOR METHOD PROJECT EM-WM-03-129 00
05-DEC-03 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) DENIAL OF EXTENSION OF STAGE III MILESTONE FROM APRIL 2002 (04/02) AGREEMENT TO RESOLVE DISPUTES 24840 00
05-DEC-03 WERNTZ, J. H. ENVIRONMENTAL PROTECTION AGENCY (EPA) DENIAL OF EXTENSION OF STAGE III MILESTONE FROM APRIL 2002 (04/02) AGREEMENT TO RESOLVE DISPUTES 24841 00
05-DEC-03 ABBOTT, D. G. FEASIBILITY STUDY (FS) PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU THERMAL DESORPTION (ISTD) IN THE SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-03-00962 00
02-DEC-03 LOPEZ, S. L. ESTIMATED RADIOLOGICAL INVENTORY SENT FROM TEST AREA NORTH (TAN) TO THE SUBSURFACE DISPOSAL AREA (SDA) 1960 - 1993 INEEL/EXT-03-00997 00
01-DEC-03 ICP COMMUNITY RELATIONS UPDATE FACT SHEET - EXCAVATION BEGINS AT PIT 9 DEMONSTRATION FACILITY 24817 00
25-NOV-03 SHAW, R. M. STARTUP OF ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) UNIT F EM-ER-03-289 00
25-NOV-03 KOZAK, M. INDEPENDENT PEER REVIEW OF SOURCE TERM MODELING FOR THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) SUBSURFACE DISPOSAL AREA (SDA) ICP/EXT-03-00081 00
19-NOV-03 DOWNS, W. MASS RELEASE OF CHLORINATED SOLVENTS THROUGH OIL, ADSORBENT, AND POLYETHYLENE BAGGING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-03-00057 00
19-NOV-03 OLSON, G. L. FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-2000-00029 01
17-NOV-03 ARROWROCK GROUP, INC. THE IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) A HISTORICAL CONTEXT AND ASSESSMENT NARRATIVE AND INVENTORY INEEL/EXT-97-01021 01
14-NOV-03 HAIN, K. E. INFORMAL DISPUTE CONCERNING OPERABLE UNIT (OU) 7-13 AND 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-03-285 00
13-NOV-03 SENTIERI, P. J. CRITICALITY SAFETY EVALUATION FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-01-01617 05
11-NOV-03 SLOAN, P. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) COLD TEST PITS FOR OPERABLE UNITS (OU) 7-13 & 7-14 INEEL/EXT-99-00364 04
10-NOV-03 NYGARD, D. RESPONSE TO DEPARTMENT OF ENERGY (DOE) RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON DRAFT FINAL SECOND ADDENDUM WORK PLAN FOR OPERABLE UNIT (OU) 7-13 AND 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY 24814 00
29-OCT-03 YANCEY, N. A. TEST PLAN FOR EVALUATION OF IN SITU THERMAL DESORPTION (ISTD) AND GROUTING TECHNOLOGIES FOR OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-03-00059 00
28-OCT-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS INEEL/EXT-02-01117 05
27-OCT-03 PIERRE, W. CONTINUING CONCERNS WITH THE DRAFT FINAL SECOND ADDENDUM TO THE WORK PLAN FOR OPERABLE UNIT (OU) 7-13 AND 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 24813 00
10-OCT-03 HELM, B. R. PRECONCEPTUAL DESIGN RETRIEVAL ALTERNATIVES FOR THE PIT 9 REMEDIATION PROJECT INEEL/EXT-03-00908 00
09-OCT-03 LANDMAN, W. H. TREATMENT ALTERNATIVES FEASIBILITY STUDY (FS) FOR THE PIT 9 REMEDIATION PROJECT INEEL/EXT-03-00907 00
08-OCT-03 LIVIERATOS, T. STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) CONCURRENCE FOR THE FIVE YEAR REVIEW OF THE ACTION TO ADDRESS ORGANIC CONTAMINATION OF THE VADOSE ZONE (OCVZ) AT THE SUBSURFACE DISPOSAL AREA (SDA), OPERABLE UNIT (OU) 7-08 24812 00
08-OCT-03 AUSTAD, S. L. ANALYSIS OF ALTERNATIVES SUMMARY FOR THE PIT 9 REMEDIATION PROJECT INEEL/EXT-03-00909 00
06-OCT-03 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-02-00542 02
01-OCT-03 NISHIOKA, D. E. TECHNOLOGY EVALUATION OF RETRIEVAL OPTIONS FOR THE PIT 9 REMEDIATION PROJECT INEEL/EXT-03-00526 00
30-SEP-03 GROENEWOLD, G. S. TEST PLAN FOR STUDY OF OPERABLE UNIT (OU) 7-13 & 7-14 SOIL AND WASTE MATERIAL SAMPLES OBTAINED FROM OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-03-00759 01
29-SEP-03 NEELEY, M. N. CRITICALITY SAFETY EVALUATION FOR IN SITU THERMAL DESORPTION (ISTD) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) INEEL/EXT-03-00825 00
20-SEP-03 ABBOTT, D. G. PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU GROUTING (ISG) IN SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-03-00316 00
18-SEP-03 POETON, R. W. UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (U. S. EPA) REGION 10 FIVE YEAR REVIEW REPORT FOR OPERABLE UNIT (OU) 7-12 PAD-A AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) 29223 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
12-SEP-03 BURTON, B. N. WASTE MANAGEMENT PLAN (WMP) FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-02-00767 01
10-SEP-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS INEEL/EXT-02-01117 04
04-SEP-03 WEBBER, F. L. TRANSMITTAL OF WHITE PAPER - THE NUMERICAL VALUE OF THE SOIL-TO-WATER PARTITION COEFFICIENT (KD) FOR PLUTONIUM AT THE INEEL - REPRESENTS AN INDEPENDENT REVIEW BY OUTSIDE INEEL SUBJECT MATTER EXPERTS JMS-105-03 00
03-SEP-03 HOUSLEY, L. T. ENVIRONMENTAL AND OPERATIONAL MID-YEAR DATA REPORT FOR THE OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) PROJECT - 2003 INEEL/EXT-03-00917 00
02-SEP-03 NISHIOKA, D. E. ENGINEERING DESIGN FILE (EDF) - WASTE RETRIEVAL PROCESS TECHNOLOGY SEARCH FOR THE OPERABLE UNIT (OU) 7-10 STAGE III PROJECT EDF-4025 00
02-SEP-03 BURTON, B. N. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 PREREMEDIAL DESIGN, RETRIEVED WASTE AND SOIL CHARACTERIZATION, AND ENVIRONMENTAL MANAGEMENT SCIENCE PROGRAM TESTS INEEL/EXT-03-00554 00
31-AUG-03 SENTIERI, P. J. CRITICALITY SAFETY EVALUATION FOR IN SITU GROUTING (ISG) IN THE SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-03-00638 00
28-AUG-03 BERKEY, E. WHITE PAPER - NUMERICAL VALUE OF THE SOIL-TO-WATER PARTITION COEFFICIENT (KD) FOR PLUTONIUM AT THE INEEL - REPRESENTS AN INDEPENDENT REVIEW BY OUTSIDE INEEL SUBJECT MATTER EXPERTS 24827 00
28-AUG-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS INEEL/EXT-02-01117 03
27-AUG-03 PRATT, M. B. PROJECT TURNOVER DOCUMENTATION PACKAGE FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-03-00622 00
27-AUG-03 GROENEWOLD, G. S. TEST PLAN FOR STUDY OF OPERABLE UNIT (OU) 7-13 & 7-14 SOIL AND WASTE MATERIAL SAMPLES OBTAINED FROM OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-03-00759 00
18-AUG-03 GEARHEARD, M. F. UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (U. S. EPA) REGION 10 OFFICE OF ENVIRONMENTAL CLEANUP FIVE YEAR REVIEW - INEEL SUBSURFACE DISPOSAL AREA (SDA) ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OPERABLE UNIT (OU) 7-08 29222 00
04-AUG-03 JACKSON, T. TREATMENT TECHNOLOGIES FOR THE OPERABLE UNIT (OU 7-10) STAGE III PROJECT INEEL/EXT-03-00022 00
30-JUL-03 PEATROSS, R. G. HAZARD IDENTIFICATION DOCUMENT FOR THE OPERABLE UNIT (OU) 7-10 STAGE III PROJECT INEEL/EXT-03-00790 00
30-JUL-03 THOMPSON, D. F. PLAN (PLN) - RISK MANAGEMENT PLAN FOR OPERABLE UNIT (OU) 7-10 STAGE III PROJECT PLN-1358 01
16-JUL-03 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR MONITORING TYPE B PROBES FOR OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) INEEL/EXT-2000-01435 01
10-JUL-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS INEEL/EXT-02-01117 02
08-JUL-03 MEAGHER, B. G. FEASIBILITY STUDY (FS) PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU VITRIFICATION (ISV) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-03-00317 00
30-JUN-03 HULL, L. C. FATE OF MAGNESIUM CHLORIDE BRINE APPLIED TO SUPPRESS DUST FROM UNPAVED ROADS AT INEEL SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-01-01173 00
30-JUN-03 GILES, J. R. EVALUATION OF GAMMA RAY PASSIVE LOGGING TOOL CALIBRATIONS FOR TYPE A PROBES AT INEEL SUBSURFACE DISPOSAL AREA (SDA) OPERABLE UNITS (OU) 7-13 AND 7-14 INEEL/EXT-03-00118 00
20-JUN-03 THOMPSON, D. F. PLAN (PLN) - RISK MANAGEMENT PLAN FOR OPERABLE UNIT (OU) 7-10 STAGE III PROJECT PLN-1358 00
18-JUN-03 MILLER, C. M. FINAL RESULTS REPORT, IN SITU GROUTING (ISG) TECHNOLOGY FOR APPLICATION IN BURIED TRANSURANIC (TRU) WASTE SITES - OPERABLE UNIT (OU) 7-13 AND 7-14 - VOLUME 1 (VOL.01) AND VOLUME 2 (VOL.02) INEEL/EXT-02-00233 01
09-JUN-03 ROBACK, R. C. INITIAL REPORT AQUIFER BACKGROUND STUDY: SUMMARY OF URANIUM AND PLUTONIUM DATA FROM INEEL GROUNDWATER SAMPLES INEEL/EXT-03-00655 00
06-JUN-03 HULL, L. C. FATE AND TRANSPORT OF PLUTONIUM AND AMERICIUM IN THE SUBSURFACE OF OU 7-13 AND 7-14 INEEL/EXT-03-00558 00
05-JUN-03 JAMISON, R. K. PRE-FINAL INSPECTION CHECKLIST FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-02-01184 00
02-JUN-03 LEECASTER, M. K. DETERMINATION OF BACKGROUND URANIUM CONCENTRATION IN THE SNAKE RIVER PLAIN AQUIFER (SRPA) UNDER THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY'S (INEEL) RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) INEEL/EXT-03-00367 00
13-MAY-03 CASPER, J. L. FIELD SAMPLING PLAN (FSP) FOR THE LYSIMETER AND PERCHED WATER MONITORING OF OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-2000-00714 01
01-MAY-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS INEEL/EXT-02-01117 01
30-APR-03 SENTIERI, P. J. CRITICALITY SAFETY EVALUATION FOR IN SITU VITRIFICATION (ISV) PROCESSING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEEL INEEL/EXT-03-00207 00
30-APR-03 ROBACK, R. C. INTERIM REPORT FOR PLUTONIUM AQUIFER BACKGROUND STUDY INEEL/EXT-03-00358 00
21-APR-03 MYERS, D. R. FISCAL YEAR 2002 (FY-02) SUMMARY REPORT FOR OPERABLE UNIT (OU) 7-13 & 7-14 PROBING PROJECT INEEL/EXT-03-00001 00
31-MAR-03 OLSON, G. L. FISCAL YEAR 2002 (FY-02) ENVIRONMENTAL MONITORING REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) INEEL/EXT-03-00055 00
26-MAR-03 HAIN, K. E. OPERABLE UNIT (OU) 7-13 & 7-14 SECOND ADDENDUM TO REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN AND SCOPE OF WORK (SOW) EM-ER-03-086 00
25-MAR-03 HOUSLEY, L. T. ENVIRONMENTAL AND OPERATIONAL YEAR END DATA REPORT FOR THE OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) PROJECT - 2002 INEEL/EXT-03-00186 00
17-MAR-03 PIERRE, W. OPERABLE UNIT (OU) 7-13 & 7-14 SECOND ADDENDUM TO REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN AND SCOPE OF WORK (SOW) 26453 00
14-MAR-03 SENTIERI, P. J. CRITICALITY SAFETY EVALUATION FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-01-01617 03
13-MAR-03 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-02-00542 01
01-MAR-03 MULLEN, C. K. BERYLLIUM WASTE TRANSURANIC (TRU) INVENTORY IN THE SUBSURFACE DISPOSAL AREA (SDA), OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-01-01678 02
25-FEB-03 HOLDREN, K. J. SECOND REVISION TO THE SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-95/0253 02
14-FEB-03 MCMURTREY, R. D. INTERIM REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) PROJECT INEEL/EXT-02-00862 00
12-FEB-03 SNOOK, J. G. TRANSMITTAL OF FINALIZED GLOVEBOX EXCAVATOR METHOD PROJECT DOCUMENTS EM-ER-03-044 00
12-FEB-03 SENTIERI, P. J. CRITICALITY SAFETY STUDY OF SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-01-01294 01
06-FEB-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) INEEL/EXT-98-00857 05
05-FEB-03 RITTER, P. D. NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MONITORING PLAN FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-03-00079 00
29-JAN-03 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-02-00542 00
27-JAN-03 BURTON, B. N. WASTE MANAGEMENT PLAN (WMP) FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-02-00767 00
22-JAN-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS INEEL/EXT-02-01117 00
21-JAN-03 BURTON, B. N. ENGINEERING DESIGN FILE (EDF) - APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARAR) IMPLEMENTATION MATRIX FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT EDF-2324 00
09-JAN-03 MCELROY, D. L. ADVANCED TENSIOMETER MONITORING RESULTS FROM THE DEEP VADOSE ZONE AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) INEEL/EXT-02-01276 00
23-DEC-02 ARMSTRONG, A. T. EVALUATION OF IN SITU GROUTING (ISG) FOR OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-01-00278 00
23-DEC-02 ZITNIK, J. F. PRELIMINARY EVALUATION OF REMEDIAL ALTERNATIVES FOR THE SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-02-01258 00
20-DEC-02 THOMAS, T. N. EVALUATION OF IN SITU VITRIFICATION (ISV) FOR OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-01-00279 00
20-DEC-02 HOLDREN, K. J. EVALUATION OF SOIL AND BURIED TRANSURANIC (TRU) WASTE RETRIEVAL TECHNOLOGIES FOR OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-01-00281 00
20-DEC-02 HOLDREN, K. J. EVALUATION OF SHORT TERM RISKS FOR OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-02-00038 00
19-DEC-02 JOSTEN, N. E. COMPILATION OF ANALYTICAL NOTES AND DATA ANALYSES FOR THE INTEGRATED PROBING PROJECT (IPP) 1999 - 2002 INEEL/EXT-02-01306 00
03-DEC-02 IANI, L. J. INEEL PIT 9 DISPUTE RESOLUTION -CONFIRMATION OF ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) UNDERSTANDING OF MAJOR POINTS DISCUSSED DURING FRIDAY'S TELECONFERENCE 24722 00
21-NOV-02 SENTIERI, P. J. CRITICALITY SAFETY EVALUATION FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-01-01617 02
01-NOV-02 KEMPTHORNE, D. DIRK KEMPTHORNE'S LETTER TO SPENCER ABRAHAM, SECRETARY OF U. S. DEPARTMENT OF ENERGY (DOE-HQ), REGARDING RESCHEDULED VISIT TO IDAHO 24719 00
23-OCT-02 LITTLE, M. A COMPREHENSIVE INVENTORY OF RADIOLOGICAL AND NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED OR PROJECTED TO BE BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) INEEL RWMC DURING THE YEARS OF 1984 TO 2003 - SUPPLEMENTAL VOLUME 1 AND 2 (VOL.01 & VOL.02) INEL-95/0135-SUPPL 00
21-OCT-02 SENTIERI, P. J. CRITICALITY SAFETY EVALUATION FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-01-01617 01
15-OCT-02 DAVIES, S. A. SUPPLEMENT TO REMEDIAL DESIGN (RD) PACKAGE FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT DOE/ID-11032-SUPPL 00
11-OCT-02 SLOAN, P. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) COLD TEST PITS FOR OPERABLE UNITS (OU) 7-13 & 7-14 INEEL/EXT-99-00364 03
03-OCT-02 JEWELL, J. K. ESTIMATING THE MASS OF PU-239 WASTE NEAR P9-20 PROBE HOLE FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-02-01189 00
27-SEP-02 HOLDREN, K. J. ANCILLARY BASIS FOR RISK ANALYSIS OF SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-02-01125 00
19-SEP-02 DAVIES, S. A. REMEDIAL DESIGN (RD) PACKAGE FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - VOLUME 1 (VOL.01) AND VOLUME 2 (VOL.02) DOE/ID-11032 00
16-SEP-02 MCMURTREY, R. D. OPERABLE UNIT (OU) 7-08, ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) ENVIRONMENTAL AND OPERATIONAL MID-YEAR DATA REPORT, 2002 INEEL/EXT-02-00981 00
12-SEP-02 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 DOE/ID-10587 07
05-SEP-02 PACE, B. STATUS OF CULTURAL RESOURCES REVIEW OF PIT 9 GLOVEBOX EXCAVATOR METHOD PROJECT 24755 00
01-SEP-02 INEEL COMMUNITY RELATIONS A COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) - PIT 9 CLEANUP CONSTRUCTION BEGINS 24749 00
02-AUG-02 NEITZEL, S. LETTER FROM THE IDAHO STATE HISTORICAL SOCIETY - REVIEW COMMENTS ON THE GLOVEBOX EXCAVATOR METHOD PROJECT AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 24754 00
01-AUG-02 PREUSSNER, B. D. SPECIFICATION (SPC) - BACKHOE SAFETY RELATED MODIFICATIONS FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SPC-351 00
01-AUG-02 PREUSSNER, B. D. SPECIFICATION (SPC) - BACKHOE MODIFICATIONS FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SPC-401 00
31-JUL-02 PRATT, M. B. OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT, CRITICAL DECISION 2/3 (CD-2/3) SUBMITTAL DOCUMENTS DKJ-157-02 00
30-JUL-02 SNOOK, J. G. START OF CONSTRUCTION FOR GLOVEBOX EXCAVATOR METHOD PROJECT EM-ER-02-125 00
24-JUL-02 JOHNSON, B. E. PERFORMANCE SPECIFICATION (SPC) - EMISSIONS MONITORING SYSTEM FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SPC-392 00
23-JUL-02 POPE, M. I. PERFORMANCE SPECIFICATION (SPC) - HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTER SYSTEMS FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SPC-391 00
19-JUL-02 CARPENEDO, R. J. DESIGN SPECIFICATION (SPC) - PACKAGING GLOVEBOX SYSTEM (PGS) FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SPC-387 01
16-JUL-02 STARCK, R. A. LETTER TO THE IDAHO STATE HISTORICAL SOCIETY TO REVIEW THE GLOVEBOX EXCAVATOR METHOD PROJECT AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) - INEEL/EXT-01-01512 ENCLOSED TO FACILITATE REVIEW TS-ESTD-02-109 00
16-JUL-02 STARCK, R. A. LETTER TO THE SHOSHONE BANNOCK TRIBES TO REVIEW THE GLOVEBOX EXCAVATOR METHOD PROJECT AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) - INEEL/EXT-01-01512 ENCLOSED TO FACILITATE REVIEW TS-ESTD-02-110 00
15-JUL-02 JESSMORE, J. J. OPERABLE UNIT (OU) 7-13 & 7-14 IN SITU GROUTING (ISG) TREATABILITY STUDIES (TS) BENCH SCALE TESTING INEEL/EXT-02-00851 00
14-JUL-02 GUILLEN, L. E. A-E CONSTRUCTION SPECIFICATION (SPC) - FACILITY PACKAGE FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SPC-389 00
10-JUL-02 CARPENEDO, R. J. PERFORMANCE SPECIFICATION (SPC) - PACKAGING GLOVEBOX SYSTEM (PGS) LIFT TABLE FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SPC-388 00
03-JUL-02 WATSON, L. R. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) COLD TEST PITS FOR OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-99-00364 02
26-JUN-02 NYGARD, D. IDAHO DEPARTEMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON PRE-DRAFT WASTE AREA GROUP 7 (WAG-7), OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION AND BASELINE RISK ASSESSMENT (RI/BRA) 28047 00
26-JUN-02 SNOOK, J. G. CRITICAL DECISION 2/3 (CD-2/3) FOR GLOVEBOX EXCAVATOR METHOD PROJECT APPROVED EM-ER-02-107 00
15-MAY-02 PRATT, M. B. OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT PARTIAL CRITICAL DECISION 3B (CD-3B) SUBMITTAL DKJ-111-02 00
10-MAY-02 PALMER, S. L. A-E PERFORMANCE SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - WEATHER ENCLOSURE STRUCTURE (WES) WMF-671 SPC-364 00
10-MAY-02 JENSEN, S. A. A-E CONSTRUCTION SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - FACILITY FLOOR STRUCTURE (FFS) FABRICATION SPC-366 00
10-MAY-02 JENSEN, S. A. A-E CONSTRUCTION SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - FACILITY STRUCTURES SPC-367 00
21-APR-02 LIVIERATOS, T. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REVIEW COMMENTS FOR DRAFT METHODOLOGY FOR DEVELOPING PRELIMINARY REMEDIATION GOALS FOR OPERABLE UNIT (OU) 7-13 AND 7-14 SUBSURFACE DISPOSAL AREA (SDA) 1842977 00
18-APR-02 ABRAHAM, S. AGREEMENT TO RESOLVE DISPUTES IN THE MATTER OF: MARCH 16, 2001 (03/16/2001) STATEMENT OF DISPUTE - STATE OF IDAHO (IDEQ), UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (EPA) AND UNITED STATES DEPARTMENT OF ENERGY (DOE-HQ) 10970 00
18-APR-02 PRATT, M. B. OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT, CRITICAL DECISION 3A (CD-3A) SUBMITTAL DOCUMENTS DKJ-73-02 00
18-APR-02 DIRKMAAT, P. J. APPROVAL OF CRITICAL DECISION 3A (CD-3A) - EARLY PROCUREMENT AND SITE UTILITIES WORK FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT LOCATED AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT THE INEEL EM-INTEC-02-021 00
17-APR-02 HAIN, K. E. PARTIAL ACHIEVEMENT OF CRITICAL DECISION 2/3 (CD-2/3) FOR GLOVEBOX EXCAVATOR METHOD PROJECT RETRIEVAL DEMONSTRATION EM-ER-02-061 00
17-APR-02 THOMPSON, E. R. HISTORICAL DESCRIPTION OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SURROGATE BURIED WASTE TEST PITS FOR ENVIRONMENTAL RESTORATION (ER) WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-2000-00785 01
16-APR-02 KINGSFORD, C. O. CONSTRUCTION SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SITE DEVELOPMENT SPC-352 01
15-APR-02 LEECASTER, M. K. GEOSTATISTIC MODELING OF SUBSURFACE CHARACTERISTICS IN RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) REGION, OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-02-00029 00
08-APR-02 BURTON, B. N. APPROVED ENVIRONMENTAL CHECKLIST (EC) - RWMC OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT RWMC-99-002EC 01
04-APR-02 ENGLISH, B. L. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON CLOSURE PLAN (CP) FOR TRANSURANIC STORAGE AREA (TSA) INTERIM STATUS UNITS (PADS 1, 2, AND R) LOCATED AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ON THE INEEL (EPA ID NOS. ID489000895 24734 00
04-APR-02 HARKER, W. S. INDEPENDENT PROJECT REVIEW (IPR) PLAN OF OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT, CD-A3 SCOPE EM-IDM-02-027 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
04-APR-02 STEPHENS, D. L. A-E PERFORMANCE SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - RETRIEVAL CONFINEMENT STRUCTURE (RCS) SPC-358 00
02-APR-02 MONSON, B. R. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DOE'S MARCH 15, 2002 (03/15/02) LETTER CONCERNING EXISTING INVENTORY PERMIT DEFINITION AS APPLIED TO CERCLA WASTES LOCATED AT INEEL 24733 00
29-MAR-02 O'NEILL, K. C. AGENCY EXTENSION OF DEADLINE FOR SUBMITTAL OF THE DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 7-13 AND OU 7-14 1842786 00
28-MAR-02 IDEQ IDEQ, EPA, AND DOE AGREEMENT FOR EXTENSION OF DEADLINE FOR SUBMITTAL OF DRAFT REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) AND FEASIBILITY STUDY (FS) FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-13 & 7-14 24731 00
25-MAR-02 HAIN, K. E. COMMENTS SUBMITTED BY DOE-ID PROGRAMMATIC SAFETY REVIEW GROUP ON PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT AND RESPONSES TO EPA AND IDEQ COMMENTS ON CONCEPTUAL DESIGN REPORT (CDR) EM-ER-02-043 00
25-MAR-02 AKERS, D. W. SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT DESIGN INPUT FOR FISSILE MATERIAL MONITORING SYSTEM (FMMS) SPC-360 00
15-MAR-02 SENTIERI, P. J. CRITICALITY SAFETY STUDY OF THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-01-01294 00
15-MAR-02 CRESAP, D. A. PERFORMANCE SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR FISSILE MATERIAL MONITOR (FMM) - GLOVEBOX EXCAVATOR METHOD PROJECT SPC-355 00
15-MAR-02 RASCH, D. N. DOE RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REQUEST FOR INFORMATION CONCERNING LETTER FROM DOE DESCRIBING POSITION ON DEFINITION OF EXISTING INVENTORIES AS STIPULATED IN THREE HWMA RCRA PERMITS ADDRESSING UNITS AT RWMC TS-ETSD-02-039 00
06-MAR-02 ABRAHAM, S. LETTER FROM THE SECRETARY OF ENERGY TO THE GOVERNOR OF IDAHO - PROPOSAL TO RESOLVE DISPUTE IS BEING ACTIVELY PURSUED 24730 00
06-MAR-02 BRADLEY, T. M. FOLLOW-ON COMMENTS REGARDING NAVAL REACTORS PROGRAM RADIONUCLIDE INVENTORIES AT THE SUBSURFACE DISPOSAL AREA (SDA) NR:IBO-02/032 00
28-FEB-02 HOUSLEY, L. T. ENGINEERING DESIGN FILE (EDF) - A COMPILATION OF RESULTS FROM SHALLOW SOIL-GAS SURVEYS OF THE SUBSURFACE DISPOSAL AREA (SDA) FOR OU 7-08 INEEL/EXT-01-00026 01
14-FEB-02 BRADLEY, T. M. NAVAL REACTORS FACILITY (NRF) SUMMARY COMMENTS REGARDING PROJECTED INVENTORY OF NAVAL REACTORS WASTE DISPOSAL AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) NR:IBO-02/029 00
29-JAN-02 ROBERSON, J. H. THANK YOU FOR INSTITUTE FOR ENERGY AND ENVIRONMENTAL RESEARCH (IEER) REPORT - POISON IN THE VADOSE ZONE: AN EXAMINATION OF THE THREATS TO THE SNAKE RIVER PLAIN AQUIFER (SRPA) FROM INEEL - DOE POSITION ON CONCLUSIONS LISTED IN EXECUTIVE SUMMARY 24727 00
24-JAN-02 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON PIT 9 10% CONCEPTUAL DESIGN FOR GLOVEBOX EXCAVATOR METHOD 24724 00
23-JAN-02 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT 10% REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR STAGE II PIT 9 GLOVEBOX EXCAVATOR METHOD OPERABLE UNIT (OU) 7-10 24723 00
23-JAN-02 GEARHEARD, M. F. ENVIRONMENTAL PROTECTION AGENCY (EPA) NOTICE OF INSPECTION & REQUEST FOR INFORMATION TO EVALUATE COMPLIANCE WITH TERMS OF DECEMBER 1991 (12/91) FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) AND RELEVANT SECTIONS OF NATIONAL PRIORITIES LIST (NPL 24725 00
22-JAN-02 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) NOTICE OF FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (FFA/CO) INSPECTION OF THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) AT IDAHO FALLS, IDAHO 24726 00
09-JAN-02 KEMPTHORNE, D. LETTER FROM GOVERNOR OF IDAHO TO THE SECRETARY OF ENERGY - CONTROVERSY REGARDING CLEANUP OF PIT 9 - RESOLUTION OF OUTSTANDING ISSUES 24732 00
01-JAN-02 DAVIES, S. A. OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - CONCEPTUAL DESIGN REPORT (CDR) FOR CRITICAL DECISION 1 (CD-1) INEEL/EXT-01-01512 00
01-JAN-02 DAVIES, S. A. OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT PRELIMINARY PROJECT EXECUTION PLAN (PEP) INEEL/EXT-01-01513 00
20-DEC-01 VARVEL, M. D. OPERABLE UNIT (OU) 7-08 ESTIMATE OF TORTUOSITY FACTOR FOR GAS DIFFUSION IN OVERBURDEN SOIL IN SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-01-01534 00
14-DEC-01 FREI, M. W. EVALUATION OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) MEMORANDUM DECISION AND ORDER DATED JULY 23, 2001 (07/23/01) TO THE GOVERNOR OF IDAHO FOR RESOLUTION - INCLUDED DEPARTMENT OF ENERGY (DOE) POSITION PAPER EM-ER-01-200 00
03-DEC-01 ROUSSEAU, J. P. USGS COMMENTARY ON INSTITUTE FOR ENERGY AND ENVIRONMENTAL RESEARCH (IEER) REPORT - POISON IN THE VADOSE ZONE: AN EXAMINATION OF THE THREATS TO THE SNAKE RIVER PLAIN AQUIFER (SRPA) FROM THE INEEL 24728 00
30-NOV-01 CASTANON, L. A. INEEL PIT 9 DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) AGREEMENT WITH AN ADDITIONAL EXTENSION TO CURRENT DEADLINE - NEW DEADLINE OF DECEMBER 15, 2001 (12/15/2001) 24721 00
29-NOV-01 O'NEILL, K. C. TRANSMITTAL OF FINAL CLEMSON SORPTION STUDY REPORT AND LONG TERM CORROSION DEGRADATION TEST THIRD (3RD) YEAR RESULTS EM-ER-01-197 00
28-NOV-01 ALLRED, C. S. INEEL PIT 9 DISPUTE RESOLUTION - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) PROPOSAL FOR SETTLEMENT 24720 00
21-NOV-01 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE WASTE AREA GROUP 7 (WAG-7) ROUTINE MONITORING INEEL/EXT-01-01538 00
30-OCT-01 FREI, M. W. EXTENSION OF DISPUTE RESOLUTION FOR PIT 9 RETRIEVAL DEMONSTRATION UNTIL NOVEMBER 30, 2001 (11/30/2001) - CONTAINS LIST OF ENFORCEABLE DEADLINES & MILESTONES EM-ER-01-180 00
25-OCT-01 CASTANON, L. A. INEEL PIT 9 DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) AGREEMENT TO THE NOVEMBER 30, 2001 (11/30/2001) EXTENSION DATE 24718 00
25-OCT-01 HAIN, K. E. RESPONSE TO AUGUST 22, 2001 (08/22/2001) ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR INFORMATION PURSUANT TO SECTION 104 0F CERCLA FOR WAG-7 OF THE INEEL EM-ER-01-173 00
18-OCT-01 CASTANON, L. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR INFORMATION WITH RESPONSES TO BBWI'S REQUEST FOR CLARIFICATION ENCLOSED 24716 00
15-OCT-01 ALLRED, C. S. PIT 9 DISPUTE RESOLUTION - AGREEMENT TO EXTEND DEADLINE FOR AN ADDITIONAL PERIOD OF TIME CONCLUDING ON NOVEMBER 30, 2001 (11/30/2001) - ENFORCEABLE DEADLINES LISTED 24715 00
12-OCT-01 ALLRED, C. S. PHONE CALL CONFIRMED FIRM DATES FOR FINAL TWO MILESTONES FOR STAGE II OF PIT 9 PROJECT - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AGREEABLE TO EXTENSION OF DISPUTE RESOLUTION DATE TO NOVEMBER 30, 2001 (11/30/01) 24714 00
11-OCT-01 BERGHOLZ, W. E. CONFIRMS TELEPHONE DISCUSSIONS HELD OCTOBER 11, 2001 (10/11/01) BETWEEN STEVE ALLRED AND ASSISTANT SECRETARY ROBERSON CONCERNING EXTENSION OF OCTOBER 12, 2001 (10/12/01) PIT 9 DISPUTE RESOLUTION DEADLINE, DOE REQUESTS EXTENSION TO NOVEMBER 30, 2001 24713 00
11-OCT-01 BUKOWSKI, T. A. FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-2000-00029 00
10-OCT-01 ROBERSON, J. H. THREE ENFORCEABLE MILESTONES SUCCESSFULLY DEVELOPED BY IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ), ENVIRONMENTAL PROTECTION AGENCY (EPA) AND DOE NEGOTIATING TEAM FOR PIT 9 DISPUTE DURING OCTOBER 3, 2001 (10/03/01) TELECONFERENCE MEETING 24711 00
10-OCT-01 BERGHOLZ, W. E. OCTOBER 3, 2001 (10/03/2001) PIT 9 TELECONFERENCE MEETING RESULTED IN AGREEMENT ON SEVERAL MILESTONES FOR STAGE II WITH DRAFT PROPOSED REVISIONS ATTACHED EM-ER-01-168 00
05-OCT-01 KREIZENBECK, R. DISPUTE RESOLUTION, INEEL OPERABLE UNIT (OU) 7-10, PIT 9 - ENVIRONMENTAL PROTECTION AGENCY (EPA) OBSERVATIONS AND ASSIGNMENT OF STAFF TO NEGOTIATE A RESOLUTION 24708 00
05-OCT-01 WATSON, L. R. HEALTH & SAFETY PLAN (HSP OR HASP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) COLD TEST PITS FOR OPERABLE UNIT (OU) 7-13 7-14 INEEL/EXT-99-00364 01
04-OCT-01 GEARHEARD, M. F. INEEL, CERCLA SECTION 104(E) REQUEST FOR INFORMATION - ENVIRONMENTAL PROTECTION AGENCY (EPA) WILL RESPOND DIRECTLY TO BECHTEL BWXT IDAHO, LLC (BBWI) REGARDING EXTENSION TO INFORMATION REQUEST 24707 00
04-OCT-01 GEARHEARD, M. F. INEEL CERCLA SECTION 104(E) REQUEST FOR INFORMATION - ENVIRONMENTAL PROTECTION AGENCY (EPA) - BBWI TO PROVIDE DOCUMENTS BY OCTOBER 25, 2001 (10/25/2001) 24709 00
01-OCT-01 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER TO ASSISTANT SECRETARY FOR ENVIRONMENTAL MANAGEMENT - BELIEVE THAT CONCEPTUAL PLAN CAN PROVIDE A BASIS TO MOVE FORWARD TO A RESOLUTION 24710 00
01-OCT-01 BERGHOLZ, W. E. TRANSMITTAL OF WASTE AREA GROUP 7 (WAG-7) ANALYSIS OF OPERABLE UNIT (OU) 7-10 STAGE II MODIFICATIONS EM-ER-01-159 00
01-OCT-01 MCCONNEL, B. C. WASTE AREA GROUP 7 (WAG-7) ANALYSIS OF OPERABLE UNIT (OU) 7-10 STAGE II MODIFICATIONS INEEL/EXT-01-01105 00
28-SEP-01 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 7-14 IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) INEEL/EXT-01-00766 00
25-SEP-01 ROBERSON, J. H. LETTER TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) DIRECTOR FROM DEPARTMENT OF ENERGY (DOE) ASSISTANT SECRETARY FOR ENVIRONMENTAL MANAGEMENT (EM) - AGREEMENT REACHED ON A CONCEPTUAL PATH FORWARD - FUNDAMENTAL TOPICS OF AGREEMENT FOR PIT 9 24705 00
25-SEP-01 OLSEN, M. D. REQUEST FOR INFORMATION PURSUANT TO SECTION 104 OF CERCLA FOR INEEL - EPA LETTER RECEIVED AUGUST 21, 2001 (08/21/2001) - BBWI LEGAL - BBWI WILL ADDRESS DOE'S REQUEST FOR RECORDS WITH CLARIFICATION REQUEST ENCLOSED MDO-62-01 00
25-SEP-01 BERGHOLZ, W. E. ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR INFORMATION PURSUANT TO SECTION 104 OF CERCLA FOR INEEL - BBWI WILL PREPARE DOE'S REQUEST FOR RECORDS OCC-01-129 00
21-SEP-01 ADLER-FLITTON, M. K. LONG TERM CORROSION & DEGRADATION TEST THIRD (3RD) YEAR RESULTS INEEL/EXT-01-00036 00
18-SEP-01 MCMURTREY, R. D. OPERABLE UNIT (OU) 7-08, ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) ENVIRONMENTAL AND OPERATIONAL MID-YEAR DATA REPORT, 2001 INEEL/EXT-01-00770 00
05-SEP-01 PIERRE, W. EPA RESPONSE TO DOE LETTERS: PATH FORWARD FOR IN SITU VITRIFICATION (ISV) EVALUATION IN OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EM-ER-01-141 AND IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) EM-ER-01-142 10952 00
05-SEP-01 PIERRE, W. PATH FORWARD FOR IN SITU VITRIFICATION (ISV) EVALUATION IN OU 7-13 AND 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AND IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) - EPA DOES NOT CONCUR WITH EXPANDED SCOPE OF WORK 24706 00
30-AUG-01 LOCKHART, F. R. LETTER FROM DOE ROCKY FLATS FIELD OFFICE TO REGIONAL DIRECTOR OF ENVIRONMENTAL PROTECTION AGENCY (EPA) - OPTIMISTIC MEETING NEXT WEEK FOCUSED ON RESOLUTION OF PIT 9 DISPUTE WILL BE SUCCESSFUL 01-DOE-01667 00
29-AUG-01 FINDLEY, C. E. INEEL DISPUTE RESOLUTION OU 7-10 - PIT 9 DISPUTE NEGOTATIONS - ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) PROPOSAL - GOALS AND PATH FORWARD 24703 00
27-AUG-01 HAIN, K. E. PATH FORWARD FOR IN SITU VITRIFICATION (ISV) EVALUATION IN OPERABLE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EM-ER-01-141 00
27-AUG-01 HAIN, K. E. PATH FORWARD FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) EM-ER-01-142 00
22-AUG-01 GEARHEARD, M. F. ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR INFORMATION PURSUANT TO SECTION 104 OF CERCLA FOR INEEL 24701 00
22-AUG-01 DEBOLT, P. A. TRANSMITTAL OF WRITTEN DISPOSITION QUESTIONS FOR DEPARTMENT OF ENERGY (DOE) RECORD CUSTODIANS 24704 00
22-AUG-01 ANDERSON, D. L. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) SOIL MOISTURE INSTRUMENTED PROBE - PROBING, LOGGING AND INSTRUMENTATION PROJECT EDF-ER-234 01
22-AUG-01 ANDERSON, D. L. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) VAPOR PORT INSTRUMENTED PROBE EDF-ER-235 00
22-AUG-01 DICK, J. R. NITRATE EXPLOSIVES TESTS TO SUPPORT THE OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU VITRIFICATION (ISV) PROJECT INEEL/EXT-01-00265 00
15-AUG-01 FINDLEY, C. E. DISPUTE RESOLUTION OU 7-10 - NEED FOR STAGE I CORING - EXTENT OF ADDITIONAL SAMPLING NEEDED 24700 00
14-AUG-01 BOSTON, R. D. RESPONSE TO REPORT OF J. L. ALVAREZ AND J. A. AUXIER REGARDING WASTE RETRIEVAL FROM PIT 9, THE 90% DESIGN 24695 00
13-AUG-01 FINDLEY, C. E. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO UNDER SECRETARY OF ENERGY LETTER ON OU 7-10 DISPUTE RESOLUTION NEGOTIATION SCHEDULE EXTENSION TO OCTOBER 12, 2001 (10/12/2001) 24699 00
10-AUG-01 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO EXTENSION REQUEST FOR PIT 9 DISPUTE RESOLUTION 24698 00
08-AUG-01 MCMURTREY, R. D. OPERATIONS & MAINTENANCE (O&M) PLAN FOR OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) INEEL/EXT-01-00016 00
07-AUG-01 CARD, R. G. LETTER FROM UNDER SECRETARY OF ENERGY TO ACTING ADMINISTRATOR OF ENVIRONMENTAL PROTECTION AGENCY (EPA) REGION 10 (X) - DISPUTE OVER REQUEST BY DOE TO EXTEND SCHEDULE FOR IMPLEMENTATION OF WASTE RETRIEVAL IN PIT 9 - NEW NEGOTIATIONS BEING IMPLEMENTED 24697 00
06-AUG-01 CARD, R. G. LETTER FROM UNDER SECRETARY OF ENERGY TO DIRECTOR OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) - DISPUTE OVER REQUEST BY DOE TO EXTEND SCHEDULE FOR IMPLEMENTATION OF WASTE RETRIEVAL IN PIT 9 - NEW NEGOTIATIONS BEING IMPLEMENTED 23573 00
01-AUG-01 GREEN, O. D. REPORT OF JOSEPH L. ALVAREZ AND JOHN A. AUXIER REGARDING WASTE RETRIEVAL FROM PIT 9, THE 90% DESIGN DATED JULY 25, 2001 (07/25/01) - TO DETERMINE TO WHAT EXTENT THERE WAS FLEXIBILITY TO REDUCE PIT 9 PROJECT TIME AND COST AND TRANSMITTAL LETTER 24694 00
25-JUL-01 FINDLEY, C. E. OPERABLE UNIT (OU) 7-10 PIT 9 MODIFICATIONS ANALYSIS - INEEL DISPUTE - ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURS WITH IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TO DENY DEPARTMENT OF ENERGY'S (DOE'S) REQUEST FOR AN EXTENSION 21473 00
23-JUL-01 ALLRED, C. S. DETERMINATION OF DISPUTE - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) MEMORANDUM DECISION AND ORDER ON DISPUTE RESOLUTION IN THE MATTER OF DEPARTMENT OF ENERGY'S (DOE'S) MARCH 16, 2001 (03/16/01) STATEMENT OF DISPUTE 24692 00
18-JUL-01 FINDLEY, C. E. DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY (EPA) OPTIONS ON HOW TO PROCEED WITH PROJECT AND REACH AGREEMENT ON ACCEPTABLE SCHEDULE AND REMEDIAL APPROACH 24690 00
18-JUL-01 ALLRED, C. S. PIT 9 DISPUTE RESOLUTION - IDAHO DEPARTMENT OF EMVIRONMENTAL QUALITY (IDEQ) DENIAL OF DEPARTMENT OF ENERGY'S (DOE'S) FEBRUARY 26, 2001 (02/26/01) REQUEST FOR EXTENSION OF PIT 9 DEADLINES AND MARCH 16, 2001(03/16/01) STATEMENT OF DISPUTE 24691 00
17-JUL-01 HAIN, K. E. DISPUTE RESOLUTION - DELIVERY OF PIT 9 SCHEDULE DETAILED INFORMATION ON ASSUMPTIONS USED TO DEVELOP THE SCHEDULE SUBMITTED WITH THE FEBRUARY 26, 2001 (02/26/2001) REQUEST FOR EXTENSION OF DEADLINES (EM-ER-01-028) EM-ER-01-123 00
11-JUL-01 HAIN, K. E. JULY 10 AND JULY 11, 2001 (07/11/2001 - 07/12/2001) MEETING ON PIT 9 SCHEDULE EXTENSION DISPUTE- STATEMENT FROM EACH AGENCY LEAD CONCERNING RESULTS OF THE MEETING - SUMMATION TO THE SENIOR EXECUTIVE COMMITTEE (SEC) 24740 00
05-JUL-01 BERGHOLZ, W. E. DISPUTE RESOLUTION - REVISED AGENDA FOR PIT 9 SCHEDULE DISPUTE MEETING TO BE HELD JULY 10 AND JULY 11, 2001 (07/10/01 - 07/11/01) - ALSO ENCLOSED IS A CONCEPTUAL DESCRIPTION OF AN ALTERNATIVE TO SCHEDULE AND SCOPE OF SCHEDULE PROVIDED BY IDEQ AND EPA OM-01-002 00
03-JUL-01 GREEN, O. D. DISPUTE RESOLUTION - STAGE II VALUE ENGINEERING REVIEW MEETING SCHEDULED JULY 10 AND JULY 11, 2001 (07/10/01 - 07/11/01) - ENVIRONMENTAL PROTECTION AGENCY (EPA) AND IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RECEIVED AND REVIEWED PROPOSED SCHED 24689 00
28-JUN-01 PIERRE, W. POTENTIAL APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS FOR THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPERABLE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 24900 00
26-JUN-01 FINDLEY, C. E. DISPUTE RESOLUTION - OPERABLE UNIT (OU) 7-10 ENVIRONMENTAL PROTECTION AGENCY (EPA) SCHEDULE ASSUMPTIONS 24688 00
25-JUN-01 COOK, B. A. AGENDA FOR OU 7-10 STAGE II VALUE ENGINEERING REVIEW EM-ER-01-110 00
18-JUN-01 COOK, B. A. CONFIRMATION OF JUNE 15, 2001 (06/15/2001) SENIOR EXECUTIVE COMMITTEE CONFERENCE CALL DECISIONS EM-ER-01-107 00
15-JUN-01 FINDLEY, C. E. DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY (EPA) AGREES TO OPERABLE UNIT (OU) 7-10 EXTENSION OF DEADLINE TO JULY 18, 2001 (07/18/2001) 24686 00
15-JUN-01 ALLRED, C. S. DISPUTE RESOLUTION - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AGREES TO OPERABLE UNIT (OU) 7-10 EXTENSION OF DEADLINE TO JULY 18, 2001 (07/18/2001) 24687 00
14-JUN-01 FINDLEY, C. E. DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY (EPA) AGREEMENT TO OPERABLE UNIT (OU) 7-10 EXTENSION OF DEADLINE JULY 6, 2001 (07/06/2001) 24684 00
11-JUN-01 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR MONITORING TYPE B PROBES FOR OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) INEEL/EXT-2000-01435 00
08-JUN-01 FINDLEY, C. E. ENVIRONMENTAL PROTECTION AGENCY (EPA) STATEMENT OF DISPUTE - DEPARTMENT OF ENERGY (DOE) REQUEST FOR EXTENSION OF MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 24683 00
08-JUN-01 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) WILL EXTEND DEADLINE FOR RESOLVING DISPUTE OVER EXTENSION OF MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 24685 00
07-JUN-01 DIRKMAAT, P. J. DEPARTMENT OF ENERGY (DOE) PLANNED SPENT NUCLEAR FUEL (SNF) SHIPMENTS EM-ER-01-097 00
07-JUN-01 COOK, B. A. CONFIRMATION OF JUNE 7, 2001 (06/07/2001) SENIOR EXECUTIVE COMMITTEE (SEC) CONFERENCE CALL DECISIONS EM-ER-01-098 00
01-JUN-01 GROSSMAN, C. J. THE SORPTION OF SELECTED RADIONUCLIDES IN SEDIMENTARY INTERBED SOILS FROM THE SNAKE RIVER PLAIN INEEL/EXT-01-01106 00
31-MAY-01 VARVEL, M. D. ENGINEERING DESIGN FILE (EDF) - MASS ESTIMATES OF ORGANIC COMPOUNDS BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-08 AND 7-13 & 7-14 INEEL/EXT-01-00277 00
23-MAY-01 ALLRED, C. S. DISPUTE RESOLUTION - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AND ENVIRONMENTAL PROTECTION AGENCY (EPA) JOINT COUNTER PROPOSAL 24682 00
22-MAY-01 SMITH, F. LEE TRANSMITTAL OF REVISED APPENDIX N OF THE PAD A OPERATIONS, MAINTENANCE, AND MONITORING PLAN FOR THE REMEDIAL ACTION REPORT PAD A LIMITED ACTION OPERABLE UNIT 7-12 CCN 22067 0
30-APR-01 JACKSON, T. FEASIBILITY STUDY (FS) ASSESSMENT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 21311 00
20-APR-01 ALLRED, C. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) AND IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AGREEMENT TO EXTEND TIME FRAME FOR DELIBERATIONS OF THE SENIOR EXECUTIVE COMMITTEE (SEC) 24681 00
19-APR-01 LYLE, J. L. COMMITMENT TO PROVIDE A PROPOSED PATH FORWARD AND PROPOSAL TO EXTEND THE SENIOR EXECUTIVE COMMITTEE (SEC) TIME PERIOD FOR RESOLUTION OF DISPUTE EM-ER-01-073 00
04-APR-01 HULL, L. C. APPROACH TO SIMULATION OF ACTINIDES FOR OPERABLE UNIT (OU) 7-13 7-14 BASELINE RISK ASSESSMENT (BRA) LCH-04-01 00
02-APR-01 LYLE, J. L. ELEVATION OF OPERABLE UNIT (OU) 7-10 DISPUTE RESOLUTION TO THE SENIOR EXECUTIVE COMMITTEE (SEC) EM-ER-01-057 00
01-APR-01 WHITMIRE, D. L. SUMMARY REPORT - SIMULATION OF GROUNDWATER FLOW NEAR SUBSURFACE DISPOSAL AREA (SDA) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) INEEL/EXT-01-01643 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
27-MAR-01 GREEN, O. D. PIT 9 - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DEPARTMENT OF ENERGY'S (DOE'S) INVOCATION OF DISPUTE 24677 00
21-MAR-01 GEARHEARD, M. F. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY'S (DOE'S) INVOCATION OF DISPUTE 24738 00
16-MAR-01 HAIN, K. E. SUBMITTAL OF STATEMENT OF DISPUTE TO DISPUTE RESOLUTION COMMITTEE REGARDING REQUEST FOR EXTENSION OF MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 EM-ER-01-048 00
15-MAR-01 BRADLEY, T. M. NAVAL NUCLEAR PROPULSION PROGRAM - RADIOLOGICAL INVENTORY OF WASTE DISPOSED AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) - RESPONSE TO QUESTIONS CONCERNING POTENTIAL DATA GAPS FOR NAVAL REACTORS FACILITY (NRF) WASTE DISPOSED AT THE RWMC NR:IBO-01/039 00
14-MAR-01 INEEL COMMUNITY RELATIONS DOE NEWS - STATE AND INEEL SCIENTISTS FOCUS ON UNDERSTANDING RESULTS OF RADIONUCLIDE DETECTION 24675 00
13-MAR-01 WELLS, R. P. ENGINEERING DESIGN FILE (EDF) - REVIEW OF THE ROCKY FLATS PLANT (RFP) DATA CONTAINED IN THE HISTORICAL DATA TASK (HDT) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 - FUNCTIONAL FILE #INEEL/EXT-01-00030 INEEL/EXT-01-00030 00
12-MAR-01 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) NON-CONCURRENCE OF REQUEST TO EXTEND DEADLINES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 24671 00
09-MAR-01 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) DENIAL OF FEBRUARY 26, 2001 (02/26/2001) REQUEST FOR EXTENSION DEADLINES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 24670 00
02-MAR-01 NYGARD, D. RESPONSE TO DECEMBER 2000 (12/2000) SECOND ADDENDUM TO WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT AND SECOND REVISION TO THE SCOPE OF WORK (SOW) 10926 00
26-FEB-01 EDGERTON, B. G. DEPARTMENT OF ENERGY (DOE) REQUEST FOR EXTENSION OF DEADLINES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 EM-ER-01-028 00
20-FEB-01 MILLER, B. P. HEALTH & SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 INTEGRATED PROBING PROJECT (IPP) - PREVIOUSLY KNOWN AS SUBSURFACE INVESTIGATION INEEL/EXT-98-00857 04
13-FEB-01 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 TRACER TEST AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-2000-01428 00
29-JAN-01 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TABLE DESCRIBING MINIMUM INFORMATION NEEDED TO REACH A SUPPORTABLE DECISION FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 24669 00
01-JAN-01 NITSCHKE, ROBERT L. APPLICATION FOR THE RISK-BASED STORAGE OF PCB REMEDIATION WASTE AT THE INEEL RWMC TSA-RE INEEL/EXT-99-00637 2
01-JAN-01 BECKER, WILLIAM J. APPLICATION FOR THE RISK-BASED STORAGE OF PCB REMEDIATION WASTE AT THE INEEL RWMC TSA-RE INEEL/EXT-99-00637 2
21-DEC-00 FJELD, R. A. FINAL REPORT - COLUMN TESTS TO STUDY TRANSPORT OF PLUTONIUM AND OTHER RADIONUCLIDES IN SEDIMENTARY INTERBED AT INEEL INEEL/EXT-01-00763 00
20-DEC-00 HAMPTON, N. L. REVIEW OF WASTE AREA GROUP 7 (WAG-7) ECOLOGICAL CONTAMINANTS OF POTENTIAL CONCERN INEEL/EXT-2000-01405 00
12-DEC-00 BERGHOLZ, W. E. WAG-7 NOVEMBER 15, 2000 (11/15/2000) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) MEETING - INCLUDES PROPOSED PRIORITIES MEETING AGENDA DECEMBER 19, 2000 (12/19/2000) AND RESPONSE TO DIVISION OF ENVIRONMENTAL QUALITY (DEQ) DIFFERENCE OF OPINION EM-ER-232-00 00
01-DEC-00 MCNEIL TECHNOLOGIES, INC. ANALYSIS OF THE ENVIRONMENTAL PROTECTION AGENCY'S (EPA) RECORDS OF DECISION (ROD) RELATED TO LANDFILLS 21310 00
30-NOV-00 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR FLUORESCENT TRACER DYE STUDY FOR OPERABLE UNIT (OU) 7-13 & 7-14 SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-2000-01118 00
22-NOV-00 EDGERTON, B. G. WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 REVISED WORKING SCHEDULE EM-ER-222-00 00
10-NOV-00 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 SUBSURFACE INVESTIGATION INEEL/EXT-98-00857 03
01-NOV-00 CHOPPIN, G. R. ACTINIDE SOLUBILITY EXPERIMENTS IN INEEL PERCHED SIMULANT SOLUTION FINAL REPORT INEEL/EXT-01-00762 00
01-NOV-00 ROBACK, R. C. ASSESSMENT OF URANIUM AND PLUTONIUM IN SATURATED AND UNSATURATED ZONES BENEATH THE SUBSURFACE DISPOSAL AREA (SDA), INEEL INEEL/EXT-01-00771 00
31-OCT-00 HAIN, K. E. DOE RESPONSES TO AGENCY COMMENTS ON STAGE II DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 PIT 9 INTERIM RECORD OF DECISION (ROD) EM-ER-00-206 00
27-OCT-00 HATHAWAY, C. DISPOSAL OF WASTE AREA GROUP 5 (WAG-5) AUXILIARY REACTOR AREA 16 (ARA-16) AND ARA-25 SOILS AND PIPING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPE-EM-ER-205 00
26-OCT-00 HULL, L. C. TEST PLAN TO MEASURE ADSORPTION OF ACTINIDES ON INTERBED MATERIALS FROM RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) DOE/ID-10796 00
01-OCT-00 INEEL COMMUNITY RELATIONS INEEL REPORTER - ON-GOING PROBING CAMPAIGN YIELDING VALUABLE INFORMATION ABOUT BURIED WASTE - OCTOBER 2000 - NOVEMBER 2000 (10/2000 - 11/2000) 21900 00
28-SEP-00 BEITEL, G. A. EVALUATION OF OPERABLE UNIT (OU) 7-10 STAGE I SOIL MOISTURE READINGS - OU 7-10 STAGED INTERIM ACTION (SIA) PROJECT STAGE I INEEL/EXT-2000-00651 00
27-SEP-00 HAIN, K. E. WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 PIT 9 RECORD OF DECISION (ROD) - REQUEST FOR EXTENSION EM-ER-188-00 00
21-SEP-00 ADLER-FLITTON, M. K. LONG TERM CORROSION DEGRADATION (LTCD) TEST FIRST (1ST) YEAR RESULTS INEEL/EXT-99-00678 00
20-SEP-00 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON THE SCOPE OF WORK (SOW) FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR RWMC SUBSURFACE DISPOSAL AREA (SDA) - REJECTED BY REGULATORS 24341 00
20-SEP-00 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV DOE/ID-10587 06
01-SEP-00 CASE, M. J. TECHNICAL REVISION OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) LOW LEVEL WASTE (LLW) RADIOLOGICAL PERFORMANCE ASSESSMENT FOR CALENDAR YEAR 2000 (CY-2000) INEEL/EXT-2000-01089 00
25-AUG-00 HAIN, K. E. WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 PIT 9 RECORD OF DECISION (ROD) - REQUEST FOR EXTENSION EM-ER-162-00 00
15-AUG-00 HAIN, K. E. DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) LETTER DATED JULY 7, 2000 (07/07/2000) & IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER DATED JULY 19, 2000 (07/19/2000) - PIT 9 RECORD OF DECISION (ROD) REQUEST FOR EXTENSION EM-ER-153-00 00
07-AUG-00 MEYER, T. J. RESOLUTIONS TO IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON INTERIM RISK ASSESSMENT (IRA) & CONTAMINANT SCREENING FOR WASTE AREA GROUP 7 (WAG-7) REMEDIAL INVESTIGATION (RI) DOE/ID-10569 DRAFT REVISION 2 (REV.02) MARCH 02, 1998 (03/02/98) 10841 00
07-AUG-00 MEYER, T. J. RESOLUTIONS TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON INTERIM RISK ASSESSMENT (IRA) & CONTAMINANT SCREENING FOR WASTE AREA GROUP 7 (WAG-7) REMEDIAL INVESTIGATION (RI) DOE/ID-10569 DRAFT REVISION 2 (REV.02) MARCH 02, 1998 (03/02/98) 10842 00
01-AUG-00 SLATE, L. J. PRELIMINARY CRITICALITY SAFETY EVALUATION FOR IN SITU GROUTING (ISG) IN SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-2000-00794 00
19-JUL-00 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED JUNE 30, 2000 (06/30/2000) - OU 7-10 STAGED INTERIM ACTION PROJECT (SIAP) - TRANSMITTAL OF STAGE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN 24667 00
18-JUL-00 BAUMER, A. R. OPERABLE UNIT (OU) 7-13 & 7-14 PLAN FOR INSTALLATION, LOGGING & MONITORING OF PROBEHOLES IN THE SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-98-00856 01
07-JUL-00 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED JUNE, 30 2000 (06/30/2000) CONCERNING REQUEST FOR MODIFICATION MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) 24666 00
30-JUN-00 HAIN, K. E. OPERABLE UNIT (OU) 7-10 STAGED INTERIM ACTION (SIA) PROJECT - TRANSMITTAL OF STAGE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - (EXTENSION OF OPERABLE UNIT (OU) 7-10, 7-13 & 7-14 ENFORCEABLE DEADLINES) EM-ER-118-00 00
20-APR-00 EPA AGREEMENT IN PRINCIPLE BY WASTE AREA GROUP 7 (WAG-7) PROJECT MANAGEMENT TEAM - APRIL 20, 2000 (04/20/2000) 24668 00
13-APR-00 HAIN, K. E. WASTE AREA GROUP 7 (WAG-7) REQUEST FOR MODIFICATION OF MILESTONES - OPERABLE UNIT (OU) 7-10 STAGED INTERIM ACTION (SIA) PROJECT, OU 7-13 & 7-14 PITS AND TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-63-00 00
01-APR-00 HULL, L. C. SOLUBILITY CALCULATIONS FOR CONTAMINANTS OF POTENTIAL CONCERN, OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-2000-00465 00
21-MAR-00 WEIDNER, J. R. ENGINEERING DESIGN FILE (EDF) - DURABILITY OF JET GROUT MATERIALS AND APPLICATION TECHNOLOGY FOR SUBSURFACE DISPOSAL AREA (SDA) - CONTAMINATED WASTE PITS AND TRENCHES TREATABILITY STUDIES (TS) - GROUT PERFORMANCE - IN SITU GROUTING (ISG) TREATABILITY ER-EDF-128 00
16-MAR-00 ARMSTRONG, A. TRANSMITTAL OF DRAFT UNITED STATES GEOLOGICAL SOCIETY (USGS) ADMINISTRATIVE REPORT OPE-ER-51-00 00
08-MAR-00 BEITEL, G. A. ENGINEERING DESIGN FILE (EDF) - OU 7-10 STAGED INTERIM ACTION (SIA) PROJECT - STAGE I INDEPENDENT TECHNICAL PANEL SAFETY REVIEW OF PROPOSED STAGE I DRILLING ACTIVITIES EDF-ER-143 00
01-MAR-00 MILLER, B. P. HEALTH & SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 SUBSURFACE INVESTIGATION INEEL/EXT-98-00857 02
29-FEB-00 GREEN, T. S. ENVIRONMENTAL RESTORATION (ER) PLAN - DOWNHOLE LOGGING PLN-493 04
23-DEC-99 BAUMER, A. R. ENVIRONMENTAL RESTORATION (ER) DEPARTMENT DRILLING LOGBOOK - RWMC SDA - TSA DRILLING - DECEMBER 23, 1999 - JANUARY 12, 2000 (12/23/99 - 1/12/2000) ER-122-99 00
17-DEC-99 BAUMER, A. R. ENVIRONMENTAL RESTORATION (ER) DEPARTMENT DRILLING LOGBOOK - WELL #SOUTH MON-A-010 - RWMC SDA - TSA DRILLING - DECEMBER 17, 1999 - JANUARY 13, 2000 (12/17/99 - 01/13/2000) ER-123-99 00
15-DEC-99 HAIN, KATHLEEN E. OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - COMBINATION OF OPERABLE UNITS (OUS) 13 AND 14 OPE-ER-198-99 00
01-DEC-99 INEEL COMMUNITY RELATIONS INEEL REPORTER - NOVEMBER 1999 AND DECEMBER 1999 (11/99 & 12/99) - INEEL INSERTS PROBE TUBE INTO BURIED WASTE PIT 10964 00
10-NOV-99 AR COORDINATOR OPERABLE UNIT (OU) 7-12 - IDAHO NATIONAL ENGINEERING LABORATORY (INEL) ADMINISTRATIVE RECORD (AR) INDEX FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) PAD-A REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OU 7-12 AR.INDEX.OU.7-12 00
01-NOV-99 BONNEMA, B. E. ENGINEERING DESIGN FILE (EDF) - ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) DESIGN BASIS SELF ASSESSMENT - IDENTIFY KEY SYSTEM FEATURES FOR OCVZ THERMAL SOIL VAPOR EXTRACTION UNITS & EVALUATE DESIGN BASIS EDF-ER-097 00
01-NOV-99 NITSCHKE, ROBERT L APPLICATION FOR THE RISK-BASED STORAGE OF PCB REMEDIATION WASTE AT THE INEEL RWMC TSA-RE INEEL/EXT-99-00637 0
01-NOV-99 BECKER, WILLIAM J. APPLICATION FOR THE RISK-BASED STORAGE OF PCB REMEDIATION WASTE AT THE INEEL RWMC TSA-RE INEEL/EXT-99-00637 0
01-NOV-99 HARVEGO, L. A. INTERIM PHASE II REMEDIAL ACTION (RA) REPORT FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OU 7-08 INEEL/EXT-99-00742 00
27-OCT-99 JORGENSEN, D. K. ENVIRONMENTAL RESTORATION (ER) DEPARTMENT DRILLING LOGBOOK - RWMC SDA - TSA DRILLING - OCTOBER 27, 1999 - DECEMBER 23, 1999 (10/27/99 - 12/23/99) ER-100-99 00
15-OCT-99 JINES, A. TRANSMITTAL OF DOCUMENTS - FIELD SAMPLING PLAN (FSP) FOR RWMC DRILLING & CORING SAMPLING PROJECT - INEEL/EXT-99-00598 & EXTRACTION OF PLUTONIUM FROM SPIKED INEEL SOIL SAMPLES USING LIGAND-ASSISTED SUPERCRITICAL FLUID TECHNIQUE - INEEL/EXT-99-00870 OPE-ER-155-99 00
01-OCT-99 INEEL COMMUNITY RELATIONS UPDATE FACT SHEET - TREATABILITY STUDIES (TS) BEING CONDUCTED AT WASTE AREA GROUP 7 (WAG-7) 10962 00
27-SEP-99 JESSMORE, J. J. OPERABLE UNIT (OU) 7-13 & 7-14 - IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) WORK PLAN DOE/ID-10690 00
01-SEP-99 PFEIFER, M. C. TEST PLAN FOR GEOPHYSICAL CHARACTERIZATION OF PITS 2, 3, AND 5 AND SOIL VAULTS 1 - 14 IN RWMC INEEL/EXT-99-00714 00
26-AUG-99 FOX, R. V. EXTRACTION OF PLUTONIUM FROM SPIKED INEEL SOIL SAMPLES USING LIGAND-ASSISTED SUPERCRITICAL FLUID EXTRACTION (LA-SFE) TECHNIQUE INEEL/EXT-99-00870 00
19-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 7-05 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SURFACE WATER PATHWAYS AND SURFICIAL SEDIMENTS OU 7-05 AR.INDEX.OU.7-05 00
19-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 7-08 - INEL ADMINISTRATIVE RECORD (AR) INDEX OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) VADOSE ZONE ORGANICS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 7-08 AR.INDEX.OU.7-08 00
19-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 7-10 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) PIT 9 COMPREHENSIVE DEMONSTRATION INTERIM ACTION (IA) OU 7-10 AR.INDEX.OU.7-10 00
09-AUG-99 JINES, A. TRANSMITTAL OF EX SITU TREATABILITY STUDY (TS) WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 & RESPONSES TO AGENCY REVIEW COMMENTS ON DRAFT DOCUMENT OPE-ER-107-99 00
01-AUG-99 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) DRILLING AND CORE SAMPLING PROJECT INEEL/EXT-99-00598 00
01-JUL-99 BONNEMA, B. E. EX SITU TREATABILITY STUDY (TS) WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 DOE/ID-10678 00
14-MAY-99 JINES, A. TRANSMITTAL OF OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT EX SITU TREATABILITY STUDY (TS) WORK PLAN OPE-ER-70-99 00
12-MAY-99 AR COORDINATOR OPERABLE UNIT (OU) 7-06 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) GROUNDWATER PATHWAY OU 7-06 AR.INDEX.OU.7-06 00
11-MAY-99 AR COORDINATOR OPERABLE UNIT (OU) 7-11 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION OF OU 7-11 AR.INDEX.OU.7-11 00
01-MAY-99 LMITCO OPERABLE UNIT (OU) 7-13 & 7-14 IN SITU THERMAL DESORPTION (ISTD) TREATABILITY STUDY (TS) WORK PLAN DOE/ID-13467 00
01-MAY-99 HOLDREN, K. J. OPERABLE UNIT (OU) 7-13 & 7-14 PLAN FOR INSTALLATION & LOGGING OF PROBEHOLES IN PITS 4 & 10 OF SDA INEEL/EXT-98-00856 00
01-MAY-99 MILLER, B. P. HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 SUBSURFACE INVESTIGATION INEEL/EXT-98-00857 01
27-APR-99 ARMSTRONG, A. OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (R/FS) - TRANSMITTAL OF IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) WORK PLAN DRAFT FOR REVIEW OPE-ER-63-99 00
08-APR-99 JINES, A. DISCUSSION OF & RESPONSE TO U. S. GEOLOGICAL SURVEY (USGS) PEER REVIEW: PROPOSED WELLS AT SUBSURFACE DISPOSAL AREA (SDA) 17181 00
08-APR-99 BARRIE, S. L. ENGINEERING DESIGN FILE (EDF) - GROUNDWATER MONITORING RESULTS FOR WASTE AREA GROUP 7 (WAG-7) - OCTOBER 1997 TO JULY 1998 (10/97 - 07/98) EDF-ER-063 00
08-APR-99 JINES, A. REPORT TITLED SIGNIFICANT ISSUES TO BE RESOLVED TO SUPPORT & DEFEND INTERIM RISK ASSESSMENT & ADDITIONAL WORK REQUIRED TO RESOLVE THOSE ISSUES DATED OCTOBER 15, 1998 (10/15/98) OPE-ER-53-99 00
01-APR-99 DOE REMEDIATION PLANS FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEEL - REVISION 1 (REV.01) - REVISION 8 (REV.08) WERE DRAFTS - REVISION 9 (REV.09) WAS ISSUED AS THE FIRST FINAL DOCUMENT DOE/ID-10670 09
31-MAR-99 JINES, A. OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - TRANSMITTAL OF IN SITU VITRIFICATION (ISV) TREATABILITY STUDY (TS) WORK PLAN OPE-ER-46-99 00
31-MAR-99 JINES, A. OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - TRANSMITTAL OF DRAFT IN SITU THERMAL DESORPTION (ISTD) TREATABILITY STUDY (TS) WORK PLAN OPE-ER-47-99 00
01-MAR-99 FARNSWORTH, R. K. OPERABLE UNIT (OU) 7-13 & 7-14 IN SITU VITRIFICATION (ISV) TREATABILITY STUDY (TS) WORK PLAN DOE/ID-10667 00
01-NOV-98 INEEL COMMUNITY RELATIONS INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) 17370 00
29-SEP-98 INEEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY - AGENCIES RELEASE EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) DOCUMENT FOR PIT 9 10541 00
01-SEP-98 DOE, EPA, IDHW EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR PIT 9 INTERIM ACTION (IA) RECORD OF DECISION (ROD) AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEEL IDAHO FALLS, IDAHO 10537 00
01-SEP-98 INEEL COMMUNITY RELATIONS INEEL REPORTER - TRANSURANIC WASTE PROGRAM UNDERGOES INSPECTION 16781 00
11-AUG-98 JINES, A. TRANSMITTAL OF ADDENDUM A TO WORK PLAN FOR OU 7-13 & 7-14 OPE-ER-98-130 00
01-AUG-98 JORGENSEN, D. K. INTERIM RISK ASSESSMENT (IRA) & CONTAMINANT SCREENING FOR WASTE AREA GROUP 7 (WAG-7) REMEDIAL INVESTIGATION (RI) DOE/ID-10569 00
01-AUG-98 JORGENSEN, D. K. ADDENDUM TO WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10622 00
01-AUG-98 BRUCE, J. E. FIELD SAMPLING PLAN (FSP) FOR D&D OF RWMC CERTIFIED & SEGREGATED (C&S) BUILDING (WMF-612) INEEL/EXT-98-00565 00
01-AUG-98 MILLER, B. P. HEALTH & SAFETY PLAN (HSP) FOR OU 7-10 CONTINGENCY PROJECT STAGE I COLD TEST INEEL/EXT-98-00570 00
27-JUL-98 AR COORDINATOR OPERABLE UNIT (OU) 7-04 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AIR PATHWAY OU 7-04 AR.INDEX.OU.7-04 00
22-JUL-98 HAIN, K. E. TRANSMITTAL OF ADDENDUM A TO WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 OPE-ER-119-98 00
15-JUL-98 AR COORDINATOR OPERABLE UNIT (OU) 7-01 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SUBSURFACE DISPOSAL AREA (SDA) SOIL VAULTS OU AR.INDEX.OU.7-01 00
01-JUL-98 MAGNUSON, S. O. DEVELOPMENT CALIBRATION & PREDICTIVE RESULTS OF A SIMULATOR FOR SUBSURFACE PATHWAY FATE & TRANSPORT OF AQUEOUS & GASEOUS PHASE CONTAMINANTS IN SUBSURFACE DISPOSAL AREA (SDA) AT INEEL INEEL/EXT-97-00609 00
29-JUN-98 DUSTIN, J. D. WORK PLAN FOR STAGE I OU 7-10 CONTINGENCY PROJECT DOE/ID-10623 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
01-JUN-98 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - AGENCIES OUTLINE CONTINGENCY PLAN FOR PIT 9 CLEANUP 16785 00
01-JUN-98 DUSTIN, J. D. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 7-10 CONTINGENCY REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) - STAGE I DOE/ID-10620 00
01-JUN-98 MILLER, B. P. HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 7-10 CONTINGENCY PROJECT STAGE I SUBSURFACE INVESTIGATION INEEL/EXT-98-00138 00
01-MAY-98 INEEL COMMUNITY RELATIONS INEEL REPORTER - PIT 9 SUBCONTRACT TERMINATED 16783 00
01-MAY-98 DOOLEY, K. J. WASTE AREA GROUP 7 (WAG-7) HEALTH & SAFETY PLAN (HSP) FOR ROUTINE MONITORING OF OPERABLE UNITS (OU) 7-13 & 7-14 - EFFECTIVE 05/06/98 THIS DOCUMENT REPLACED EGG-ER-10748 - SEE ER-DAR-1259 INEEL/EXT-98-00454 00
01-APR-98 BURGESS, J. D. HEALTH & SAFETY PLAN (HSP) FOR INSTALLATION OF GROUNDWATER & SOIL VAPOR MONITORING WELLS BETWEEN RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AND CENTRAL FACILITIES AREA (CFA) INEEL/EXT-98-00150 00
30-DEC-97 HAIN, K. E. TRANSMITTAL OF WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-08 FINAL PHASE II REMEDIATION STRATEGY FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OPE-ER-292-97 00
24-DEC-97 KOCH, D. F. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) TWO (2) YEAR REVIEW OF LIMITED ACTION REMEDY FOR OPERABLE UNIT (OU) 7-12 (PAD-A) 24739 00
18-DEC-97 EPA IDAHO DEPARTMENT OF HEALTH AND WELFARE (IDHW) AND ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS AND COMMENT RESOLUTIONS FOR OPERABLE UNIT (OU) 7-08 FINAL PHASE II REMEDIATION STRATEGY FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) 16060 00
17-DEC-97 WILKENING, R. M. U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) REGION 10 OFFICE OF ENVIRONMENTAL CLEANUP TWO (2) YEAR REVIEW OF IDAHO NATIONAL ENGINEERING LABORATORY (INEL) SUBSURFACE DISPOSAL AREA (SDA) PAD-A OPERABLE UNIT (OU) 7-12 15102 00
11-DEC-97 WILKENING, R. M. EPA, IDHW & DOE REVIEW COMMENTS ON DRAFT FINAL PHASE II REMEDIATION STRATEGY FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OPERABLE UNIT (OU) 7-08 15103 00
01-DEC-97 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) DOE/ID-10587 05
01-DEC-97 PARSONS OPERABLE UNIT (OU) 7-08 ORGANIC CONTAMINATION IN THE VADOZE ZONE (OCVZ) PHASE II REMEDIATION STRATEGY INEEL/EXT-97-01229 01
01-DEC-97 BARRIE, S. L. SAMPLING & ANALYSIS PLAN (SAP) FOR ROUTINE MONITORING OF OPERABLE UNIT (OU) 7-06 - FORMERLY EGG-ER-10747 INEL-94/0027 06
01-NOV-97 INEEL COMMUNITY RELATIONS INEEL REPORTER - NOVEMBER 1997 & DECEMBER 1997 (11/97 & 12/97) - CITIZENS ASK FOR INPUT ON FOUR COMPREHENSIVE INVESTIGATIONS, PIPELINE FOR TRANSURANIC (TRU) WASTE, TECHNOLOGY ON ACID PIT & NOTICE OF INTENT (NOI) FOR ENVIRONMENTAL IMPACT STATEMENT (EI 14284 00
01-OCT-97 LMITCO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) & REMEDIAL DESIGN WORK PLAN (RDWP) OU 7-10 - PIT 9 PROJECT INTERIM ACTION (IA) INEL-94/0110 02
01-OCT-97 HIGGINS, L. M. FINAL PHASE I REMEDIAL ACTION (RA) REPORT FOR ORGANIC CONTAMINATION VADOSE ZONE (OCVZ) OU 7-08 INEL/EXT-97-00811 02
29-SEP-97 AR COORDINATOR OPERABLE UNIT (OU) 7-02 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SUBSURFACE DISPOSAL AREA (SDA) ACID PIT OU 7-0 AR.INDEX.OU.7-02 00
01-SEP-97 INEEL COMMUNITY RELATIONS INEEL REPORTER - SEPTEMBER & OCTOBER 1997 (09/97 & 10/97) - DOE TO SUBMIT PROPOSAL OF PIT 9 CLEANUP, AGENCIES SIGN TRA ROD, WROC INCREASES VOLUME OF WASTE TREATED & CITIZENS ADVISORY BOARD (CAB) REVIEWS, PROVIDES COMMENTS ON DRAFT ERP FACT SHEET 14283 00
01-SEP-97 NOT SPECIFIED HOT SPOT REMOVAL SYSTEM - SYSTEM DESCRIPTION INEEL/EXT-97-00666 00
01-SEP-97 JORGENSEN, D. K. REVISED SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-95/0253 01
01-JUN-97 INEEL COMMUNITY RELATIONS INEEL REPORTER - JUNE & JULY 1995 (06/97 & 07/97) - AGENCIES RESOLVE DISPUTES ON PIT 9 & TEST AREA NORTH (TAN) PROJECTS 14315 00
06-MAY-97 DICKE, C. A. REVIEW OF THE TRACK 2 SUMMARY REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ACID PIT AND INTERPRETATION OF THE ACID PIT SECONDARY ION MASS SPECTROMETRY ANALYSIS CAD-01-97 00
01-MAY-97 BECKER, B. H. SELECTION AND DEVELOPMENT OF MODELS USED IN THE WASTE AREA GROUP 7 (WAG-7) BASELINE RISK ASSESSMENT (BRA) INEEL/EXT-97-00391 00
01-MAY-97 DICKE, C. A. DISTRIBUTION COEFFICIENTS & CONTAMINANT SOLUBILITIES FOR WAG-7 BASELINE RISK ASSESSMENT (BRA) INEL/EXT-97-00201 00
01-MAY-97 GALLOWAY, K. J. WORK PLAN FOR THE IN SITU STABILIZATION TREATABILITY STUDY (TS) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ACID PIT INEL/EXT-97/00068 00
21-MAR-97 GROENEWOLD, G. S. SCOPING STUDIES TO IDENTIFY FORMS OF MERCURY IN ACID PIT SOIL SAMPLES GSG-10-97 00
18-MAR-97 DOE, EPA, IDHW AGREEMENT TO RESOLVE DISPUTES 1088-06-29-120-A 00
01-MAR-97 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - COMPREHENSIVE INVESTIGATION CONTINUING FOR RWMC WAG-7 OU 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 13945 00
01-MAR-97 EVANS, S. K. TEST PLAN FOR MATERIAL TESTING PHASE OF IN SITU STABILIZATION TREATABILITY STUDY (TS) INEL/EXT-97-00096 00
06-SEP-96 BARNES, C. M. EDF - ENGINEERING DESIGN FILE - ENGINEERING SUPPORT FILLING DATA GAPS FOR PROCESSES & TECHNOLOGIES - COLLECTION OF TECHNOLOGY & PROCESS INFORMATION FOR USE IN OU 7-13 & 7-14 FEASIBILITY STUDY (FS) ER-WAG7-92 00
01-AUG-96 BARNES, C. M. EDF - ENGINEERING DESIGN FILE - INDEX & DISCUSSION OF DATA GATHERED FOR PLASMA ARC CENTRIFUGAL FURNACE ER-WAG7-87 00
01-JUN-96 INEL COMMUNITY RELATIONS INEL REPORTER - WEEKLY NEWSETTER DISCUSSING HOW WASTES ARE MANAGED AT THE INEL - CONSTRUCTION UNDERWAY ON PIT 9 RETRIEVAL FACILITY 24175 00
15-MAY-96 LABUY, S. A. ENGINEERING DESIGN FILE (EDF) - ADVANCED REACTIVITY MEASUREMENT FACILITY (ARMF) RADIOACTIVE SOURCE SHIPPING DRUM - DESIGN INPUTS, ANALYSES, DESIGN DESCRIPTION EDF-ER-023 00
08-MAY-96 JENSEN, N. R. TRANSMITTAL OF FINAL WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-96-83 00
02-MAY-96 HAMPTON, N. L. ENGINEERING DESIGN FILE (EDF) - WAG-7 DATA COMPILATION TASKS - SUBSURFACE DISPOSAL AREA (SDA) BIOTIC DATA COMPILATION ER-WAG7-76 01
01-MAY-96 BENSEN, T. A. WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-95/0343 00
17-APR-96 NEARMAN, M. J. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10276 00
10-APR-96 BURGESS, D. EDF - ENGINEERING DESIGN FILE - OU 7-13 ELEVATION OF SURFICIAL SEDIMENT & BASALT CONTACT & SOIL VOLUMES ABOVE PITS & TRENCHES IN SDA, INEL ER-WAG7-88 00
14-FEB-96 DOE FEDERAL FACILITY AGREEMENT CONSENT ORDER (FFA/CO) FEBRUARY 14, 1996 (02/14/96) PROJECT MANAGER MEETING MINUTES - TELECONFERENCE 17866 00
07-FEB-96 PRENDERGAST, W. J. EDF - ENGINEERING DESIGN FILE - DIGEST OF REPORTS & INFORMATION ON STATUS OF ISV TECHNOLOGY ER-WAG7-85 00
05-FEB-96 KOCH, D. F. IDHW-DEQ RESPONSE TO REVISION OF WAG-7 OU 7-06 GROUNDWATER SAMPLING & ANALYSIS PLAN (SAP) - APPROVAL TO CONTINUE DISCHARGE OF M SERIES WELL PURGE WATER TO GROUND SURFACE 10437 00
01-FEB-96 INEL COMMUNITY RELATIONS INEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - REMEDIATION BEGINS ON ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) 11614 00
18-JAN-96 DOE FEDERAL FACILITY AGREEMENT CONSENT ORDER (FFA/CO) JANUARY 18, 1996 (01/18/96) PROJECT MANAGER MEETING MINUTES - TELECONFERENCE 17862 00
09-JAN-96 PIERRE, W. EPA EXTENSION OF COMMENT PERIOD ON DRAFT WORK PLAN FOR OU 7-13 & 7-14 WAG-7 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10174 00
05-JAN-96 AR COORDINATOR OPERABLE UNIT (OU) 7-07 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF VADOSE ZONE RADIATION METALS PATHWAY OU 7-07 AR.INDEX.OU.7-07 00
21-DEC-95 NEARMAN, M. J. EPA EXTENSION OF COMMENT PERIOD ON DRAFT WORK PLAN OU 7-13 & 7-14 WAG-7 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10173 00
20-DEC-95 KOCH, D. F. IDHW COMMENTS ON DRAFT WORK PLAN FOR OPERABLE UNIT (OU) 7-13 AND 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10151 00
01-DEC-95 RAVIO, B. D. WASTE DESCRIPTION INFORMATION FOR TRANSURANICALLY CONTAMINATED WASTES STORED AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) INEL-95/0412 00
01-NOV-95 INEL COMMUNITY RELATIONS INEL REPORTER - 11/95 - 12/95 - MILESTONE ACHIEVED AHEAD OF SCHEDULE 11381 00
31-OCT-95 GREEN, L. A. TRANSMITTAL OF DRAFT WORK PLAN FOR OU 7-13 TRU PITS & TRENCHES REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) WAG-7 OPE-ERP-203-95 00
25-OCT-95 GARCIA, K. M. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 & 7-14 FEASIBILITY STUDY (FS) - DIGEST #2 (TWO) OF REPORTS ON SURFACE BARRIERS FOR ARID REGIONS ER-WAG-83 00
19-OCT-95 GREEN, L. A. DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 10445 00
19-OCT-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) & DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY ( EPA) COMMENTS OPE-ER-201-95 00
17-OCT-95 NOT SPECIFIED SETTLEMENT AGREEMENT SA1095 0
02-OCT-95 BARNES, C. M. ENGINEERING DESIGN FILE (EDF) - ENGINEERING SUPPORT OF OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - PIT 9 INTERFACE INFORMATION FROM LESAT IN MEETING ON SEPTEMBER 14, 1995 (09/14/95) ER-WAG7-79 00
01-OCT-95 INEL COMMUNITY RELATIONS INEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - LAST INVESTIGATION BEGINS AT RWMC WAG-7 10879 00
01-OCT-95 GREENWELL, R. D. DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) INEL-94/0171 00
01-OCT-95 JONES, R. K. HEALTH & SAFETY PLAN (HSP) RWMC ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) PAD-A LIMITED ACTION MAINTENANCE ACTIVITIES OU 7-08 & 7-12 INEL-95/0467 00
01-SEP-95 BARNES, C. M. ENGINEERING DESIGN FILE (EDF) - PRELIMINARY DEVELOPMENT OF ALTERNATIVE REMEDIATION TECHNOLOGIES & IDENTIFICATION OF DATA NEEDS FOR OPERABLE UNIT (OU) 7-13 & 7-14 FEASIBILITY STUDY (FS) ER-WAG7-78 01
22-AUG-95 JENSEN, N. R. TRANSMITTAL OF DRAFT FINAL SCOPE OF WORK (SOW) OU 7-13 TRU PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WAG-7 & RESOLUTION TO AGENCY COMMENTS OPE-ERP-160-95 00
11-AUG-95 GREEN, L. A. TRANSMITTAL OF FINAL REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 7-12 PAD-A AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPE-ER-151-95 00
01-AUG-95 BARRIE, S. L. SAMPLING AND ANALYSIS PLAN (SAP) FOR ROUTINE MONITORING OF OPERABLE UNIT (OU) 7-06 (FORMERLY EGG-ER-10747) INEL-94/0027 05
01-AUG-95 LITCO A COMPREHENSIVE INVENTORY OF RADIOLOGICAL & NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED OR PROJECTED TO BE BURIED IN SDA OF INEL RWMC DURING YEARS 1984 - 2003, VOL.01 INEL-95/0135,VOL.01 01
01-AUG-95 LITCO A COMPREHENSIVE INVENTORY OF RADIOLOGICAL & NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED OR PROJECTED TO BE BURIED IN SDA OF INEL RWMC DURING YEARS 1984 - 2003, VOL.02 INEL-95/0135,VOL.02 01
01-AUG-95 LITCO A COMPREHENSIVE INVENTORY OF RADIOLOGICAL & NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED OR PROJECTED TO BE BURIED IN SDA OF INEL RWMC DURING YEARS 1984 - 2003, VOL.03 INEL-95/0135,VOL.03 01
01-AUG-95 HUNTLEY, R. M. SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-95/0253 00
01-AUG-95 PARSONS CORPORATION PAD-A LIMITED ACTION LONG TERM MONITORING PLAN OU 7-12 (PARSONS #ES-14.6.9.8) INEL-95/0271 05
01-AUG-95 LITCO COMPREHENSIVE INVENTORY OF RADIOLOGICAL AND NONRADIOLOGICAL CONTAMINANTS ON WASTE BURIED SUBSURFACE DISPOSAL AREA (SDA) INEL RWMC DURING YEARS 1952 - 1983, VOL.01 - FORMERLY EGG-WM-10903 INEL-95/0310,VOL.01 01
01-AUG-95 LITCO COMPREHENSIVE INVENTORY OF RADIOLOGICAL AND NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED IN SUBSURFACE DISPOSAL AREA (SDA) OF INEL RWMC DURING YEARS 1952 - 1983, VOL.02 INEL-95/0310,VOL.02 01
01-AUG-95 LITCO COMPREHENSIVE INVENTORY OF RADIOLOGICAL AND NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED IN SUBSURFACE DISPOSAL AREA (SDA) INEL RWMC DURING YEARS 1952 - 1983, VOL.03 INEL-95/0310,VOL.03 01
01-AUG-95 LITCO COMPREHENSIVE INVENTORY OF RADIOLOGICAL AND NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) INEL RWMC DURING THE YEARS 1952 - 1983, VOL.04 INEL-95/0310,VOL.04 01
01-AUG-95 LITCO COMPREHENSIVE INVENTORY OF RADIOLOGICAL AND NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED IN SUBSURFACE DISPOSAL AREA (SDA) OF INEL RWMC DURING YEARS 1952 - 1983, VOL.05 INEL-95/0310,VOL.05 01
28-JUL-95 PARSONS CORPORATION REMEDIAL ACTION (RA) REPORT PAD-A LIMITED ACTION OPERABLE UNIT (OU) 7-12 (PARSON'S NO. 07.012.0.320.01) INEL-95/0313 02
28-JUL-95 GREEN, L. A. REVISED LONG TERM MONITORING PLAN FOR OU 7-12 PAD-A AT RWMC OPE-ER-95-142 00
28-JUL-95 GREEN, L. A. TRANSMITTAL OF MOISTURE RESULTS FOR PAD-A OU 7-12 AT RWMC OPE-ER-95-143 00
24-JUL-95 GREEN, L. A. PAD-A LIMITED ACTION DOCUMENTATION 9965 00
18-JUL-95 KOCH, D. F. IDAHO DEPARTMENT OF HEALTH AND WELFARE - DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT SCOPE OF WORK FOR OU 7-13 AND 7-14 WAG-7 COMPREHENSIVE RI/FS 10039 00
12-JUL-95 HARKER, Y. D. ENGINEERING DESIGN FILE (EDF) - ENVIRONMENTAL RESTORATION (ER) HISTORICAL DATA TASK (HDT) RECENT & PROJECTED DATA TASK (RPDT) - TEST REACTOR AREA (TRA) EVALUATION - SCALING FACTORS FOR WASTE ACTIVITIES MEASURED BY G-M METHOD ER-WAG7-57 00
09-JUN-95 HAMPTON, N. L. ENGINEERING DESIGN FILE (EDF) - WAG-7 DATA COMPILATION TASKS - SUBSURFACE DISPOSAL AREA (SDA) BIOTIC DATA COMPILATION ER-WAG7-76 00
07-JUN-95 HULA, G. A. TRANSMITTAL OF DRAFT SCOPE OF WORK (SOW) FOR OU 7-13 TRU PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT WAG-7 OPE-ER-106-95 00
31-MAY-95 KECK, K. N. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - SUBSURFACE DISPOSAL AREA (SDA) SURFACE WATER DESCRIPTION & DATA ER-WAG7-66 00
31-MAY-95 MARTIAN, P. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) - SUBSURFACE DISPOSAL AREA (SDA) BURIED DRUM FAILURE RATE DATA COMPILATION ER-WAG7-68 00
31-MAY-95 NEUPAUER, R. M. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) - SDA LITHOLOGY & PERCHED WATER DATA COMPILATION ER-WAG7-69 00
31-MAY-95 MCCARTHY, J. M. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - SUBSURFACE DISPOSAL AREA (SDA) HYDRAULIC CHARACTERIZATION DATA COMPILATION: BASALTS ER-WAG7-70 00
31-MAY-95 MCCARTHY, J. M. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - SUBSURFACE DISPOSAL AREA (SDA) HYDRAULIC CHARACTERIZATION DATA COMPILATION: SURFICIAL SEDIMENTS & INTERBEDS ER-WAG7-71 00
31-MAY-95 MAGNUSON, S. O. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) WATER & SOILS SAMPLING DATA - SUBSURFACE DISPOSAL AREA (SDA) SOIL BASALT & WATER CONCENTRATION DATA COMPILATION: RADIONUCLIDES & INORGANICS ER-WAG7-72 00
31-MAY-95 SONDRUP, A. J. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) SUBSURFACE DISPOSAL AREA (SDA) VOLATILE ORGANIC DATA COMPILATION SOIL VAPOR EMISSION & WATER SAMPLES ER-WAG7-73 00
31-MAY-95 NEUPAUER, R. M. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) DATA COMPILATION SUBSURFACE DISPOSAL AREA (SDA) COVER OVERBURDEN THICKNESS ER-WAG7-74 00
31-MAY-95 STALEY, C. S. ENGINEERING DESIGN FILE (EDF) - AIR MONITORING DATA SUPPORTING WASTE AREA GROUP 7 (WAG-7) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ER-WAG7-75 00
16-MAY-95 ROHE, M. J. ENGINEERING DESIGN FILE (EDF) - LARGE SCALE AQUIFER STRESS TEST & INFILTRATION TEST: WATER MANAGEMENT SYSTEM OPERATIONS & RESULTS ER-WAG7-59 00
08-MAY-95 BISHOP, C. W. ENGINEERING DESIGN FILE (EDF) LARGE SCALE INFILTRATION TEST CPN DATA ANALYSIS ER-WAG7-58 00
20-APR-95 DOE, EPA, IDHW ACTION DETERMINATION FOR OPERABLE UNIT (OU) 7-04 AIR PATHWAY TRACK 2 PRELIMINARY SCOPING PACKAGE 10017 00
05-APR-95 DOE, EPA, IDHW ACTION DETERMINATION OU 7-01 SOIL VAULT ROWS, SUBSURFACE DISPOSAL AREA (SDA) RWMC - TO BE INCLUDED IN SDA PITS & TRENCHES RI/FS OR OTHER SUITABLE COMPREHENSIVE RI/FS 10034 00
05-APR-95 KOCH, D. F. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON TRACK 2 PRELIMINARY SCOPING PACKAGE OPERABLE UNIT (OU) 7-04 AIR PATHWAY AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 10530 00
31-MAR-95 KOCH, D. F. IDHW-DEQ RECOMMENDATION FOR TRACK 2 SUMMARY REPORT FOR OU 7-01 SOIL VAULT ROWS AT RWMC INVESTIGATION TO BE UNDERTAKEN WITHIN OU 7-13 OR OU 7-14 RI/FS 10036 00
15-MAR-95 GREEN, L. A. TRACK 2 DECISION STATEMENT FOR OU 7-01 SOIL VAULT ROWS, SUBSURFACE DISPOSAL AREA (SDA) RWMC - TO BE INCLUDED IN A FUTURE RI/FS 10035 00
15-MAR-95 GREEN, L. A. DEPARTMENT OF ENERGY (DOE) RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) AND IDHW COMMENTS ON FINAL TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 7-01 OPE-ER-043-95 00
01-MAR-95 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 INEL-95/0086 04
22-FEB-95 WYLIE, A. H. EDF - ENGINEERING DESIGN FILE - LARGE SCALE AQUIFER PUMPING TEST RESULTS ER-WAG7-56 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
14-FEB-95 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 7-01 10040 00
14-FEB-95 KOCH, D. F. IDAHO DEPARTMENT OF HEALTH AND WELFARE (IDHW) REVIEW COMMENTS FOR PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 7-01 10041 00
10-FEB-95 SCHWARTZ, F. G. PIT 9 ADMINISTRATIVE RECORD (AR) - FIXED PRICE CONTRACT WITH LESAT, SUBCONTRACT #C91-133136 & COST DIFFERENCE SUMMARIZED IN SUPPORT OF PIT 9 ESD DEVELOPMENT OPE-ER-024-95 00
08-FEB-95 DOE, EPA, IDHW ACTION DETERMINATION OU 7-07 VADOSE ZONE RADIONUCLIDES AND METALS TRACK 2 PRELIMINARY SCOPING PACKAGE 10004 00
06-FEB-95 DOE, EPA, IDHW NOTICE OF AVALIABILITY FOR THE EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR PIT 9 RECORD OF DECISION (ROD) 5863 00
01-FEB-95 INEL COMMUNITY RELATIONS UPDATE FACT SHEET - CONSTRUCTION BEGINS AT PIT 9 8896 00
27-JAN-95 GREEN, L. A. TRANSMITTAL OF ANALYTICAL RESULTS FROM THE HORIZONTAL LYSIMETER & VERTICAL NEUTRON ACCESS TUBE BOREHOLES FOR OU 7-12, PAD-A, LIMITED ACTION OPE-ER-011-95 00
26-JAN-95 DOE, EPA, IDHW EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE PIT 9 INTERIM ACTION (IA) RECORD OF DECISION (ROD) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 5862 00
26-JAN-95 GREEN, L. A. TRANSMITTAL OF ACTION DETERMINATION FOR AIR PATHWAY TRACK 2 OU 7-04 & VADOSE ZONE RAD & METALS TRACK 2 OU 7-07 OPE-ER-007-95 00
26-JAN-95 GREEN, L. A. TRANSMITTAL OF EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR PIT 9 OPE-ER-008-95 00
24-JAN-95 DUNNIVANT, F. M. EDF - ENGINEERING DESIGN FILE - RESULTS FROM LARGE SCALE AQUIFER PUMPING & INFILTRATION TEST (APIT) DOWNHOLE GAMMA SPECTROSCOPIC MONITORING ER-WAG7-54 00
01-JAN-95 NOT SPECIFIED REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) AND REMEDIAL DESIGN WORK PLAN (RDWP) OU 7-10 - PIT 9 PROJECT INTERIM ACTION (IA) INEL-94/0110 01
22-DEC-94 GREEN, L. A. DEPARTMENT OF ENERGY (DOE) RESPONSE TO IDAHO DEPARTMENT OF HEALTH AND WELFARE (IDHW) COMMENTS ON DRAFT TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 7-01 OPE-ER-335-94 00
07-DEC-94 DOE, EPA, IDHW ACTION DETERMINATION FOR OPERABLE UNIT (OU) 7-06: WAG-7 GROUNDWATER PATHWAY TRACK 2 SUMMARY REPORT, JUNE 1994 (06/94) 5868 00
02-DEC-94 DOE, EPA, IDHW RECORD OF DECISION (ROD) DECLARATION FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OPERABLE UNIT (OU) 7-08 INEL RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SUBSURFACE DISPOSAL AREA (SDA) 5761 00
02-DEC-94 INEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY - AGENCIES SIGN ROD FOR OCVZ - MAKE DECISION TO EXTRACT, TREAT ORGANIC VAPORS 9651 00
01-DEC-94 INEL COMMUNITY RELATIONS INEL REPORTER - (12/94) - ENERGY SECRETARY ANNOUNCES PIT 9 CONTRACT WINNER 8897 00
01-DEC-94 BURNS, D. E. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 7-01 INEL-94/0241 00
04-NOV-94 AR COORDINATOR OPERABLE UNIT (OU) 7-09 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION OF THE TRANSURANIC (TRU) STORAGE AREA (TSA) RELEASES OU 7-09 AR.INDEX.OU.7-09 00
02-NOV-94 GREEN, L. A. TRANSMITTAL OF VALIDATION REPORT FOR NITRATE ANALYTICAL RESULTS FROM BORROW MATERIALS FOR PAD-A LIMITED ACTION OPE-ER-290-94 00
24-OCT-94 LYLE, J. L. PIT 9 PRIMARY DOCUMENT EXTENSION NOTIFICATION OPE-ER-288-94 00
07-OCT-94 DOE, EPA, IDHW WAG-7 OU 7-02 ACID PIT TRACK 2 DECISION STATEMENT - TO BE INCLUDED IN OU 7-13 RI/FS 5505 00
30-SEP-94 GREEN, L. A. DOE RESPONSE TO IDHW COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OU 7-08 AT THE RWMC, INEL OPE-ER-267-94 00
26-AUG-94 KOCH, D. F. IDHW REVIEW OF THE RECORD OF DECISION (ROD) - DECLARATION OF ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) - OU 7-08 - OPE-ER-152-94 5766 00
24-AUG-94 AR COORDINATOR OPERABLE UNIT (OU) 7-03 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) CONTAMINATED NON-TRANSURANIC (TRU) PITS AND TRENCHES OU 7-03 AR.INDEX.OU.7-03 00
22-AUG-94 WILKENING, R. M. EPA COMMENTS ON THE RECORD OF DECISION (ROD) FOR THE ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) 5765 00
16-AUG-94 GREEN, L. A. TRANSMITTAL OF VALIDATED DATA RESULTS FOR RWMC PAD-A PA-01/02 LYSIMETER SAMPLES OPE-ER-212-94 00
13-JUL-94 GREEN, L. A. CHANGES IN ENVIRONMENTAL RESTORATION (ER) PROGRAM DUE TO SECRETARIAL POLICY ON THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) OPE-ER1-056-94 00
11-JUL-94 LYLE, J. L. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) RWMC, INEL OPE-ER-152-94 00
01-JUN-94 MK-FIC REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PAD-A LIMITED ACTION RWMC OU 7-12 (DRAFT FINAL) 07.012.1.1.101.01 01
01-JUN-94 HIGGS, B. D. WAG-7 GROUNDWATER PATHWAY TRACK 2 SUMMARY REPORT EGG-ER-10731 00
18-MAY-94 PIERRE, W. PRELIMINARY DESIGN SUMMARY REPORT FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) RWMC INEL 5707 00
16-MAY-94 KOCH, D. F. CONFIRMATION OF ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) WELL INSTALLATION MODIFICATION 5708 00
09-MAY-94 MK-FIC REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK - PAD-A LIMITED ACTION RWMC OU 7-12 07.012.0.140.01 03
04-MAY-94 DOWNS, W. C. EDF - ENGINEERING DESIGN FILE - LONG TERM TESTING AT ORGANIC CONTAMINATION IN THE VADOSE (OCVZ) OU 7-08 POSSIBLE ORIGIN OF CHLOROFORM AT THE RWMC ER-VVED-076 00
26-APR-94 LYLE, J. L. TRANSMITTAL OF DRAFT FINAL TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) OPE-ER-099-94 00
18-APR-94 BREEN, M. S. PUBLIC MEETING TRANSCRIPTS NAVAL REACTORS FACILITY (NRF) INDUSTRIAL WASTE DITCH & LANDFILL AREAS & ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) MEETINGS HELD IN IDAHO FALLS, BOISE, & MOSCOW, IDAHO 5703 00
14-APR-94 DOE, EPA, IDHW ACTION DETERMINATION FOR DRAFT FINAL SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 7-05: SURFACE WATER PATHWAYS AND SURFICIAL SEDIMENTS 5864 00
12-APR-94 LUGAR, R. M. TRACK 1 DECISION DOCUMENTATION PACKAGE - INVESTIGATION FOR TSA RELEASES - ADDITIONAL ACTIVITIES SHOULD BE INITIATED FOR THIS SITE 5689 00
01-APR-94 JORGENSEN, D. K. WAG-7 OU 7-02 ACID PIT TRACK 2 SUMMARY REPORT EGG-ERD-10242 00
25-MAR-94 GREEN, L. A. TRANSMITTAL OF THE DRAFT TREATABILITY STUDY (TS) REPORT FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OU 7-08 OPE-ER-69-94 00
24-MAR-94 GREEN, L. A. TRANSMITTAL OF FINAL INSERTS FOR THE ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-70-94 00
22-MAR-94 LANEY, P. T. COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP-10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) PTL-02-94 00
18-MAR-94 LIVERMAN, E. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WAG-3 & WAG-10 RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 5777 00
18-MAR-94 LIVERMAN, E. EPA REVIEW COMMENTS OF DRAFT LIMITED ACTION PAD-A REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK 9966 00
01-MAR-94 INEL COMMUNITY RELATIONS DOE SEEKS PUBLIC COMMENT ON INDUSTRIAL WASTE DITCH AND LANDFILLS AT THE NAVAL REACTORS FACILITY (NRF) & ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) AT RWMC 5640 00
01-MAR-94 INEL COMMUNITY RELATIONS PROPOSED PLAN FOR OPERABLE UNIT (OU) 7-08, ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) 5642 00
01-MAR-94 INEL COMMUNITY RELATIONS FACT SHEET - INVESTIGATION COMPLETE FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) 7527 00
01-MAR-94 DAMES & MOORE COMPILATION AND SUMMARIZATION OF THE SUBSURFACE DISPOSAL AREA (SDA) RADIONUCLIDE TRANSPORT DATA AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) EGG-ER-10546 03
01-MAR-94 HERD, M. D. FINAL WORK PLAN FOR THE ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OPERABLE UNIT (OU) 7-08 PILOT SCALE TREATABILITY STUDY (TS) EGG-WM-10132 01
25-FEB-94 DOE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) - ENVIRONMENTAL ASSESSMENT (EA) OF REMEDIATION OF ORGANIC CONTAMINATION VADOSE ZONE (OCVZ) 5620 00
23-FEB-94 FORSBERG, D. L. EDF - ENGINEERING DESIGN FILE - REVISED PLUTONIUM, AMERICIUM-241, AND URANIUM-235 INVENTORY ESTIMATES FOR PIT 9 BASED ON THE 1993 HISTORICAL DATA TASK ER-BWP-82 02
18-FEB-94 ROBISON, S. A. PROPOSED PLAN FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ), INEL 5672 00
17-FEB-94 DOE, EPA, IDHW RECORD OF DECISION (ROD): DECLARATION FOR PAD-A AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SUBSURFACE DISPOSAL AREA (SDA) 5632 00
14-FEB-94 JONES, E. EPA COMMENTS: INEL OU 7-08 DRAFT FINAL RI/FS REPORT 5628 00
07-FEB-94 GREEN, L. A. RESPONSES TO COMMENTS ON THE DRAFT FINAL RECORD OF DECISION (ROD) FOR PAD-A AT WASTE AREA GROUP 7 (WAG-7) OPE-ER-023-94 00
03-FEB-94 BROWN, D. L. CROSS REFERENCE DOCUMENT FOR ORAL & WRITTEN COMMENTS ON PROPOSED PLAN AND THE PAD-A RECORD OF DECISION (ROD) FINAL RI/FS REPORT 5631 00
26-JAN-94 JONES, E. EPA COMMENTS: INEL WAG-7 GROUNDWATER PATHWAY DRAFT TRACK 2 SUMMARY REPORT 5622 00
13-JAN-94 GREEN, L. A. DOE RESPONSE TO IDHW & EPA COMMENTS ON DRAFT RI/FS FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OU 7-08 OPE-ER-004-94 00
27-DEC-93 CLEARY, P. A. ADVANCE NOTICE OF SAMPLING, RWMC 5610 00
23-DEC-93 LYLE, J. L. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR PAD-A REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPE-ER-073-93 00
03-DEC-93 NOT SPECIFIED ACTION DETERMINATION PROCEED TO RI/FS FOR TRACK 1 INVESTIGATION OF NON-TRU PITS & TRENCHES 5592 00
01-DEC-93 SONDRUP, A. J. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR THE ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OU 7-08 VOLUME I (VOL.01): REMEDIAL INVESTIGATION (RI) EGG-ER-10684,VOL.01 00
01-DEC-93 DUNCAN, F. L. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR THE ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OU 7-08 VOLUME II (VOL.02): REMEDIAL INVESTIGATION (RI) APPENDICES EGG-ER-10684,VOL.02 00
01-DEC-93 LEON, C. A. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OPERABLE UNIT (OU) 7-08 VOLUME III (VOL.03): FEASIBILITY STUDY (FS) EGG-ER-10684,VOL.03 00
01-DEC-93 BURTON, B. N. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) & REMEDIAL DESIGN WORK PLAN (RDWP) - OU 7-10 PIT 9 PROJECT INTERIM ACTION (IA) EGG-ER-11055 00
01-DEC-93 HONEYCUTT, T. K. TECHNICAL MEMORANDUM FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) SOILS TREATABILITY STUDY (TS): PHYSICAL SEPARATION OF RADIONUCLIDES IN SOILS EGG-ER-11101 00
22-NOV-93 DOE RESOLUTION TO COMMENTS ON THE DRAFT RECORD OF DECISION (ROD) FOR PAD-A, SENT TO IDHW 5607 00
22-NOV-93 DOE RESOLUTION TO COMMENTS ON THE DRAFT RECORD OF DECISION (ROD) FOR PAD-A, SENT TO EPA 5608 00
22-NOV-93 LYTLE, J. E. APPROVAL OF AN EG&G IDAHO WASTE SHIPMENT 5609 00
19-NOV-93 KOCH, D. F. IDHW REVIEW COMMENTS FOR THE PRELIMINARY WORKING DRAFT RECORD OF DECISION (ROD) FOR PAD-A AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT SUBSURFACE DISPOSAL AREA (SDA) 5616 00
17-NOV-93 NEARMAN, M. J. EPA REVIEW COMMENTS ON THE INEL WAG-7 PAD-A RECORD OF DECISION (ROD), REVISION 1 (REV.01) DATED SEPTEMBER 1993 (09/93) 5615 00
04-NOV-93 NEARMAN, M. J. EPA REVIEW COMMENTS ON DRAFT RI/FS REPORT FOR THE ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) - OU 7-08, THREE (3)VOLUMES, DATED AUGUST 1993 (08/93) 5613 00
03-NOV-93 NYGARD, D. REVIEW COMMENTS FOR WAG-7 GROUNDWATER PATHWAY DRAFT TRACK 2 SUMMARY REPORT, OPERABLE UNIT (OU) 7-06, APRIL 1993, (04/93)(EGG-ER-10731) 5364 00
03-NOV-93 KOCH, D. F. TECHNICAL REVIEW COMMENTS FOR DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR THE ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OPERABLE UNIT (OU) 7-08 5571 00
01-NOV-93 INEL COMMUNITY RELATIONS INEL REPORTER - 11/93 - AGENCIES SIGN RECORD OF DECISION (ROD) FOR PIT 9 6994 00
04-OCT-93 LYLE, J. L. DRAFT RECORD OF DECISION (ROD) FOR PAD-A REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ER-093-93 00
01-OCT-93 HEMPHILL, C. J. TRANSCRIPTS - TASK 10.04 - COMMUNITY RELATIONS MEETING ASSISTANCE: PAD-A PUBLIC MEETINGS IN IDAHO FALLS 08/17/93, BOISE 08/18/93, AND MOSCOW 08/19/93 5568 00
01-OCT-93 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) - DECLARATION FOR PIT 9 AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SUBSURFACE DISPOSAL AREA (SDA) 5569 00
20-SEP-93 NEARMAN, M. J. EPA COMMENTS ON THE RESPONSIVENESS SUMMARY FOR PIT 9 5530 00
20-SEP-93 NEARMAN, M. J. INEL WAG-7 RWMC PIT 9 INTERIM ACTION (IA) - DEVELOPMENT OF DELISTING LEVELS 5554 00
17-SEP-93 LYLE, J. L. TRANSMITTAL OF THE RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 7-10, PIT 9, AT THE RWMC AT INEL ERD-091-93 00
16-SEP-93 NEARMAN, M. J. EPA COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF DECISION (ROD) 5524 00
04-SEP-93 NOT SPECIFIED EPA COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF DECISION (ROD) 5523 00
04-SEP-93 NYGARD, D. STATE OF IDAHO COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF DECISION (ROD) 5525 00
04-SEP-93 NEARMAN, M. J. ADDITIONAL EPA COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF DECISION (ROD) 5537 00
03-SEP-93 NEARMAN, M. J. EPA COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF THE DECISION (ROD) 5542 00
01-SEP-93 NOT SPECIFIED EVALUATION OF THE CORRECTIVE ACTION MANAGEMENT UNIT (CAMU) RULE'S APPLICATION TO THE PIT 9 INTERIM ACTION (IA) 5534 00
01-SEP-93 NOT SPECIFIED FINAL RESPONSIVENESS SUMMARY OVERVIEW 5551 00
30-AUG-93 NYGARD, D. ADDITIONAL ARARS INDENTIFIED BY THE STATE OF IDAHO 5527 00
11-AUG-93 STALEY, C. S. EDF - ENGINEERING DESIGN FILE - RADIOLOGICAL AND NONRADIOLOGICAL EFFECTS OF INCINERATING RETRIEVED WASTES FROM PIT 9 RWMC-91-004.3 02
10-AUG-93 NYGARD, D. TECHNICAL REVIEW COMMENTS FOR DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR PAD-A AT THE RWMC (OU 7-12) 5319 00
10-AUG-93 DOE RESPONSE FROM DOE-ID TO EPA COMMENTS ON THE DRAFT PIT 9 RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 5543 00
10-AUG-93 DOE RESPONSE FROM DOE-ID TO IDHW COMMENTS ON THE DRAFT PIT 9 RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 5544 00
05-AUG-93 STALEY, C. S. EDF - ENGINEERING DESIGN FILE - RADIOLOGICAL IMPACTS FROM ROUTINE OPERATIONS OF PIT 9 WASTE RETRIEVAL RWMC-91-004 02
02-AUG-93 BARRY, G. A. TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) 93MSE/ID-225 00
01-AUG-93 NOT SPECIFIED PIT 9 LAND DISPOSAL RESTRICTION (LDR) AS APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARAR) ANALYSIS 5545 00
01-AUG-93 BARRY, G. A. SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 6744 00
29-JUL-93 NOT SPECIFIED FINDING OF NO SIGNIFICANT IMPACT (FONSI) FOR INTERIM ACTION (IA) FOR CLEANUP OF PIT 9 AT RWMC, INEL 6821 00
21-JUL-93 NEARMAN, M. J. EPA COMMENTS ON THE 06/02/93 REVISION OF THE RECORD OF DECISION (R0D) 5526 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
01-JUL-93 INEL COMMUNITY RELATIONS PROPOSED PLAN FOR PAD-A AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), IDAHO NATIONAL ENGINEERING LABORATORY (INEL) 5342 00
01-JUL-93 BROWN, R. M. INEL TRANSURANIC WASTE ACCEPTANCE CRITERIA (WAC) DOE/ID-10074 05
01-JUL-93 HALFORD, D. K. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR PAD-A OPERABLE UNIT (OU) 7-12 WAG-7 RWMC INEL - VOLUME 1 OF 2 (VOL.01 OF VOL.02) EGG-WM-9967,VOL.01 01
01-JUL-93 HALFORD, V. E. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR PAD-A OPERABLE UNIT (OU) 7-12 WASTE AREA GROUP 7 (WAG-7) EGG-WM-9967,VOL.02 01
01-JUL-93 MEACHUM, T. R. ENGINEERING DESIGN FILE (EDF) - AREAS AND VOLUMES FOR SELECTED RWMC PITS AND TRENCHES ER&WM-EDF-0007-93 00
28-JUN-93 NEARMAN, M. J. INEL WAG-7 - PAD-A DRAFT PROPOSED PLAN, REV.04, REVIEW COMMENTS 5363 00
23-JUN-93 LYLE, J. L. PIT 9 DRAFT FINAL RECORD OF DECISION (ROD) EXTENSION NOTIFICATION (ERWM-ERD-046-93) 5546 00
17-JUN-93 MONSON, R. S. ENGINEERING DESIGN FILE (EDF) - SAMPLE ANALYSIS RESULTS FROM SAMPLING OF RWMC SEPTIC & SEWER SYSTEMS FOR CONSTRUCTION 639 00
06-JUN-93 NEARMAN, M. J. INEL WAG-7 - PAD-A DRAFT PROPOSED PLAN, REV.03, MAY 1993 (05/93) REVIEW COMMENTS 5362 00
04-JUN-93 EPA EPA COMMENTS ON THE 06/02/93 REVISION OF THE RECORD OF DECISION (ROD) 5522 00
03-JUN-93 NOT SPECIFIED SUPPLEMENT TO THE REVISED PROPOSED PLAN FOR A CLEANUP OF PIT 9 AT RWMC, INEL 6820 00
28-MAY-93 MEACHUM, T. R. EDF - ENGINEERING DESIGN FILE - AREAS AND VOLUMES FOR SELECTED RWMC PITS AND TRENCHES ER/WM-EDF-0007-93 00
26-MAY-93 NYGARD, D. REVIEW COMMENTS FOR DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 7-01, FEBRUARY 1993 (02/93), - EGG-ER-10564 5354 00
21-MAY-93 LYLE, J. L. DRAFT PROPOSED PLAN (PP) FOR THE PAD-A OPERABLE UNIT (OU) 7-12 IN WASTE AREA GROUP 7 (WAG-7) ERWM-ERD-033-93 00
17-MAY-93 NOT SPECIFIED DRAFT RESPONSIVENESS SUMMARY OVERVIEW 5539 00
14-MAY-93 LYLE, J. L. TRANSMITTAL OF THE DRAFT FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 7-10, PIT 9, AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), INEL (ERWM-ERD-054-93) 5548 00
03-MAY-93 DAMES & MOORE COST ESTIMATE BREAKDOWN FOR PAD-A POST CLOSURE OPERATIONS - ANNUAL ENVIRONMENTAL MONITORING 5335 00
29-APR-93 NEARMAN, M. J. INEL WAG-7 DRAFT REMEDIAL INVESTIGATION (RI) FOR THE ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ), OPERABLE UNIT (OU) 7-08, FEBRUARY 1993 (02/93) 5357 00
23-APR-93 LYLE, J. L. PIT 9 DRAFT FINAL RECORD OF DECISION (ROD) EXTENSION NOTIFICATION (ERWM-ERD-046-93) 5547 00
21-APR-93 NYGARD, D. REVIEW COMMENTS FOR DRAFT REMEDIAL INVESTIGATION (RI) REPORT FOR THE ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OPERABLE UNIT (OU) 7-08 (EGG-ER-10684) 5356 00
16-APR-93 INEL COMMUNITY RELATIONS PUBLIC MEETING ON THE PROPOSED PLAN FOR PAD-A AT BOISE PUBLIC LIBRARY, BOISE, IDAHO, 08/18/93 5502 00
16-APR-93 INEL COMMUNITY RELATIONS PUBLIC MEETING ON THE PROPOSED PLAN FOR PAD-A AT WESTBANK INN, IDAHO FALLS, IDAHO, 08/17/93 5503 00
16-APR-93 INEL COMMUNITY RELATIONS PUBLIC MEETING ON THE PROPOSED PLAN FOR PAD-A AT UNIVERSITY PLACE INN, MOSCOW, IDAHO, 08/19/93 5504 00
02-APR-93 NEARMAN, M. J. INEL WAG-7 PIT 9 INTERIM ACTION (IA) DRAFT RESPONSIVENESS SUMMARY 5361 00
18-MAR-93 DOE RESPONSE TO IDHW ON THE DRAFT PIT 9 RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 5528 00
18-MAR-93 DOE RESPONSE TO EPA COMMENTS ON THE DRAFT PIT 9 RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 5529 00
10-MAR-93 NYGARD, D. COMMENTS ON THE DRAFT RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 5359 00
03-MAR-93 LYLE, J. L. TRANSMITTAL OF ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) REMEDIAL INVESTIGATION (RI) AND BASELINE RISK ASSESSMENT (BRA) REPORT (RI/BRA) AM/ERWM-ERD-017-93 00
01-MAR-93 BURNS, S. M. DRAFT FINAL SCOPING TRACK 2 SUMMARY REPORT FOR OU 7-05: SURFACE WATER PATHWAYS & SURFICIAL SEDIMENTS EGG-ERD-10449 00
17-FEB-93 NYGARD, D. RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) DRAFT RECORD OF DECISION (ROD) - (COMMENT PERIOD EXTENSION) 5360 00
11-FEB-93 LYLE, J. L. FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR THE PAD-A OPERABLE UNIT (OU) IN WASTE AREA GROUP 7 (WAG-7) AM/ERWM-ERD-008-93 00
10-FEB-93 LYLE, J. L. TRANSMITTAL OF DRAFT SUMMARY REPORT FOR SOIL VAULT ROW TRACK 2 STUDY AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AM/ERWM-ERD-005-93 00
09-FEB-93 DOE RESPONSE TO EPA COMMENTS ON THE DRAFT RECORD OF DECISION (ROD) FOR PIT 9 AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 5532 00
02-FEB-93 NOT SPECIFIED IDHW COMMENTS ON THE 06/02/93 REVISION OF THE RECORD OF DECISION (ROD) 5536 00
01-FEB-93 DOE RESOLUTIONS TO COMMENTS ON THE DRAFT REMEDIAL INVESTIGATION (RI) REPORT FOR THE ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OPERABLE UNIT (OU) 7-08, FEBRUARY 1993 (02/93) 5588 00
01-FEB-93 DOE FINDING OF NO SIGNIFICANT IMPACT (FONSI) FOR THE REMEDIATION OF THE ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) AT THE RWMC ON THE INEL 5619 00
20-JAN-93 LYLE, J. L. NOTIFICATION OF FIFTEEN (15) DAY EXTENSION TO THE PAD-A REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORKING SCHEDULE AM/ERWM-ERD-003-93 00
19-JAN-93 NYGARD, D. TECHNICAL REVIEW COMMENTS ON THE MODIFIED DRAFT FINAL RI/FS STUDY FOR PAD-A AT RWMC OU 7-12 6114 00
12-JAN-93 NEARMAN, M. J. INEL WAG-7 RWMC PAD-A COMMENTS ON THE MODIFIED DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY RI/FS 5310 00
12-JAN-93 NORLAND, R. L. REVIEW OF SAMPLING DATA AFFECTING THE PAD-A RISK ASSESSMENT RLN-04-93 00
08-JAN-93 RHODES, D. W. EVALUATION OF RECORDS FOR WASTE GENERATED AT ICPP & DISPOSED AT RWMC DURING THE PERIOD OF 1960 - 1983 DWR-01-93 00
07-JAN-93 BARRIE, S. L. TRACK 1 NO FURTHER ACTION DETERMINATION, RWMC-01 DRAINAGE & SEPTIC TANK FOR WMF-613 (NEW); RWMC-02 SEPTIC TANK & DRAINFIELD WMF-601 & WMF-604; RWMC-03 SEPTIC TANK & DRAINFIELD SWEPP 5235 00
31-DEC-92 LYLE, J. L. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 7-10 PIT 9 AT THE RWMC AT THE INEL AM/ERWM-ERD-120 00
24-DEC-92 NOT SPECIFIED DRAFT RESPONSIVENESS SUMMARY OVERVIEW 5552 00
23-DEC-92 NEARMAN, M. J. INEL WAG-7 PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 7-05, DATED OCTOBER 1992 (10/92) - EPA COMMENTS 5353 00
22-DEC-92 STALEY, C. S. EDF - ENGINEERING DESIGN FILE - HAZARDOUS CHEMICAL RELEASES RESULTING FROM PIT 9 WASTE RETRIEVAL AT RWMC RWMC-91-004.2 01
21-DEC-92 PIERRE, W. TREATABILITY VARIANCE FOR PIT 9 RECORD OF DECISION (ROD) 5533 00
16-DEC-92 LYLE, J. L. MODIFIED DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR THE PAD-A OPERABLE UNIT (OU) IN WASTE AREA GROUP 7 (WAG-7) AM/ERWM-ERD1-280-92 00
01-DEC-92 DORIGAN, L. EROSION MODELING RESULTS AND EROSION CONTROL DESIGN RECOMENDATIONS PAD-A OPERABLE UNIT (OU) 7-12 5308 00
30-NOV-92 NYGARD, D. REVIEW OF EG&G LETTER DATED NOVEMBER 9, 1992 (11/09/92) PROVIDING AIR EMMISSIONS INFORMATION FOR THE PILOT SCALE TREATABILITY STUDY (TS), OPERABLE UNIT (OU) 7-08 AT THE RWMC 5355 00
20-NOV-92 NYGARD, D. EXTENSION APPROVAL FOR PREPARATION OF THE REVISED DRAFT FINAL RI/FS FOR THE PAD-A OPERABLE UNIT (OU) AT WAG-7 5330 00
17-NOV-92 HULA, G. A. MINUTES FROM 11/16/92 TELECONFERENCE HELD WITH IDHW AND EPA REGARDING PAD-A RI/FS 5305 00
16-NOV-92 LYLE, J. L. REQUEST FOR EXTENSION FOR PREPARATION OF A REVISED DRAFT FINAL RI/FS FOR THE PAD-A OU AT WAG-7 AM/ERWM-ERD-098-92 00
04-NOV-92 INEL COMMUNITY RELATIONS PUBLIC MEETING TRANSCRIPTS - REVISED PROPOSED PLAN FOR PIT 9 - MOSCOW, BOISE, TWIN FALLS, POCATELLO AND IDAHO FALLS, IDAHO 5233 00
01-NOV-92 INEL COMMUNITY RELATIONS INEL REPORTER - 11/92 - REVISED PIT 9 PROPOSED PLAN ISSUED, MEETINGS SCHEDULED 6041 00
29-OCT-92 BURTON, B. N. EDF - ENGINEERING DESIGN FILE - SUMMARY PROCESS DESCRIPTION OF PROPOSED REMEDIAL ALTERNATIVES FOR A CLEANUP OF PIT 9 AT THE INEL RWMC ERD-BWP-077 00
22-OCT-92 NOT SPECIFIED RECORD OF WRITTEN COMMENTS RECEIVED DURING THE PUBLIC COMMENT PERIOD ON THE REVISED PIT 9 PROPOSED PLAN 5231 00
20-OCT-92 FORSBERG, D. L. EDF - ENGINEERING DESIGN FILE - PIT 9 COMPREHENSIVE DEMONSTRATION PROJECT COST ESTIMATE BASIS OF ALTERNATIVES LISTED IN THE REVISED PROPOSED PLAN ERD-BWP-076 00
19-OCT-92 DOE PUBLIC AFFAIRS DOE NEWS - AGENCIES REVISE PIT 9 PROPOSED PLAN, SCHEDULE MEETINGS 5213 00
16-OCT-92 NYGARD, D. REVIEW OF DOE-ID LETTER DATED 09/11/92 PROVIDING AIR EMMISSIONS INFORMATION FOR MEETING SUBSTANTIVE REQUIREMENTS IDAHO'S AIR QUALITY REGULATIONS, VVE TREATABILITY STUDY (TS) 5696 00
14-OCT-92 LYLE, J. L. DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR THE PAD-A OPERABLE UNIT (OU) IN WASTE AREA GROUP 7 (WAG-7) AM/ERWM-RPO-235-92 00
09-OCT-92 LYLE, J. L. ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AM/ERWM-ERD-092-92 00
01-OCT-92 INEL COMMUNITY RELATIONS REVISED PROPOSED PLAN FOR A CLEANUP OF PIT 9 AT THE RWMC, INEL 5203 00
01-OCT-92 NOT SPECIFIED CODED VERBAL AND WRITTEN COMMENTS RECEIVED ON THE REVISED PROPOSED PLAN FOR PIT 9 5535 00
01-OCT-92 MCCARTHY, J. M. EDF - ENGINEERING DESIGN FILE - GWSCREEN MODELING FOR THE PIT 9 PROJECT - SENSITIVITY TO KD IN THE SOURCE AND ATTENUATION LAYER RWMC-92-005.1 00
25-SEP-92 LYLE, J. L. EXTENSION OF DOCUMENT FINALIZATION PERIOD FOR THE PAD-A REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AM/ERWM-ERD-093-92 00
11-SEP-92 MACDONALD, D. W. VAPOR VACUUM EXTRACTION (VVE) TREATABILITY STUDY (TS) AT THE RWMC AM/ERWM-ERD-085-92 00
31-AUG-92 LYLE, J. L. TRANSMITTAL OF THE REVISED SCOPE OF WORK (SOW) FOR THE WASTE AREA GROUP 7 (WAG-7) SOIL VAULT TRACK 2 AM/ERWM-ERD-082-92 00
10-AUG-92 NEARMAN, M. J. INEL RWMC - COMMENTS ON DRAFT RI/FS FOR PAD-A OU 7-12 WAG-7 RWMC INEL, 04/92 6045 00
19-JUL-92 COE, M. DOE NEWS - PAD-A COMMENT PERIOD & PUBLIC MEETINGS SCHEDULED 6263 00
17-JUL-92 NYGARD, D. DRAFT RI/FS FOR PAD-A AT THE RWMC (COMMENT - REVIEW PERIOD EXTENDED) 5328 00
17-JUL-92 PIERRE, W. INEL OPERABLE UNIT (OU) 7-12 PAD-A DRAFT RI/FS 5329 00
13-JUL-92 PITTMAN, J. R. WATER - ROCK INTERACTION - PROCEEDINGS OF THE SEVENTH (7TH) INTERNATIONAL SYMPOSIUM OF WATER - ROCK INTERACTION 5307 00
01-JUL-92 SAIC DOCKET REPORT ON HEALTH BASED LEVELS & SOLUBILITIES USED IN THE EVALUATION OF DELISTING PETITIONS, SUBMITTED UNDER 40 CFR 260.20 & 260.22 5550 00
01-JUL-92 RICE, R. S. EDF - ENGINEERING DESIGN FILE - RESULTS OF PAD-A OVERBURDEN SAMPLING AND ANALYSIS ERD-BWP-70 00
03-JUN-92 LYLE, J. L. TRANSMITTAL OF THE RWMC PAD-A DRAFT RI/FS ERD-060-92 00
01-JUN-92 MATTHERN, G. E. SCOPE OF WORK (SOW) FOR THE ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), OPERABLE UNIT (OU) 7-08 - UNAUTHENTICATED EGG-ERD-10376 07
01-JUN-92 CHATWIN, T. D. FINAL WORK PLAN FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OPERABLE UNIT (OU) 7-08 FOCUSED REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT EGG-WM-10049 01
01-JUN-92 ANDERSON, I. R. SAMPLING & ANALYSIS PLAN (SAP) FOR THE ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OU 7-08 FOCUSED RI/FS EGG-WM-10175,VOL.01 00
01-JUN-92 ANDERSON, I. R. SAMPLING & ANALYSIS PLAN (SAP) FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OU 7-08 FOCUSED RI/FS EGG-WM-10175,VOL.02 00
01-JUN-92 HALFORD, V. E. DRAFT FINAL SCOPE OF WORK PAD-A REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EGG-WM-9792 04
01-JUN-92 RENY, D. A. TENTATIVE HAZARD CLASSIFICATION FOR PIT 9 COMPREHENSIVE DEMONSTRATION EGG-WM-9966 00
01-JUN-92 SCHLAFMAN, M. J. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 1) 0
01-JUN-92 HIARING, C. M. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 1) 0
01-JUN-92 HORTON, R. B. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 1) 0
01-JUN-92 HORTON, R. B. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 2) 0
01-JUN-92 SCHLAFMAN, M. J. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 2) 0
01-JUN-92 HIARING, C. M. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 2) 0
01-JUN-92 HORTON, R. B. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 3) 0
01-JUN-92 SCHLAFMAN, M. J. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 3) 0
01-JUN-92 HIARING, C. M. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 3) 0
22-MAY-92 NYGARD, D. IDHW TECHNICAL REVIEW COMMENTS FOR DRAFT FINAL FOCUSED REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN FOR OCVZ, AT THE RWMC (OU 7-08) 5675 00
21-MAY-92 NEARMAN, M. J. EPA COMMENTS: INEL RWMC - DRAFT FINAL WORK PLAN FOR OCVZ, OPERABLE UNIT (OU) 7-08, FOCUSED REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), DATED MAY 1992 (05/92) 5674 00
18-MAY-92 NEARMAN, M. J. EPA REVIEW COMMENTS ON DRAFT SCOPE OF WORK FOR THE TRACK 2 INVESTIGATION OF OPERABLE UNIT (OU) 7-01: SUBSURFACE DISPOSAL AREA (SDA) SOIL VAULTS 10042 00
11-MAY-92 PIERRE, W. REVISIONS TO INEL RWMC PAD-A SCOPE OF WORK 5326 00
01-MAY-92 EPA VITRIFICATION TECHNOLOGIES FOR TREATMENT OF HAZARDOUS AND RADIOACTIVE WASTE EPA/625/R-92/002 00
30-APR-92 NYGARD, D. REVISION TO PAD-A SCOPE OF WORK 5320 00
22-APR-92 LYLE, J. L. EXTENSION OF COMMENT PERIOD FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE, (OCVZ) REMEDIAL INVESTIGASTION FEASIBILITY STUDY (RI/FS) WORK PLAN ERD1-118-92 00
20-APR-92 LYLE, J. L. TRANSMITTAL OF THE TRACK 2 SCOPE OF WORK (SOW) FOR THE WASTE AREA GROUP 7 WAG-7 SOIL VAULT TRACK 2 ERD1-087-92 00
08-APR-92 AWC, INC. JOHNSTON ATOLL TRU SOIL CLEANUP PROJECT (DRAFT REPORT) 5101 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
08-APR-92 LYLE, J. L. REVISIONS TO PAD-A SCOPE OF WORK ERD-051-92 00
01-APR-92 HONEYCUTT, T. K. SAMPLING AND ANALYSIS PLAN (SAP) FOR THE TRACK 2 INVESTIGATION OF OPERABLE UNIT (OU) 7-05 SURFACE WATER - SURFICIAL SEDIMENTS - PART 2 CONTAINS QUALITY ASSURANCE PROJECT PLAN (QAPJP) EGG-WM-10090 00
01-APR-92 MCKENZIE, M. D. SUMMARY OF CONCEPTUAL COST FOR PIT 9 EGG-WM-10153 00
27-MAR-92 LYLE, J. L. SCOPE FOR ORGANIC CONTAMINATION OF THE VADOSE ZONE (OCVZ) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ERD1-081-92 00
23-MAR-92 FORSBERG, D. L. EDF - ENGINEERING DESIGN FILE - EVALUATION OF REMEDIAL ALTERNATIVES FOR PIT 9 INTERIM ACTION (IA) ERP-BWP-68 00
17-MAR-92 FIGUEROA, I. C. EDF - ENGINEERING DESIGN FILE - PIT 9 RESIDUAL RISK ASSESSMENT ERP-BWP-69 00
01-MAR-92 ROOD, A. S. GWSCREEN: A SEMI-ANALYTICAL MODEL FOR ASSESSMENT OF GROUNDWATER PATHWAY FROM SURFACE OR BURIED CONTAMINATION: THEORY & USER'S MANUAL (REPORT) EGG-GEO-10158 00
27-FEB-92 LYLE, J. L. ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN ERD-025-92 00
27-FEB-92 LYLE, J. L. PAD-A REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) COMMENT RESOLUTIONS ERD1-030-92 00
26-FEB-92 PIERRE, W. COMMENTS FOR DRAFT WORK PLAN FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) REMEDIAL INVESTIGATION FEASIBILITY STUDY RI/FS, OPERABLE UNIT (OU) 7-08, DECEMBER 1991 (12/91) 5358 00
01-FEB-92 RICE, R. S. RWMC SDA ACID PIT INVESTIGATION: SAMPLING & ANALYSIS PLAN (SAP) EGG-WM-9638 03
23-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, IDAHO PRESS TRIBUNE, NAMPA, IDAHO 01/23/92 4427 00
23-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, THE TIMES NEWS, TWIN FALLS, IDAHO, 01/23/92 4428 00
23-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, IDAHO STATESMAN, BOISE, IDAHO, 01/23/92 4429 00
23-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED FOR PROPOSED PLAN FOR PIT 9, IDAHO STATE JOURNAL, POCATELLO, IDAHO, 01/23/92 4430 00
23-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, LEWISTON, IDAHO 01/23/92 4433 00
22-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, IDAHOAN, MOSCOW, IDAHO 01/22/91 4431 00
22-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, SOUTH IDAHO PRESS, BURLEY, IDAHO 01/22/92 4432 00
22-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON THE PROPOSED PLAN FOR PIT 9, BURLEY, IDAHO 01/22/92 7762 00
21-JAN-92 NOT SPECIFIED COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9 - THE POST REGISTER IDAHO FALLS, IDAHO 01/21/92 3550 00
07-JAN-92 NOT SPECIFIED PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN FOR AN INTERIM ACTION (IA) AT PIT 9 AT RWMC, IDAHO FALLS, IDAHO 01/07/92 3544 00
01-JAN-92 LIEKHUS, K. J. NONRADIONUCLIDE INVENTORY IN PIT 9 AT RWMC EGG-WM-10079 00
01-JAN-92 LUGAR, R. M. EDF - ENGINEERING DESIGN FILE - RESULTS OF CHEMICAL & RADIOLOGICAL ANALYSIS OF RWMC PIT 9 & ACID PIT PERIMETER SUBSURFACE SOIL ERP-BWP-67 00
13-DEC-91 DOE PUBLIC AFFAIRS RECORD OF WRITTEN COMMENTS RECEIVED DURING THE PUBLIC COMMENT PERIOD 12/13/91 - 02/11/92 ON THE PROPOSED PLAN OF PIT 9 5098 00
06-DEC-91 COE, M. DOE NEWS - AGENCIES RESCHEDULE COMMENT PERIOD ON PROPOSED CLEANUP 3392 00
05-DEC-91 NOT SPECIFIED PROPOSED PLAN FOR A CLEANUP OF PIT 9 AT RWMC, INEL 3543 00
05-DEC-91 NOT SPECIFIED CODED VERBAL AND WRITTEN COMMENTS RECEIVED ON THE ORIGINAL PROPOSED PLAN FOR PIT 9 5521 00
04-DEC-91 ASI SUMMARY OF PUBLIC SCOPING COMMENTS CONCERNING PROPOSED REMEDIATION OF PAD-A AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OF THE INEL 5333 00
01-DEC-91 PAARMANN, M. L. RWMC INVESTIGATIONS REPORT, VOLUME 1 (VOL.01) EGG-WM-9707,VOL.01 00
01-DEC-91 PAARMANN, M. L. RWMC INVESTIGATIONS REPORT, VOLUME 2 (VOL.02) EGG-WM-9707,VOL.02 00
01-DEC-91 PAARMANN, M. L. RWMC INVESTIGATIONS REPORT, VOLUME 3 (VOL.03) EGG-WM-9707,VOL.03 00
01-DEC-91 PAARMANN, M. L. RWMC INVESTIGATIONS REPORT, VOLUME 4 (VOL.04) EGG-WM-9707,VOL.04 00
20-NOV-91 SATO, W. N. DEAR CITIZEN LETTER - PUBLIC SCOPING MEETINGS PLANNED FOR PAD-A 3391 00
01-NOV-91 INEL COMMUNITY RELATIONS PUBLIC NOTICE OF SCOPING MEETING - CLEANUP WON'T BEGIN UNTIL PUBLIC COMMENTS ARE RECEIVED, CITIZENS ARE ASKED TO COMMENT ON CLEANUP OF THREE (3) AREAS AT RWMC 5321 00
01-NOV-91 DOE PUBLIC PARTICIPATION IN ENVIRONMENTAL RESTORATION (ER) ACTIVITIES DOE/EH-0221 00
01-NOV-91 MCCLELLAN, Y. PRELIMINARY RISK EVALUATION FOR PIT 9 EGG-WM-9938 00
03-OCT-91 PIERRE, W. DRAFT RWMC PAD-A REMEDIAL INVESTIGATION (RI) REPORT 3231 00
03-OCT-91 NYGARD, D. TECHNICAL REVIEW COMMENTS DRAFT RI/BRA REPORT PAD-A OPERABLE UNIT (OU) 7-12, REV.01, 08/91 5314 00
30-SEP-91 MONSON, R. S. ENGINEERING DESIGN FILE (EDF) - SAMPLE ANALYSIS RESULTS FROM SAMPLING OF RWMC & SWEPP SEWER & SEPTIC SYSTEMS RWMC-505 00
27-SEP-91 SCHWALLER, R. G. FINAL REPORT - SOIL OVERBURDEN SAMPLING AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) TRANSURANIC STORAGE AREA (TSA) EGG-WM-8986-B 00
11-SEP-91 LIIKALA, S. C. ENGINEERING SCALE TESTS OF ISV TO PCB AND RADIOACTIVE CONTAMINATED SOILS 5099 00
26-AUG-91 SLOAN, P. A. ENGINEERING DESIGN FILE (EDF) - IN SITU VITRIFICATION (ISV) LARGE FIELD TEST SITING REQUIREMENTS & SELECTION ERP-ISV-032 00
21-AUG-91 NYGARD, D. TRANSMITTAL - FINAL SCOPE OF WORK RI/FS AT PAD-A OF RWMC 5327 00
01-AUG-91 KNIGHT, J. L. BRIEF ANALYSIS & DESCRIPTION OF TRANSURANIC (TRU) WASTES IN SUBSURFACE DISPOSAL AREA (SDA) OF RWMC AT INEL EGG-WTD-9438 01
01-AUG-91 CALLOW, R. A. IN SITU VITRIFICATION (ISV) APPLICATION TO BURIED WASTE (BW): FINAL REPORT OF INTERMEDIATE FIELD TESTS AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) EGG-WTD-9807 00
10-JUL-91 KING, J. J. ENGINEERING DESIGN FILE (EDF) - METHODOLOGY FOR DETERMINATION OF A RADIOLOGICAL INVENTORY FOR PIT 9 & CORRESPONDING RESULTS ERP-BWP-64 00
01-JUL-91 DONEHEY, A. J. IN SITU TECHNOLOGY EVALUATION & FUNCTIONAL & OPERATIONAL GUIDELINES FOR TREATABILITY STUDIES AT RWMC AT THE INEL EGG-WTD-9799 00
17-JUN-91 NYGARD, D. DRAFT FINAL SCOPE OF WORK RI/FS PAD-A CONDITIONAL APPROVAL 2775 00
04-JUN-91 LYLE, J. L. TRANSMITTAL OF DRAFT SCOPE OF WORK FOR THE WASTE AREA GROUP 7 (WAG-7) PAD-A RI/FS AT THE INEL ERD1-088-91 00
01-JUN-91 DOE NATURAL RESOURCE TRUSTEESHIP & ECOLOGICAL EVALUATION FOR ENVIRONMENTAL RESTORATION (ER) AT DOE FACILITIES PUBLIC PARTICIPATION ENVIRONMENTAL RESTORATION (ER) ACTIVITIES DOE/EH-0192 00
16-MAY-91 NYGARD, D. DRAFT SCOPE OF WORK FOR PAD-A RI/FS AT INEL RWMC 5332 00
08-MAY-91 PIERRE, W. DRAFT SCOPE OF WORK FOR PAD-A REMEDIAL ACTION AT THE INEL RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 5313 00
30-APR-91 LYLE, J. L. TRANSMITTAL OF DRAFT SCOPE OF WORK FOR THE WAG-7 PAD-A RI/FS AT THE INEL ERD1-060-91 00
01-FEB-91 ARRENHOLZ, D. A. IN SITU VITRIFICATION (ISV) PROGRAM TREATABILITY INVESTIGATION PROGRESS REPORT EGG-WTD-9383 01
01-JAN-91 ARRENHOLZ, D. A. HISTORICAL REPORT OF TRANSURANIC (TRU) WASTE PITS AND TRENCHES AT SUBSURFACE DISPOSAL AREA (SDA) OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) WTD-91-027 00
08-MAY-90 MIYASAKI, D. H. ENGINEERING DESIGN FILE (EDF) - CALCULATION OF OFF GAS CONCENTRATIONS DURING IN SITU VITRIFICATION (ISV) PROCESS - INTERMEDIATE FIELD TEST ERP-ISV-034 00
01-FEB-90 SALEEM, Z. BACKGROUND DOCUMENT FOR EPA'S COMPOSITE MODEL FOR LANDFILLS (EPACML) 5549 00
01-DEC-89 CLAWSON, K. L. CLIMATOGRAPHY OF THE INEL, 2ND (SECOND) EDITION DOE/ID-12118 00
12-OCT-89 MACKINNON, R. J. ENGINEERING DESIGN FILE (EDF) - IN SITU VITRIFICATION (ISV) CODE IMPLEMENTATION - OUTLINE MODELING REQUIREMENTS FOR ISV ERP-ISV-021 00
02-JUN-89 BELLER, J. M. ENGINEERING DESIGN FILE (EDF) - BURIED WASTE PROGRAM (BWP) IN SITU VITRIFICATION (ISV) - PRODUCTION SCALE COST ESTIMATE BWP-ISV-006 00
31-MAY-89 CALLOW, R. A. ENGINEERING DESIGN FILE (EDF) - INTERMEDIATE SCALE IN SITU VITRIFICATION (ISV) TEST REQUIREMENTS & PIT DESIGN BWP-ISV-010 00
01-MAY-89 LEWIS, B. D. REF - STRATIGRAPHY OF UNSATURATED ZONE AT RWMC, INEL, IDAHO DOE/ID-22080 00
21-FEB-89 MELVILLE, J. B. ENGINEERING DESIGN FILE (EDF) - ISV TREATABILITY STUDY (TS) - LARGE SCALE DEMONSTRATION TEST TIME REQUIRED TO VITRIFY TRU CONTAMINATED PITS & TRENCHES AT SDA BWP-ISV-007 00
24-JAN-89 GARCIA, E. C. ENGINEERING DESIGN FILE (EDF) - IN SITU VITRIFICATION (ISV) SUMMARY CHARACTERIZATION OF SUBSURFACE DISPOSAL AREA (SDA) - ESTIMATE METAL CONTENT OF WASTE BURIED IN SDA BWP-ISV-005 00
01-AUG-88 GLEBS, R. T. SUBTITLE D: HOW WILL IT AFFECT LANDFILLS? 5306 00
29-APR-88 VIGIL, M. J. ENGINEERING DESIGN FILE (EDF) - MODEL OF MIGRATION OF HAZARDOUS CONSTITUENT - ESTIMATE OF WATER IN PITS DURING FLOODING EVENTS BWP-12 00
01-APR-88 LANEY, P. T. ANNUAL PROGRESS REPORT FY-87 SUBSURFACE INVESTIGATIONS (SI) PROGRAM AT RWMC OF INEL DOE/ID-10183 00
01-DEC-87 MANN, L. J. REF - PURGEABLE ORGANIC COMPOUNDS IN GROUNDWATER AT INEL, IDAHO - USGS OPEN FILE REPORT 87-766 DOE/ID-22074 00
01-NOV-87 LEWIS, B. D. HYDROGEOLOGY & GEOCHEMISTRY OF UNSATURATED ZONE RWMC, INEL DOE/ID-22073 00
01-JUN-87 MARKHAM, O. D. SUMMARIES OF INEL RADIOECOLOGY AND ECOLOGY PROGRAM RESEARCH PROJECTS DOE/ID-12111 00
01-MAR-87 BUELT, J. L. IN SITU VITRIFICATION (ISV) OF TRANSURANIC WASTE: AN UPDATED SYSTEMS EVALUATION AND APPLICATIONS ASSESSMENT PNL-4800-SUPPL.1 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - RWMC-03 SEPTIC TANK & DRAINFIELD FOR SWEPP 2734 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - RWMC-02 SEPTIC TANK AND DRAINFIELD FOR WMF-601 AND WMF-604 2735 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - RWMC-01 DRAINAGE AND SEPTIC TANK FOR WMF-613 NEW FACILITY NOT OPERATIONAL YET 2736 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - RWMC-05 TRANSURANIC STORAGE AREA (TSA) TEMPORARY STORAGE ONLY 2764 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - RWMC SUBSURFACE DISPOSAL AREA (SDA) 2837 00
29-SEP-86 MILLER, C. L. EDF - ENGINEERING DESIGN FILE - RWMC SMALL SCALE SOIL GROUT TEST REPORT EDF-263 00
01-AUG-85 REYES, B. D. ENVIRONMENTAL SURVEILLANCE FOR THE INEL RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AND OTHER AREAS - ANNUAL REPORT 1984 EGG-2386 00
01-JUL-85 RODGERS, A. D. A HISTORY OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEL WM-F1-81-003 03
01-JUL-84 ARTHUR, W. J. VERTEBRATES OF INEL DOE/ID-12099 00
01-MAR-82 SCHUMAN, R. P. IMMOBILIZATION OF TRANSURANIC (TRU) SLUDGE IN GLASS CERAMIC MATERIALS (REPORT) EGG-FM-5709 00
01-AUG-79 HUDSON, R. J. EARLY WASTE RETRIEVAL FINAL REPORT TREE-1321 00
16-JUL-79 REICH, E. E. BERYLLIUM REGULATIONS LETTER 5538 00
01-AUG-78 MCKINNEY, J. D. INITIAL DRUM RETRIEVAL FINAL REPORT TREE-1286 00
01-AUG-76 BARRACLOUGH, J. T. HYDROLOGY OF SOLID WASTE BURIAL GROUND AS RELATED TO POTENTIAL MIGRATION OF RADIONUCLIDES, INEL - USGS OPEN FILE REPORT 76-471 IDO-22056 0
01-MAY-72 THOMPSON, R. J. SOLID RADIOACTIVE WASTE RETRIEVAL TEST ACI-120 00
10-JUN-71 LEE, W. H. ROCKY FLATS SOLID WASTE SENT TO THE NATIONAL REACTOR TESTING STATION (NRTS) 1954 THROUGH 1970 1792319 00
10-JUN-71 LEE, W. H. ROCKY FLATS SOLID WASTE SHIPPED TO NATIONAL REACTOR TESTING STATION (NRTS) 26267 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page