Select By Waste Area Group (WAG)

For WAG 6

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
06-AUG-18 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY2017 RPT-1635 0
01-MAY-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY2016 RPT-1543 0
01-JAN-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2015 RPT-1503 0
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JUN-16 NOT SPECIFIED QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 9, 10, AND REMOVAL ACTIONS DOE/ID-10587 11
08-FEB-16 FAULK, DENNIS EPA CONCURRENCE ON THE IDAHO NATIONAL LAB 5 YEAR REVIEW 5282268 0
31-DEC-15 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2010-2014 DOE/ID-11513 0
01-AUG-15 NOT SPECIFIED INL SITE COMMUNITY INVOLVEMENT PLAN DOE/ID-11518 0
01-JUN-15 NOT SPECIFIED ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT DOE/ID-11293 3
01-MAY-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2014 RPT-1361 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
28-AUG-14 FAULK, DENNIS EPA LETTER OF APPROVAL OF THE OU 10-04 REMEDIAL ACTION REPORT 4713378 0
01-AUG-14 KIMBRO, VALERIE M. REMEDIAL ACTION REPORT FOR OPERABLE UNITS 6-05 AND 10-04, PHASE IV DOE/ID-11498 0
24-JUL-14 LIVIERATOS, TED DEQ COMMENTS ON THE OU 10-04 PHASE IV REMEDIAL ACTION REPORT 4682814 0
24-JUL-14 FAULK, DENNIS EPA COMMENTS ON THE OU 10-04 PHASE IV REMEDIAL ACTION REPORT 4682815 0
01-APR-13 HOLDREN, K. JEAN PHASE I REMEDIAL ACTION REPORT FOR OPERABLE UNITS 6-05 AND 10-04 DOE/ID-11480 0
01-SEP-11 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES TO REVISE INSTITUTIONAL CONTROLS IN VARIOUS RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11439 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 1) DOE/ID-11429 (PART 1) 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 2) DOE/ID-11429 (PART 2) 0
31-AUG-09 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 10, AND REMOVAL ACTIONS DOE/ID-10587 10
30-OCT-07 NELSON, L. O. IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2007 DOE/ID-11350 00
02-OCT-07 VANHORN, R. L. LONG TERM ECOLOGICAL MONITORING PLAN FOR THE IDAHO NATIONAL LABORATORY (INL) INEEL/EXT-02-01191 03
31-JUL-07 HANEY, T. J. LONG-TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2007 DOE/ID-11316 01
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
02-OCT-06 OLAVESON, B. E. IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2006 DOE/ID-11294 00
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
24-MAR-06 OPALSKI, D. D. EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR RECORD OF DECISION (ROD) FOR EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES DOE/ID-11264 00
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
22-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2005 (FY-05) DOE/ID-11249 00
30-AUG-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2004 (FY-04) DOE/NE-ID-11200 00
19-JAN-05 WELLS, R. P. REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I DOE/NE-ID-11186 00
23-MAR-04 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10587 08
09-FEB-04 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I DOE/ID-11101 00
05-FEB-04 WELLS, R. P. OPERATIONS AND MAINTENANCE (O&M) PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I DOE/ID-11102 01
18-DEC-03 WELLS, R. P. OPERATIONS AND MAINTENANCE (O&M) PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I DOE/ID-11102 00
24-APR-03 JOLLEY, W. L. INSTITUTIONAL CONTROLS STATUS REPORT FOR WASTE AREA GROUPS 6 AND 10 (WAG-6 AND WAG-10) INEEL/EXT-03-00199 00
20-MAR-03 HOBSON, S. CITIZENS ADVISORY BOARD (CAB) REVIEW AND COMMENTS - RECOMMENDATION #92 FOR THE PROPOSED PLAN FOR OPERABLE UNIT (OU) 10-04 - WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) 02-CAB-031 00
04-MAR-03 NELSON, G. E. SUBMITTAL OF OPERABLE UNITS (OU) 6-05 AND 10-04 FINAL SCOPE OF WORK (SOW) FOR EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES EM-ER-03-063 00
01-FEB-03 BROOMFIELD, B. J. OPERABLE UNITS (OU) 6-05 AND 10-04, EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES, REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) DOE/ID-11035 00
30-JAN-03 NELSON, G. E. SUBMITTAL OF OPERABLE UNITS (OU) 6-05 AND 10-04 REVISED DRAFT SCOPE OF WORK (SOW) FOR EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES EM-ER-03-031 00
18-DEC-02 HATHAWAY, C. TRANSMITTAL OF ENGINEERING DESIGN FILE (EDF) - RISK ASSESSMENT FOR THE RESIDUAL RADIOLOGICAL CONTAMINATION AT THE BORAX I REACTOR BURIAL SITE, CERCLA SITE BORAX-02, OPERABLE UNIT (OU) 6-01 EM-ER-02-212 00
12-DEC-02 GILES, J. R. ENGINEERING DESIGN FILE (EDF) - RISK ASSESSMENT FOR THE RESIDUAL RADIOLOGICAL CONTAMINATION AT THE BORAX I REACTOR BURIAL SITE, CERCLA SITE BORAX-02, OPERABLE UNIT (OU) 6-01 EDF-2208 01
20-NOV-02 INEEL COMMUNITY RELATIONS PRESS RELEASE - AGENCIES SIGN RECORD OF DECISION (ROD) TO CLEANUP EXPLODED ORDNANCE AND OTHER SITES AT THE INEEL 24761 00
18-NOV-02 NELSON, G. E. TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 6-05 AND 10-04 EXPERIMENTAL BREEDER REACTOR I AND BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) EM-ER-02-192 00
05-NOV-02 BROOMFIELD, B. J. RECORD OF DECISION (ROD) FOR EXPERIMENTAL BREEDER REACTOR I & BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES - OPERABLE UNITS (OU) 6-05 AND 10-04 DOE/ID-10980 00
23-OCT-02 NELSON, G. E. IMPLEMENTATION AND MAINTENANCE OF SITE WIDE INSTITUTIONAL CONTROLS AS DISCUSSED IN THE RECORD OF DECISION (ROD) FOR EBR-I/BORAX AREA AND MISCELLANEOUS SITES - DOE/ID-10980, SEPTEMBER 2002 (09/02) EM-ER-02-181 00
24-SEP-02 NELSON, G. E. SUBMITTAL OF FINAL RECORD OF DECISION (ROD) FOR EXPERIMENTAL BREEDER REACTOR I BOILING REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES - OPERABLE UNIT (OU) 6-05 AND 10-04 (DOE/ID-10980) EM-ER-02-161 00
12-SEP-02 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 DOE/ID-10587 07
25-JUN-02 EPA EPA AND IDEQ COMMENT RESOLUTION FORMS - DRAFT RECORD OF DECISION (ROD) - EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I /BORAX) AND MISCELLANEOUS SITES - OPERABLE UNITS (OU) 6-05 & 10-04 - DOE/ID-10980 23839 00
11-JUN-02 NELSON, G. E. TWENTY (20) DAY EXTENSION OF COMMENT RESOLUTION PERIOD FOR OPERABLE UNIT (OU) 10-04 DRAFT RECORD OF DECISION (ROD) EM-ER-02-101 00
26-APR-02 HAIN, K. E. DOE RESPONSE TO CAB COMMENTS - INEEL CITIZENS ADVISORY BOARD (CAB) SUBMITTAL OF RECOMMENDATION #92 EM-ER-02-057 00
13-FEB-02 HOBSON, S. CITIZENS ADVISORY BOARD (CAB) REQUEST FOR A 30 DAY EXTENSION TO PUBLIC COMMENT PERIOD ON OPERABLE UNIT (OU) 10-04 PROPOSED PLAN 02-CAB-008 00
12-FEB-02 SCHWARTZ, N. TRANSCRIPT FROM OPERABLE UNIT (OU) 10-04 PROPOSED PLAN PUBLIC MEETING HELD IN IDAHO FALLS, IDAHO FEBRUARY 12, 2002 (02/12/02) 24759 00
07-FEB-02 SCHWARTZ, N. TRANSCRIPT FROM OPERABLE UNIT (OU) 10-04 PROPOSED PLAN PUBLIC MEETING HELD IN BOISE, IDAHO FEBRUARY 7, 2002 (02/07/02) 24758 00
06-FEB-02 NELSON, G. E. OPERABLE UNIT (OU) 10-04 FFA/CO DEADLINE FOR SUBMITTAL OF DRAFT RECORD OF DECISION (ROD) - CONFIRMATION OF AGREEMENT REGARDING DEADLINE EXTENSION BY 30 CALENDAR DAYS EM-ER-02-019 00
25-JAN-02 NELSON, G. E. INEEL WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 PROPOSED PLAN - EXTENSION OF PUBLIC REVIEW PERIOD BY 30 CALENDAR DAYS EM-ER-02-014 00
01-JAN-02 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) ENVIRONMENTAL INVESTIGATION COMPLETE 10955 00
01-JAN-02 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR OPERABLE UNIT (OU) 10-04 - WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) 10956 00
13-SEP-01 HAIN, K. E. TRANSMITTAL OF INEEL WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 SUBMITTAL OF DRAFT PROPOSED PLAN FOR REVIEW AND COMMENT EM-ER-01-151 00
17-AUG-01 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) REMEDIAL ACTION (RA) REVIEW - INEEL STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR 1 (BORAX I) BURIAL GROUNDS 23603 00
17-AUG-01 POETON, R. W. U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) REGION 10 OFFICE OF ENVIRONMENTAL CLEANUP REMEDIAL ACTION REVIEW - INEEL STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS 24742 00
16-AUG-01 NELSON, G. E. SUBMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 - VOLUME 1 (VOL.01) AND VOLUME 2 (VOL.02) EM-ER-01-131 00
15-AUG-01 VANHORN, R. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 - VOLUME 1 (VOL.01) OF 2 DOE/ID-10807,VOL.01 00
15-AUG-01 VANHORN, R. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 - VOLUME 2 (VOL.02) OF 2 DOE/ID-10807,VOL.02 00
02-AUG-01 NELSON, G. E. WAG-10 - REQUEST FOR AGREEMENT WITH FIFTEEN (15) DAY SCHEDULE EXTENSION FOR ISSUING THE FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) IN ACCORDANCE WITH FFA/CO SECTION 8.18 EM-ER-01-126 00
05-JUL-01 NELSON, G. E. SUBMITTAL OF DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ASSESSMENT FOR WASTE AREA GROUPS 6 AND 10 (WAG-6 AND WAG-10) OPERABLE UNIT (OU) 10-04 FOR REVIEW AND COMMENT EM-ER-01-119 00
08-MAY-01 WINTER, G. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON THE DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 10934 00
08-MAY-01 HATHAWAY, C. 2001 ANNUAL INSPECTION SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-05 STATIONARY LOW POWER REACTOR 1 (SL-1) AND OU 6-01 BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS EM-ER-01-077 00
07-MAY-01 DOE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS AND RESOLUTIONS TO COMMENTS ON THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WASTE AREA GROUP 6 AND 10 (WAG-6 & WAG-10) FOR OPERABLE UNIT (OU) 10-04 10940 00
04-MAY-01 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON THE DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 10933 00
04-MAY-01 NOT SPECIFIED ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS AND RESOLUTIONS TO COMMENTS ON THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 10-04 10939 00
05-OCT-00 AR COORDINATOR EXPERIMENTAL BREEDER REACTOR I (EBR-I) NO ACTION SITES - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR NO ACTION SITES FOR EBR WASTE AREA GROUP 6 (WAG-6) AR.INDEX.EBR.6-NA 00
05-OCT-00 HATHAWAY, C. TRANSMITTAL OF OPERABLE UNIT (OU) 5-05 STATIONARY LOW POWER 1 (SL-1) BURIAL GROUNDS & OU 6-01 BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIED REACTOR ANNUAL INSPECTION REPORT, DE-AC07-99ID13727 EM-ER-191-00 00
20-SEP-00 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV DOE/ID-10587 06
01-MAY-00 PERRY, S. W. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 10-04 FLY ASH PIT & BORAX INEEL/EXT-99-01053 00
23-MAR-00 GIANOTTO, D. F. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-99-01253 00
05-NOV-99 AR COORDINATOR OPERABLE UNIT (OU) 6-02 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR OU 6-02 AR.INDEX.OU.6-02 00
11-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 5-05 AND OU 6-01 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 SCOPING OF THE AUXILIARY REACTOR AREA II (ARA II) STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND OU 5-05 AND OU 6-01 AR.INDEX.OU.5-05 00
01-AUG-99 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - COMPREHENSIVE INVESTIGATION UNDER WAY FOR WASTE AREA GROUP 10 (WAG-10) 18049 00
22-JUN-99 PIERRE, W. REQUEST FOR EXTENSION FOR OPERABLE UNIT (OU) 10-04 DEADLINE FOR DRAFT RECORD OF DECISION (ROD) 10663 00
16-JUN-99 NYGARD, D. RESPONSE TO REQUEST FOR EXTENSION OF OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) SCHEDULE & ADDITION OF NEW OPERABLE UNITS (OU) TITLED 10-08 & 10-09 10666 00
26-APR-99 BURNS, D. E. WORK PLAN FOR WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10554 00
05-FEB-99 KROUPA, P. C. WASTE AREA GROUP 10 (WAG-10) TIME EXTENSION ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-21-99 00
29-JAN-99 WINTER, G. CORRECTED REVIEW COMMENTS ON WORK PLAN FOR WASTE AREA GROUPS 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - (DRAFT) DOE/ID-10554 NOVEMBER 1998 (11/98) 10566 00
29-DEC-98 POETON, R. W. EXTENSION OF REVIEW FOR WASTE AREA GROUPS 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT WORK PLAN 10565 00
22-OCT-98 AR COORDINATOR OPERABLE UNIT (OU) 6-03 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR OU 6-03 AR.INDEX.OU.6-03 00
01-DEC-97 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) DOE/ID-10587 05
01-OCT-97 ROTHERMEL, J. S. REMEDIAL ACTION (RA) REPORT OPERABLE UNIT (OU) 5-05 STATIONARY LOW POWER REACTOR 1 (SL-1) & OU 6-01 BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS ENGINEERED BARRIERS DOE/ID-10591 00
01-JUL-97 CRAM, A. J. STATIONARY LOW POWER REACTOR 1 (SL-1) & BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS ENGINEERED BARRIERS PROJECT OPERATION AND MAINTENANCE (O&M) PLAN OPERABLE UNIT (OU) 5-05 & OU 6-01 INEL-95/0625 01
27-MAY-97 RODMAN, G. R. FINAL REPORT - D&D OF BORAX V REACTOR BUILDING INEL-96/0325 00
01-MAY-97 BLACKMORE, C. S. BORAX V FACILITY SITE POST DECONTAMINATION & DISMANTLEMENT (D&D) CHARACTERIZATION REPORT INEL-96/0464 00
14-MAR-97 BARNA, S. M. SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10553 00
25-FEB-97 WINTER, G. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT FINAL SCOPE OF WORK FOR OU 10-04 WASTE AREA GROUP 6 (WAG-6) & 10 (WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10415 00
05-FEB-97 LABUY, S. A. EDF - ENGINEERING DESIGN FILE - BORAX V DECONTAMINATION & DISMANTLEMENT (D&D) RESRAD SITE RELEASE ANALYSIS EDF-ER-025 00
31-DEC-96 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT OU 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) STATEMENT OF WORK (SOW) - (OPE-ER-171-96) 10306 00
30-DEC-96 WINTER, G. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WAG-6 & WAG-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), DOE/ID-10553, NOVEMBER 1996 (11/96) 10307 00
13-DEC-96 DEPPERSCHMIDT, J. D. TRANSMITTAL OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) TO INEL NATURAL RESOURCE TRUSTEE COUNCIL MEMBERS OPE-EP-96-474 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
30-OCT-96 MITCHELL, J. R. BORAX V ENTOMBMENT PROJECT REQUIREMENTS UNDER 40 CFR 61, SUBPART M - JRM-378-96 JRM-378-96 0
01-JUL-96 FITCH, D. R. FIELD SAMPLING PLAN (FSP) SL-1 & BORAX I BURIAL GROUNDS OPERABLE UNIT (OU) 5-05 & 6-01 (PARSONS ES-28.6.3) DOE/ID-10540 00
04-APR-96 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL WORK PLAN FOR SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) ACTIVITIES & DOE COMMENT RESOLUTIONS TO IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS OPE/ER-96-061 00
01-APR-96 COTTEN, G. B. DESIGN DRAWINGS - CONSTRUCTION PLANS - APPENDIX C OF DOE/ID-10532, SL-1 & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS PROJECT RD/RA WORK PLAN 11822 00
01-APR-96 ROSENBERGER, M. S. DOE RESOLUTIONS FOR IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY ( IDHW-DEQ) COMMENTS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 5-05 & 6-01 11823 00
01-APR-96 COTTEN, G. B. STATIONARY LOW POWER REACTOR-1 (SL-1) & BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS ENGINEERED BARRIERS PROJECT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN (PARSON'S #ES.28.06.23) DOE/ID-10532 00
01-APR-96 HOLDREN, K. J. TECHNICAL MEMORANDUM: CONTAINMENT OPTIONS FOR BORAX-09 INEL-95/0490 00
01-APR-96 PARSONS ENGINEERING STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS PROJECT OPERATION & MAINTENANCE (O&M) PLAN OU 5-05 & 6-01 - PARSONS #ES-28.6.9.12 INEL-95/0625 00
01-APR-96 PARSONS ENGINEERING STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS HEALTH & SAFETY PLAN (HSP) OU 5-05 & 6-01 - PARSONS #ES.28.6.12 INEL-95/0636 00
22-MAR-96 GREEN, L. A. WORKING SCHEDULE FOR SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL DESIGN AND REMEDIAL ACTION (RD/RA) ACTIVITIES OPE-ER-52-96 00
21-MAR-96 GREEN, L. A. TRANSMITTAL OF REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK FOR SL-1 & BORAX I BURIAL GROUNDS - RESOLUTION TABLES FOR IDHW REVIEW COMMENTS ARE INCLUDED OPE-ER-50-96 00
01-MAR-96 ROTHERMEL, J. S. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS - OU 5-05 & 6-01 INEL-95/0456 00
08-FEB-96 GREEN, L. A. TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS OU 5-05 & 6-01 AND TEN (10) NO ACTION SITES ROD OPE-ER-27-96 00
08-FEB-96 GREEN, L. A. TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS OU 5-05 & 6-01 AND TEN (10) NO ACTION SITES ROD OPE-ER-28-96 00
09-JAN-96 DOE, EPA, IDHW RECORD OF DECISION (ROD) FOR STATIONARY LOW POWER REACTOR 1 (SL-1) OU 5-05 & BORAX I BURIAL GROUNDS OU 6-01 & 10 (TEN) NO ACTION SITES (OU 5-01, 5-03, 5-04 AND 5-11) INEL-95/0282 00
22-DEC-95 GREEN, L. A. STATIONARY LOW POWER REACTOR 1 (SL-1) & BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS (OU 5-05 & 6-01) & TEN (10) NO ACTION SITES RECORD OF DECISION (ROD), TRANSMITTAL OF OPE-ER-234-95 00
07-DEC-95 JINES, A. AUXILIARY REACTOR AREA (ARA) WINDBLOWN SOILS EVALUATION OPE-ER-225-95 00
13-NOV-95 UNDERWOOD, E. J. IDHW REVIEW COMMENTS ON OU 5-05 AND 6-01 DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK 11486 00
08-NOV-95 UNDERWOOD, E. J. IDHW REVIEW COMMENTS ON OPERABLE UNIT (OU) 5-05 AND 6-01 DRAFT FINAL RECORD OF DECISION (ROD) 10172 00
02-NOV-95 JENSEN, N. R. TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) BOILING WATER REACTOR EXPERIMENT BORAX I BURIAL GROUNDS OPERABLE UNIT (OU) 5-05 AND 6-01 & TEN (10) NO ACTION SITES RECORD OF DECISION (ROD), FOR REVIEW AND SIGNATURE OPE-ER-204-95 00
23-OCT-95 BURNS, S. M. ASSESSMENT OF EXPERIMENTAL BREEDER REACTOR 04 (EBR-04) SEPTIC TANK EXCAVATION 10843 00
19-OCT-95 GREEN, L. A. DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 10445 00
19-OCT-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) & DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY ( EPA) COMMENTS OPE-ER-201-95 00
13-OCT-95 UNDERWOOD, E. J. IDHW COMMENTS ON VARIOUS DOCUMENTS FOR OPERABLE UNIT (OU) 5-05 AND 6-01 10171 00
10-OCT-95 ORLEAN, H. EPA COMMENTS ON SEPTEMBER 1995 (09/95) DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) 10163 00
06-OCT-95 GREEN, L. A. SAMPLING EVENT NOTIFICATION OPE-ER-193-95 00
01-OCT-95 GREENWELL, R. D. DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) INEL-94/0171 00
22-SEP-95 UNDERWOOD, E. J. IDHW ASSESSMENT OF RISK FROM EXTERNAL EXPOSURE TO RADIATION FROM CONTAMINATION BROUGHT TO THE SURFACE BY BIOLOGICAL ACTIVITY AT SL-1 AND BORAX I SITES 10169 00
22-SEP-95 UNDERWOOD, E. J. IDHW TRANSMITTAL OF VARIOUS DOCUMENTS FOR OPERABLE UNIT (OU) 5-05 AND 6-01 10170 00
20-SEP-95 GREEN, L. A. COMMENT RESOLUTION TABLES FOR 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS), PROPOSED PLAN OPE-ER-176-95 00
20-SEP-95 JINES, A. ASSESSMENT OF RISK FROM EXTERNAL EXPOSURE TO RADIATION FROM CONTAMINATION BROUGHT TO SURFACE BY BIOLOGICAL ACTIVITY AT SL-1 AND BORAX I SITES OPE-ER-177-95 00
13-SEP-95 GREEN, L. A. TRANSMITTAL OF VARIOUS DOCUMENTS FOR OU 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS) OPE-ER-187-95 00
12-SEP-95 GREEN, L. A. TRANSMITTAL OF VARIOUS DOCUMENTS FOR OPERABLE UNITS (OU) 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS) OPE-ER0-172-95 00
07-SEP-95 JORGENSEN, D. K. ENGINEERING DESIGN FILE (EDF) - ARA WINDBLOWN AREA RISK EVALUATION - (EDF SERIAL NUMBER IS INEL-95/103) ER-WAG5-54 02
01-SEP-95 HOLDREN, K. J. ASSESSMENT OF SURFACE SOILS SURROUNDING SL-1 BURIAL GROUNDS 10137 00
30-AUG-95 FILEMYR, R. G. SUPPORT DOCUMENTATION: ESTIMATION OF URANIUM-235 SURFACE SOIL CONCENTRATIONS BASED ON MASS UNRECOVERED AT BORAX I BURIAL GROUNDS 10133 00
30-AUG-95 FILEMYR, R. G. ERRATA FOR REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OPERABLE UNITS (OU) 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS 10134 00
30-AUG-95 FILEMYR, R. G. SUPPORT DOCUMENTATION; ANNUAL DOSE CALCULATIONS FOR SELECTED SCENARIOS AT SL-1 AND BORAX I BURIAL GROUNDS 10135 00
30-AUG-95 FILEMYR, R. G. SL-1 & BORAX I CLASS C WASTE EQUIVALENCY DETERMINATION 10136 00
22-AUG-95 ORLEAN, H. EPA COMMENTS ON FINAL DRAFT RECORD OF DECISION (ROD) FOR OU 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) 10162 00
18-AUG-95 UNDERWOOD, E. J. IDHW REVIEW COMMENTS ON OPERABLE UNIT (OU) 5-05 AND 6-01 DRAFT RECORD OF DECISION (ROD) 10168 00
07-AUG-95 DOE, EPA, IDHW NO FURTHER ACTION DETERMINATION FOR TRACK 1 INVESTIGATION OF UST WMO-703 - DECISION DOCUMENTATION PACKAGE 10047 00
03-AUG-95 GREEN, L. A. TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS (OU 5-05 & 6-01) & TEN (10) NO ACTION SITES RECORD OF DECISION (ROD) - DRAFT FOR REVIEW OPE-ER-146-95 00
25-JUL-95 BLOOD, H. R. EPA COMMENTS ON DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT, VOLUME 1 OF 2 (VOL.01 OF VOL.02) FOR OPERABLE UNIT (OU) 5-05 & 6-01 SL-1 & BORAX I BURIAL GROUNDS 10158 00
07-JUL-95 ORLEAN, H. EPA COMMENTS ON ASSESSMENT OF SURFACE SOILS SURROUNDING SL-1 BURIAL GROUND 10161 00
24-JUN-95 DOE, EPA, IDHW BORAX-09 (BORAX V REACTOR BUILDING) TRACK 1 TO BE INCLUDED IN WAG-6 & WAG-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - DECISION DOCUMENTATION PACKAGE 10030 00
20-JUN-95 UNDERWOOD, E. J. IDAHO DEPARTMENT OF HEALTH AND WELFARE, DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON ASSESSMENT OF SURFACE SOILS SURROUNDING THE SL-1 BURIAL GROUND AND ARA WINDBLOWN AREA RISK EVALUATION 10167 00
18-MAY-95 DANE, R. INEL PROPOSED PLANS PUBLIC MEETING & COMMENT SESSION TRANSCRIPT - PRESENTATION 1: SL-1 & BORAX I BURIAL SITE INVESTIGATIONS & TRACK 1'S - PRESENTATION 2: CFA LANDFILLS & TRACK 1'S - HELD IN MOSCOW, IDAHO MAY 18, 1995 (05/18/96) 10157 00
17-MAY-95 SCHWARTZ, N. INEL PROPOSED PLANS PUBLIC MEETING & COMMENT SESSION TRANSCRIPT - PRESENTATION 1: SL-1 & BORAX I BURIAL SITE INVESTIGATIONS & TRACK 1'S - PRESENTATION 2: CFA LANDFILLS TRACK 1'S - HELD IN BOISE, IDAHO MAY 17, 1995 (05/17/95) 10156 00
16-MAY-95 DANE, R. INEL PROPOSED PLANS PUBLIC MEETING & COMMENT SESSION TRANSCRIPT - PRESENTATION 1: SL-1 & BORAX I BURIAL SITE INVESTIGATIONS & TRACK 1'S - PRESENTATION 2: CFA LANDFILLS & TRACK 1'S - HELD IN IDAHO FALLS MAY 16, 1995 (05/16/95) 10155 00
02-MAY-95 GREEN, L. A. TRANSMITTAL OF PROPOSED PLAN FOR OU 5-05, SL-1 BURIAL BURIAL GROUND AND 6-01, BORAX I BURIAL GROUND AND VARIOUS NO ACTION TRACK 1 SITES OPE-ER-086-95 00
01-MAY-95 DOE, EPA, IDHW PROPOSED PLAN FOR OPERABLE UNITS (OU) 5-05 AND 6-01 STATIONARY LOW POWER REACTOR 1 (SL-1) AND THE BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS 10011 00
01-APR-95 DOE, EPA, IDHW NOTICE OF AVAILABILITY FOR CFA LANDFILL I, II, & III OU 4-12, STATIONARY LOW POWER REACTOR 1 (SL-1) & BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS OU 5-05 & 6-01 10013 00
01-APR-95 INEL COMMUNITY RELATIONS UPDATE FACT SHEET - INEL INVESTIGATES REACTOR DEBRIS 9649 00
20-MAR-95 UNDERWOOD, E. J. IDHW REVIEW COMMENTS ON OPERABLE UNIT (OU) 5-05 AND 6-01 DRAFT PROPOSED PLAN 10166 00
17-MAR-95 BLOOD, H. R. EPA COMMENTS ON DRAFT PROPOSED PLAN FOR SL-1 & BORAX I BURIAL GROUNDS (OU 5-05 & 6-01) 10160 00
01-MAR-95 FILEMYR, R. G. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS INEL-95/0027 00
01-MAR-95 HOLDREN, K. J. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS INEL-95/0027 00
01-MAR-95 VETTER, D. W. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS INEL-95/0027 00
01-MAR-95 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 INEL-95/0086 04
17-FEB-95 BLOOD, H. R. EPA COMMENTS ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS 10159 00
17-FEB-95 RENO, S. L. IDHW COMMENTS ON REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) - DRAFT FINAL 10165 00
08-FEB-95 NOT SPECIFIED NO FURTHER ACTION DETERMINATION FOR THE TRACK 1 INVESTIGATION OF UNDERGROUND STORAGE TANKS (UST) 602-SW1 AND 602-SW2 - DECISION DOCUMENTATION PACKAGE 5870 00
06-FEB-95 NOT SPECIFIED NO FURTHER ACTION DETERMINATION FOR TRACK 1 INVESTIGATION OF UNDERGROUND STORAGE TANK (UST) AEF-601W - DECISION DOCUMENTATION PACKAGE 5877 00
02-DEC-94 VETTER, D. W. RECORD OF MEETING WITH CRAIG KVAMME, LITCO, REGARDING BASIS FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) DISPOSAL COSTS 10027 00
04-NOV-94 AR COORDINATOR OPERABLE UNIT (OU) 6-04 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR OU 6-04 AR.INDEX.OU.6-04 00
09-SEP-94 GREEN, L. A. REVISION OF SCHEDULE FOR OPERABLE UNIT (OU) 5-05 SL-1 BURIAL GROUND SITE ARA-06 AND 6-01 BORAX I BURIAL GROUND SITE BORAX-02 OPE-ER-237-94 00
01-SEP-94 INEL COMMUNITY RELATIONS INEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - DOE STUDIES TWO (2) RADIONUCLIDE BURIAL GROUNDS 7865 00
01-AUG-94 RENO, S. L. COMMENTS IN REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) VOLUME 1 OF 2 (DRAFT) - VOL.01 OF VOL.02 10164 00
25-JUL-94 PAARMANN, M. L. TRACK 1 INVESTIGATION OF EBR-10 UNDERGROUND STORAGE TANK (UST) (WMO-705) - NO FURTHER ACTION DETERMINATION DECISION DOCUMENTATION PACKAGE 5730 00
06-JUL-94 HOLDREN, K. J. INTERVIEWS WITH DARRELL HANNI REGARDING THE STATIONARY LOW POWER REACTOR SL-1 BURIAL GROUND KJH-09-94 00
15-JUN-94 LYLE, J. L. TRANSMITTAL OF THE DRAFT REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS, VOLUME 1 (VOL.01) OF 2 OPE-ER-157-94 00
07-JUN-94 NOT SPECIFIED TRACK 1 INVESTIGATION OF BORAX-01 BORAX V LEACH POND - SITE TO BE INCLUDED IN OU 10-06 RI/FS 5757 00
01-MAY-94 DOE COMPREHENSIVE WELL SURVEY FOR INEL VOLUME II (VOL.02), REVISION 3 (REV.03) - EXPERIMENTAL BREEDER REACTOR (EBR) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) DOE/ID-10402,VOL.02 03
15-APR-94 MEADOWS, D. RECORD OF MEETING WITH ROGER WILHELMSON, EG&G IDAHO REGARDING PIPES IN STATIONARY LOW POWER REACTOR 1 (SL-1) 10024 00
14-APR-94 MEADOWS, D. RECORD OF MEETING WITH EDDY CHEW, DEPARTMENT OF ENERGY (DOE) IDAHO, REGARDING STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND - PIPES 10025 00
14-APR-94 HOLDREN, K. J. MEMO OF CONVERSATION WITH RICHARD GREEN REGARDING PIPES IN STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND 10028 00
01-MAR-94 HALFORD, V. E. RI/FS SCOPE OF WORK FOR OPERABLE UNITS (OU) 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EGG-ER-10998 01
17-FEB-94 TUCKER, J. RECORD OF MEETING WITH DICK MESERVEY, EG&G IDAHO REGARDING BOILING WATER REACTOR EXPERIMENT (BORAX) I 10023 00
16-FEB-94 VANDERPOEL, G. RECORD OF MEETING WITH ROGER G. JENSEN, USGS REGARDING DEPTH TO AQUIFER NEAR BOILING WATER REACTOR EXPERIMENT (BORAX) I & STATIONARY LOW POWER REACTOR 1 (SL-1) 10022 00
25-JAN-94 MEADOWS, D. RECORD OF MEETING WITH GLENN BRISCOE REGARDING STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND 10026 00
07-DEC-93 PAARMANN, M. L. NO ACTION SITE FOR THE EBR-1 SEPTIC TANK (AEF-702) AND SEEPAGE PIT (AEF-703) 5575 00
07-DEC-93 PAARMANN, M. L. NO ACTION SITE FOR THE EBR-1 SEEPAGE PIT (WMO-702) 5576 00
07-DEC-93 PAARMANN, M. L. NO ACTION SITE FOR THE EBR-1 CESSPOOL, SEPTIC TANK (EBR-709), AND SEEPAGE PIT (EBR-713) 5577 00
07-DEC-93 PAARMANN, M. L. NO ACTION SITE FOR THE EBR-1 SEPTIC TANK (WMO-701) 5578 00
07-DEC-93 PAARMANN, M. L. NO ACTION SITE FOR THE EBR-1 SEPTIC TANK (EBR-714) AND SEEPAGE PIT (EBR-716) 5579 00
03-DEC-93 NOT SPECIFIED NO FURTHER ACTION DETERMINATION FOR THE TRACK 1 INVESTIGATION OF THE UNDERGROUND STORAGE TANK (UST) WMO-704 - DECISION DOCUMENTATION PACKAGE 5594 00
03-DEC-93 DOE, EPA, IDHW NO FURTHER ACTION DETERMINATION FOR THE TRACK 1 INVESTIGATION OF UNDERGROUND STORAGE TANK (UST) EBR-1 717 - DECISION DOCUMENTATION PACKAGE 5595 00
03-DEC-93 NOT SPECIFIED NO FURTHER ACTION DETERMINATION FOR THE TRACK 1 INVESTIGATION OF THE SEPTIC TANK AEF-703 AND LEACH FIELD - DECISION DOCUMENTATION PACKAGE 5596 00
02-DEC-93 PAARMANN, M. L. NO FURTHER ACTION DETERMINATION FOR TRACK 1 INVESTIGATION OF RADIOACTIVELY CONTAMINATED SOIL IN VICINITY OF EBR-1 - DECISION DOCUMENTATION PACKAGE 5593 00
02-NOV-93 BLOOD, H. R. EPA COMMENTS: THE DRAFT RI/FS SCOPE OF WORK FOR OPERABLE UNITS (OU) 5-05 AND 6-01, SL-1 AND BORAX I BURIAL GROUNDS 5623 00
01-NOV-93 NOT SPECIFIED TECHNICAL MEMORANDUM - PRELIMINARY BASELINE RISK ASSESSMENT (BRA) FOR OU 5-05 & 6-01, SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) MISC-94001 00
26-OCT-93 STOOPS, T. M. IDHW-DEQ COMMENTS TO THE DRAFT SCOPE OF WORK (SOW) FOR THE RI/FS FOR OU 5-05 (SL-1 BURIAL GROUND) AND OU 6-01 (BORAX I BURIAL GROUND) 5773 00
01-OCT-93 NOT SPECIFIED TECHNICAL MEMORANDUM - OVERVIEW OF EXPOSURE SCENARIOS FOR BASELINE RISK ASSESSMENT (BRA) OU 5-05, 6-01 STATIONARY LOW POWER REACTOR, BORAX I BURIAL GROUNDS REMEDIAL INVESTIGATION (RI) 5662 00
02-AUG-93 BARRY, G. A. TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) 93MSE/ID-225 00
01-AUG-93 BARRY, G. A. SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 6744 00
01-JUN-93 SEHLKE, G. WELL FITNESS EVALUATION FOR INEL, VOLUME 1 (VOL.01) DOE/ID-10392,VOL.01 00
08-APR-93 PAARMANN, M. L. TRACK 1 INVESTIGATION - BORAX-04 BORAX TRASH DUMP - DECISION DOCUMENTATION PACKAGE 5259 00
08-APR-93 PAARMANN, M. L. TRACK 1 INVESTIGATION - EBR-07 EBR-1 (AEF-704) FUEL OIL TANK AT AEF-603 (MAP SAYS DIESEL) - DECISION DOCUMENTATION PACKAGE 5260 00
08-APR-93 PAARMANN, M. L. TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - EBR-11 EBR-1 FUEL OIL TANK (EBR-706) 5261 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
08-APR-93 PAARMANN, M. L. TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE- EBR-12 EBR-1 DIESEL TANK (EBR-707) 5262 00
08-APR-93 PAARMANN, M. L. TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - EBR-13 EBR-1 GASOLINE TANK (EBR-708) 5263 00
01-DEC-92 ARAVE, A. E. FINAL REPORT - DECONTAMINATION AND DECOMMISSIONING (D&D) OF BORAX V FACILITY TURBINE BUILDING EGG-2683 00
12-MAY-92 WILLIAMS, A. C. APRIL 23, 1992 (04/23/92) MEETINGS ON REVIEW OF OPERABLE UNIT (OU) 6-02 TRACK 1 DECISION DOCUMENTATION PACKAGE ERD1-123-92 00
08-FEB-89 PIGOTT, W. R. INITIAL ASSESSMENT - EBR-1 RADIOACTIVE SOIL CONTAMINATION EBR-15 576 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - BORAX-02 BORAX I BURIAL SITE 2629 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - BORAX-01 BORAX I I- V LEACH POND 2763 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - BORAX-03 AEF SEPTIC TANK AEF-703 2766 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - BORAX-04 BORAX TRASH DUMPS 2767 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - BORAX-05 FUEL OIL TANK, SOUTHWEST OF AEF-602 2768 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - BORAX-07 INACTIVE FUEL OIL TANK BY AEF-601 3003 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EBR-11 EBR-1 FUEL OIL TANK EBR-706 2633 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EBR-03 EBR-1 SEEPAGE PIT WMO-702 2634 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EBR-04 EBR-1 SEPTIC TANK WMO-701 2635 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EBR-06 - EBR-1 SEPTIC TANK (EBR-714) & SEEPAGE PIT (EBR-716) 2637 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EBR-07 EBR-1 AEF-704 FUEL OIL TANK AT AEF-603 (MAP SAYS DIESEL) 2638 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EBR-08 EBR-1 WMO-703 FUEL OIL TANK, SOON INACTIVE 2639 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EBR-09 EBR-1 WMO-704 FUEL OIL TANK AT WMO-601 2640 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EBR-10 EBR-1 WMO-750 GASOLINE TANK 2641 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT- EBR-12 EBR-1 DIESEL TANK EBR-707 2643 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EBR-13 EBR-1 GASOLINE TANK EBR-708 2644 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EBR-14 EBR-1 GASOLINE TANK EBR-717 2645 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EBR-02 - EBR-1 SEPTIC TANK (AEF-702) & SEEPAGE PIT (AEF-703) 2765 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EBR-05 EBR-1 CESSPOOL, SEPTIC TANK EBR-709 & SEEPAGE PIT EBR-713 2770 00
01-JAN-85 SMITH, D. L. FINAL REPORT DECONTAMINATION & DECOMMISSIONING (D&D) OF BORAX V LEACH POND EGG-2300 00
01-JUL-75 KENDALL, E. W. DECONTAMINATION & DECOMMISSIONING (D&D) OF EBR-I COMPLEX FINAL REPORT (ARVFS/NAK) ANCR-1242 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page