Select By Waste Area Group (WAG)

For WAG 5

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
06-AUG-18 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY2017 RPT-1635 0
18-DEC-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 10
01-MAY-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY2016 RPT-1543 0
01-JAN-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2015 RPT-1503 0
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JUN-16 NOT SPECIFIED QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 9, 10, AND REMOVAL ACTIONS DOE/ID-10587 11
08-FEB-16 FAULK, DENNIS EPA CONCURRENCE ON THE IDAHO NATIONAL LAB 5 YEAR REVIEW 5282268 0
31-DEC-15 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2010-2014 DOE/ID-11513 0
01-AUG-15 NOT SPECIFIED INL SITE COMMUNITY INVOLVEMENT PLAN DOE/ID-11518 0
01-JUN-15 NOT SPECIFIED ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT DOE/ID-11293 3
01-MAY-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2014 RPT-1361 0
01-APR-15 NOT SPECIFIED ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT DOE/ID-11293 2
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
01-MAY-14 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2013 RPT-1268 0
01-SEP-13 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 8
01-JUN-13 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2012 RPT-1196 0
01-JUL-12 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2011 RPT-1001 0
30-APR-12 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 7
01-SEP-11 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES TO REVISE INSTITUTIONAL CONTROLS IN VARIOUS RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11439 0
01-AUG-11 NOT SPECIFIED REMOVAL ACTION REPORT FOR THE IDAHO CLEANUP PROJECT POWER BURST FACILITY AND WASTE EXPERIMENTAL REDUCTION FACILITY DOE/ID-11445 0
07-FEB-11 OPALSKI, DANIEL D. U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE ON THE FIVE-YEAR REVIEW FOR IDAHO NATIONAL LABORATORY FISCAL YEARS 2005-2009 4544925 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 1) DOE/ID-11429 (PART 1) 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 2) DOE/ID-11429 (PART 2) 0
13-JAN-11 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2010 RPT-759 0
31-AUG-09 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 10, AND REMOVAL ACTIONS DOE/ID-10587 10
09-JAN-09 RENO, SCOTT L. ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (ICP) DOE/ID-11293 1
05-FEB-08 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS DOE/ID-11042 04
30-OCT-07 NELSON, L. O. IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2007 DOE/ID-11350 00
31-JUL-07 HANEY, T. J. LONG-TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2007 DOE/ID-11316 01
09-JUL-07 CULP, B. ACTION MEMORANDUM FOR POWER BURST FACILITY (PBF) (PER-620) FINAL END STATE AND PBF VESSEL DISPOSAL DOE/ID-11331 00
09-MAY-07 WELLS, R. P. ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP (WAG-5) FOR FISCAL YEAR 2007 (FY-07) RPT-382 00
04-MAY-07 STALEY, C. S. STREAMLINED RISK ASSESSMENT FOR DECONTAMINATION AND DECOMMISSIONING (D&D) OF THE POWER BURST FACILITY (PBF) REACTOR FACILITY EDF-7433 01
01-MAY-07 CULP, B. ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR POWER BURST FACILITY (PBF) (PER-620) FINAL END STATE AND POWER BURST FACILITY (PBF) VESSEL DISPOSAL DOE/ID-11309 00
16-APR-07 MCCARTHY, J. M. GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE POWER BURST FACILITY (PBF) CLOSURE - 2007 UPDATE EDF-7618 01
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
02-OCT-06 OLAVESON, B. E. IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2006 DOE/ID-11294 00
28-SEP-06 NESSHOEFER, C. A. POWER BURST FACILITY (PBF) BELOW AND ABOVE GRADE SOURCE TERMS EDF-7000 00
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
27-JUL-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN DOE/ID-11042 03
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
06-JUN-06 WELLS, R. P. ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP (WAG-5) FOR FISCAL YEAR 2006 (FY-06) RPT-220 00
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
26-SEP-05 WELLS, R. P. PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 5 (WAG-5) ICP/EXT-05-00973 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
22-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2005 (FY-05) DOE/ID-11249 00
30-AUG-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2004 (FY-04) DOE/NE-ID-11200 00
23-AUG-05 WELLS, R. P. OPERATIONS AND MAINTENANCE (O&M) REPORT FOR OPERABLE UNIT (OU) 5-12 DOE/NE-ID-11228 00
13-JUL-05 WELLS, R. P. REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 5-12 REMEDIAL ACTION DOE/NE-ID-11205 00
07-JUN-05 RODDY, M. S. ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 5 (WAG-5) FOR FISCAL YEAR 2005 (FY-05) ICP/EXT-05-00901 00
16-FEB-05 AR COORDINATOR PER-620 REMOVAL ACTION - IDAHO COMPLETION PROJECT (ICP) ADMINISTRATIVE RECORD (AR) INDEX FOR THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) AR.INDEX.NTCRA.PER-620 00
15-FEB-05 RENO, S. L. ACTION MEMORANDUM FOR PHASE 1 (PHASE I) OF THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) - PUBLIC COMMENTS AND RESPONSES TO SIGNIFICANT COMMENTS ARE INCLUDED IN APPENDIX A, APPENDIX B, APPENDIX C AND APPENDIX D DOE/NE-ID-11213 00
15-FEB-05 HARKER, W. S. DOE RESPONSE TO CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #120 ON THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR PHASE 1 OF DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) EM-FMDP-05-007 00
11-FEB-05 AR COORDINATOR OPERABLE UNIT (OU) 5-12 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - OU 5-12 - INCLUDES NEW SITE IDENTIFICATION (NSI) DOCUMENT AR.INDEX.OU.5-12 02
26-JAN-05 AR COORDINATOR OPERABLE UNIT (OU) 5-12 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - OU 5-12 - INCLUDES EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) DOCUMENT ID #DOE/ID-11017 AR.INDEX.OU.5-12 01
05-JAN-05 DOE EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR THE POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) - (PBF/ARA) OPERABLE UNIT (OU) 5-12 DOE/ID-11017 00
17-DEC-04 RENO, S. L. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR PHASE 1 (PHASE I) OF THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) DOE/NE-ID-11196 00
13-DEC-04 SHAW, R. M. TRANSMITTAL OF EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 AND SIGNATURE READY COPIES OF ESD FOR THE ROD FOR POWER BURST FACILITY AUXILARY REACTOR AREA (PBF/ARA) OU 5 FMDP-FFA/CO-04-085 00
04-NOV-04 RODDY, M. S. ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 5 (WAG-5) FOR FISCAL YEAR 2004 (FY-04) ICP/EXT-04-00369 01
27-OCT-04 RENO, S. L. NEW SITE IDENTIFICATION (NSI) FOR PBF-37 - CONTAMINATED SOILS BENEATH PER-751 PUMP HOUSE FLOOR SLAB AND FOUNDATION 24889 00
20-SEP-04 RODDY, M. S. ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 5 (WAG-5) FOR FISCAL YEAR 2004 (FY-04) ICP/EXT-04-00369 00
09-SEP-04 SMITH, D. M. GROUNDWATER MONITORING PLAN (GMP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) DOE/ID-10779 02
03-AUG-04 HAIN, K. E. TRANSMITTAL OF DRAFT ENGINEERING EVALUATION COST ANALYSIS (EC/CA) FOR POWER BURST FACILITY (PBF) REACTOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) - ISSUE PAPER INCLUDED EM-ER-04-172 00
01-AUG-04 PRATT, M. B. DRAFT ENGINEERING EVALUATION COST ANALYSIS (EC/CA) FOR PBF REACTOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) DOE/NE-ID-11187 0A
28-MAY-04 HOLMES, F. C. APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSION AND DISMANTLEMENT (D&D) OF PBF-620 (PER-620) , POWER BURST FACILITY (PBF) REACTOR, IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) 24887 00
23-MAR-04 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10587 08
24-SEP-03 WELLS, R. P. FINAL DOCUMENTATION FOR OPERABLE UNIT (OU) 5-12 NO ACTION SITES DOE/ID-11058 00
18-SEP-03 JOLLEY, W. L. ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 5 (WAG-5) FOR FISCAL YEAR 2003 (FY-03) INEEL/EXT-03-00729 00
22-AUG-03 HATHAWAY, C. TRANSMITTAL TO THE AGENCIES OF THE ANNUAL WASTE AREA GROUP 5 (WAG-5) INSTITUTIONAL CONTROLS STATUS REPORT EM-ER-03-210 00
19-AUG-03 WELLS, R. P. INSTITUTIONAL CONTROLS STATUS REPORT FOR THE POWER BURST FACILITY AND AUXILIARY REACTOR AREA (PBF/ARA), OPERABLE UNIT (OU) 5-12, FOR FISCAL YEAR 2003 (FY-03) DOE/ID-11064 00
01-AUG-03 GILES, J. R. 2003 ANNUAL INSPECTION SUMMARY FOR STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND INEEL/EXT-03-01126 00
01-APR-03 WELLS, R. P. GROUNDWATER MONITORING PLAN (GMP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) DOE/ID-10779 01
01-APR-03 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II FOR WASTE AREA GROUP 5 (WAG-5) DOE/ID-10798 01
01-APR-03 GILES, J. R. FIELD SAMPLING PLAN (FSP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) PHASE II DOE/ID-10808 01
01-APR-03 ROBERTS, J. D. HEALTH & SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 5-12 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) PROJECTS INEEL/EXT-2000-00515 02
25-MAR-03 IDEQ STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS AND RESOLUTIONS - FIELD SAMPLING PLAN (FSP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) PHASE II 24792 00
25-MAR-03 IDEQ STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS AND RESOLUTIONS - GROUNDWATER MONITORING PLAN (GMP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) 24793 00
25-MAR-03 EPA U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS AND RESOLUTIONS - WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, PHASE II 24794 00
25-MAR-03 IDEQ STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS AND RESOLUTIONS - WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, PHASE II 24795 00
10-FEB-03 LIVIERATOS, T. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) PHASE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 1 (REV.01) 24770 00
10-FEB-03 LIVIERATOS, T. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON THE DRAFT FINAL GROUNDWATER MONITORING PLAN (GMP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) 24772 00
10-FEB-03 KOCH, D. F. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON THE FIELD SAMPLING PLAN (FSP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) PHASE II 24773 00
06-FEB-03 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) PHASE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 1 (REV.01) 24771 00
23-JAN-03 HATHAWAY, C. TRANSMITTAL OF DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) TO THE WAG-5 RECORD OF DECISION (ROD) EM-ER-03-018 00
22-NOV-02 HATHAWAY, C. TRANSMITTAL OF REVISED INSTITUTIONAL CONTROLS STATUS REPORT FOR THE POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OPERABLE UNIT (OU) 5-12 FOR THE YEAR 2002 (PBF/ARA) - WASTE AREA GROUP 5 (WAG-5) EM-ER-02-199 00
12-NOV-02 WELLS, R. P. INSTITUTIONAL CONTROLS STATUS REPORT FOR THE POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OPERABLE UNIT (OU) 5-12 FOR THE YEAR 2002 (PBF/ARA) WASTE AREA GROUP 5 (WAG-5) DOE/ID-11018 01
05-NOV-02 HATHAWAY, C. TRANSMITTAL OF ANNUAL GROUNDWATER MONITORING STATUS (TRENDING) REPORT FOR WASTE AREA GROUP 5 (WAG-5) FOR FISCAL YEAR 2002 (FY-02) EM-ER-02-188 00
09-OCT-02 JOLLEY, W. L. ANNUAL GROUNDWATER MONITORING STATUS (TRENDING) REPORT FOR WASTE AREA GROUP 5 (WAG-5) FOR FISCAL YEAR 2002 (FY-02) INEEL/EXT-02-01032 00
12-SEP-02 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 DOE/ID-10587 07
29-AUG-02 WELLS, R. P. INSTITUTIONAL CONTROLS STATUS REPORT FOR THE POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OPERABLE UNIT (OU) 5-12 FOR THE YEAR 2002 (PBF/ARA) - WASTE AREA GROUP 5 (WAG-5) DOE/ID-11018 00
14-MAR-02 LIVIERATOS, T. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS ON WASTE AREA GROUP 5 (WAG-5) INSTITUTIONAL CONTROLS STATUS REPORT FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OPERABLE UNIT (OU) 5-12 (PBF/ARA) FOR YEAR 2 10967 00
01-FEB-02 WELLS, R. P. INSTITUTIONAL CONTROLS STATUS REPORT FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OPERABLE UNIT (OU) 5-12 (PBF/ARA) FOR YEAR 2001 DOE/ID-10977 00
09-JAN-02 LIVIERATOS, T. IDEQ REVIEW COMMENTS AND RESOLUTIONS ON REMEDIAL ACTION (RA) REPORT FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 PHASE I REMEDIAL ACTION (RA); SITES ARA-02, ARA-16, ARA-25, AND INACTIVE SITES ARA-07, ARA-08, ARA-13 AND ARA-21 (DRAFT FINAL) 10953 00
01-JAN-02 WELLS, R. P. REMEDIAL ACTION (RA) REPORT FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 PHASE I REMEDIAL ACTION (RA) SITES ARA-02, ARA-16, ARA-25, AND INACTIVE WASTE SYSTEM SITES ARA-07, ARA-08, ARA-13, AND ARA-21 DOE/ID-10954 00
03-DEC-01 LIVIERATOS, T. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) GENERAL AND SPECIFIC COMMENTS ON REMEDIAL ACTION (RA) REPORT FOR WAG-5 OU 5-12 PHASE I REMEDIAL ACTION (RA); SITES ARA-02, ARA-16, ARA-25, AND INACTIVE SITES ARA-07, ARA-08, ARA-13 AND ARA-21 (DRAFT) 21566 00
28-AUG-01 HATHAWAY, C. WASTE AREA GROUP 5 (WAG-5) EXTENSION REQUEST FOR PHASE I PRE-FINAL INSPECTION REPORT AND REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 5-12 EM-ER-01-143 00
17-AUG-01 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) REMEDIAL ACTION (RA) REVIEW - INEEL STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR 1 (BORAX I) BURIAL GROUNDS 23603 00
17-AUG-01 POETON, R. W. U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) REGION 10 OFFICE OF ENVIRONMENTAL CLEANUP REMEDIAL ACTION REVIEW - INEEL STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS 24742 00
26-JUN-01 HATHAWAY, C. TRANSMITTAL OF REVISION 1 (REV.01) OF WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 POWER BURST FACILITY & AUXILIARY REACTOR AREA (PBF/ARA) PHASE I REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EM-ER-01-111 00
19-JUN-01 WELLS, R. P. WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE I - OPERABLE UNIT (OU) 5-12 DOE/ID-10761 01
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
14-JUN-01 HATHAWAY, C. DISPOSAL OF WASTE AREA GROUP 5 (WAG-5) AUXILIARY REACTOR AREA 13 (ARA-13) SEPTIC WASTE AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPE-EM-ER-01-103 00
08-MAY-01 HATHAWAY, C. 2001 ANNUAL INSPECTION SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-05 STATIONARY LOW POWER REACTOR 1 (SL-1) AND OU 6-01 BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS EM-ER-01-077 00
19-APR-01 HATHAWAY, C. TRANSMITTAL OF FISCAL YEAR 2001 (FY-2001) ANNUAL GROUNDWATER MONITORING TRENDING REPORT FOR WASTE AREA GROUP 5 (WAG-5) EM-ER-01-072 00
12-APR-01 WELLS, R. P. FISCAL YEAR 2001 (FY-2001) ANNUAL GROUNDWATER MONITORING TRENDING REPORT FOR WASTE AREA GROUP 5 (WAG-5) INEEL/EXT-01-00268 00
12-APR-01 WOOLEY, K. A. HEALTH & SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 5-12 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) PROJECTS INEEL/EXT-2000-00515 01
22-FEB-01 HATHAWAY, C. TRANSMITTAL OF WASTE AREA GROUP 5 (WAG-5) FISCAL YEAR 2001 (FY-2001) GROUNDWATER MONITORING ANALYTICAL DATA (L&V REPORTS) EM-ER-01-036 00
19-DEC-00 WELLS, R. P. OPERATIONS AND MAINTENANCE (O&M) PLAN FOR POWER BURST FACILITY AND AUXILIARY REACTOR AREA (PBF/ARA) OPERABLE UNIT (OU) 5-12 - APPENDIX A IS THE INSTITUTIONAL CONTROL PLAN DOE/ID-10805 00
19-DEC-00 HATHAWAY, C. TRANSMITTAL OF WASTE AREA GROUP 5 (WAG-5) DRAFT FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II EM-ER-244-00 00
18-DEC-00 WELLS, R. P. WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II DOE/ID-10798 00
13-DEC-00 GILES, J. R. FIELD SAMPLING PLAN (FSP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) PHASE II DOE/ID-10808 00
07-DEC-00 HATHAWAY, C. TRANSMITTAL OF AUXILIARY REACTOR AREA 02 (ARA-02) SANITARY WASTE SYSTEM ANALYTICAL DATA (L&V REPORTS) EM-ER-231-00 00
27-OCT-00 HATHAWAY, C. TRANSMITTAL OF AUXILIARY REACTOR AREA 21 (ARA-21) ARA-IV TEST AREA SEPTIC TANK AND CHLORINATION TANK ANALYTICAL DATA (L&V REPORTS) EM-ER-207-00 00
27-OCT-00 HATHAWAY, C. DISPOSAL OF WASTE AREA GROUP 5 (WAG-5) AUXILIARY REACTOR AREA 16 (ARA-16) AND ARA-25 SOILS AND PIPING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPE-EM-ER-205 00
26-OCT-00 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II 21902 00
05-OCT-00 HATHAWAY, C. TRANSMITTAL OF OPERABLE UNIT (OU) 5-05 STATIONARY LOW POWER 1 (SL-1) BURIAL GROUNDS & OU 6-01 BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIED REACTOR ANNUAL INSPECTION REPORT, DE-AC07-99ID13727 EM-ER-191-00 00
01-OCT-00 WELLS, R. P. GROUNDWATER MONITORING PLAN (GMP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) DOE/ID-10779 00
25-SEP-00 WEBBER, F. L. INSTITUTIONAL CONTROLS STATUS REPORT FOR POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) OPERABLE UNIT (OU) 5-12 DOE/ID-10797 00
20-SEP-00 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV DOE/ID-10587 06
01-JUN-00 INEEL COMMUNITY RELATIONS INEEL REPORTER - WASTE AREA GROUP 5 (WAG-5) CLEANUP UNDERWAY WITH GOAL OF SAVING $2.4 MILLION - JUNE 2000 - JULY 2000 (06/2000 - 07/2000) 21213 00
01-APR-00 HIARING, C. M. POWER BURST FACILITY & AUXILIARY REACTOR AREA (PBF/ARA) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 DOE/ID-10722 00
06-MAR-00 AR COORDINATOR OPERABLE UNIT (OU) 5-12 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - OU 5-12 AR.INDEX.OU.5-12 00
07-FEB-00 DOE RECORD OF DECISION (ROD) FOR POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) OPERABLE UNIT (OU) 5-12 DOE/ID-10700 00
11-JAN-00 O'NEILL, K. C. TRANSMITTAL OF OPERABLE UNIT (OU) 5-12 RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPE-ER-06-00 00
05-JAN-00 DOE DEPARTMENT OF ENERGY (DOE) RESPONSE & RESOLUTIONS TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 10820 00
03-JAN-00 DOE NEW SITE IDENTIFICATION (NSI) - ARA-24 OPERABLE UNIT (OU) 5-12 - RADIOLOGICALLY CONTAMINATED SOIL AND ABANDONED SUBSTRUCTURES AT ARA-III 19276 00
22-DEC-99 DOE DEPARTMENT OF ENERGY (DOE) RESPONSE & RESOLUTIONS TO IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 10821 00
16-DEC-99 O'NEILL, K. C. TIME EXTENSION REQUESTED TO INCORPORATE COMMENTS ON OPERABLE UNIT (OU) 5-12 DRAFT RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPE-ER-200-99 00
09-DEC-99 GILES, J. R. ENGINEERING DESIGN FILE (EDF) - EXTENT OF SILVER-108M CONTAMINATION AT AUXILIARY REACTOR AREA III (ARA-III) RADIOACTIVE WASTE LEACH POND CERCLA SITE ARA-12 - FUNCTIONAL FILE #INEEL/EXT-99-01241 EDF-ER-103 00
08-DEC-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 10818 00
08-DEC-99 KOCH, D. F. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 10819 00
01-DEC-99 AR COORDINATOR OPERABLE UNIT (OU) 5-08 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 5-08 AR.INDEX.OU.5-08 00
01-DEC-99 AR COORDINATOR OPERABLE UNIT (OU) 5-09 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 5-09 AR.INDEX.OU.5-09 00
18-NOV-99 NOT SPECIFIED SPERT II AIR COMPRESSOR - ELECTRONIC NOTES REGARDING LOCATION 10803 00
18-NOV-99 ROSE, K. A. IDHW CONCURRENCE WITH HAZARDOUS WASTE DETERMINATION (HWD) FOR ARA-I BUILDING ARA-626 HOT CELLS 1 AND 2 CONCRETE FLOORS AND SOILS BENEATH THE FLOORS 10804 00
26-OCT-99 HAIN, K. E. TRANSMITTAL OF SUMMARY REPORT FOR SEGMENTED GATE SYSTEM TREATABILITY STUDY (TS) OPE-ER-169-99 00
07-OCT-99 KOCH, D. F. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR POWER BURST FACILITY AND AUXILIARY REACTOR AREA (PBF/ARA) OPERABLE UNIT (OU) 5-12 - DOE/ID-10700, AUGUST 1999 (10/99) 10795 02
01-OCT-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL 10794 00
01-OCT-99 GILES, J. R. SUMMARY REPORT FOR SEGMENTED GATE SYSTEM TREATABILITY STUDY (TS) INEEL/EXT-99-00733 00
19-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 5-13 - IDAHO NATIONAL ENGINEERING LABORATORY (INEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE POWER BURST FACILITY (PBF) CORROSIVE WASTE SUMP AND EVAPORATION POND OU 5-13 AR.INDEX.OU.5-13 00
11-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 5-01 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OU 5-01 AR.INDEX.OU.5-01 00
11-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 5-03 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OU 5-03 AR.INDEX.OU.5-03 00
11-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 5-05 AND OU 6-01 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 SCOPING OF THE AUXILIARY REACTOR AREA II (ARA II) STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND OU 5-05 AND OU 6-01 AR.INDEX.OU.5-05 00
11-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 5-06 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF AUXILIARY REACTOR AREA (ARA) ARA III AND ARA IV - OU 5-06 AR.INDEX.OU.5-06 00
19-MAY-99 BERKE, J. S. TRANSCRIPT FROM INEEL PUBLIC MEETING ON PROPOSED CLEANUP PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) HELD ON MAY 19, 1999 (05/19/99) IN LEWISTON, IDAHO 10825 00
18-MAY-99 CARPENTER, K. TRANSCRIPT FROM INEEL PUBLIC MEETING ON PROPOSED CLEANUP PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) HELD ON MAY 18, 1999 (05/18/99) IN IDAHO FALLS, IDAHO 10823 00
18-MAY-99 SCHWARTZ, N. TRANSCRIPT FROM INEEL PUBLIC MEETING ON PROPOSED CLEANUP PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) HELD ON MAY 18, 1999 (05/18/99) IN BOISE, IDAHO 10824 00
11-MAY-99 AR COORDINATOR OPERABLE UNIT (OU) 5-07 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 5-07 AR.INDEX.OU.5-07 00
03-MAY-99 IDHW RESOLUTIONS FOR IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) 17399 00
01-MAY-99 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) INEEL 17237 00
29-APR-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL 10664 00
29-APR-99 EPA ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) PROPOSED PLAN 17397 00
26-APR-99 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTORS AREA (PBF/ARA) 10665 00
22-APR-99 NICKLAUS, D. HAZARDOUS WASTE DETERMINATION (HWD) FOR ARA-I BUILDING ARA-626 HOT CELLS 1 AND 2 CONCRETE FLOORS AND SOILS BENEATH THE FLOORS 10805 00
01-APR-99 ROSE, K. A. WASTE AREA GROUP 5 (WAG-5) PROPOSED PLAN COMMENTS FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) 17395 00
01-APR-99 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR SEGMENTED GATE SYSTEM TREATABILITY STUDY (TS) INEEL/EXT-98-00859 00
01-APR-99 WELLS, R. P. TREATABILITY STUDY (TS) WORK PLAN FOR SEGMENTED GATE SYSTEM TECHNOLOGY DEPLOYMENT INEEL/EXT-98-01097 00
01-APR-99 SCOBBY, P. T. HEALTH & SAFETY PLAN (HSP) FOR SEGMENTED GATE SYSTEM TREATABILITY STUDY (TS) INEEL/EXT-99-00179 00
18-MAR-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL 10569 00
15-MAR-99 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTORS AREA (PBF/ARA) MARCH 1999 (03/99) 10573 00
18-FEB-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVISED COMMENTS ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL 10813 00
16-FEB-99 O'NEILL, K. C. TRANSMITTAL OF DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) OPE-ER-27-99 00
11-FEB-99 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW OF COMMENTS ON DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10811 00
11-FEB-99 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE (IDHW-DEQ) REVIEW OF DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 17004 00
11-FEB-99 O'NEILL, K. C. TRANSMITTAL OF CORRECTED PAGES FOR DRAFT FINAL OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-25-99 00
09-FEB-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL 10812 00
21-JAN-99 O'NEILL, K. C. TRANSMITTAL OF DRAFT FINAL OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-15-99 00
01-JAN-99 INEEL COMMUNITY RELATIONS UPDATE FACT SHEET - WASTE AREA GROUP 5 (WAG-5) ENVIRONMENTAL INVESTIGATION NEARLY COMPLETE - JANUARY 1999 (01/99) 10563 00
01-JAN-99 HOLDREN, K. J. WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10607 00
15-DEC-98 DOE DEPARTMENT OF ENERGY (DOE) RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10711 02
14-DEC-98 DOE DOE RESPONSE TO IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12, COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10793 00
18-NOV-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10808 00
01-NOV-98 INEEL COMMUNITY RELATIONS INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) 17370 00
19-OCT-98 DOE NEW SITE IDENTIFICATION (NSI) - AUXILIARY REACTOR AREA 25 (ARA-25) ARA-I SOILS BENEATH ARA-626 HOT CELLS 10548 00
16-JUL-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION (RI) WITH BASELINE RISK ASSESSMENT, DOE/ID-10607, MAY 1998 (05/98) 10809 00
01-JUL-98 DIETZ, C. G. SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-07 AUXILIARY REACTOR AREA ARA-02 SEPTIC TANK SLUDGE REMOVAL ACTION INEEL/EXT-98-00106 00
01-JUN-98 O'NEILL, K. C. TRANSMITTAL OF DRAFT REMEDIAL INVESTIGATION BASELINE RISK ASSESSSMENT (RI/BRA) FOR OPERABLE UNIT (OU) 5-12 WAG-5 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-89-98 00
01-MAY-98 DOE DEPARTMENT OF ENERGY (DOE) RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), DOE/ID-10607, DRAFT REVISION 0 (REV.0) 10807 00
01-MAY-98 DOE DOE RESPONSE TO IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON WAG-5 OPERABLE UNIT (OU) 5-12, COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10607, DRAFT REVISION 0 (REV.0) 10810 00
01-DEC-97 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) DOE/ID-10587 05
24-NOV-97 COVELESKIE, A. D. ENGINEERING DESIGN FILE (EDF) - AUXILIARY REACTOR AREA 729 (ARA-729) RADIOLOGICAL DATA EVALUATION OPERABLE UNIT (OU) 5-12 EDF-ER-30/1000-69 00
28-OCT-97 JOSTEN, N. E. ENGINEERING DESIGN FILE (EDF) - IN SITU GAMMA RADIATION SURVEY AT ARA-23 & ARA-24 OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ER-WAG5-104 00
01-OCT-97 ROTHERMEL, J. S. REMEDIAL ACTION (RA) REPORT OPERABLE UNIT (OU) 5-05 STATIONARY LOW POWER REACTOR 1 (SL-1) & OU 6-01 BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS ENGINEERED BARRIERS DOE/ID-10591 00
01-JUL-97 CRAM, A. J. STATIONARY LOW POWER REACTOR 1 (SL-1) & BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS ENGINEERED BARRIERS PROJECT OPERATION AND MAINTENANCE (O&M) PLAN OPERABLE UNIT (OU) 5-05 & OU 6-01 INEL-95/0625 01
02-MAY-97 ANDERSON, B. S. TRANSMITTAL OF DRAFT FINAL WORK PLAN FOR WASTE AREA GROUP 5 WAG-5, OPERABLE UNIT (OU) 5-12, COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-72-97 00
01-MAY-97 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - COMPREHENSIVE INVESTIGATION BEGINS FOR POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) WAG-5 OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 13946 00
01-MAY-97 WEBBER, F. L. FINAL WORK PLAN FOR WAG-5 OU 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10555 00
01-JAN-97 HIARING, C. M. FINAL SCOPE OF WORK FOR OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10547 00
13-NOV-96 KENOYER, D. J. TRANSITION OF RADIOLOGICALLY CONTAMINATED SURPLUS FACILITIES FROM EM-60 TO EM-40 DJK-09-96-A 00
01-OCT-96 LMITCO ACTION MEMORANDUM FOR A REMOVAL ACTION AT ARA-02 SEPTIC SYSTEM SITE OPERABLE UNIT (OU) 5-07 AT INEL INEL-96/0307 00
01-SEP-96 WELLS, R. P. SAMPLING & ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 5-07, ARA-I SITE, ARA-02 REMOVAL ACTION (PARSONS #ES.35.6.3, REV.01) DOE/ID-10545 01
01-JUL-96 FITCH, D. R. FIELD SAMPLING PLAN (FSP) SL-1 & BORAX I BURIAL GROUNDS OPERABLE UNIT (OU) 5-05 & 6-01 (PARSONS ES-28.6.3) DOE/ID-10540 00
01-JUL-96 FITCH, D. R. HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 5-07 ARA-02 SITE REMOVAL ACTION INEL-96/0237 00
23-MAY-96 DOE TRACK 1 INVESTIGATION NO FURTHER ACTION DETERMINATION FOR AUXILIARY REACTOR AREA 19 (ARA-19) ARA-II DETENTION TANK FOR FUEL OIL & RADIONUCLIDES (ARA-719) - DECISION DOCUMENTATION PACKAGE 10309 00
23-MAY-96 DOE TRACK 1 INVESTIGATION - PBF REACTOR AREA ABANDONED SEPTIC SYSTEM 10444 00
23-MAY-96 DOE NO FURTHER ACTION DETERMINATION - TRACK 1 INVESTIGATION - POWER BURST FACILITY 25 (PBF-25) SPECIAL POWER EXCURSION REACTOR TEST (SPERT) IV SEPTIC TANK & LEACH FIELD 10538 00
10-MAY-96 GREEN, L. A. REVISED ENFORCEABLE SCHEDULE FOR WAG-5 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN OPE-ER-96-84 00
04-APR-96 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL WORK PLAN FOR SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) ACTIVITIES & DOE COMMENT RESOLUTIONS TO IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS OPE/ER-96-061 00
01-APR-96 COTTEN, G. B. DESIGN DRAWINGS - CONSTRUCTION PLANS - APPENDIX C OF DOE/ID-10532, SL-1 & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS PROJECT RD/RA WORK PLAN 11822 00
01-APR-96 ROSENBERGER, M. S. DOE RESOLUTIONS FOR IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY ( IDHW-DEQ) COMMENTS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 5-05 & 6-01 11823 00
01-APR-96 COTTEN, G. B. STATIONARY LOW POWER REACTOR-1 (SL-1) & BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS ENGINEERED BARRIERS PROJECT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN (PARSON'S #ES.28.06.23) DOE/ID-10532 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
01-APR-96 PARSONS ENGINEERING STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS PROJECT OPERATION & MAINTENANCE (O&M) PLAN OU 5-05 & 6-01 - PARSONS #ES-28.6.9.12 INEL-95/0625 00
01-APR-96 PARSONS ENGINEERING STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS HEALTH & SAFETY PLAN (HSP) OU 5-05 & 6-01 - PARSONS #ES.28.6.12 INEL-95/0636 00
22-MAR-96 GREEN, L. A. WORKING SCHEDULE FOR SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL DESIGN AND REMEDIAL ACTION (RD/RA) ACTIVITIES OPE-ER-52-96 00
21-MAR-96 GREEN, L. A. TRANSMITTAL OF REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK FOR SL-1 & BORAX I BURIAL GROUNDS - RESOLUTION TABLES FOR IDHW REVIEW COMMENTS ARE INCLUDED OPE-ER-50-96 00
01-MAR-96 ROTHERMEL, J. S. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS - OU 5-05 & 6-01 INEL-95/0456 00
29-FEB-96 DOE TRACK 2 DECISION STATEMENT FOR THE OPERABLE UNIT (OU) 5-06 ARA-III ARA-12 SITE & ARA-IV ARA-20 SITE - ACTION DETERMINATION 10412 00
29-FEB-96 DOE TRACK 2 DECISION STATEMENT FOR THE OPERABLE UNIT (OU) 5-06 ARA-III ARA-12 SITE & ARA-IV ARA-20 SITE - NO FURTHER ACTION DETERMINATION 10413 00
08-FEB-96 GREEN, L. A. TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS OU 5-05 & 6-01 AND TEN (10) NO ACTION SITES ROD OPE-ER-27-96 00
08-FEB-96 GREEN, L. A. TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS OU 5-05 & 6-01 AND TEN (10) NO ACTION SITES ROD OPE-ER-28-96 00
09-JAN-96 DOE, EPA, IDHW RECORD OF DECISION (ROD) FOR STATIONARY LOW POWER REACTOR 1 (SL-1) OU 5-05 & BORAX I BURIAL GROUNDS OU 6-01 & 10 (TEN) NO ACTION SITES (OU 5-01, 5-03, 5-04 AND 5-11) INEL-95/0282 00
08-JAN-96 COVELESKIE, A. D. EDF - ENGINEERING DESIGN FILE - SOURCE TERM DETERMINATION OF ARA-02 SEPTIC TANKS ER-BWP-88 00
22-DEC-95 GREEN, L. A. STATIONARY LOW POWER REACTOR 1 (SL-1) & BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS (OU 5-05 & 6-01) & TEN (10) NO ACTION SITES RECORD OF DECISION (ROD), TRANSMITTAL OF OPE-ER-234-95 00
14-DEC-95 GREEN, L. A. TECHNICAL MEMORANDUM ASSESSMENT OF SURFACE SOILS SURROUNDING THE SL-1 BURIAL GROUND OPE-ER-228-95 00
07-DEC-95 JINES, A. AUXILIARY REACTOR AREA (ARA) WINDBLOWN SOILS EVALUATION OPE-ER-225-95 00
13-NOV-95 UNDERWOOD, E. J. IDHW REVIEW COMMENTS ON OU 5-05 AND 6-01 DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK 11486 00
08-NOV-95 UNDERWOOD, E. J. IDHW REVIEW COMMENTS ON OPERABLE UNIT (OU) 5-05 AND 6-01 DRAFT FINAL RECORD OF DECISION (ROD) 10172 00
02-NOV-95 JENSEN, N. R. TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) BOILING WATER REACTOR EXPERIMENT BORAX I BURIAL GROUNDS OPERABLE UNIT (OU) 5-05 AND 6-01 & TEN (10) NO ACTION SITES RECORD OF DECISION (ROD), FOR REVIEW AND SIGNATURE OPE-ER-204-95 00
19-OCT-95 GREEN, L. A. DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 10445 00
19-OCT-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) & DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY ( EPA) COMMENTS OPE-ER-201-95 00
13-OCT-95 UNDERWOOD, E. J. IDHW COMMENTS ON VARIOUS DOCUMENTS FOR OPERABLE UNIT (OU) 5-05 AND 6-01 10171 00
10-OCT-95 ORLEAN, H. EPA COMMENTS ON SEPTEMBER 1995 (09/95) DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) 10163 00
06-OCT-95 GREEN, L. A. SAMPLING EVENT NOTIFICATION OPE-ER-193-95 00
01-OCT-95 GREENWELL, R. D. DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) INEL-94/0171 00
22-SEP-95 UNDERWOOD, E. J. IDHW ASSESSMENT OF RISK FROM EXTERNAL EXPOSURE TO RADIATION FROM CONTAMINATION BROUGHT TO THE SURFACE BY BIOLOGICAL ACTIVITY AT SL-1 AND BORAX I SITES 10169 00
22-SEP-95 UNDERWOOD, E. J. IDHW TRANSMITTAL OF VARIOUS DOCUMENTS FOR OPERABLE UNIT (OU) 5-05 AND 6-01 10170 00
20-SEP-95 GREEN, L. A. COMMENT RESOLUTION TABLES FOR 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS), PROPOSED PLAN OPE-ER-176-95 00
20-SEP-95 JINES, A. ASSESSMENT OF RISK FROM EXTERNAL EXPOSURE TO RADIATION FROM CONTAMINATION BROUGHT TO SURFACE BY BIOLOGICAL ACTIVITY AT SL-1 AND BORAX I SITES OPE-ER-177-95 00
13-SEP-95 GREEN, L. A. TRANSMITTAL OF VARIOUS DOCUMENTS FOR OU 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS) OPE-ER-187-95 00
12-SEP-95 GREEN, L. A. TRANSMITTAL OF VARIOUS DOCUMENTS FOR OPERABLE UNITS (OU) 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS) OPE-ER0-172-95 00
07-SEP-95 JORGENSEN, D. K. ENGINEERING DESIGN FILE (EDF) - ARA WINDBLOWN AREA RISK EVALUATION - (EDF SERIAL NUMBER IS INEL-95/103) ER-WAG5-54 02
01-SEP-95 HOLDREN, K. J. ASSESSMENT OF SURFACE SOILS SURROUNDING SL-1 BURIAL GROUNDS 10137 00
30-AUG-95 FILEMYR, R. G. SUPPORT DOCUMENTATION: ESTIMATION OF URANIUM-235 SURFACE SOIL CONCENTRATIONS BASED ON MASS UNRECOVERED AT BORAX I BURIAL GROUNDS 10133 00
30-AUG-95 FILEMYR, R. G. ERRATA FOR REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OPERABLE UNITS (OU) 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS 10134 00
30-AUG-95 FILEMYR, R. G. SUPPORT DOCUMENTATION; ANNUAL DOSE CALCULATIONS FOR SELECTED SCENARIOS AT SL-1 AND BORAX I BURIAL GROUNDS 10135 00
30-AUG-95 FILEMYR, R. G. SL-1 & BORAX I CLASS C WASTE EQUIVALENCY DETERMINATION 10136 00
22-AUG-95 ORLEAN, H. EPA COMMENTS ON FINAL DRAFT RECORD OF DECISION (ROD) FOR OU 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) 10162 00
18-AUG-95 UNDERWOOD, E. J. IDHW REVIEW COMMENTS ON OPERABLE UNIT (OU) 5-05 AND 6-01 DRAFT RECORD OF DECISION (ROD) 10168 00
03-AUG-95 GREEN, L. A. TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS (OU 5-05 & 6-01) & TEN (10) NO ACTION SITES RECORD OF DECISION (ROD) - DRAFT FOR REVIEW OPE-ER-146-95 00
25-JUL-95 BLOOD, H. R. EPA COMMENTS ON DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT, VOLUME 1 OF 2 (VOL.01 OF VOL.02) FOR OPERABLE UNIT (OU) 5-05 & 6-01 SL-1 & BORAX I BURIAL GROUNDS 10158 00
07-JUL-95 ORLEAN, H. EPA COMMENTS ON ASSESSMENT OF SURFACE SOILS SURROUNDING SL-1 BURIAL GROUND 10161 00
20-JUN-95 UNDERWOOD, E. J. IDAHO DEPARTMENT OF HEALTH AND WELFARE, DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON ASSESSMENT OF SURFACE SOILS SURROUNDING THE SL-1 BURIAL GROUND AND ARA WINDBLOWN AREA RISK EVALUATION 10167 00
08-JUN-95 ROOD, S. M. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT INEL, VOLUME I, (VOL.01) INEL-95/0259,VOL.01 00
18-MAY-95 DANE, R. INEL PROPOSED PLANS PUBLIC MEETING & COMMENT SESSION TRANSCRIPT - PRESENTATION 1: SL-1 & BORAX I BURIAL SITE INVESTIGATIONS & TRACK 1'S - PRESENTATION 2: CFA LANDFILLS & TRACK 1'S - HELD IN MOSCOW, IDAHO MAY 18, 1995 (05/18/96) 10157 00
17-MAY-95 SCHWARTZ, N. INEL PROPOSED PLANS PUBLIC MEETING & COMMENT SESSION TRANSCRIPT - PRESENTATION 1: SL-1 & BORAX I BURIAL SITE INVESTIGATIONS & TRACK 1'S - PRESENTATION 2: CFA LANDFILLS TRACK 1'S - HELD IN BOISE, IDAHO MAY 17, 1995 (05/17/95) 10156 00
16-MAY-95 DANE, R. INEL PROPOSED PLANS PUBLIC MEETING & COMMENT SESSION TRANSCRIPT - PRESENTATION 1: SL-1 & BORAX I BURIAL SITE INVESTIGATIONS & TRACK 1'S - PRESENTATION 2: CFA LANDFILLS & TRACK 1'S - HELD IN IDAHO FALLS MAY 16, 1995 (05/16/95) 10155 00
02-MAY-95 GREEN, L. A. TRANSMITTAL OF PROPOSED PLAN FOR OU 5-05, SL-1 BURIAL BURIAL GROUND AND 6-01, BORAX I BURIAL GROUND AND VARIOUS NO ACTION TRACK 1 SITES OPE-ER-086-95 00
01-MAY-95 DOE, EPA, IDHW PROPOSED PLAN FOR OPERABLE UNITS (OU) 5-05 AND 6-01 STATIONARY LOW POWER REACTOR 1 (SL-1) AND THE BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS 10011 00
20-APR-95 DOE, EPA, IDHW TRACK 1 INVESTIGATION NO FURTHER ACTION DETERMINATION FOR ARA-15 ARA-III RADIONUCLIDE TANK (ARA-735) - DECISION DOCUMENTATION PACKAGE 10014 00
20-APR-95 DOE, EPA, IDHW TRACK 1 INVESTIGATION NO FURTHER ACTION DETERMINATION FOR ARA-18 ARA-III RADIONUCLIDE TANK (ARA-736) 10015 00
01-APR-95 DOE, EPA, IDHW NOTICE OF AVAILABILITY FOR CFA LANDFILL I, II, & III OU 4-12, STATIONARY LOW POWER REACTOR 1 (SL-1) & BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS OU 5-05 & 6-01 10013 00
01-APR-95 INEL COMMUNITY RELATIONS UPDATE FACT SHEET - INEL INVESTIGATES REACTOR DEBRIS 9649 00
20-MAR-95 UNDERWOOD, E. J. IDHW REVIEW COMMENTS ON OPERABLE UNIT (OU) 5-05 AND 6-01 DRAFT PROPOSED PLAN 10166 00
17-MAR-95 BLOOD, H. R. EPA COMMENTS ON DRAFT PROPOSED PLAN FOR SL-1 & BORAX I BURIAL GROUNDS (OU 5-05 & 6-01) 10160 00
14-MAR-95 AR COORDINATOR OPERABLE UNIT (OU) 5-02 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OU 5-02 AR.INDEX.OU.5-02 00
01-MAR-95 NOT SPECIFIED FINAL REMEDIAL ACTION REPORT POWER BURST FACILITY (PBF)-08 CORROSIVE WASTE SUMP AND PBF-10 EVAPORATION POND INTERIM ACTION OPERABLE UNIT 5-13 05.013.2.1.209.01 3
01-MAR-95 FILEMYR, R. G. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS INEL-95/0027 00
01-MAR-95 VETTER, D. W. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS INEL-95/0027 00
01-MAR-95 HOLDREN, K. J. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS INEL-95/0027 00
01-MAR-95 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 INEL-95/0086 04
17-FEB-95 BLOOD, H. R. EPA COMMENTS ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS 10159 00
17-FEB-95 RENO, S. L. IDHW COMMENTS ON REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) - DRAFT FINAL 10165 00
06-FEB-95 DOE, EPA, IDHW NO FURTHER ACTION DETERMINATION FOR THE TRACK 1 INVESTIGATION OF HISTORICAL SITE OF SPERT III LARGE LEACH POND - DECISION DOCUMENTATION PACKAGE 10002 00
01-JAN-95 INEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY FOR THE EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR THE POWER BURST FACILITY (PBF) CORROSIVE WASTE SUNP & EVAPORATION POND RECORD OF DECISION (ROD) 5815 00
23-DEC-94 WILCYNSKI, J. M. EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) POWER BURST FACILITY (PBF) CORROSIVE WASTE SUMP AND EVAPORATION POND RECORD OF DECISION (ROD) 5814 00
02-DEC-94 VETTER, D. W. RECORD OF MEETING WITH CRAIG KVAMME, LITCO, REGARDING BASIS FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) DISPOSAL COSTS 10027 00
04-NOV-94 AR COORDINATOR OPERABLE UNIT (OU) 5-04 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OU 5-04 AR.INDEX.OU.5-04 00
04-NOV-94 AR COORDINATOR OPERABLE UNIT (OU) 5-10 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE AUXILIARY REACTOR AREA (ARA) CHEMICAL EVAPORATION POND REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - OU 5-10 AR.INDEX.OU.5-10 00
04-NOV-94 AR COORDINATOR OPERABLE UNIT (OU) 5-11 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OU 5-11 AR.INDEX.OU.5-11 00
04-NOV-94 AR COORDINATOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) NO ACTION SITES - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR NO ACTION SITES FOR PBF/ARA WASTE AREA GROUP 5 (WAG-5) AR.INDEX.PBF/ARA.5-NA 00
01-OCT-94 HILLMAN-MASON, K. Y. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-08 & 5-09 (INEL-94/0108 FORMERLY EGG-ER-11428) INEL-94/0108 00
26-SEP-94 BLOOD, H. R. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS OF PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 5-08 & 5-09 (DRAFT) 10044 00
23-SEP-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REVIEW COMMENTS OF THE PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 5-08 & 5-09 (DRAFT) (EGG-ER-11428) 10045 00
09-SEP-94 GREEN, L. A. REVISION OF SCHEDULE FOR OPERABLE UNIT (OU) 5-05 SL-1 BURIAL GROUND SITE ARA-06 AND 6-01 BORAX I BURIAL GROUND SITE BORAX-02 OPE-ER-237-94 00
01-SEP-94 INEL COMMUNITY RELATIONS INEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - DOE STUDIES TWO (2) RADIONUCLIDE BURIAL GROUNDS 7865 00
19-AUG-94 GREEN, L. A. TRANSMITTAL OF DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 5-08 AND 5-09 OPE-ER-216-94 00
01-AUG-94 RENO, S. L. COMMENTS IN REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) VOLUME 1 OF 2 (DRAFT) - VOL.01 OF VOL.02 10164 00
28-JUL-94 NOT SPECIFIED TRACK 1 INVESTIGATION FOR THE RUBBLE PILE AND CONSTRUCTION DEBRIS NORTHWEST OF PBF-720 - NO FURTHER ACTION DETERMINATION 5740 00
28-JUL-94 NOT SPECIFIED TRACK 1 INVESTIGATION FOR 500 GALLON UNDERGROUND STORAGE TANK (UST) - NO FURTHER ACTION DETERMINATION 5741 00
06-JUL-94 HOLDREN, K. J. INTERVIEWS WITH DARRELL HANNI REGARDING THE STATIONARY LOW POWER REACTOR SL-1 BURIAL GROUND KJH-09-94 00
15-JUN-94 LYLE, J. L. TRANSMITTAL OF THE DRAFT REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS, VOLUME 1 (VOL.01) OF 2 OPE-ER-157-94 00
15-JUN-94 GREEN, L. A. TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OU 5-06 ARA-III SITE ARA-12 & ARA-IV SITE ARA-20 OPE-ER-184-94 00
07-JUN-94 NOT SPECIFIED TRACK 1 INVESTIGATION FOR THE PBF-04 HISTORICAL LOCATION PBF CONTROL AREA OIL TANK AT PBF-608 - ACTION DETERMINATION, PROCEED TO TRACK 2 5751 00
01-JUN-94 PICKETT, S. L. FINAL TRACK 2 SUMMARY REPORT FOR OU 5-06 - ARA-III SITE, ARA-12 & ARA-IV SITE, ARA-20 EGG-ER-11144 00
01-MAY-94 WILCYNSKI, J. M. EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR THE POWER BURST FACILITY (PBF) CORROSIVE WASTE SUMP AND EVAPORATION POND RECORD OF DECISION (ROD) AT THE INEL 5702 00
01-MAY-94 EG&G IDAHO, INC. TECHNICAL MEMORANDUM BASELINE RISK ASSESSMENT (BRA) FOR OU 10-06 RADIONUCLIDE CONTAMINATED SOILS RI/FS DRAFT EGG-ER-11316 00
26-APR-94 LYLE, J. L. TRANSMITTAL OF DRAFT FINAL TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) OPE-ER-099-94 00
15-APR-94 MEADOWS, D. RECORD OF MEETING WITH ROGER WILHELMSON, EG&G IDAHO REGARDING PIPES IN STATIONARY LOW POWER REACTOR 1 (SL-1) 10024 00
14-APR-94 MEADOWS, D. RECORD OF MEETING WITH EDDY CHEW, DEPARTMENT OF ENERGY (DOE) IDAHO, REGARDING STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND - PIPES 10025 00
14-APR-94 HOLDREN, K. J. MEMO OF CONVERSATION WITH RICHARD GREEN REGARDING PIPES IN STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND 10028 00
08-APR-94 BLOOD, H. R. EPA COMMENTS: DRAFT TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-06 ARA-III, SITE ARA-12 & ARA-IV, SITE ARA-20 5690 00
07-APR-94 LYLE, J. L. TRANSMITTAL OF THE DOCUMENT REVISION REQUEST (DRR) FOR OPERABLE UNIT (OU) 10-06 PHASE II SAMPLING & ANALYSIS PLAN (SAP) & HEALTH & SAFETY PLAN (HSP) OPE-ER-085-94 00
04-APR-94 FREDERICK, D. B. IDHW COMMENTS FOR TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-06: ARA-III, SITE ARA-12 AND ARA-IV, SITE ARA-20 AT THE INEL, DRAFT, FEBRUARY 1994 (02/94) - EGG-ER-11144 5691 00
01-APR-94 NOT SPECIFIED TRACK 1 INVESTIGATION FOR THE ARA-744 EVAPORATION POND LOCATED NE OF ARA-I - NO FURTHER ACTION DETERMINATION 5654 00
22-MAR-94 LANEY, P. T. COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP-10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) PTL-02-94 00
18-MAR-94 LIVERMAN, E. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WAG-3 & WAG-10 RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 5777 00
01-MAR-94 HALFORD, V. E. RI/FS SCOPE OF WORK FOR OPERABLE UNITS (OU) 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EGG-ER-10998 01
01-MAR-94 HANEY, T. J. HEALTH & SAFETY PLAN (HSP) FOR PHASE II OF THE OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EGG-ER-11231 01
17-FEB-94 TUCKER, J. RECORD OF MEETING WITH DICK MESERVEY, EG&G IDAHO REGARDING BOILING WATER REACTOR EXPERIMENT (BORAX) I 10023 00
16-FEB-94 VANDERPOEL, G. RECORD OF MEETING WITH ROGER G. JENSEN, USGS REGARDING DEPTH TO AQUIFER NEAR BOILING WATER REACTOR EXPERIMENT (BORAX) I & STATIONARY LOW POWER REACTOR 1 (SL-1) 10022 00
07-FEB-94 LYLE, J. L. TRANSMITTAL OF THE PHASE II SAMPLING & ANALYSIS PLAN (SAP) FOR THE RADIONUCLIDE CONTAMINATED SOILS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 10-06 OPE-ER-030-94 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
25-JAN-94 MEADOWS, D. RECORD OF MEETING WITH GLENN BRISCOE REGARDING STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND 10026 00
10-JAN-94 PIERRE, W. EPA COMMENTS ON THE EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR THE POWER BURST FACILITY (PBF) CORROSIVE WASTE SUMP & EVAPORATION POND INTERIM ACTION (IA) OU 5-13 5851 00
01-JAN-94 HANEY, D. F. SAMPLING & ANALYSIS PLAN (SAP) FOR PHASE II OF OU 10-06 RADIONUCLIDE CONTAMINATED SOILS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EGG-ER-10971 00
01-DEC-93 MSE, INC. FINAL SCOPE OF WORK FOR OU 10-06 RADIONUCLIDE CONTAMINATED SOILS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EGG-ER-10902 00
01-DEC-93 HONEYCUTT, T. K. TECHNICAL MEMORANDUM FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) SOILS TREATABILITY STUDY (TS): PHYSICAL SEPARATION OF RADIONUCLIDES IN SOILS EGG-ER-11101 00
22-NOV-93 MK-FIC FINAL REMEDIAL DESIGN (RD) IMPLEMENTING REMEDIAL ACTION (RA) WORK PLAN FOR PBF-08 CORROSIVE WASTE SUMP & PBF-10 EVAPORATION POND REMEDIATION OU 5-13 05.013.1.3.101.01 02
10-NOV-93 BLOOD, H. R. REVIEW OF TRACK 2 SUMMARY REPORT OPERABLE UNIT (OU) 5-07 ARA-I SITES ARA-02 & ARA-03 5715 00
09-NOV-93 MK-FIC DOE, EPA AND IDHW REVIEW COMMENTS AND RESOLUTIONS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REV.01 FOR PBF INTERIM ACTION (IA) OU 5-13 7212 00
02-NOV-93 BLOOD, H. R. EPA COMMENTS: THE DRAFT RI/FS SCOPE OF WORK FOR OPERABLE UNITS (OU) 5-05 AND 6-01, SL-1 AND BORAX I BURIAL GROUNDS 5623 00
02-NOV-93 STOOPS, T. M. IDHW-DEQ RECOMMENDATIONS FOR OU 5-07 TRACK 2 SUMMARY REPORT 5624 00
01-NOV-93 NOT SPECIFIED TECHNICAL MEMORANDUM - PRELIMINARY BASELINE RISK ASSESSMENT (BRA) FOR OU 5-05 & 6-01, SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) MISC-94001 00
26-OCT-93 STOOPS, T. M. IDHW-DEQ COMMENTS TO THE DRAFT SCOPE OF WORK (SOW) FOR THE RI/FS FOR OU 5-05 (SL-1 BURIAL GROUND) AND OU 6-01 (BORAX I BURIAL GROUND) 5773 00
01-OCT-93 NOT SPECIFIED TECHNICAL MEMORANDUM - OVERVIEW OF EXPOSURE SCENARIOS FOR BASELINE RISK ASSESSMENT (BRA) OU 5-05, 6-01 STATIONARY LOW POWER REACTOR, BORAX I BURIAL GROUNDS REMEDIAL INVESTIGATION (RI) 5662 00
02-AUG-93 BARRY, G. A. TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) 93MSE/ID-225 00
01-AUG-93 BARRY, G. A. SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 6744 00
24-JUN-93 NOT SPECIFIED TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - ARA-I DRAIN (ARA-626) ARA-17 OU 5-01 5322 00
24-JUN-93 NOT SPECIFIED TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - PBF SPERT IV BLOWDOWN PIT (ADJACENT TO PBF-716) PBF-24 OU 5-03 5323 00
22-JUN-93 NOT SPECIFIED TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - PBF COOLING TOWER AREA AND DRAINAGE DITCH AT PBF REACTOR AREA PBF-28 OU 5-03 5324 00
21-JUN-93 NOT SPECIFIED TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - ARA-III SANITARY SEWER LEACH FIELD AND SEPTIC TANK (ARA-740) 5325 00
01-JUN-93 SEHLKE, G. WELL FITNESS EVALUATION FOR INEL, VOLUME 1 (VOL.01) DOE/ID-10392,VOL.01 00
19-MAY-93 NOT SPECIFIED NO FURTHER ACTION DETERMINATION FOR TRACK 1 INVESTIGATION OF PBF-19, HISTORICAL LOCATION OF A 3,000 GAL. UNDERGROUND STORAGE TANK (UST) SPERT III (WERF) ON WEST SIDE OF PBF-609 5597 00
11-MAY-93 NOT SPECIFIED ACTION DETERMINATION EXPEDITED ACTION FOR THE TRACK 1 INVESTIGATION OF PBF-26 SPERT IV LAKE SOUTH OF PBF-613 5599 00
01-MAY-93 PICKETT, S. L. TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-07: ARA-1 SITES ARA-02 AND ARA-03 & REVIEW COMMENTS EGG-ER-10593 00
08-APR-93 DIETZ, C. G. TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - NO FURTHER ACTION DETERMINATION - PBF REACTOR AREA BOILER BLOWDOWN PIT PBF-06 5257 00
08-APR-93 DIETZ, C. G. NO FURTHER ACTION DETERMINATION - PBF REACTOR AREA OIL DRUM STORAGE - PBF-07 TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE 5258 00
29-MAR-93 NOT SPECIFIED NO FURTHER ACTION DETERMINATION FOR THE TRACK 1 INVESTIGATION OF PBF-12, HISTORICAL SITE OF SPERT I SEEPAGE PIT 5598 00
16-FEB-93 COE, M. DOE NEWS - AGENCIES SIGN THREE (3) RECORDS OF DECISION (ROD) FOR NO REMEDIAL ACTION (RA) 6149 00
01-DEC-92 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) FOR THE AUXILIARY REACTOR AREA ARA-I CHEMICAL EVAPORATION POND OPERABLE UNIT (OU) 5-10 5232 00
01-NOV-92 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) AVAILABILITY FOR THE PBF INTERIM ACTION (IA) 5212 00
01-SEP-92 INEL COMMUNITY RELATIONS POWER BURST FACILITY (PBF) RECORD OF DECISION (ROD) FOR CORROSIVE WASTE SUMP & EVAPORATION POND 5204 00
01-SEP-92 NOT SPECIFIED NO ACTION SITE - PBF CONTROL AREA SEPTIC TANK (PBF-724) & SEEPAGE PIT (PBF-735) 5214 0
01-SEP-92 NOT SPECIFIED NO ACTION SITE - PBF CONTROL AREA SEPTIC TANK (PBF-738 & PBF-739) AND SEEPAGE PIT (PBF-736) 5215 00
01-SEP-92 NOT SPECIFIED NO ACTION SITE - PBF CONTROL AREA SEPTIC TANK (PBF-632) AND SEEPAGE PIT (PBF-745 & PBF-748) 5216 00
01-SEP-92 HOVER, R. J. NO ACTION SITE - PBF REACTOR AREA SEPTIC TANK & DRAINFIELD (PBF-728) 5217 00
01-SEP-92 NOT SPECIFIED NO ACTION SITE - SPERT II SEPTIC TANK (PBF-725) AND SEEPAGE PIT (PBF-760) 5218 00
01-SEP-92 NOT SPECIFIED NO ACTION SITE - SPERT IV SEPTIC TANK (PBF-727) AND LEACH PIT (PBF-757) 5219 00
01-SEP-92 NOT SPECIFIED NO ACTION SITE - SPERT III SEPTIC TANK (PBF-726) & SEEPAGE PIT 5220 00
01-SEP-92 NOT SPECIFIED NO ACTION SITE - ARA-I SEWAGE TREATMENT FACILITY 5221 00
01-SEP-92 NOT SPECIFIED NO ACTION SITE - ARA-II SEEPAGE PIT TO EAST (ARA-720A) 5222 00
01-SEP-92 NOT SPECIFIED NO ACTION SITE - ARA-II SEEPAGE PIT (ARA-720B) 5223 00
01-SEP-92 NOT SPECIFIED NO ACTION SITE - ARA-II SEPTIC TANK (ARA-738) 5224 00
01-SEP-92 NOT SPECIFIED NO ACTION SITE - ARA-II SEPTIC TANK EAST (ARA-613) 5225 00
01-SEP-92 NOT SPECIFIED NO ACTION SITE - ARA-II SEPTIC TANK (ARA-606) 5226 00
01-SEP-92 NOT SPECIFIED NO ACTION SITE - ARA-III SEPTIC TANK & DRAINFIELD (ARA-739) 5227 00
01-SEP-92 NOT SPECIFIED NO ACTION SITE - ARA-IV SEPTIC TANK AND SEEPAGE PIT NO. 2 5228 00
01-SEP-92 NOT SPECIFIED NO ACTION SITE - ARA-IV CONTROL AREA SEPTIC TANK AND SEEPAGE PIT NO. 3 5229 00
24-JUL-92 DOE RESPONSE TO STATE OF IDAHO AND EPA COMMENTS ON THE DRAFT POWER BURST FACILITY (PBF) RECORD OF DECISION (ROD) 5210 00
24-JUL-92 BLOOD, H. R. REVIEW COMMENTS FOR THE DRAFT RECORD OF DECISION (ROD) FOR THE POWER BURST FACILITY (PBF) EVAPORATION POND INTERIM ACTION (IA) - OU 5-13 5211 00
23-JUL-92 NYGARD, D. REVIEW COMMENTS FOR THE DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 5-13 AT THE AUXILIARY REACTOR AREA POWER BURST FACILITY (PBF/ARA) WAG-5 5209 00
10-JUL-92 NOT SPECIFIED PUBLIC COMMENT TRANSCRIPTS - PROPOSED PLAN FOR THE ARA CHEMICAL EVAPORATION POND 5164-ARA 00
01-JUL-92 BARGELT, R. J. TECHNICAL MEMORANDUM EXPOSURE ASSESSMENT SCENARIOS FOR THE PBF AND ARA, INEL 5135 00
01-JUL-92 INEL COMMUNITY RELATIONS ATTENTION: AGENCIES SEEK PUBLIC COMMENT ON THREE (3) PLANS 5136 00
26-JUN-92 INEL COMMUNITY RELATIONS PROPOSED PLANS AND DEAR CITIZEN LETTER FOR MONITORING THE PERCHED WATER AT TRA, THE MOTOR POOL POND AT CFA, AND THE CHEMICAL EVAPORATION POND AT ARA - SEE DOCUMENT NUMBER 5141 FOR CORRECTED PAGE B-6 TO CFA PROPOSED PLAN 5130 00
01-JUN-92 STANISICH, S. N. FINAL REMEDIAL INVESTIGATION (RI) REPORT FOR THE ARA CHEMICAL EVAPORATION POND EGG-WM-10001 00
08-APR-92 NOT SPECIFIED PUBLIC MEETING TRANSCRIPTS - PROPOSED PLAN FOR THE PBF CORROSIVE WASTE SUMP AND EVAPORATION POND, IDAHO FALLS, IDAHO 04/08/92 - BURLEY, IDAHO 04/09/92 5122 01
04-APR-92 INEL COMMUNITY RELATIONS CITIZENS ARE ASKED TO COMMENT ON A CLEANUP PROJECT AT THE INEL 5167 00
01-APR-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON THE PROPOSED PLAN FOR POWER BURST FACILITY (PBF) 5166 00
19-MAR-92 DOE DEAR CITIZEN LETTER AND PROPOSED PLAN FOR AN INTERIM ACTION (IA) OF PBF CORROSIVE WASTE SUMP & PBF EVAPORATION POND 5076 00
12-MAR-92 MK-FIC INTERIM ACTION (IA) PROPOSED PLAN FOR PBF-10 COST ESTIMATE ERP-92-199 00
01-MAR-92 INEL COMMUNITY RELATIONS INEL REPORTER - 03/92 - AGENCIES TO DISCUSS POWER BURST FACILITIES (PBF) CLEANUP PROJECT 4612 00
01-MAR-92 STANISICH, S. N. PRELIMINARY RISK ASSESSMENT OF PBF-08 & PBF-10 SUMP & EVAPORATION POND 5077 00
24-FEB-92 PIERRE, W. TRANSMITTAL OF CFA-05 MOTOR POOL POND & ARA-01 CHEMICAL EVAPORATION POND SCHEDULE 5105 00
01-NOV-91 BELLER, J. M. TRA WARM WASTE POND (WWP) AT INEL SEDIMENT TREATABILITY STUDY (TS), PHASE I REPORT EGG-WM-10000 00
01-AUG-90 BACA, R. G. INDEPENDENT VERIFICATION AND BENCHMARK TESTING OF THE PORFLO-3 COMPUTER CODE, VERSION 1.0 EGG-BG-9175 00
23-MAY-90 BLUMBERG, D. J. OCTOBER 16, 1989 (10/16/89) ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR ADDITIONAL INFORMATION FOR DELETION OF SELECTED SOLID WASTE MANAGEMENT UNITS (SWMU'S) FROM THE CONSENT ORDER AND COMPLIANCE AGREEMENT (COCA) THROUGH SUMMARY ASSESSMENT PROC DJB-49-90 00
01-MAY-90 LUDI, K. M. SECTION 4 - SAMPLING AND ANALYSIS PROGRAM FROM REPORT NO. EGG-WM-8996, CLOSURE PLAN (CP) FOR POWER BURST FACILITY (PBF) 5168 00
13-MAR-90 SOLECKI, J. E. SUPPORTING INFORMATION REQUESTED FOR SUMMARY ASSESSMENTS FOR SOLID WASTE MANAGEMENT UNITS (SWMU'S) 6036 00
12-JAN-90 BLUMBERG, D. J. SUMMARY ASSESSMENT REVIEW LETTER FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) AND STATE DJB-09-90 00
11-JAN-90 SOLECKI, J. E. DETAILED SCHEDULES FOR PREPARATION OF CLOSURE PLANS (CP) FOR COCA WASTE MANAGEMENT UNITS 8206 00
22-DEC-89 BLUMBERG, D. J. STATUS REPORT FOR DECEMBER 1989 (12/89) CLOSURE PLAN (CP) PREPARATION KHK-147-89 00
01-DEC-89 HARDY, C. K. PHASE I SAMPLING & ANALYSIS PLAN (SAP) FOR PBF EVAPORATION POND & WASTE SUMP (COCA UNITS PBF-08 & PBF-10) EGG-WM-8804 00
01-DEC-89 CASEY, C. E. INTERNAL TECHNICAL REPORT - RADIOLOGICAL ANALYSIS OF POWER BURST FACILITY (PBF) EVAPORATION POND SAMPLES ST-CS-035-89 00
15-NOV-89 SOLECKI, J. E. RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM EPA & STATE 10986 00
09-NOV-89 BLUMBERG, D. J. RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) AND STATE DJB-40-89 00
09-NOV-89 BLUMBERG, D. J. SUMMARY ASSESSMENT REVIEW LETTER FROM EPA & STATE DJB-41-89 00
26-OCT-89 KOSHUTA, C. R. NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL - EPA AND IDHW REVIEWED DOE'S REVISED CLOSURE PLAN SCHEDULE AND FEEL THE SCHEDULE IS DEFICIENT 6709 00
16-OCT-89 GEARHEARD, M. F. SUMMARY ASSESSMENT REVIEWS 3537 00
29-SEP-89 SOLECKI, J. E. REVISED CLOSURE PLAN (CP) SCHEDULE FOR EIGHT (8) LDU'S FOR EG&G AND THREE (3) LDU'S FOR WINCO 10110 00
01-SEP-89 SOLECKI, J. E. REVISED CLOSURE PLAN (CP) APPROACH FOR LAND DISPOSAL UNITS (LDU) 8472 00
12-JAN-88 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-13 REACTOR AREA RUBBLE PIT 2232 00
05-JAN-88 FEIGNER, K. D. REVIEW OF SELECTED SUMMARY ASSESSMENTS 2494 00
06-JUL-87 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-07 REACTOR AREA OIL DRUM STORAGE PER-T-13 2717 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-01 CHEMICAL - EVAPORATION POND TO SE ARA-745 2979 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-02 SANITARY WASTE LEACH FIELD AND SEEPAGE PIT ARA-746 2980 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-03 PAD NEAR ARA-627 (PB SHEETING) 2981 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-04 SEWAGE TREATMENT FACILITY ARA-737 2982 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-05 EVAPORATION POND TO NORTH EAST ARA-744 2983 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-07 SEEPAGE PIT TO EAST ARA-720A 2985 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-08 SEEPAGE PIT TO WEST ARA-720B 2986 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-09 SEPTIC TANK ARA-738 2987 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-10 SEPTIC TANK EAST ARA-613 2988 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-11 SEPTIC TANK WEST ARA-606 2989 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-16 RADIONUCLIDE TANKS ARA-729 2994 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-21 TEST AREA SEPTIC TANK AND LEACH PIT NO. 2 2999 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-22 CONTROL AREA SEPTIC TANK AND LEACH PIT NO. 3 ARA-617 3000 00
29-SEP-86 MILLER, C. L. EDF - ENGINEERING DESIGN FILE - RWMC SMALL SCALE SOIL GROUT TEST REPORT EDF-263 00
22-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-14 SPERT II INACTIVE FUEL OIL TANK FRONT OF PBF-612 2724 00
22-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-26 SPERT IV LAKE ADJACENT TO PBF-758 2737 00
22-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-25 SPERT IV SEPTIC TANK & LEACH PIT PBF-727 & PBF-757 2738 00
22-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-24 SPERT IV BLOWDOWN PIT ADJACENT TO PBF-716 2739 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
22-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-22 SPERT IV LEACH POND PBF-758 2740 00
22-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-21 SPERT III LARGE LEACH POND 2741 00
22-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-20 SPERT III SMALL LEACH POND 2742 00
22-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-16 SPERT II LEACH POND 2743 00
22-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-17 SPERT II SEPTIC TANK & SEEPAGE PIT PBF-725 2746 00
22-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-19 SPERT III INACTIVE FUEL OIL TANK AT PBF-609 WEST SIDE OF WERF 2747 00
22-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-27 SPERT III SEPTIC TANK PBF-726 & SEEPAGE PIT 2762 00
19-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-01 CONTROL AREA SEPTIC TANK PBF-724 SEEPAGE PIT PBF-735 2711 00
19-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-02 CONTROL AREA SEPTIC TANKS PBF-738,PBF-739 AND SEEPAGE PIT PBF-736 2712 00
19-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-03 CONTROL AREA SEPTIC TANK FOR PBF-632 & SEEPAGE PITS PBF-745 AND PBF-748 2713 00
19-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-04 CONTROL AREA OIL TANK AT PBF-608 SUBSTATION OUTSIDE PBF FENCE 2714 00
19-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-05 REACTOR AREA WARM WASTE INJECTION WELL PBF-301 2715 00
19-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-06 REACTOR AREA BLOWDOWN PIT FOR BOILER BY PBF-621 2716 00
19-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-08 REACTOR AREA CORROSIVE WASTE DISPOSAL SUMP BRINE TANK PBF-731 2718 00
19-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-09 REACTOR AREA SEPTIC TANK & DRAINFIELD PBF-728 2719 00
19-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-10 REACTOR AREA EVAPORATION POND PBF-733 2720 00
19-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-11 SPERT I SEEPAGE PIT PBF-750 2721 00
19-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-12 SPERT I LEACH POND 2722 00
19-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-15 REACTOR AREA CORROSIVE WASTE INJECTION WELL PBF-302 2725 00
15-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-06 SL-1 BURIAL GROUND 2984 00
15-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-12 RADIOACTIVE WASTE LEACH POND 2990 00
15-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-13 SANITARY SEWER LEACH FIELD AND SEPTIC TANK ARA-740 2991 00
15-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-14 SEPTIC TANK AND DRAINFIELD ARA-739 2992 00
15-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-15 RADIONUCLIDE TANK ARA-735 2993 00
15-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-17 DRAIN FROM ARA-626 2995 00
15-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-18 RADIONUCLIDE TANK ARA-736 2996 00
15-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-19 DETENTION TANK FOR FUEL OIL - RADIONUCLIDES ARA-719 2997 00
15-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-20 TEST AREA CONTAMINATED LEACH PIT #1 2998 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page