06-AUG-18 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY2017 RPT-1635 0
27-FEB-18 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I AND PHASE II, PART A INTERIM REMEDIAL ACTION REPORT DOE/ID-11475 1
07-FEB-18 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 4
29-JAN-18 NOT SPECIFIED CORRECTED TABLE B-3 DOE/ID-11462 REV 0 6087213 0
18-DEC-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 10
05-SEP-17 NOT SPECIFIED ANNUAL GROUNDWATER DETECTION MONITORING REPORT FOR THE IDAHO CERCLA DISPOSAL FACILITY (2016) DOE/ID-11565 0
28-JUN-17 NOT SPECIFIED TEMPORARY MANAGEMENT ACTIVITIES FOR ICDF LANDFILL LEACHATE FOR SPRING AND SUMMER OF 2017 5889467 0
01-JUN-17 LAWRENCE, SARAH D. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
01-JUN-17 FORBES, JEFFREY R. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
01-JUN-17 SHANKLIN, DEAN E. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
01-MAY-17 KOCH, DARYL F. DEQ RESPONSE TO TEMPORARY MANAGEMENT OF ACTIVITIES FOR IDAHO CERCLA DISPOSAL FACILITY LANDFILL LEACHATE FOR SPRING AND SUMMER OF 2017 (WDP-RWMC-17-013) 5784729 0
01-MAY-17 EINAN, DAVID R. EPA RESPONSE TO TEMPORARY MANAGEMENT ACTIVITIES FOR IDAHO CERCLA DISPOSAL FACILITY LANDFILL LEACHATE FOR SPRING AND SUMMER OF 2017 5784730 0
01-MAY-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY2016 RPT-1543 0
01-MAY-17 JENSEN, NOLAN R. TEMPORARY MANAGEMENT ACTIVITIES FOR IDAHO CERCLA DISPOSAL FACILITY LANDFILL LEACHATE FOR SPRING AND SUMMER OF 2017 (WDP-RWMC-17-013) WDP-RWMC-17-013 0
26-JAN-17 KOCH, DARYL F. DEQ CONCURRENCE TO ADDENDUM TO TABLES 1 AND 3 OF THE GENERAL ACTION MEMO FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 3) (EM-FMDP-17-001) 5661786 0
26-JAN-17 FAULK, DENNIS EPA CONCURRENCE TO ADDENDUM TO TABLES 1 AND 3 OF THE GENERAL ACTION MEMO FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 3) (EM-FMDP-17-001) 5661787 0
18-JAN-17 WHITHAM, KENNETH ADDENDUM TO TABLES 1 AND 3 OF THE GENERAL ACTION MEMO FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 3) (EM-FMDP-17-001) EM-FMDP-17-001 0
01-JAN-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2015 RPT-1503 0
09-AUG-16 NOT SPECIFIED IDAHO CERCLA DISPOSAL FACILITY GROUNDWATER DETECTION MONITORING PROGRAM: DATA ANALYSIS PLAN DOE/ID-10998 1
09-AUG-16 NOT SPECIFIED BIENNIAL REPORT ON DETECTION MONITORING OF ICDF GROUNDWATER (2014-2015) DOE/ID-11550 0
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JUN-16 NOT SPECIFIED QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 9, 10, AND REMOVAL ACTIONS DOE/ID-10587 11
01-JUN-16 JOLLEY, WENDELL L. FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11545 0
01-JUN-16 FORBES, JEFFREY R. FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11545 0
19-MAY-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES FOR OPERABLE UNIT 10-08 RECORD OF DECISION FOR SITE-WIDE GROUNDWATER, MISCELLANEOUS SITES, AND FUTURE SITES DOE/ID-11547 0
08-FEB-16 FAULK, DENNIS EPA CONCURRENCE ON THE IDAHO NATIONAL LAB 5 YEAR REVIEW 5282268 0
31-DEC-15 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2010-2014 DOE/ID-11513 0
14-SEP-15 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - FORMER INTEC BUILDINGS CPP-601, CPP-602, CPP-627, AND CPP-640 AND EARTHEN CAP, CPP-139 (PART B) NSI-26008 00
01-AUG-15 NOT SPECIFIED INL SITE COMMUNITY INVOLVEMENT PLAN DOE/ID-11518 0
01-JUL-15 NOT SPECIFIED FISCAL YEAR 2014 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11526 0
01-JUN-15 NOT SPECIFIED ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT DOE/ID-11293 3
01-JUN-15 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 3
01-MAY-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2014 RPT-1361 0
01-APR-15 NOT SPECIFIED ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT DOE/ID-11293 2
31-MAR-15 FAULK, DENNIS EPA CONCURRENCE FOR DISCHARGE OF IWTU WATER TO STORM WATER EVAPORATION CCN 317610 0
17-MAR-15 JOHANSEN, P.E. DEQ CONCURRENCE FOR DISCHARGE OF WATER FROM IWTU TO CPP-1793 STORM WATER EVAPORATION POND CCN 317584 0
09-MAR-15 BROWN, M.E. REQUEST FOR CONCURRENCE FOR DISCHARGE OF WATER FROM INTEGRATED WASTE TREATMENT UNIT(IWTU) TO CPP-1793 STORM WATER EVAPORATION POND CCN 317526 0
01-MAR-15 KOSLOW, KAREN N. ICDF COMPLEX FIVE-YEAR OPERATIONS AND MAINTENANCE ACTIVITIES REPORT FOR FISCAL YEARS 2010 THROUGH 2014 RPT-1351 0
01-MAR-15 NOT SPECIFIED ANNUAL REPORT - ESTIMATED IODINE-129 FLUX BETWEEN THE IDAHO CERCLA DISPOSAL FACILITY LANDFILL AND EVAPORATION PONDS (THROUGH DECEMBER 31, 2014) RPT-1369 0
01-FEB-15 NOT SPECIFIED IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX GROUNDWATER MONITORING PLAN DOE/ID-10955 6
19-JAN-15 HOBBES, TAMMY L. TRANSMITTAL OF THE IDAHO CERCLA DISPOSAL FACILITY EVAPORATION POND ANNUAL AND QUINQUENNIAL SAMPLING RESULTS - 2014 CCN 317288 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
01-JAN-15 NOT SPECIFIED ANNUAL GROUNDWATER DETECTION MONITORING REPORT FOR THE IDAHO CERCLA DISPOSAL FACILITY (2014) DOE/ID-11522 0
01-JUN-14 NOT SPECIFIED FISCAL YEAR 2013 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11500 0
01-JUN-14 NOT SPECIFIED BIENNIAL REPORT ON DETECTION MONITORING OF ICDF GROUNDWATER (2012-2013) DOE/ID-11506 0
01-MAY-14 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2013 RPT-1268 0
01-MAR-14 NOT SPECIFIED ANNUAL REPORT - ESTIMATED IODINE-129 FLUX BETWEEN THE IDAHO CERCLA DISPOSAL FACILITY LANDFILL AND EVAPORATION PONDS (THROUGH DECEMBER 31, 2013) RPT-1279 0
01-FEB-14 NOT SPECIFIED ICDF COMPLEX OPERATIONAL AND MONITORING SAMPLING AND ANALYSIS PLAN DOE/ID-11005 3
13-JAN-14 HOBBES, TAMMY L. TRANSMITTAL OF THE IDAHO CERCLA DISPOSAL FACILITY EVAPORATION POND ANNUAL SAMPLING RESULTS - 2013 CCN 315980 0
01-DEC-13 NOT SPECIFIED ICDF COMPLEX WASTE ACCEPTANCE CRITERIA DOE/ID-10881 12
01-NOV-13 NOT SPECIFIED ICDF COMPLEX OPERATIONS AND MAINTENANCE PLAN DOE/ID-11000 9
01-NOV-13 NOT SPECIFIED ANNUAL GROUNDWATER DETECTION MONITORING REPORT FOR THE IDAHO CERCLA DISPOSAL FACILITY (2012) DOE/ID-11491 1
01-OCT-13 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/ID-11333 1
01-SEP-13 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 8
01-JUN-13 NOT SPECIFIED FISCAL YEAR 2012 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11476 0
01-JUN-13 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2012 RPT-1196 0
31-MAR-13 NOT SPECIFIED ESTIMATED IODINE-129 FLUX BETWEEN THE IDAHO CERCLA DISPOSAL FACILITY LANDFILL AND EVAPORATION POND (THROUGH DECEMBER 31, 2012) RPT-1214 0
15-MAR-13 FAULK, DENNIS OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL (WDP-RWMC-13-018) 4212308 0
08-MAR-13 KOCH, DARYL F. DEPARTMENT OF ENERGY REVISED OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL (WDP-RWMC-13-018) MARCH 4, 2013 4210680 0
04-MAR-13 JENSEN, NOLAN R. DEPARTMENT OF ENERGY REVISED OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL (WDP-RWMC-13-018) WDP-RWMC-13-018 0
01-MAR-13 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I, INTERIM REMEDIAL ACTION REPORT DOE/ID-11475 0
16-JAN-13 ANDERSON, SCOTT A. CONTRACT NO. DE-AC07-05ID14516 - TRANSMITTAL OF THE ICDF EVAPORATION POND AND PUMP STATION ANNUAL SAMPLING RESULTS AND LIMITATIONS AND VALIDATION REPORTS CCN 314555 0
08-JAN-13 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - INTEC BUILDINGS CPP-601, CPP-602, CPP-627, AND CPP-640 LANDFILL, CPP-139 (PART A) NSI-26008 0
31-DEC-12 NOT SPECIFIED ICDF COMPLEX OPERATIONS AND MAINTENANCE PLAN DOE/ID-11000 8
26-NOV-12 JENSEN, NOLAN R. TRANSMITTAL OF THE OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I, REMEDIAL ACTON REPORT (DRAFT) (WDP-RWMC-12-065) WDP-RWMC-12-065 0
01-SEP-12 NOT SPECIFIED ICDF COMPLEX WASTE ACCEPTANCE CRITERIA DOE/ID-10881 11
01-SEP-12 NOT SPECIFIED ICDF COMPLEX OPERATIONS AND MAINTENANCE PLAN DOE/ID-11000 7
31-AUG-12 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN DOE/ID-11334 2
20-AUG-12 NOT SPECIFIED ANNUAL EMISSIONS REPORTING METHODOLOGY FOR THE IDAHO CERCLA DISPOSAL FACILITY EDF-9993 1
31-JUL-12 NOT SPECIFIED FISCAL YEAR 2011 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11462 0
27-JUL-12 KOCH, DARYL TREATMENT OF MATERIALS AND FUELS COMPLEX (MFC) EXPERIMENTAL BREEDER REACTOR-II (EBR) PRIMARY SODIUM TANK TREATMENT SOLUTION AND RINSATES AT THE IDAHO CERCLA DISPOSAL FACILITY (ICDF) 4038817 0
11-JUL-12 KOCH, DARYL F. DEPARTMENT OF ENERGY REVISED OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL (WDP-RWMC-12-027) LETTER DATED JULY 3, 2012 4025891 0
09-JUL-12 FAULK, DENNIS REVISED OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL 4022644 0
03-JUL-12 COOPER, JAMES R. DEPARTMENT OF ENERGY REVISED OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL (WDP-RWMC-12-027) WDP-RWMC-12-027 0
01-JUL-12 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2011 RPT-1001 0
30-JUN-12 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 2
20-JUN-12 JOHANSEN, PETE DRAFT FINAL OU 3-14 REMEDIAL ACTIONS: PHASE II 90% DESIGN DOCUMENT (EDF-101116) 4008610 0
30-APR-12 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 7
16-APR-12 FAULK, DENNIS EPA CONCURRENCE - ADDITION OF BUILDINGS TO THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES 3956551 0
09-APR-12 KOCH, DARYL F. DEQ CONCURRENCE - REQUEST FOR ADDENDUM TO TABLE 1 OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 1) 3956550 0
09-APR-12 SHAW, R. MARK ADDENDUM TO TABLE 1. OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 1) (EM-FMDP-12-027) EM-FMDP-12-027 0
19-MAR-12 HAIN, KATHLEEN E. TRANSMITTAL OF THE OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT (EDF-10116), REVISION 0 (WDP-RWMC-12-012) WDP-RWMC-12-012 0
14-MAR-12 JOHANSEN, PETE COMMENTS ON THE OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN (DRAFT), DOE-ID-11337 IR-25322 0
12-MAR-12 NOT SPECIFIED ICDF COMPLEX WASTE PROFILE AND VERIFICATION SAMPLE GUIDANCE DOE/NE-ID-11175 3
06-MAR-12 SHANKLIN, DEAN E. OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT EDF-10116 0
01-MAR-12 NOT SPECIFIED ICDF COMPLEX REMEDIAL ACTION WORK PLAN DOE/ID-10984 2
17-FEB-12 FAULK, DENNIS WASTE AREA GROUP 3, OU 3-13 GROUP 2 SOILS BENEATH CPP-601, AND CPP-602 DEFERRED ACTION REMEDY IR-25318 0
17-FEB-12 JOHANSEN, PETE WASTE AREA GROUP 3, OU 3-13 GROUP 2 SOILS BENEATH CPP-601 AND CPP-602 DEFERRED ACTION REMEDY IR-25319 0
15-FEB-12 FAULK, DENNIS EPA Concurrence on Operable Unit 3-14 Draft Final Phase II 90% Design and Phase III Acceleration Proposal IR-25317 0
15-FEB-12 HAIN, KATHLEEN E. TRANSMITTAL OF THE FINAL REMOVAL ACTION REPORT FOR CPP-601, CPP-602, CPP-627, CPP-630, AND CPP-640 (DOE/ID-11453)(WDP-RWMC-12-005) WDP-RWMC-12-005 0
14-FEB-12 JOHANSEN, PETE WASTE AREA GROUP 3, FINAL REMOVAL ACTION REPORT FOR CPP-601, CPP-602, CPP-627, CPP-630, AND CPP-640, DOE/ID-11453, FEBRUARY 2012 IR-25320 0
14-FEB-12 KOCH, DARYL F. Department of Energy Operable Unit 3-14 Phase III Acceleration Proposal (WDP-RWMC-12-003) WDP-RWMC-12-003 0
08-FEB-12 NOT SPECIFIED GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-601, CPP-602, CPP-627, AND CPP-640 FUEL REPROCESSING COMPLEX NON-TIME-CRITICAL REMOVAL ACTION EDF-10195 1
08-FEB-12 NOT SPECIFIED RESIDUAL RADIOACTIVE INVENTORY FOR FUEL REPROCESSING COMPLEX NON-TIME CRITICAL REMOVAL ACTION REPORT EDF-10239 0
01-FEB-12 NOT SPECIFIED FINAL REMOVAL ACTION REPORT FOR CPP-601, CPP-602, CPP-627, CPP-630, AND CPP-640 DOE/ID-11453 0
31-JAN-12 NOT SPECIFIED PREFINAL INSPECTION REPORT FOR OPERABLE UNIT 3-14, PHASE I DOE/ID-11461 0
03-JAN-12 BULLOCK, ROBERT E. CONCURRENCE ON LEAVING PIPING WITH LEADED JOINTS BENEATH CPP-601 AND CPP-602 AS IMPRACTICAL TO REMOVE AT THE INTEC CPP-601/627/640 LANDFILL CLOSURE ON THE INL (EPA ID NO. IDD4890008952) IR-25316 0
01-JAN-12 NOT SPECIFIED ICDF COMPLEX OPERATIONAL AND MONITORING SAMPLING AND ANALYSIS PLAN DOE/ID-11005 2
10-NOV-11 FAULK, DENNIS CONCURRENCE ON LEAVING PIPING WITH LEADED JOINTS BENEATH CPP-601 AND CPP-602 AS IMPRACTICAL TO REMOVE (WDP-RWMC-11-068) AR-25313 0
07-NOV-11 HAIN, KATHLEEN E. REQUEST FOR CONCURRENCE ON LEAVING PIPING WITH LEADED JOINTS BENEATH CPP-601 AND CPP-602 AS IMPRACTICAL TO REMOVE (WDP-RWMC-11-068) AR-25312 0
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
01-SEP-11 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES TO REVISE INSTITUTIONAL CONTROLS IN VARIOUS RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11439 0
31-AUG-11 NOT SPECIFIED FISCAL YEAR 2010 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11442 1
01-AUG-11 NOT SPECIFIED ICDF COMPLEX WASTE ACCEPTANCE CRITERIA DOE/ID-10881 10
01-JUN-11 NOT SPECIFIED ICDF COMPLEX OPERATIONS AND MAINTENANCE PLAN DOE/ID-11000 6
07-APR-11 MARCINOWSKI, FRANK REVISION OF THE DISPOSAL AUTHORIZATION STATEMENT FOR THE IDAHO COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT DISPOSAL FACILITY CCN 311791 0
07-FEB-11 OPALSKI, DANIEL D. U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE ON THE FIVE-YEAR REVIEW FOR IDAHO NATIONAL LABORATORY FISCAL YEARS 2005-2009 4544925 0
01-FEB-11 NOT SPECIFIED PERFORMANCE ASSESSMENT FOR THE IDAHO CERCLA DISPOSAL FACILITY LANDFILL DOE/ID-10978 2
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 1) DOE/ID-11429 (PART 1) 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 2) DOE/ID-11429 (PART 2) 0
13-JAN-11 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2010 RPT-759 0
10-OCT-10 NOT SPECIFIED BIENNIAL REPORT ON DETECTION MONITORING OF ICDF GROUNDWATER (2008-2009) DOE/ID-11435 0
23-JUL-10 DEQ, DOE, EPA NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-13 - ABANDONED DRUM NEAR CPP-665 NSI-25178 1
18-MAY-10 NOT SPECIFIED ICDF COMPLEX WASTE ACCEPTANCE CRITERIA DOE/ID-10881 9
20-APR-10 NOT SPECIFIED FISCAL YEAR 2009 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11419 0
14-DEC-09 DOE, DEQ, EPA NEW SITE IDENTIFICATION FORM - CONTAMINATION ADJACENT TO THE CPP-603 EAST FOUNDATION NSI-25258 0
14-DEC-09 DOE, DEQ, EPA NEW SITE IDENTIFICATION FORM - CONTAMINATION ADJACENT TO THE CPP-633 WASTE CONTAINER ENGINEERED CAP, EAST FOUNDATION NSI-25259 0
09-DEC-09 NOT SPECIFIED ICDF COMPLEX WASTE ACCEPTANCE CRITERIA DOE/ID-10881 8
18-NOV-09 FORSYTHE, HOWARD S. OPERABLE UNIT 3-13, GROUP 3, OTHER SURFACE SOILS (PHASE II) REMEDIAL ACTION REPORT DOE/ID-11402 0
30-SEP-09 JESSMORE, JAMES J, ASSESSMENT OF SHALLOW INJECTION WELLS 21-CPP, 22 CPP, AND 23-CPP RPT-530 1
14-SEP-09 HUTCHISON, DAVID P. SUBMITTAL OF NOTICE OF COMPLETION OF ABANDONMENT FOR CLASS V SHALLOW INJECTION WELLS 15-CPP (34-X-0001-078), 41-CPP (34-X-0001-079), AND 44-CPP (34-X-0001-080) LOCATED AT INTEC, INL SITE CCN 309108 0
31-AUG-09 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 10, AND REMOVAL ACTIONS DOE/ID-10587 10
01-JUL-09 NOT SPECIFIED ANNUAL GROUNDWATER DETECTION MONITORING REPORT FOR THE IDAHO CERCLA DISPOSAL FACILITY (2008) DOE/ID-11403 0
30-JUN-09 NOT SPECIFIED 2008 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11395 0
29-JUN-09 NOT SPECIFIED OPERABLE UNIT 3-13, GROUP 7, SFE-20 HOT WASTE TANK SYSTEM REMEDIAL ACTION REPORT DOE/ID-11391 0
25-JUN-09 NOT SPECIFIED ICDF COMPLEX WASTE ACCEPTANCE CRITERIA DOE/ID-10881 7
04-JUN-09 NOT SPECIFIED INTEC OU 3-13, GROUP 3, SITES CPP-13, CPP-35, CPP-81, AND CPP-93 PRE-FINAL/FINAL INSPECTION REPORT PFI-1006 0
05-MAY-09 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN DOE/ID-11334 1
19-FEB-09 NOT SPECIFIED ICDF COMPLEX WASTE ACCEPTANCE CRITERIA DOE/ID-10881 6
23-JAN-09 CLOUGH, MARK K OPERABLE UNIT (OU) 3-13 PREFINAL/FINAL INSPECTION CHECKLISTS FOR CPP-01, CPP-04, CPP-05, CPP-09, CPP-10, CPP-11, CPP-69, AND CPP-130 PFI-1003 0
09-JAN-09 RENO, SCOTT L. ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (ICP) DOE/ID-11293 1
08-DEC-08 AR COORDINATOR OPERABLE UNIT (OU) 3-14 - IDAHO NATIONAL LABORATORY (INL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TANK FARM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-14 AR.INDEX.OU.3-14 1
17-OCT-08 DOE, EPA, DEQ SHALLOW INJECTION WELL 41-CPP WEST OF BUILDING CPP-710 NSI-25119 0
29-SEP-08 NOT SPECIFIED ICDF COMPLEX OPERATIONS AND MAINTENANCE PLAN DOE/ID-11000 4
23-SEP-08 NOT SPECIFIED SHALLOW INJECTION WELLS CPP-133 AND CPP-134 NSI-25205 0
15-SEP-08 CLOUGH, MARK, K. PRE-FINAL INSPECTION CHECKLIST FOR CPP-4/5 SITE CLOSURE PFI-1000 0
15-SEP-08 CLOUGH, MARK, K PRE-FINAL INSPECTION CHECKLIST FOR CPP-09/10 SITE CLOSURE PFI-1001 0
11-AUG-08 EATON, D. L. ACTION MEMORANDUM FOR DECOMMISSIONING CPP-601/640 FUEL REPROCESSING FACILITIES DOE/ID-11360 0
08-JUL-08 CAHN, L. S. ICDF DETECTION MONITORING BIENNIAL REPORT (2006-2007) DOE/ID-11373 0
27-JUN-08 NOT SPECIFIED OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN DOE/ID-11334 0
25-JUN-08 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER WASTE MANAGEMENT PLAN DOE/ID-11335 0
25-JUN-08 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER CHARACTERIZATION PLAN FOR THE NORTH TANK FARM SOIL DOE/ID-11336 0
24-JUN-08 NOT SPECIFIED OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 0
17-JUN-08 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/ID-11333 0
05-JUN-08 NOT SPECIFIED ICDF COMPLEX WASTE ACCEPTANCE CRITERIA DOE/ID-10661 5
02-JUN-08 JEFFREY R. FORBES INTEC GROUNDWATER MONITORING REPORT (2007) DOE/ID-11356 1
02-JUN-08 SHANNON L. ANSLEY INTEC GROUNDWATER MONITORING REPORT (2007) DOE/ID-11356 1
29-MAY-08 HERNANDEZ, NICHOLE K. PREFINAL INSPECTION OF CERCLA SITES CPP-08, CPP-19, AND CPP-132 PFI-1004 0
23-APR-08 NOT SPECIFIED TITLE TEST-1 04
10-MAR-08 SHANKLIN, D. E. 2007 ANNUAL OPERATIONS REPORT FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION DOE/ID-11358 00
19-FEB-08 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-13 - ABANDONED DRUM NEAR CPP-665 NSI-25178 A 00
05-FEB-08 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS DOE/ID-11042 04
30-JAN-08 DAVISON, L. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM DOE/ID-11048 02
14-JAN-08 EATON, D. L. ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE CHEMICAL PROCESSING PLANT (CPP-601/640) FUEL REPROCESSING FACILITIES DOE/ID-11346 02
29-NOV-07 CETO, N. CONCURRENCE ON USE OF CHEMICAL PROCESSING PLANT (CPP)-67 FOR DISPOSAL OF COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) GENERATED INDUSTRIAL WASTE 25184 00
28-NOV-07 KOCH, D. F. CONCURRENCE ON USE OF CHEMICAL PROCESSING PLANT (CPP)-67 FOR DISPOSAL OF COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) GENERATED INDUSTRIAL WASTE 25183 00
19-NOV-07 HERNANDEZ, N. K. REQUEST FOR CONCURRENCE ON USE OF CHEMICAL PROCESSING PLANT (CPP)-67 FOR DISPOSAL OF COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) GENERATED INDUSTRIAL WASTE FMDP-RFDP-07-027 00
19-NOV-07 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-13 GROUP 3 - SOIL CONTAMINATION BENEATH OLIVE AVENUE CPP-132 NSI-25157 00
15-NOV-07 SCHWENDIMAN, G. L. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 4-6 (PHASE II) REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) WORK PLAN APPENDIX F-1, NEW SITE CPP-130 - SOILS AND BURIED DEBRIS - NOVEMBER 2007 DOE/ID-11342 00
01-NOV-07 NOT SPECIFIED IDAHO CERCLA DISPOSAL FACILITY COMPLEX COMPLIANCE DEMONSTRATION FOR DOE ORDER 435.1 DOE/ID-10956 2
09-OCT-07 SIMONDS, R. E. (JACK) HEALTH AND SAFETY PLAN (HSP OR HASP) FOR IDAHO CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS INEEL/EXT-01-01318 04
03-OCT-07 FORSYTHE, H. S. MONITORING REPORT/DECISION SUMMARY FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER DOE/ID-11326 00
09-AUG-07 DAVISON, R. L. IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX GROUNDWATER MONITORING PLAN (GMP) DOE/ID-10955 05
31-JUL-07 DAVISON, L. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS (PHASE I) REMEDIAL ACTION (RA) REPORT DOE/ID-11311 00
31-JUL-07 CAHN, L. S. EVALUATION OF INDICATOR PARAMETERS FOR IDAHO CERCLA DISPOSAL FACILITY (ICDF) RPT-425 00
25-JUL-07 SHANKLIN, D. E. OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) SCOPE OF WORK DOE/ID-11318 00
09-JUL-07 HEILESON, W. M. IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE ACCEPTANCE CRITERIA (WAC) DOE/ID-10881 04
25-JUN-07 GIBSON, P. L. IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS AND MAINTENANCE (O&M) PLAN DOE/ID-11000 03
30-MAY-07 CAHN, L. S. ANNUAL GROUNDWATER DETECTION MONITORING REPORT FOR THE IDAHO CERCLA DISPOSAL FACILITY (ICDF) (2006) DOE/ID-11330 00
22-MAY-07 MCMANAMON, L. E. ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 03
16-MAY-07 AR COORDINATOR OPERABLE UNIT (OU) 3-14 - IDAHO NATIONAL LABORATORY (INL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TANK FARM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-14 AR.INDEX.OU.3-14 00
16-MAY-07 DEQ RECORD OF DECISION (ROD) FOR TANK FARM SOIL AND IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER, OPERABLE UNIT (OU) 3-14 DOE/ID-11296 00
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
23-FEB-07 FORBES, J. R. ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER MONITORING REPORT (2006) DOE/ID-11301 00
15-FEB-07 NOT SPECIFIED INTEC OU 3-13, GROUP 3, SITE CPP-03 PRE-FINAL INSPECTION REPORT PFI-1005 0
09-FEB-07 WESSMAN, DAVID L. TRANSMITTAL OF THE CLOSURE CERTIFICATION FOR THE CERCLA CPP-1789 STAGING AND STORAGE ANNEX (OS-ETSD-07-021) OS-ETSD-07-021 0
04-JAN-07 CROSON, D. V. FINAL REMOVAL ACTION REPORT FOR THE CPP-603A BASIN FACILITY DOE/ID-11306 01
03-JAN-07 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-13 - BURIED DEBRIS WITHIN SITE CPP-03 NSI-25047 00
20-DEC-06 BRADFORD, JEFF D. TRANSMITTAL OF THE CERCLA CLOSURE PLAN FOR THE CPP-1789 STAGING AND STORAGE ANNEX AT IDAHO CCN 304040 0
15-DEC-06 CROSON, D. V. FINAL REMOVAL ACTION REPORT FOR THE CPP-603A BASIN FACILITY DOE/ID-11306 00
14-DEC-06 HEILESON, W. M. IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS WASTE MANAGEMENT PLAN (WMP) - APPENDIX G TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 DOE/ID-10886 01
14-DEC-06 HEILESON, W. M. IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) DOE/ID-10984 01
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
20-NOV-06 BRAGASSA, J. L. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11089 02
20-NOV-06 RICE, R. S. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) WASTE MANAGEMENT PLAN (WMP) - ATTACHMENT 6 TO DOE/ID-11089, REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11092 02
15-NOV-06 SHANKLIN, D. E. OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) DOE/ID-10771 04
31-OCT-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 02
17-OCT-06 HEILESON, W. M. IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE PROFILE AND VERIFICATION SAMPLE GUIDANCE DOE/NE-ID-11175 02
10-OCT-06 HEILESON, W. M. IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE ACCEPTANCE CRITERIA (WAC) DOE/ID-10881 03
26-SEP-06 HEILESON, W. M. IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION (RA) REPORT DOE/ID-11252 00
06-SEP-06 ROUSSEAU, J. P. RESPONSE TO COMMENTS ALLEGING IDAHO NATIONAL LABORATORY (INL) RELATED CS-137 AND SR-90 CONTAMINATION IN THE MICHAUD FLATS AREA NEAR POCATELLO, IDAHO CCN 304024 00
22-AUG-06 NOT SPECIFIED IDAHO CLEANUP PROJECT (ICP) PUBLIC NOTICE - PUBLIC MEETINGS SCHEDULED ON PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 25016 00
21-AUG-06 MAXAND, J. SNAKE RIVER ALLIANCE REQUEST FOR EXTENSION TO COMMENT PERIOD ON THE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER 25015 00
16-AUG-06 NOT SPECIFIED IDAHO CLEANUP PROJECT (ICP) PUBLIC NOTICE - AGENCIES RELEASE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER 25014 00
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
09-AUG-06 CAHN, L. S. METHODS TO REDUCE WATER INFILTRATION AND RECHARGE OF THE NORTHERN SHALLOW PERCHED WATER ZONE AT IDAHO NUCLEAR TECHNOLOGIES AND ENGINEERING CENTER (INTEC) EDF-6868 00
02-AUG-06 SIMONDS, R. E. (JACK) HEALTH AND SAFETY PLAN (HSP OR HASP) FOR IDAHO CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS INEEL/EXT-01-01318 03
01-AUG-06 CAHN, L. S. PROPOSED PLAN FOR TANK FARM SOIL AND GROUNDWATER AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), OPERABLE UNIT (OU) 3-14 RPT-223 00
28-JUL-06 SHANKLIN, D. E. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 4 - 6 (PHASE II) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11254 00
27-JUL-06 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST FOR AN EXTENSION FOR STORAGE OF DEBRIS IN WASTE BOXES AT THE FULL CONTAINER STORAGE AREA AT THE IDAHO CERCLA DISPOSAL FACILITY (ICDF) 24985 00
27-JUL-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN DOE/ID-11042 03
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
27-JUL-06 SHANKLIN, D. E. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS (PHASE II) FIELD SAMPLING PLAN (FSP) DOE/ID-11256 00
27-JUL-06 SCHWENDIMAN, G. L. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 4-6 (PHASE II) WASTE MANAGEMENT PLAN (WMP) DOE/ID-11258 00
19-JUL-06 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST FOR TIME EXTENSION FOR STORAGE OF DEBRIS IN WASTE BOXES AT THE FULL CONTAINER STORAGE AREA AT THE IDAHO CERCLA DISPOSAL FACILITY (ICDF) 24984 00
19-JUL-06 SHANKLIN, D. E. 2005 ANNUAL OPERATIONS REPORT FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) DOE/ID-11275 01
13-JUL-06 JENSEN, N. R. REQUEST FOR TIME EXTENSION FOR STORAGE OF DEBRIS IN WASTE BOXES AT THE FULL CONTAINER STORAGE AREA AT THE IDAHO CERCLA DISPOSAL FACILITY (ICDF) FMDP-RFDP-06-043 00
13-JUL-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 01
01-JUL-06 NOT SPECIFIED IDAHO CLEANUP PROJECT (ICP) FACT SHEET - TANK FARM SOIL AND IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER - AGENCIES TO RELEASE PROPOSED PLAN FOR CLEANUP 24977 00
27-JUN-06 CAHN, L. S. ANALYSIS OF BASELINE DATA FROM IDAHO CERCLA DISPOSAL FACILITY (ICDF) DETECTION MONITORING WELLS INEEL/EXT-03-00251 01
20-JUN-06 FORBES, J. R. ANNUAL INTEC GROUNDWATER MONITORING REPORT FOR GROUP 5 - SNAKE RIVER PLAIN AQUIFER (2005) DOE/ID-11278 0
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
05-JUN-06 RICHARDS, B. T. REMOVAL ACTION WORK PLAN (RAWP) FOR THE CHEMICAL PROCESSING PLANT (CPP-603A) BASIN FACILITY DOE/NE-ID-11214 02
31-MAY-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 00
11-MAY-06 DAVISON, R. L. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS, CPP-37B AND CPP-37C CHARACTERIZATION RESULTS REPORT RPT-175 00
08-MAY-06 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-13 - SOILS UNDER THE CPP-637 AND CPP-620 FACILITIES 24948 00
01-MAY-06 CAHN, L. S. OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER FEASIBILITY STUDY (FS) DOE/ID-11247 00
27-APR-06 CAHN, L. S. OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) DOE/NE-ID-11227 00
27-APR-06 BAILEY, A. L. END OF WELL REPORTS FOR THE OPERABLE UNIT (OU) 3-14 2004 TANK FARM SOIL INVESTIGATION AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) ICP/EXT-04-00706 00
07-APR-06 KECK, K. N. IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) TANK FARM INADVERTENT INTRUDER ASSESSMENT EDF-6803 00
27-MAR-06 GIBSON, P. L. WASTE TRACKING PLAN FOR THE IDAHO CERCLA DISPOSAL FACILITY COMPLEX (ICDF) PLN-914 01
08-MAR-06 PROVENCHER, R. B. APPROVAL TO PROCEED WITH THE PREPARATION OF AN ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE FINAL DECOMMISSIONING OF THE CHEMICAL PROCESSING PLANT 601 (CPP-601) FUEL REPROCESSING COMPLEX AT THE IDAHO NATIONAL LABORATORY (INL) SITE FMDP-RFDP-06-028 00
27-FEB-06 JENSEN, N. R. COMPLETION NOTIFICATION OF REGULATORY COMMITMENT TO REMOVE ICDF MERCURY CONTAMINATED SOIL STAGING PILE FMDP-RFDP-06-024 00
23-FEB-06 SHANKLIN, D. E. 2005 ANNUAL OPERATIONS REPORT FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) DOE/ID-11275 00
20-FEB-06 HARVEGO, L. A. DATA SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS, REMEDIATION SITE CPP-97 CONFIRMATION SAMPLING RPT-174 00
07-FEB-06 GIBSON, P. L. IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS AND MAINTENANCE (O&M) PLAN DOE/ID-11000 02
07-FEB-06 COLE, M. R. FINAL REPORT FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF CPP-627 REMOTE ANALYTICAL FACILITY ICP/EXT-06-01145 00
19-JAN-06 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-13 - ONE AND HALF INCH (1 1/2") PLA-2069C LEAK WEST OF CPP-750 - SITE CODE CPP-124 24926 00
13-JAN-06 FORBES, J. R. ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER MONITORING REPORT FOR GROUP 4 - PERCHED WATER (2005) DOE/ID-11259 00
13-DEC-05 MCMANAMON, L. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM INEEL/EXT-02-01436 02
29-NOV-05 VERWOLF, M. C. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-113, CPP-114, CPP-115 AND CPP-116 - SHALLOW INJECTION WELLS NEAR CPP-702 AND SHALLOW INJECTION WELLS LOCATED IN THE OLIVE AVENUE UTILITY TUNNEL 24922 00
14-NOV-05 FORBES, J. R. LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER DOE/ID-10746 02
10-NOV-05 HULL, L. C. OPERABLE UNIT (OU) 3-14 TANK FARM ALLUVIUM GEOCHEMICAL PROPERTIES REPORT DOE/ID-11271 00
02-NOV-05 VARVEL, M. D. IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER BALANCE REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER DOE/ID-11248 00
01-NOV-05 JENSEN, N. R. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-128, 4" SWA-100532 LEAK NEAR THE INTERSECTION WITH 8" SWN-3001 24920 00
25-OCT-05 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-126 - 20 INCH SW-NS-110477 FLANGE LEAK EAST OF CPP-601 24918 00
25-OCT-05 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-125 - 2 INCH SWA-106450 FLANGE LEAK NORTH OF CPP-1618 24919 00
04-OCT-05 BAILEY, A. L. OPERABLE UNIT (OU) 3-13, GROUP 3, SITE CPP-03 FIELD SAMPLING PLAN (FSP) DOE/ID-11246 00
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
22-SEP-05 PARKE, C. L. CANCELLED DUE TO PROJECT CLOSURE - WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - DMCS NON-ACTIVE DOCUMENT NOTIFICATION DOE/ID-10837 03
22-SEP-05 VARVEL, M. D. CANCELLED DUE TO PROJECT CLOSURE - REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - DMCS NON-ACTIVE DOCUMENT NOTIFICATION DOE/ID-10838 03
22-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2005 (FY-05) DOE/ID-11249 00
22-SEP-05 PARKE, C. L. CANCELLED DUE TO PROJECT CLOSURE - REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - DMCS NON-ACTIVE DOCUMENT NOTIFICATION DOE/NE-ID-11230 01
22-SEP-05 PARKE, C. L. CANCELLED DUE TO PROJECT CLOSURE - HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 GROUP 6 BURIED GAS CYLINDERS - DMCS NON-ACTIVE DOCUMENT NOTIFICATION INEEL/EXT-2000-00270 06
21-SEP-05 MYERS, D. R. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) CHARACTERIZATION PLAN DOE/ID-11090 01
15-SEP-05 EINAN, D. R. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) AND ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DOE'S AUGUST 26, 2005 (08/26/05) REQUEST FOR STAGING PILE EXTENSION TO TREAT MERCURY CONTAMINATED SOIL AT THE INL CERCLA DISPOSAL FACILITY (ICDF) 24917 00
08-SEP-05 HAIN, K. E. NEW SITE IDENTIFICATION (NSI) - CHEMICAL PROCESSING PLANT (CPP) PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR OVERHEAD PIPELINE SPILLS - ADDITIONAL INFORMATION 24921 00
08-SEP-05 BAILEY, A. L. CHARACTERIZATION SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 7, VES-SFE-20 HOT WASTE TANK SYSTEM AT IDAHO NUCLEAR TECHNOLOGY ENGINEERING CENTER (INTEC) ICP/EXT-05-00993 00
30-AUG-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2004 (FY-04) DOE/NE-ID-11200 00
26-AUG-05 JENSEN, N. R. DOE REQUEST FOR EXTENSION OF SCHEDULE TO TREAT MERCURY CONTAMINATED SOIL AND FOR USE OF STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) SOIL STAGING PILE AT THE INL CERCLA DISPOSAL FACILITY (ICDF) FMDP-RFDP-05-081 00
26-JUL-05 GIBSON, P. L. IDAHO CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN DOE/ID-10851 04
25-JUL-05 HEILESON, W. M. IDAHO NATIONAL LABORATORY (INL) CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE ACCEPTANCE CRITERIA (WAC) DOE/ID-10881 5
25-JUL-05 HEILESON, W. M. IDAHO NATIONAL LABORATORY (INL) CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE ACCEPTANCE CRITERIA (WAC) DOE/ID-10881 02
21-JUL-05 GIBSON, P. L. ENGINEERING DESIGN FILE (EDF) - IDAHO CERCAL DISPOSAL FACILITY (ICDF) WASTE PLACEMENT PLAN EDF-ER-286 04
18-JUL-05 SHANKLIN, D. E. SITE COMPLETION REPORT FOR AREA CPP-67, WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS DOE/NE-ID-11234 00
29-JUN-05 MACCONNEL, M. J. SUBMITTAL OF ADDITIONAL INFORMATION AND REQUEST FOR APPROVAL OF PERMANENT ABANDONMENT FOR CLASS V SHALLOW INJECTION WELLS MAH-CA-CT-319, 40-CPP, 45-CPP, AND 46-CPP 34886 00
23-JUN-05 SHANKLIN, D. E. REMEDIAL ACTION (RA) REPORT FOR THE TANK FARM INTERIM ACTION (TFIA), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM SOILS DOE/NE-ID-11209 00
20-JUN-05 DOORNBOS, M. H. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-111 - RELEASE IN CPP-604 ACCESS CORRIDOR 24909 00
20-JUN-05 HAIN, K. E. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-117, CPP-118, CPP-119, CPP-120, CPP-121, CPP-122 AND CPP-123 - FUEL PROCESSING POTENTIAL RELEASES 24915 00
15-JUN-05 VARVEL, M. D. REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS DOE/NE-ID-11230 00
09-JUN-05 KUHNS, D. J. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-112 - WM-184 CHEMICAL PROCESSING PLANT (CPP) TANK FARM CONTAINMENT VAULT POTENTIAL RELEASE 24908 00
08-JUN-05 CETO, N. COMMENT PERIOD EXTENSION FOR DRAFT OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) 24905 00
01-JUN-05 LEWIS, M. G. ADDITIONAL INFORMATION FOR SHALLOW INJECTION WELLS MAH-CA-CT-319, 40-CPP, 45-CPP, AND 46-CPP ICP/EXT-05-00934 00
26-MAY-05 EINAN, D. R. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST TO CHANGE THE EXISTING PM-2A V-14 STAGING AREA TO A TEMPORARY UNIT 24907 00
24-MAY-05 FORBES, J. R. ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER MONITORING REPORT FOR GROUP 5 - SNAKE RIVER PLAIN AQUIFER (SRPA) 2004 DOE/NE-ID-11222 00
19-MAY-05 RODDY, M. S. ENGINEERING DESIGN FILE (EDF) - GEOCHEMICAL STUDY FOR PERCHED WATER SOURCE IDENTIFICATION AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) EDF-5758 00
12-MAY-05 PETTENGILL, C. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) HEALTH AND SAFETY PLAN (HSP OR HASP) INEEL/EXT-03-00628 01
11-MAY-05 SPOMER, M. DEPARTMENT OF ENVIRONMENTAL QUALITY'S (DEQ) RESPONSE TO DOE REQUEST TO CHANGE THE EXISTING PM-2A V-14 STAGING AREA TO A TEMPORARY UNIT 24906 00
26-APR-05 VERWOLF, M. C. TRANSMITTAL OF REQUEST TO CHANGE THE EXISTING PM-2A V-14 STAGING AREA TO TREATMENT UNIT AND PROPOSED NEW CONSTITUENTS TO ICDF LANDFILL AND EVAPORATION POND WASTE ACCEPTANCE CRITERIA (WAC) FMDP-RFDP-05-024 00
13-APR-05 SHANKLIN, D. E. OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) DOE/ID-10771 03
07-APR-05 FORBES, J. R. IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 2005 MONITORING WELL INSTALLATION PLAN DOE/NE-ID-11207 01
28-FEB-05 HEILESON, W. M. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE PROFILE AND VERIFICATION SAMPLE GUIDANCE DOE/NE-ID-11175 01
15-FEB-05 RICHARDS, B. T. REMOVAL ACTION WORK PLAN FOR THE CPP-603 BASIN FACILITY DOE/NE-ID-11214 00
14-FEB-05 GIANOTTO, D. F. CHARACTERIZATION RESULTS REPORT FOR OPERABLE UNIT (OU) 3-13 GROUP 3, OTHER SURFACE SOILS REMEDIATION SET 1 (PHASE 1): CPP-92, CPP-98, CPP-99, AND CPP-97 ICP/EXT-04-00601 00
09-FEB-05 MCMANAMON, L. E. TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-2000-00529 03
31-JAN-05 HEILESON, W. M. ENGINEERING DESIGN FILE (EDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT EDF-ER-275 04
27-JAN-05 JESSMORE, P. J. ADDENDUM FOR THE CONSTRUCTION WORK PLAN FOR WASTE AREA GROUP (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ATTACHMENT 3 INCLUDES AGENCY REVIEW COMMENTS AND RESOLUTIONS DOE/ID-11086 01
26-JAN-05 HEILESON, W. M. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) SHORT TERM RISK ASSESSMENT EDF-ER-327 02
20-JAN-05 RICE, R. S. WASTE MANAGEMENT PLAN (WMP) FOR THE STAGING AND STORAGE ANNEX (SSA) CPP-1789 DOE/ID-10800 05
20-JAN-05 VERNON, D. K. ENGINEERING DESIGN FILE (EDF) - LEACHATE CONTAMINANT REDUCTION TIME STUDY EDF-ER-274 03
19-JAN-05 HAIN, K. E. RESPONSE TO THE JANUARY 6, 2005 (01/06/05) E-MAIL CONCERNING INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS FMDP-FFA/CO-05-094 00
12-JAN-05 FORBES, J. R. IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 2005 MONITORING WELL INSTALLATION PLAN - APPENDIX P TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/NE-ID-11207 00
11-JAN-05 DOORNBOS, M. H. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) DESIGN INVENTORY EDF-ER-264 03
11-JAN-05 VERNON, D. K. ENGINEERING DESIGN FILE (EDF) - LINER AND LEACHATE COMPATABILITY STUDY EDF-ER-278 03
10-JAN-05 ZOHNER, S. K. ENGINEERING DESIGN FILE (EDF) - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX EDF-ER-290 03
06-JAN-05 RICE, R. S. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER - APPENDIX F TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10749 03
06-JAN-05 FORBES, J. R. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER WELL INSTALLATION DOE/ID-10774 03
06-JAN-05 RICHARDS, B. T. ACTION MEMORANDUM FOR THE NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT THE CPP-603A BASINS, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) DOE/NE-ID-11194 00
22-DEC-04 FORBES, J. R. MONITORING REPORT AND DECISION SUMMARY FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) DOE/ID-11098 01
21-DEC-04 MCMANAMON, L. E. HEALTH AND SAFETY PLAN (HSP OF HASP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER PROJECT - APPENDIX H TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) INEEL/EXT-2000-00257 02
17-DEC-04 FORBES, J. R. ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER MONITORING REPORT FOR GROUP 4 - PERCHED WATER (2004) DOE/NE-ID-11192 00
17-DEC-04 SHANKLIN, D. E. FISCAL YEAR 2004 (FY-04) ANNUAL OPERATIONS REPORT FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) DOE/NE-ID-11206 00
07-DEC-04 AR COORDINATOR CPP-603 REMOVAL ACTION - IDAHO COMPLETION PROJECT (ICP) ADMINISTRATIVE RECORD (AR) INDEX FOR THE NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (NEEL) FUEL STORAGE BASIN COMPLEX AT CPP-630 AR.INDEX.NTCRA.CPP-603 00
03-NOV-04 VERWOLF, M. C. RESPONSE TO SEPTEMBER 23, 2004 (09/23/04) LETTER REGARDING OPERABLE UNIT (OU) 3-13 GROUP 4 TC-99 INVESTIGATION AND OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FMDP-FFA/CO-04-053 00
27-OCT-04 EDGETT, S. M. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS INEEL/EXT-01-01318 02
25-OCT-04 BORSCHEL, T. F. INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN DOE/ID-10851 03
21-OCT-04 VERWOLF, M. C. SUMMARY OF AGENCY CONFERENCE CALL HELD OCTOBER 14, 2004 (10/14/04) REGARDING THE GROUP 6 BURIED GAS CYLINDER REMEDIATION APPROACH RELATED TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE INFORMATION REPOSITORY (IR) FMDP-FFA/CO-04-045 00
12-OCT-04 VERWOLF, M. C. RESPONSE TO STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY'S (DEQ) LETTER CONCERNING IODINE-129 GROUNDWATER AND SOIL RESULTS LIMITATIONS AND VALIDATION (L&V) REPORTS, DATED OCTOBER 1, 2004 FMDP-FFA/CO-04-036 00
30-SEP-04 VERWOLF, M. C. CERTIFICATION OF INSTALLATION OF TANK FARM INFILTRATION BARRIER AND TRANSMITTAL OF PRE-FINAL INSPECTION REPORT FOR OPERABLE UNIT (OU) 3-13, TANK FARM INTERIM ACTION (TFIA), PHASE II (PHASE 2) FMDP-FFA/CO-04-029 00
30-SEP-04 SHANKLIN, D. E. PRE-FINAL INSPECTION REPORT FOR OPERABLE UNIT (OU) 3-13 TANK FARM INTERIM ACTION (TFIA), PHASE II (PHASE 2) ICP/EXT-04-00602 00
28-SEP-04 FORBES, J. R. EVALUATION OF TC-99 IN GROUNDWATER AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC): SUMMARY OF PHASE I (PHASE 1) RESULTS ICP/EXT-04-00244 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
27-SEP-04 CAHN, L. S. ANALYSIS OF PERCHED WATER DATA FROM INEEL CERCLA DISPOSAL FACILITY (ICDF) MONITORING WELLS INEEL/EXT-03-00250 00
08-SEP-04 MCMANAMON, L. E. OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I AND II DOE/ID-10771 02
31-AUG-04 ICP COMMUNITY RELATIONS AGENCIES EXTEND COMMENT PERIOD ON PLAN TO REMOVE WATER FROM OLD INEEL SPENT FUEL BASINS 24883 00
30-AUG-04 FORSYTHE, H. S. LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - ATTACHMENT 1 TO MONITORING REPORT AND DECISION SUMMARY DOE/ID-11098 REVISION 1 (REV.01) DOE/ID-10783 03
26-AUG-04 RICHARDS, B. T. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA) IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) DOE/NE-ID-11140 01
26-AUG-04 VERNON, D. K. ENGINEERING DESIGN FILE (EDF) - LEACHATE CONTAMINANT REDUCTION TIME STUDY EDF-ER-274 02
12-AUG-04 EDGETT, S. M. ENGINEERING DESIGN FILE (EDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT EDF-ER-275 03
04-AUG-04 DOE NOTICE OF AVAILABILITY - AGENCIES PROPOSE REMOVING WATER FROM OLD INEEL SPENT FUEL BASIN TO REMOVE POTENTIAL RISK TO AQUIFER 24878 00
02-AUG-04 HAIN, K. E. DOE APPROVAL OF REQUEST FOR EXTENSION OF THE PUBLIC COMMENT PERIOD FOR THE CPP-603A BASIN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) EM-ER-04-166 00
02-AUG-04 HAIN, K. E. TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA), IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), DOE/NE-ID-11140, JULY 2004 (07/04) EM-ER-04-171 00
01-AUG-04 JASON ASSOCIATES SUPPORTING DOCUMENTATION FOR CERCLA CLOSURE CERTIFICATION OF THE STAGING AND STORAGE ANNEX (SSA) PURGE WATER STORAGE TANKS 24886 00
22-JUL-04 CLOUGH, M. K. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DRAFT CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA) ENGINEERING EVALUATION COST ANALYSIS (EE/CA), IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 24876 00
22-JUL-04 CLOUGH, M. K. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REVIEW OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A NON TIME CRITICAL REMOVAL ACTION (NTCRA), DRAFT DOCUMENT (DOE/NE-ID-11140) 24877 00
22-JUL-04 DOORNBOS, M. H. TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-2000-00529 02
16-JUL-04 VARVEL, M. D. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS DOE/ID-10838 02
15-JUL-04 RICE, R. S. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - ATTACHMENT 4 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 2 (REV.02) DOE/ID-10837 02
21-JUN-04 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) CONCURRENCE ON A SUITABILITY DETERMINATION FOR AN OFF-SITE FACILITY TO MANAGE WASTE AREA GROUP 3 (WAG-3) WASTE 24870 00
21-JUN-04 MCCARTHY, J. M. ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) EDF-4488 01
18-JUN-04 DOORNBOS, M. H. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) DESIGN INVENTORY EDF-ER-264 02
18-JUN-04 VERNON, D. K. ENGINEERING DESIGN FILE (EDF) - LINER AND LEACHATE COMPATABILITY STUDY EDF-ER-278 02
18-JUN-04 ZOHNER, S. K. ENGINEERING DESIGN FILE (EDF) - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX EDF-ER-290 02
18-JUN-04 HAIN, K. E. TRANSMITTAL OF REMOVAL ACTION WORK PLAN, ACTION MEMORANDUM, AND WASTE MANAGEMENT PLAN (WMP) FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY EM-ER-04-125 00
17-JUN-04 MCCARTHY, J. M. ENGINEERING DESIGN FILE (EDF) - SOIL CONTAMINATION GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) EDF-4489 01
17-JUN-04 PETERSON, D. T. CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) ALTERNATIVES RRH-11-04 00
16-JUN-04 BRAGASSA, J. L. REMOVAL ACTION WORK PLAN FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY DOE/NE-ID-11158 00
16-JUN-04 BRAGASSA, J. L. CPP-627 CERCLA REMOVAL ACTION WASTE MANAGEMENT PLAN (WMP) DOE/NE-ID-11171 00
14-JUN-04 AR COORDINATOR CPP-627 REMOVAL ACTION - IDAHO COMPLETION PROJECT (ICP) ADMINISTRATIVE RECORD (AR) INDEX FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) SP-6 CPP-627 DECONTAMINATION AND DECOMMISSION (D&D) AR.INDEX.NTCRA.CPP-627 00
10-JUN-04 TOMLINSON, G. E. DOSE ESTIMATES FOR INTEC-603 BASIN ACTIVITIES 24881 00
09-JUN-04 HALL, R. C. TRANSMITTAL OF FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - REVISION 1 (REV.01) EM-ER-04-120 00
07-JUN-04 CAHN, L. S. OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN DOE/ID-10676 01
07-JUN-04 CAHN, L. S. TANK FARM SOIL AND GROUNDWATER FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX A TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 DOE/ID-10764 01
04-JUN-04 RASCH, D. N. SLUDGE REMOVAL FROM THE CPP-603 BASINS TS-ETSD-04-113 00
03-JUN-04 SMITH, P. N. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 GROUP 6 BURIED GAS CYLINDERS - ATTACHMENT 2 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 2 (REV.02) INEEL/EXT-2000-00270 05
01-JUN-04 PROVENCHER, R. B. ACTION MEMORANDUM FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY DOE/NE-ID-11164 00
01-JUN-04 CAHN, L. S. EVALUATION OF FEASIBILITY OF AN EARLY DECISION AND PERMANENT REMEDY FOR TANK FARM SOIL - APPENDIX E TO OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN -DOE/ID-10676, REV.01 INEEL/EXT-03-01010 00
01-JUN-04 CAHN, L. S. TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX B TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 INEEL/EXT-2000-00529 01
01-JUN-04 CAHN, L. S. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX C TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 INEEL/EXT-99-00361 01
25-MAY-04 HALL, R. C. REQUEST FOR EXTENSION FOR SUBMITTAL OF THE FINAL OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-04-107 00
18-MAY-04 GIBSON, P. L. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE PLACEMENT PLAN EDF-ER-286 03
12-MAY-04 FAULK, D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE THAT THE SCOPE AND OBJECTIVES FOR THE OPERABLE UNIT (OU) 3-13 GROUP 2 PIPING EVALUATION HAS BEEN MET BY DOE/NE-ID-11138 AND DOE/ID-11115 24850 00
11-MAY-04 HALL, R. C. DEPARTMENT OF ENERGY (DOE) APPROVAL TO PLACE NEW WASTE AREA GROUP 3 (WAG-3) SITES IN OPERABLE UNIT (OU) 3-14 24851 00
10-MAY-04 MCMANAMON, L. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 GROUP 6 BURIED GAS CYLINDERS INEEL/EXT-2000-00270 04
27-APR-04 HAIN, K. E. TRACK 1 DECISION DOCUMENTATION PACKAGE - NO ACTION REQUIRED - INVESTIGATION FOR SHALLOW INJECTION WELLS CPP-104, CPP-105, CPP-106, CPP-107 AND CPP-108 ASSOCIATED WITH FUEL OIL STORAGE TANKS (CPP-701) - APPROVED FOR OU 3-14 PER DOCUMENT ID #24851 CPP-104, CPP-105, CPP-106, CPP-107 00
24-APR-04 BRAGASSA, J. L. DECISION DOCUMENTATION PACKAGE - TRACK 1 SITES CPP-102, CPP-103, CPP-109 AND CPP-110 - SHALLOW INJECTION WELLS LOCATED AT INTEC - APPROVED AS OPERABLE UNIT (OU) 3-14 SITES PER DOE MEMO (DOCUMENT ID #24851) DATED MAY 11, 2004 (05/11/04) 24884 00
19-APR-04 DOE NOTICE OF AVAILABILITY - DEPARTMENT OF ENERGY (DOE) PROPOSES DEMOLITION OF REMOTE ANALYTICAL FACILITY BUILDING (CPP-627) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) 24839 00
15-APR-04 SCHMITT, E. C. LOW LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP (LFRG) REVIEW AND APPROVAL OF THE REVISED COMPLIANCE DEMONSTRATION DOCUMENTS, COMPOSITE ANALYSIS AND PERFORMANCE ASSESSMENT FOR THE ICDF LANDFILL 24845 00
15-APR-04 BRAGASSA, J. L. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY DOE/NE-ID-11157 01
08-APR-04 ROSENBERGER, M. S. VICINITY DISCHARGES ELIMINATION WORK PLAN FOR THE HAZARDOUS WASTE MANAGEMENT ACT (HWMA) AND THE RESOURCE CONSERVATION RECOVERY ACT (RCRA) POST CLOSURE PERMIT FOR INTEC WASTE CALCINING FACILITY (WCF) AT THE INEEL DOE/NE-ID-11138 00
05-APR-04 HALL, R. C. REQUEST FOR EXTENSION FOR SUBMITTAL OF DRAFT FINAL OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-04-078 00
01-APR-04 HALL, R. C. TRANSMITTAL OF DRAFT EVALUATION OF TC-99 IN GROUNDWATER AT INTEC - SUMMARY OF PHASE I RESULTS EM-ER-04-077 00
31-MAR-04 HOLMES, F. C. APPROVAL TO PROCEED WITH PREPARATION OF ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR DECOMMISSION AND DISMANTLEMENT (D&D) OF CPP-627, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) INEEL 24838 00
30-MAR-04 EINAN, D. R. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE TO REVISE INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL ACTION (RA) REPORT ENFORCEABLE MILESTONE 24843 00
23-MAR-04 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10587 08
16-MAR-04 DAVISON, R. L. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX GROUNDWATER MONITORING PLAN (GMP) DOE/ID-10955 03
10-MAR-04 WINSTON, P. L. ENGINEERING DESIGN FILE (EDF) - CPP-603 RADIONUCLIDE SAMPLE RESULTS EDF-4235 01
09-MAR-04 MCCARTHY, J. M. ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) EDF-4488 00
09-MAR-04 MCCARTHY, J. M. ENGINEERING DESIGN FILE (EDF) - SOIL CONTAMINATION GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) EDF-4489 00
04-MAR-04 GIBSON, P. L. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE PLACEMENT PLAN EDF-ER-286 02
03-MAR-04 HALL, R. C. NOTIFICATION THAT THE OPERABLE UNIT (OU) 3-13 GROUP 2, SOILS UNDER BUILDINGS, PIPING EVALUATION WILL NOT BE PERFORMED EM-ER-04-048 00
03-MAR-04 HATHAWAY, C. REVISION OF INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL ACTION (RA) REPORT ENFORCEABLE MILESTONE EM-ER-04-049 00
27-FEB-04 DOE NOTICE OF AVAILABILITY - AGENCIES ANNOUNCE CHANGES TO CLEANUP REMEDY AT INEEL FACILITY - INTEC OPERABLE UNIT (OU) 3-13 24836 00
25-FEB-04 AR COORDINATOR OPERABLE UNIT (OU) 3-13 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-13 - INCLUDES EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) DOCUMENT ID #DOE/ID-11109 AR.INDEX.OU.3-13 01
20-FEB-04 DOE EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 DOE/ID-11109 00
16-FEB-04 DOORNBOS, M. H. WHITE PAPER - BUILDING CPP-627 DEACTIVATION, DECONTAMINATION AND DECOMMISSIONING (D&D&D) CAN BE PERFORMED UNDER THE DEPARTMENT OF ENERGY'S (DOE) CERCLA REMOVAL ACTION AUTHORITY 24828 00
16-FEB-04 DOORNBOS, M. H. APPROVAL NEEDED OF CERCLA TIME CRITICAL REMOVAL ACTION (TCRA) FOR DEACTIVATION, DECONTAMINATION AND DECOMMISSIONING (D&D&D) OF BUILDING CPP-627 AND TRANSMITTAL OF WHITE PAPER JHV-019-04 00
11-FEB-04 HALL, R. C. TRANSMITTAL OF FINAL OU 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EM-ER-04-030 00
10-FEB-04 GIANOTTO, D. F. LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER - APPENDIX E TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10746 01
10-FEB-04 BRAGASSA, J. L. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11089 00
09-FEB-04 HALL, R. C. SUBMITTAL OF REVISED LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER (2004) REVISION 1 (REV.01) EM-ER-04-031 00
06-FEB-04 BRAGASSA, J. L. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) CHARACTERIZATION PLAN - ATTACHMENT 3 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11090 00
05-FEB-04 VARVEL, M. D. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) FIELD SAMPLING PLAN (FSP) - ATTACHMENT 1 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11091 00
02-FEB-04 KINGSFORD, C. O. ENGINEERING DESIGN FILE (EDF) - EARTHWORK QUANTITIES FOR SUBPROJECT 6, OPERABLE UNIT (OU) 3-13, GROUP 3 - OTHER SURFACE SOILS PROJECT - ATTACHMENT 5 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EDF-3778 00
02-FEB-04 HALL, R. C. SUBMITTAL OF FINAL EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), OPERABLE UNIT (OU) 3-13 EM-ER-04-022 00
29-JAN-04 RICE, R. S. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) WASTE MANAGEMENT PLAN (WMP) - ATTACHMENT 6 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11092 00
29-JAN-04 STALEY, C. S. ENGINEERING DESIGN FILE (EDF) - ANALYSIS OF POTENTIAL AIR EMISSIONS FROM EXCAVATION OF WASTE AREA GROUP 3 (WAG-3) SOIL CONTAMINATION SITES - ATTACHMENT 2 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EDF-3902 00
29-JAN-04 MCMANAMON, L. E. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) HEALTH AND SAFETY PLAN (HSP OR HASP) - ATTACHMENT 4 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN INEEL/EXT-03-00628 00
27-JAN-04 ARROWOOD, J. R. DOSE ESTIMATES FOR INTEC-603 BASIN ACTIVITIES 24837 00
27-JAN-04 MCMANAMON, L. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM INEEL/EXT-02-01436 01
24-JAN-04 KOCH, D. F. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REQUEST TO INVOKE INFORMAL DISPUTE PROCESS TO REACH FINALIZATION OF DRAFT FINAL OPERABLE UNIT (OU) 3-13 GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN 24820 00
22-JAN-04 HALL, R. C. TRANSMITTAL OF FINAL MONITORING REPORT AND DECISION SUMMARY FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) EM-ER-04-011 00
19-JAN-04 FORBES, J. R. MONITORING REPORT AND DECISION SUMMARY FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) DOE/ID-11098 00
23-DEC-03 VARVEL, M. D. IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER SYSTEM ENGINEERING STUDY DOE/ID-11115 00
22-DEC-03 HALL, R. C. TRANSMITTAL OF DRAFT FINAL EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 AND SUPPORTING DOCUMENTATION EM-ER-03-314 00
19-DEC-03 HOLMES, F. C. DOE MEMORANDUM - APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR FUEL STORAGE BASIN COMPLEX AT CPP-603, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), INEEL 24818 00
19-DEC-03 HALL, R. C. TRANSMITTAL OF DRAFT FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 3 OTHER SURFACE SOILS REMEDIATION, SETS 1-3 PHASE I (PHASE 1) EM-ER-03-316 00
19-DEC-03 HOLMES, F. C. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DEACTIVATION OF CPP-603 FUEL STORAGE BASINS EM-ER-03-318 00
18-DEC-03 HALL, R. C. DECEMBER 9, 2003 (12/09/03) AGENCY MEETING MINUTES - DECISIONS FROM ENVIRONMENTAL PROTECTION AGENCY (EPA), IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AND DEPARTMENT OF ENERGY (DOE) ON WASTE AREA GROUP 3 (WAG-3) ISSUES EM-ER-03-315 00
16-DEC-03 FORBES, J. R. ENGINEERING DESIGN FILE (EDF) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) INJECTION WELL - SUMMARY OF HISTORICAL INFORMATION AND GROUNDWATER QUALITY TRENDS EDF-3943 00
15-DEC-03 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER ACCEPTING WASTE ACCEPTANCE CRITERIA (WAC) FOR I-129 AND APPROVING ALL WASTE ACCEPTANCE CRITERIA FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) 24842 00
09-DEC-03 RICE, R. S. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - ATTACHMENT 4 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 1 (REV.01) DOE/ID-10837 01
09-DEC-03 BRAGASSA, J. L. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) OU 3-13, GROUP 6, BURIED GAS CYLINDERS DOE/ID-10838 01
09-DEC-03 WINSTON, P. L. ENGINEERING DESIGN FILE (EDF) - CPP-603 RADIONUCLIDE SAMPLE RESULTS EDF-4235 00
09-DEC-03 VAN AUSDEIN, L. A. ENGINEERING DESIGN FILE (EDF) - QUANTIFICATION OF THREE DEBRIS OBJECTS FROM THE SOUTH BASIN OF CPP-603 USING THE UNDERWATER GAMMA SPECTROMETER SYSTEM (TUGS) EDF-4271 00
09-DEC-03 MCMANAMON, L. E. HEALTH & SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 GROUP 6 BURIED GAS CYLINDERS - ATTACHMENT 2 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 1 (REV.01) INEEL/EXT-2000-00270 03
04-DEC-03 RODDY, M. S. ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER MONITORING REPORT FOR GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) 2003 DOE/ID-11118 00
03-DEC-03 RODDY, M. S. ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER MONITORING REPORT FOR GROUP 4 - PERCHED WATER (2003) DOE/ID-11117 00
03-DEC-03 HALL, R. C. NOTIFICATION THAT THE DRAFT PHASE I SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 TANK FARM SOILS AND GROUNDWATER PROJECT WILL NOT BE SUBMITTED EM-ER-03-299 00
01-DEC-03 ICP COMMUNITY RELATIONS IDAHO COMPLETION PROJECT (ICP) COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS FACILITATE SOIL CLEANUP 24815 00
17-NOV-03 HAIN, K. E. EXTENSION OF COMMENT RESOLUTION FOR OPERABLE UNIT (OU) 1-10 RECORD OF DECISION (ROD) AMENDMENT AND OPERABLE UNIT (OU) 3-13 GROUP 3 PHASE I REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EM-ER-03-287 00
12-NOV-03 SAVKRANZ, W. T. CERCLA CLOSURE PLAN (CP) FOR THE STAGING AND STORAGE ANNEX (SSA) PURGE WATER STORAGE TANKS ICP/EXT-03-00005 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
06-NOV-03 NEHER, E. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION DOE/ID-10774 02
30-OCT-03 GIBSON, P. L. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS AND MAINTENANCE (O&M) PLAN DOE/ID-11000 01
23-OCT-03 FORSYTHE, H. S. SUPPLEMENTAL WORK PLAN FOR TC-99 EVALUATION IN GROUNDWATER, WASTE AREA GROUP 3 (WAG-3) GROUP 4 PERCHED WATER - APPENDIX O TO DOE/ID-10774, REVISION 2 (REV.02) AND REVISION 3 (REV.03) ICP/EXT-03-00029 00
30-SEP-03 GIANOTTO, D. F. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER - THIS DOCUMENT IS APPENDIX F TO DOE/ID-10774, REV.01 & REV.02 DOE/ID-10749 02
30-SEP-03 FORSYTHE, H. S. WASTE MANAGEMENT PLAN (WMP) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC)OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I & II - APPENDIX L TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, R DOE/ID-10770 03
30-SEP-03 FORSYTHE, H. S. OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I AND II - APPENDIX K TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 DOE/ID-10771 01
30-SEP-03 FORSYTHE, H. S. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR GROUP 1 TANK FARM INTERIM ACTION (TFIA) DOE/ID-10772 01
29-SEP-03 GIANOTTO, D. F. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION DOE/ID-10774 01
26-SEP-03 HALL, R. C. CERTIFICATION OF CONSTRUCTION COMPLETION OF OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) - PHASE I (PHASE 1) EM-ER-03-245 00
22-SEP-03 RICE, R. S. WASTE MANAGEMENT PLAN (WMP) FOR THE STAGING AND STORAGE ANNEX (SSA) CPP-1789 DOE/ID-10800 04
09-SEP-03 RODDY, M. S. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, GEOCHEMICAL STUDY FOR PERCHED WATER SOURCE IDENTIFICATION - APPENDIX N TO DOE/ID-10774, REVISION 1 (REV.01), REVISION 2 (REV.02), AND REVISION 3 (REV.03) DOE/ID-11100 00
28-AUG-03 FITCH, D. R. THE 2003 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-11112 00
20-AUG-03 VAN AUSDEIN, L. A. ENGINEERING DESIGN FILE (EDF) - CPP-603 BASINS - FISSILE MATERIAL IN PARTICULATE FORM BASED ON 137CS TO 235U RATIO EDF-3535 00
20-AUG-03 O'NEILL, K. C. TWENTY (20) DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF THE DRAFT FINAL ADDENDUM FOR THE CONSTRUCTION WORK PLAN (CWP) FOR WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) EM-ER-03-207 00
04-AUG-03 HAIN, K. E. NEW SITE IDENTIFICATION (NSI) - CPP-102, CPP-103, CPP-104, CPP-105, CPP-106, CPP-107, CPP-108, CPP-109, CPP-110 - ABANDONED SHALLOW INJECTION WELLS AT INTEC 28120 00
01-AUG-03 NOT SPECIFIED COMPOSITE ANALYSIS FOR THE INEEL CERCLA DISPOSAL FACILITY LANDFILL DOE/ID-10979 0
31-JUL-03 RICE, R. S. WASTE MANAGEMENT PLAN (WMP) FOR THE STAGING AND STORAGE ANNEX (SSA), CPP-1789 DOE/ID-10800 03
23-JUL-03 FRENCH, P. S. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE ACCEPTANCE CRITERIA (WAC) DOE/ID-10881 01
23-JUL-03 O'NEILL, K. C. ENGINEERING DESIGN FILE (EDF) - ALTERNATIVES FOR PROTECTION OF STAGING AREA LINER SYSTEMS - DOE-ID HAS DECIDED TO USE ALTERNATIVE 4, HOT MIX ASPHALT CONCRETE WITH ASPHALT SURFACE, OF EDF-3434 FOR BULK SOIL STAGING PILE LINER SYSTEM EM-ER-03-184 00
12-JUL-03 EDGETT, S. M. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS INEEL/EXT-01-01318 01
10-JUL-03 O'NEILL, K. C. TRANSMITTAL OF INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE PLACEMENT COMPACTION DEMONSTRATION TECHNICAL MEMORANDUM EM-ER-03-176 00
07-JUL-03 BORSCHEL, T. F. INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE PLACEMENT COMPACTION DEMONSTRATION TECHNICAL MEMORANDUM 24807 00
01-JUL-03 FREI, M. W. ICDF LANDFILL - LFRG REVIEWED INFORMATION SUBMITTED AND FOUND DOCUMENTATION SUBMITTED DEMONSTRATES COMPLIANCE WITH DOE ORDER 435.1 AND HAS RECOMMENDED DISPOSAL AUTHORIZATION (APPROVAL) BE GRANTED 27978 00
26-JUN-03 BRAGASSA, J. L. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM DOE/ID-11048 00
26-JUN-03 FRITZ, K. D. ENGINEERING DESIGN FILE (EDF) - VES-SFE-20 HOT WASTE TANK SYSTEM REMEDIAL DESIGN (RD) EXCAVATION ESTIMATES - ATTACHMENT 5 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EDF-3254 00
26-JUN-03 VAN VOST, R. M. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 7 VES-SFE-20 HOT WASTE TANK SYSTEM REMEDIATION UNDERGROUND UTILITIES STUDY - ATTACHMENT 4 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EDF-3266 00
26-JUN-03 BRAGASSA, P. W. ENGINEERING DESIGN FILE (EDF) - VES-SFE-20 HOT WASTE TANK RETRIEVAL AND DEMOLITION STRUCTURAL DESIGN - ATTACHMENT 3 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EDF-3282 00
26-JUN-03 HALL, R. C. TRANSMITTAL OF THE FINAL OPERABLE UNIT (OU) 3-13 GROUP 7 VES-SFE-20 HOT WASTE TANK SYSTEM REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EM-ER-03-168 00
25-JUN-03 RICE, R. S. WASTE MANAGEMENT PLAN (WMP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM - ATTACHMENT 9 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11049 00
25-JUN-03 BRAGASSA, J. L. ENGINEERING DESIGN FILE (EDF) - TRU CONSTITUENT CALCULATIONS AND THE PROPOSED DISPOSAL PATH FOR THE VES-SFE-20 HOT WASTE TANK AND CONTENTS - ATTACHMENT 6 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EDF-3273 00
23-JUN-03 TUOTT, L. C. FIELD SAMPLING PLAN (FSP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - ATTACHMENT 8 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11047 00
23-JUN-03 MCMANAMON, L. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM - ATTACHMENT 10 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN INEEL/EXT-02-01436 00
09-JUN-03 HALL, R. C. DOCUMENTATION OF AGREEMENT REACHED DURING WASTE AREA GROUP 3 (WAG-3) CONFERENCE CALL ON MARCH 20, 2003 (03/20/03) TO MODIFY PHASE 1 OF THE TANK FARM INTERIM ACTION (TFIA) EM-ER-03-140 00
06-JUN-03 SAMPACO, K. ENGINEERING DESIGN FILE (EDF) - ALTERNATIVES FOR PROTECTION OF STAGING AREA LINER SYSTEMS EDF-3434 00
01-JUN-03 NOT SPECIFIED PHASE 1 MONITORING WELL AND TRACER STUDY REPORT FOR OPERABLE UNIT 3-13, GROUP 4, PERCHED WATER DOE/ID-10967 (PART 1) 1
01-JUN-03 NOT SPECIFIED PHASE I MONITORING WELL AND TRACER STUDY REPORT FOR OPERABLE UNIT 3-13, GROUP 4, PERCHED WATER DOE/ID-10967 (PART 2) 1
01-JUN-03 NOT SPECIFIED PHASE I MONITORING WELL AND TRACER STUDY REPORT FOR OPERABLE UNIT 3-13, GROUP 4, PERCHED WATER DOE/ID-10967 (PART 3) 1
20-MAY-03 MCMANAMON, L. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13, GROUP 1 SOILS TANK FARM INTERIM ACTION (TFIA) - APPENDIX M TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 INEEL/EXT-2000-00194 04
19-MAY-03 ALLRED, C. S. INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE ACCEPTANCE CRITERIA (WAC) 24796 00
15-MAY-03 MCCARTHY, J. M. ENGINEERING DESIGN FILE (EDF) - ACCEPTABLE RESIDUAL INVENTORY CALCULATIONS FOR CPP-603 EDF-3684 00
14-MAY-03 DOE PUBLIC NOTICE - PUBLIC INVITED TO WORKSHOP ON INEEL CERCLA DISPOSAL FACILITY (ICDF) 24790 00
12-MAY-03 DOE UPDATE ON THE PROGRESS OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) 24791 00
06-MAY-03 CRISP, D. E. TECHNICAL SPECIFICATIONS (SPC) - INEEL CERCLA DISPOSAL FACILITY (ICDF) LANDFILL AND EVAPORATION POND REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II SPC-1476 02
29-APR-03 HALL, R. C. DOCUMENTATION OF AGREEMENT TO DEFER INSTALLATION OF THE OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER PHASE II WELLS EM-ER-03-120 00
25-APR-03 WESSMAN, D. L. PATH FORWARD FOR IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY'S (INEEL) IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER'S (INTEC) VES-SFE-20 HOT WASTE TANK CHARACTERIZATION EFFORT EM-ER-03-115 00
04-APR-03 HALL, R. C. NOTIFICATION THAT A 24 HOUR PUMP TEST FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) PROJECT WILL NOT BE PERFORMED EM-ER-03-093 00
01-APR-03 RICE, R. S. WASTE MANAGEMENT PLAN (WMP) FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 TANK FARM INTERIM ACTION (TFIA), PHASE 1 DOE/ID-10770 02
01-APR-03 MCMANAMON, L. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13, GROUP 1 SOILS TANK FARM INTERIM ACTION (TFIA) INEEL/EXT-2000-00194 03
18-MAR-03 HAIN, K. E. TRANSMITTAL OF LONG TERM MONITORING PLAN, REVISION 2 (REV.02), WASTE MANAGEMENT PLAN (WMP), REVISION 3 (REV.03) AND HEALTH AND SAFETY PLAN (HSP OR HASP), REVISION 2 (REV.02) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) EM-ER-03-079 00
05-MAR-03 HAIN, K. E. REQUEST FOR A MILESTONE EXTENSION RELATED TO SUBMISSION OF PHASED WASTE AREA GROUP 3 (WAG-3) GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLANS - POSITION PAPER FOR PHASING THE WAG-3 GROUP 3 RD/RA EM-ER-03-064 00
05-MAR-03 HALL, R. C. NOTIFICATION THAT A SECONDARY DOCUMENT FOR THE OPERABLE UNIT (OU) 3-14 TANK FARM SOILS AND GROUNDWATER PROJECT WILL NOT BE SUBMITTED EM-ER-03-065 00
04-MAR-03 BOWHAN, B. R. RESOLUTION OF DISPUTE - FINAL FULLY EXECUTED ORIGINAL COPY OF AGREEMENT TO RESOLVE DISPUTE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 OCC-03-025 00
01-MAR-03 FORSYTHE, H. S. LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) DOE/ID-10783 02
01-MAR-03 FORSYTHE, H. S. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) PROJECT DOE/ID-10829 03
01-MAR-03 FORSYTHE, H. S. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) INEEL/EXT-2000-00817 02
25-FEB-03 HAIN, K. E. NOTIFICATION OF UNEXPECTED CONDITIONS AND REQUEST FOR VES-SFE-20 HOT WASTE TANK SYSTEM HAZARDOUS WASTE MANAGEMENT ACT (HWMA) RESOURCE CONSERVATION RECOVERY ACT (RCRA) CLOSURE PLAN (CP) MILESTONE RELIEF EM-ER-03-055 00
10-FEB-03 O'NEILL, K. C. TRANSMITTAL OF FINAL INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) EM-ER-03-042 00
03-FEB-03 CRISP, D. E. ENGINEERING DESIGN FILE (EDF) - IDAHO ADMINISTRATIVE PROCEDURES ACT (IDAPA) AIR COMPLIANCE DEMONSTRATION FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX L TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF EDF-2237 00
03-FEB-03 MORGANS, D. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) SHORT TERM RISK ASSESSMENT - APPENDIX E TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 EDF-ER-327 00
01-FEB-03 GIANOTTO, D. F. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER WELL INSTALLATION - APPENDIX B TO DOE/ID-10774, REVISION 2 (REV.02) AND DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10745 02
01-FEB-03 CRISP, D. E. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS WASTE MANAGEMENT PLAN (WMP) - APPENDIX G TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 DOE/ID-10886 00
01-FEB-03 CRISP, D. E. TREATABILITY STUDY (TS) TEST PLAN FOR SOIL STABILIZATION - APPENDIX I TO INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 DOE/ID-10903 00
01-FEB-03 CRISP, D. E. SAMPLING AND ANALYSIS PLAN (SAP) FOR STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) WASTE STABILIZATION OPERATIONS WAG-3 OU 3-13 - APPENDIX J TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 DOE/ID-10924 00
01-FEB-03 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - ENVIRONMENTAL PROTECTION AGENCY (EPA) AND IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS AND RESOLUTIONS ARE INCLUDED AS APPENDIX P DOE/ID-10984 00
01-FEB-03 CRISP, D. E. INEEL CERCLA DISPOSAL FACILITY (ICDF) GROUNDWATER DETECTION MONITORING PROGRAM DATA ANALYSIS PLAN - APPENDIX H TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 DOE/ID-10998 00
01-FEB-03 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS AND MAINTENANCE (O&M) PLAN - APPENDIX A TO INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 1 (VOL.01) OF 2 DOE/ID-11000 00
01-FEB-03 CRISP, D. E. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONAL AND MONITORING (O&M) SAMPLING AND ANALYSIS PLAN (SAP) - APPENDIX M TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 DOE/ID-11005 00
01-FEB-03 CRISP, D. E. ENGINEERING DESIGN FILE (EDF) - NESHAP COMPLIANCE DEMONSTRATION FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX K TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 EDF-2236 00
01-FEB-03 JENKINS, T. W. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX ON-SITE VERSUS OFF-SITE COST COMPARISON - APPENDIX O TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 EDF-2385 00
01-FEB-03 CRISP, D. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS - APPENDIX F TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 INEEL/EXT-01-01318 00
01-FEB-03 VERNON, D. K. PLAN (PLN) - TRACKING PLAN FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX C TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 PLN-914 00
14-JAN-03 TUOTT, L. C. INSTITUTIONAL CONTROL PLAN FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13 DOE/ID-10729 03
14-JAN-03 TUOTT, L. C. THE 2002 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-11033 00
13-JAN-03 MACKEY, C. ENVIRONMENTAL PROTECTION AGENCY'S (EPA) STATEMENT OF POSITION REGARDING THE NOTICE OF VIOLATION (NOV) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 24769 00
20-DEC-02 DOE DEPARTMENT OF ENERGY (DOE) STATEMENT OF DISPUTE, NOTICE OF VIOLATION (NOV) REGARDING THE DRAFT REMEDIAL ACTION (RA) REPORT FOR THE TANK FARM SOILS 24767 00
20-DEC-02 BERGHOLZ, W. E. RESPONSE TO POTENTIAL ADMINISTRATIVE VIOLATIONS AND AREAS OF CONCERN, LETTER DATED DECEMBER 4, 2002 (12/04/02) EM-ER-02-211 00
19-DEC-02 HALL, R. C. TRANSMITTAL OF FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION - REVISION 1 (REV.01), WASTE MANAGEMENT PLAN (WMP), REVISION 1 (REV.01) AND HEALTH & SAFETY PLAN (HSP OR HASP), REVISION 1 (REV.01) EM-ER-02-214 00
17-DEC-02 GIANOTTO, D. F. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER WELL INSTALLATION DOE/ID-10745 01
17-DEC-02 FORSYTHE, H. S. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER DOE/ID-10749 01
17-DEC-02 MCMANAMON, L. E. HEALTH AND SAFETY PLAN (HSP OF HASP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER PROJECT - THIS DOCUMENT IS APPENDIX H TO DOE/ID-10774, REV.01 & REV.02 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 PERCHED WATER SYSTEM INEEL/EXT-2000-00257 01
04-DEC-02 KREIZENBECK, R. NOTICE OF VIOLATION (NOV) AND PENALTY ASSESSMENT 24768 00
27-NOV-02 DOORNBOS, M. H. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) DESIGN INVENTORY EDF-ER-264 01
01-OCT-02 TUOTT, L. C. INSTITUTIONAL CONTROL PLAN FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13 DOE/ID-10729 02
19-SEP-02 DOE NEW SITE IDENTIFICATION (NSI) - SITE CPP-37C OPERABLE UNIT (OU) 3-13 - CONTAMINATION DISCOVERED SOUTHEAST OF CERCLA SITE CPP-37B 24750 00
18-SEP-02 RICE, R. S. WASTE MANAGEMENT PLAN (WMP) FOR THE STAGING AND STORAGE ANNEX (SSA), CPP-1789 DOE/ID-10800 02
12-SEP-02 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 DOE/ID-10587 07
10-SEP-02 HURST, C. J. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS, PRIORITIZATION AND SITE GROUPING REPORT DOE/ID-10996 00
10-SEP-02 HURST, C. J. TITLE I 30% REMEDIAL DESIGN (RD) FOR THE GROUP 7, VES-SFE-20 HOT WASTE TANK DOE/ID-11010 00
30-AUG-02 BREWER, K. ENGINEERING DESIGN FILE (EDF) - TRANSURANIC (TRU) CALCULATIONS FOR VES-SFE-20 WASTE TANK - ATTACHMENT 7 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EDF-2360 00
18-JUL-02 COLLINS, R. L. TRANSMITTAL OF MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA), REVISION 2 (REV.02) EM-ER-02-121 00
01-JUL-02 GIANOTTO, D. F. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - PER EM-ER-206-00 THIS MSIP IS THE RD/RA WORK PLAN FOR GROUP 5 DOE/ID-10782 02
01-JUL-02 NEHER, E. PLUME EVALUATION FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX A TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.02 DOE/ID-10784 02
01-JUL-02 GIANOTTO, D. F. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX H TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.02 DOE/ID-10829 02
01-JUN-02 INEEL COMMUNITY RELATIONS ICDF FACTS - UPDATE ON THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - JUNE 2002 (06/02) 24663 00
01-JUN-02 BRUCE, J. E. WASTE MANAGEMENT PLAN (WMP) FOR THE STAGING AND STORAGE ANNEX (SSA) CPP-1789 DOE/ID-10800 01
14-MAY-02 DAVISON, R. L. INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE DOE/ID-10848 01
14-MAY-02 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN - APPENDIX X TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 DOE/ID-10851 02
14-MAY-02 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION WASTE MANAGEMENT PLAN (WMP) - APPENDIX W TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 DOE/ID-10958 00
14-MAY-02 FRITZLER, B. E. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) TEST PAD CONSTRUCTION REPORT - APPENDIX U TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 EDF-2899 00
14-MAY-02 CROUSE, P. E. ENGINEERING DESIGN FILE (EDF) - SUBSURFACE CONSOLIDATION CALCULATION - APPENDIX F TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-266 01
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
14-MAY-02 CROUSE, P. E. ENGINEERING DESIGN FILE (EDF) - LANDFILL COMPACTION AND SUBSIDENCE STUDY - APPENDIX H TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-267 01
14-MAY-02 REIMBOLD, M. ENGINEERING DESIGN FILE (EDF) - SLOPE STABILITY ASSESSMENT - APPENDIX G TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-268 01
14-MAY-02 BOSE, D. H. ENGINEERING DESIGN FILE (EDF) - LEACHATE GENERATION STUDY - APPENDIX GG TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 EDF-ER-269 01
14-MAY-02 BOSE, D. H. ENGINEERING DESIGN FILE (EDF) - EVAPORATION POND SIZING WITH WATER BALANCE AND MAKE-UP WATER CALCULATIONS - APPENDIX L TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-271 01
14-MAY-02 EVANS, S. K. ENGINEERING DESIGN FILE (EDF) - PERMEABLE REACTIVE BARRIER DECISION ANALYSIS - APPENDIX FF TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 EDF-ER-273 02
14-MAY-02 DAY, R. E. ENGINEERING DESIGN FILE (EDF) - LEACHATE CONTAMINANT REDUCTION TIME STUDY - APPENDIX A TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 EDF-ER-274 01
14-MAY-02 MCMAHON, W. J. ENGINEERING DESIGN FILE (EDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT - APPENDIX B TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 EDF-ER-275 02
14-MAY-02 REIMBOLD, M. ENGINEERING DESIGN FILE (EDF) - EVALUATION OF GEOTECHNICAL INVESTIGATIONS REQUIRED TO COMPLETE DESIGN & CONSTRUCTION - APPENDIX D TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 2 (VOL.02) OF 5 EDF-ER-276 01
14-MAY-02 CROUSE, P. E. ENGINEERING DESIGN FILE (EDF) - WASTE TO SOIL DESIGN RATIO CALCULATIONS - APPENDIX I TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-277 01
14-MAY-02 CROUSE, P. E. ENGINEERING DESIGN FILE (EDF) - LINER AND LEACHATE COMPATABILITY STUDY - APPENDIX C TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 EDF-ER-278 01
14-MAY-02 CROUSE, P. E. ENGINEERING DESIGN FILE (EDF) - HYDROLOGIC MODELING OF FINAL COVER - APPENDIX M TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-279 02
14-MAY-02 THOMPSON, B. ENGINEERING DESIGN FILE (EDF) - LANDFILL LEACHATE COLLECTION SYSTEM DESIGN ANALYSIS - APPENDIX K TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-280 01
14-MAY-02 CROUSE, P. ENGINEERING DESIGN FILE (EDF) - LINER AND FINAL COVER LONG TERM PERFORMANCE EVALUATION AND FINAL COVER LIFE CYCLE EXPECTATION - APPENDIX J TO ICDF RD/CWP - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-281 01
14-MAY-02 REIMBOLD, M. ENGINEERING DESIGN FILE (EDF) - SEISMIC EVALUATION OF LANDFILL AND EVAPORATION POND - APPENDIX E TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-282 01
14-MAY-02 THURSTON, M. ENGINEERING DESIGN FILE (EDF) - WASTE PLACEMENT PLAN - APPENDIX T TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 EDF-ER-286 01
14-MAY-02 ZOHNER, S. K. ENGINEERING DESIGN FILE (EDF) - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING FOR ICDF COMPLEX - APPENDIX O TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (V EDF-ER-290 01
14-MAY-02 DAVISON, R. L. ENGINEERING DESIGN FILE (EDF) - SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (ERA) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX R TO ICDF RD/CWP - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 EDF-ER-311 01
14-MAY-02 ROUTT, T. M. ENGINEERING DESIGN FILE (EDF) - IDAHO ADMINISTRATIVE PROCEDURES ACT (IDAPA) PRELIMINARY AIR SCREENING RESULTS - APPENDIX N TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 EDF-ER-315 00
14-MAY-02 JENKINS, T. W. TRANSMITTAL OF FINAL INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) TITLE II DESIGN EM-ER-02-083 00
14-MAY-02 VERNON, D. K. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) STAGE II CONSTRUCTION - APPENDIX V TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 PLN-962 00
14-MAY-02 DEHNER, J. G. TECHNICAL SPECIFICATIONS (SPC) - INEEL CERCLA DISPOSAL FACILITY (ICDF) LANDFILL AND EVAPORATION POND REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - APPENDIX Y TO ICDF RD/CWP - INCLUDED IN VOLUME 4 (VOL.04) OF 5 SPC-1476 01
14-MAY-02 VERNON, D. K. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX CONTROL SYSTEM - APPENDIX DD TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 TFR-2520 00
14-MAY-02 VERNON, D. K. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WAG-3 INEEL CERCLA DISPOSAL FACILITY (ICDF) LANDFILL AND EVAPORATION POND - APPENDIX CC TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) O TFR-71 02
06-MAY-02 FORSYTHE, H. S. PHASE I MONITORING WELL AND TRACER STUDY REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER DOE/ID-10967 00
01-MAY-02 INEEL COMMUNITY RELATIONS ICDF FACTS - UPDATE ON THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - MAY 2002 (05/02) 27977 00
01-MAY-02 DAVISON, R. L. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX GROUNDWATER MONITORING PLAN (GMP) - APPENDIX S TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 DOE/ID-10955 00
18-APR-02 HAIN, K. E. TRANSMITTAL OF FINAL PHASE I MONITORING WELL AND TRACER STUDY REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 4 PERCHED WATER EM-ER-02-063 00
10-APR-02 PERKINS, T. L. DOE COMMENTS ON PUBLIC PARTICIPATION PACKAGE AND HAZARDOUS WASTE MANAGEMENT ACT (HWMA) RESOURCE CONSERVATION RECOVERY ACT (RCRA) CLOSURE PLAN (CP) FOR VES-SFE-20 HOT WASTE TANK SYSTEM AT INEEL INTEC EM-ER-02-054 00
12-MAR-02 JENKINS, T. W. TRANSMITTAL OF THE FINAL REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) FOR WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ICDF COMPLEX EM-ER-02-037 00
12-MAR-02 DAVISON, R. L. A-E PROCUREMENT SPECIFICATION (SPC) - STAGING, STORAGE, AND SIZING TREATMENT FACILITY (SSSTF) SOIL STABILIZATION SYSTEM (SSS) - APPENDIX B OF EDF-ER-296 WHICH IS APPENDIX B-1 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX SPC-1481 00
11-MAR-02 NISHIOKA, D. E. PROCUREMENT SPECIFICATION (SPC) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) - CPP-1689 ADMINISTRATIVE OFFICE TRAILER (AOT) - APPENDIX C-1 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX SPC-1484 00
07-MAR-02 HURST, C. J. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - DEBRIS TREATMENT PROCESS SELECTION AND DESIGN - APPENDIX B-2 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-1730 00
07-MAR-02 KINGSFORD, C. O. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ACCESS ROAD AND SITE PAVEMENT BALLAST REQUIREMENTS - APPENDIX B-11 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-1913 00
07-MAR-02 KINGSFORD, C. O. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - SANITARY SEWER LIFT STATION PUMP DESIGN - APPENDIX B-3 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-1937 00
07-MAR-02 HUNTER, L. D. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - INTEC FIRE WATER SYSTEM FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX B-5 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) EDF-1948 00
07-MAR-02 KINGSFORD, C. O. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - PROCESS SYSTEMS DRAIN PIPE SIZING - APPENDIX B-6 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-2648 00
07-MAR-02 POPE, M. I. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - FLOW AND PRESSURE CALCULATIONS OF THE RAW WATER AND POTABLE WATER SYSTEMS - APPENDIX B-4 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF CO EDF-2655 00
07-MAR-02 POPE, M. I. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - DECONTAMINATION FACILITY HVAC SYSTEM - APPENDIX B-7 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-2676 00
07-MAR-02 HIPP, T. M. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - FIBER OPTIC SELECTION - APPENDIX B-9 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-2738 00
07-MAR-02 DUGGAN, J. E. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ELECTRICAL LOAD STUDY - APPENDIX B-10 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-2747 00
07-MAR-02 STEPHENS, D. L. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - POST-TENSIONED SLAB DESIGN - APPENDIX B-12 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-3061 00
07-MAR-02 HAEFNER, D. R. ENGINEERING DESIGN FILE (EDF) - PROCESS AND TREATMENT OVERVIEW FOR THE MINIMUM TREATMENT PROCESS - APPENDIX B-1 TO THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-ER-296 00
07-MAR-02 SUMMERS, A. D. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) DESIGN RADIOLOGICAL CONTROL ANALYSIS - APPENDIX B-8 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-ER-302 00
07-MAR-02 DAVISON, R. L. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR CONSTRUCTION ACTIVITIES - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - APPENDIX I TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX PLN-1034 00
07-MAR-02 NISHIOKA, D. E. A-E CONSTRUCTION SPECIFICATIONS (SPC) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) - APPENDIX C TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX SPC-1485 00
07-MAR-02 DAVISON, R. L. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - APPENDIX A TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX TFR-17 02
01-MAR-02 DAVISON, R. L. STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) CONSTRUCTION WASTE MANAGEMENT PLAN (WMP) - APPENDIX H TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX DOE/ID-10873 00
01-MAR-02 DAVISON, R. L. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE ACCEPTANCE CRITERIA (WAC) - APPENDIX J TO THE STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX DOE/ID-10881 00
01-MAR-02 DAVISON, R. L. REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) FOR WAG-3 STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ICDF COMPLEX DOE/ID-10889 00
01-MAR-02 DAVISON, R. L. HEALTH & SAFETY PLAN (HSP) FOR CONSTRUCTION OF THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - APPENDIX G TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX INEEL/EXT-01-00271 00
01-MAR-02 THOMPSON, R. G. PRELIMINARY INSPECTION PLAN FOR STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) CONSTRUCTION ACTIVITIES - APPENDIX F TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX INEEL/EXT-01-00777 00
01-MAR-02 DAVISON, R. L. QUALITY PROGRAM PLAN (QPP) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX K TO THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX PLN-873 00
01-FEB-02 RODDY, M. S. ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER MONITORING REPORT FOR GROUP 5 - SNAKE RIVER PLAIN AQUIFER (SRPA) - 2001 DOE/ID-10930 00
08-JAN-02 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-14, CHEMICAL PROCESSING PLANT 58 (CPP-58) - NITRIC ACID CONTAMINATION IN PROXIMITY TO GROUP 1 INTERIM ACTION (IA) TRENCH NEAR CPP-604 10958 00
01-DEC-01 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN FOR PHASE 2 CONSTRUCTION (60% DESIGN COMPONENT) DOE/ID-10851 01
30-NOV-01 EVANS, S. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - PERMEABLE REACTIVE BARRIER DECISION ANALYSIS (60% DESIGN COMPONENT) EDF-ER-273(60%) 01
30-NOV-01 MCMAHON, W. J. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT (60% DESIGN COMPONENT EDF-ER-275(60%) 01
30-NOV-01 CROUSE, P. E. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - HYDROLOGIC MODELING OF FINAL COVER - (60% DESIGN COMPONENT) EDF-ER-279(60%) 01
30-NOV-01 ZOHNER, S. K. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING (60% DESIGN COMPONENT) - APPENDIX O TO DRAFT FINAL ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN ( EDF-ER-290(60%) 00
30-NOV-01 REIMBOLD, M. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) EVAPORATION POND LINING SYSTEM EQUIVALENCY ANALYSIS (60% DESIGN COMPONENT) EDF-ER-312(60%) 00
30-NOV-01 NIELSEN, M. R. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE PLACEMENT MAPPING PLAN (60% DESIGN COMPONENT) EDF-ER-322(60%) 00
30-NOV-01 REIMBOLD, M. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) EVAPORATION POND BERM OVERTOPPING ANALYSIS (60% DESIGN COMPONENT) EDF-ER-323(60%) 00
29-NOV-01 PERRY, S. W. ENGINEERING DESIGN FILE (EDF) - SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (ERA) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) - (60% DESIGN COMPONENT) EDF-ER-311(60%) 00
01-NOV-01 VERNON, D. K. RESOLUTION LIST (COMMENT RESPONSES) FOR IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON THE 60% REMEDIAL DESIGN (RD) COMPONENTS FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 23621 00
01-NOV-01 VERNON, D. K. RESOLUTION LIST (COMMENT RESPONSES) FOR ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE 60% REMEDIAL DESIGN (RD) COMPONENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 23623 00
01-NOV-01 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) - MASTER TABLE OF DOCUMENTS (60% DESIGN COMPONENTS) DOE/ID-10925 00
22-OCT-01 ENGLISH, M. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON THE 60% REMEDIAL DESIGN (RD) COMPONENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 23620 00
17-OCT-01 JENKINS, T. W. RESPONSE TO INEEL CITIZENS ADVISORY BOARD LETTER 01-CAB-077 DEALING WITH THE INEEL CERCLA DISPOSAL FACILITY (ICDF) EM-ER-01-162 00
09-OCT-01 COLLINS, R. L. RESPONSE TO THE ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE GROUP 6 GAS CYLINDERS AT WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 EM-ER-01-166 00
03-OCT-01 JENKINS, T. W. ON-SITE VERSUS OFF-SITE SOIL AND DEBRIS DISPOSAL COST COMPARISON AT INEEL CERCLA DISPOSAL FACILITY (ICDF) EM-ER-01-160 00
02-OCT-01 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE 60% REMEDIAL DESIGN (RD) COMPONENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 23622 00
02-OCT-01 JENKINS, T. W. RESPONSE TO IDEQ REQUEST FOR 20 (TWENTY) DAY EXTENSION FOR REVIEWS OF DRAFT STAGING, STORAGE, STABILIZATION & TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN & INEEL CERCLA DISPOSAL FACILITY (ICDF) 60% DESIGN COMPONENTS EM-ER-01-161 00
01-OCT-01 INEEL COMMUNITY RELATIONS UPDATE - DESIGN AND WASTE ACCEPTANCE CRITERIA (WAC) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) 24741 00
01-OCT-01 LYLE, J. L. RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER CONCERNING VES-SFE-20 TANK CLOSURE PLAN (CP) EM-ER-01-156 00
31-AUG-01 JENKINS, T. W. TRANSMITTAL OF FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 EM-ER-01-137 00
23-AUG-01 HAIN, K. E. TRANSMITTAL OF DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING & TREATMENT FACILITY (SSSTF) EM-ER-01-136 00
01-AUG-01 FORSYTHE, H. S. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 DOE/ID-10880 00
19-JUL-01 COLLINS, R. L. TRANSMITTAL OF THE 2001 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13, REVISION 1 (REV.01) - DOE/ID-10883 EM-ER-01-124 00
17-JUL-01 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) EXCAVATION AND TEST PAD CONSTRUCTION STORM WATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITIES (SWPPP-CA) - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 (VOL.01) OF 2 21374 00
17-JUL-01 VERNON, D. K. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) AIR SPACE VOLUME CALCULATION - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 EDF-ER-265 00
17-JUL-01 VERNON, D. K. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) STORM WATER DRAINAGE CALCULATIONS - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 EDF-ER-270 00
17-JUL-01 VERNON, D. K. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) SOIL AMENDMENT STUDY - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 EDF-ER-272 00
17-JUL-01 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) TECHNICAL SPECIFICATIONS (SPC) FOR EXCAVATION AND CONSTRUCTING AND TESTING OF CLAY LINER AND TEST PAD - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 SPC-1475 00
16-JUL-01 IVY, K. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT FOR OU 3-14, DOE/ID-10880 10946 00
16-JUL-01 CODY, C. A. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS - DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT FOR OU 3-14, DOE/ID-10880 10949 00
16-JUL-01 DOE DEPARTMENT OF ENERGY (DOE) RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT 10950 00
16-JUL-01 DOE DEPARTMENT OF ENERGY (DOE) RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON DRAFT OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT 10951 00
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - SUBSURFACE CONSOLIDATION CALCULATION - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 EDF-ER-266(30%) 00
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LANDFILL COMPACTION SUBSIDENCE STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 EDF-ER-267(30%) 00
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - SLOPE STABILITY ASSESSMENTS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 EDF-ER-268(30%) 00
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LEACHATE GENERATION STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 EDF-ER-269(30%) 00
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - EVAPORATION POND SIZING WITH WATER BALANCE AND MAKE-UP WATER CALCULATIONS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 EDF-ER-271(30%) 00
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - PERMEABLE REACTIVE BARRIER DECISION ANALYSIS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 EDF-ER-273(30%) 00
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LEACHATE AND CONTAMINANT REDUCTION TIME STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 EDF-ER-274(30%) 00
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 EDF-ER-275(30%) 00
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - EVALUATION OF GEOTECHNICAL INVESTIGATIONS REQUIRED TO COMPLETE DESIGN AND CONSTRUCTION - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 EDF-ER-276(30%) 00
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - WASTE TO SOIL DESIGN RATIO CALCULATIONS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 EDF-ER-277(30%) 00
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LINER AND LEACHATE COMPATIBILITY STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 EDF-ER-278(30%) 00
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LANDFILL LEACHATE COLLECTION SYSTEM DESIGN ANALYSIS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 EDF-ER-280(30%) 00
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LINER AND FINAL COVER LONG TERM PERFORMANCE EVALUATION AND FINAL COVER LIFE CYCLE EXPECTATION - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 EDF-ER-281(30%) 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - SEISMIC EVALUATION OF LANDFILL AND EVAPORATION POND - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 EDF-ER-282(30%) 00
09-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - WASTE PLACEMENT PLAN - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 EDF-ER-286(30%) 00
09-JUL-01 HAIN, K. E. TRANSMITTAL OF THE FINAL INEEL CERCLA DISPOSAL FACILITY (ICDF) 30% DESIGN PACKAGE EM-ER-01-117 00
09-JUL-01 CH2M HILL TECHNICAL SPECIFICATIONS (SPC) - OTHER SPECIFICATIONS REQUIRED TO COMPLETE DRAFT TITLE I DESIGN - 30% DESIGN PACKAGE - INCLUDED IN VOLUME 1 OF 5 - SUBCONTRACT #S01-588058 SPC-1476 00
01-JUL-01 CH2M HILL INEEL CERCLA DISPOSAL FACILITY (ICDF) - MASTER TABLE OF DOCUMENTS (TITLE I) - UMBRELLA DOCUMENT FOR THE TITLE I DESIGN SUBMITTAL FOR DESIGN AND CONSTRUCTION OF THE ICDF - 30% DESIGN PACKAGE - INCLUDED IN VOLUME 1 (VOL.01) OF 5 DOE/ID-10847 00
01-JUL-01 CH2M HILL INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN TITLE II DESIGN - ANNOTATED OUTLINE (TITLE I) 30% DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 DOE/ID-10848 00
01-JUL-01 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN FOR EXCAVATION AND CONSTRUCTING AND TESTING OF CLAY LINER AND TEST PAD - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 DOE/ID-10849 00
01-JUL-01 CH2M HILL INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN FOR INEEL CERCLA DISPOSAL FACILITY - ANNOTATED OUTLINE (TITLE I) - 30% DESIGN PACKAGE - INCLUDED IN VOLUME 1 OF 5 DOE/ID-10851 00
01-JUL-01 CH2M HILL INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX LANDFILL AND EVAPORATION POND OPERATIONS AND MAINTENANCE (O&M) PLAN - ANNOTATED OUTLINE (TITLE I) - 30% DESIGN PACKAGE - INCLUDED IN VOLUME 1 OF 5 DOE/ID-10852 00
01-JUL-01 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) FINAL DESIGN EXCAVATION AND TEST PAD - MASTER TABLE OF DOCUMENTS - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 DOE/ID-10854 00
01-JUL-01 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION WASTE MANAGEMENT PLAN (WMP) - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 DOE/ID-10855 00
01-JUL-01 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) FINAL DESIGN EXCAVATION AND TEST PAD DRAWINGS - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 2 OF 2 DOE/ID-10877 00
01-JUL-01 CH2M HILL INEEL CERCLA DISPOSAL FACILITY (ICDF) - DRAWINGS - TITLE I 30% DESIGN - VOLUME 5 (VOL.05) OF 5 DOE/ID-10878 00
01-JUL-01 TUOTT, L. C. THE 2001 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-10883 01
01-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) DESIGN INVENTORY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 EDF-ER-264(30%) 00
01-JUL-01 CH2M HILL ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - HYDROLOGIC MODELING OF FINAL COVER - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 EDF-ER-279(30%) 00
01-JUL-01 MCMANAMON, L. E. HEALTH & SAFETY PLAN (HSP) FOR CONSTRUCTION OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AND EVAPORATION POND - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 INEEL/EXT-2000-01424 00
28-JUN-01 HAIN, K. E. TRANSMITTAL OF THE DRAFT FINAL INEEL CERCLA DISPOSAL FACILITY (ICDF) TITLE II DESIGN PACKAGE EM-ER-01-112 00
18-JUN-01 JENKINS, T. W. SUITABILITY DETERMINATION FOR OFF-SITE FACILITIES TO MANAGE WASTE AREA GROUP 3 (WAG-3) CERCLA WASTES EM-ER-01-106 00
12-JUN-01 JENKINS, T. W. TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT EM-ER-01-099 00
01-JUN-01 DOE DRAFT ENVIRONMENTAL ASSESSMENT (EA) - DEACTIVATION, DECOMMISSIONING, AND DISMANTLEMENT (D&D&D) OF CPP-603 BASIN PROJECT DOE/EA-1368 00
29-MAY-01 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) DOCUMENT REVIEW COMMENTS AND RESOLUTIONS ON THE INEEL CERCLA DISPOSAL FACILITY (ICDF) 30% REMEDIAL DESIGN (RD) PACKAGE AND 90% TEST PAD PACKAGE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 22510 00
25-MAY-01 ENGLISH, M. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) DOCUMENT REVIEW COMMENTS ON THE DRAFT INEEL CERCLA DISPOSAL FACILITY (ICDF) 30% DESIGN PACKAGE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 REMEDIAL ACTION (RA) 22509 00
09-MAY-01 PYLE, J. D. ENGINEERING DESIGN FILE (EDF) - POTENTIAL AIR EMISSIONS ASSOCIATED WITH DEACTIVATION, DECOMMISSIONING AND DISMANTLEMENT (D&D&D) OF CPP-603A BASIN PROJECT EDF-1931 00
08-MAY-01 MCCARTHY, J. M. ENGINEERING DESIGN FILE (EDF) - D&D OF CPP-603 BASIN PROJECT - GROUNDWATER MONITORING - TRANSPORT SIMULATION APPROACH FOR THE RISK ASSESSMENT FOR DEACTIVATION OF IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) PLANT BUILDING CPP-603 EDF-1962 00
01-MAY-01 BECHTEL DATA MANAGEMENT PLAN (DMP) FOR FIELD AND NONCHEMICAL DATA FROM OPERABLE UNIT (OU) 3-13 GROUP 6, BURIED GAS CYLINDERS - ATTACHMENT 5 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 0 (REV.0), REVISION 1 (REV.01) AND REVISION 2 (REV. DOE/ID-10836 00
01-MAY-01 BECHTEL WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS (ATTACHMENT TO RD/RA WORK PLAN) DOE/ID-10837 00
01-MAY-01 BECHTEL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) OU 3-13, GROUP 6, BURIED GAS CYLINDERS DOE/ID-10838 00
24-APR-01 JENKINS, T. W. TRANSMITTAL OF DRAFT INEEL CERCLA DISPOSAL FACILITY (ICDF) 30% DESIGN PACKAGE AND DRAFT ICDF TITLE II DESIGN PACKAGE EM-ER-01-075 00
06-APR-01 JENKINS, T. W. RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER CONCERNING THE SCHEDULE FOR SFE-20 REMEDIATION EM-ER-01-061 00
03-APR-01 SMITH, B. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS AND RESOLUTIONS FOR REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS, DOE/ID-10838 23300 00
03-APR-01 SMITH, B. D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS AND RESOLUTIONS FOR REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS, DOE/ID-10838 23302 00
01-APR-01 DOORNBOS, M. H. HAZARDOUS WASTE MANAGEMENT ACT (HWMA) RESOURCE CONSERVATION & RECOVERY ACT (RCRA) CLOSURE PLAN (CP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) DOE/ID-10864 00
14-MAR-01 NYGARD, D. SCHEDULE FOR GROUP 7, SFE-20 REMEDIAL ACTION (RA), OPERABLE UNIT (OU) 3-13 22801 00
01-MAR-01 RAUNIG, D. E. PRELIMINARY CHARACTERIZATION PLAN FOR OU 3-13 GROUP 6 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) BURIED GAS CYLINDER SITES CPP-84 & CPP-94 (FORMERLY INEEL/EXT-2000-00398) - ATTACHMENT 1 TO RD/RA WORK PLAN, REVISION 1 (REV.01) AND REVISION 2 (REV.02) DOE/ID-10842 02
01-MAR-01 MCMANAMON, L. E. HEALTH & SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 GROUP 6 BURIED GAS CYLINDERS (ATTACHMENT TO RD/RA WORK PLAN) INEEL/EXT-2000-00270 02
09-JAN-01 BORSCHEL, T. F. TRANSMITTAL OF THE FINAL GEOTECHNICAL REPORT FOR THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 EM-ER-04-01 00
31-DEC-00 HURST, C. J. DRAINAGE OBSERVATION REPORT FOR GROUP 2 - SOILS UNDER BUILDINGS FOR WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13 DOE/ID-10833 00
22-DEC-00 RAIVO, B. D. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) STABILIZATION TREATMENT PROCESS SELECTION - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 EDF-1542(30%) 00
22-DEC-00 HAIN, K. E. TRANSMITTAL OF FINAL PRELIMINARY 30% DESIGN REPORT FOR STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) EM-ER-242-00 00
21-DEC-00 HAIN, K. E. TRANSMITTAL OF FINAL OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-243-00 00
21-DEC-00 DAVISON, R. L. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 3 OF 3 TFR-17 01
20-DEC-00 FORSYTHE, H. S. OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER PHASE I REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN DOE/ID-10676 00
20-DEC-00 FORSYTHE, H. S. INJECTION WELL FIELD SAMPLING PLAN (FSP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10763 00
20-DEC-00 FORSYTHE, H. S. TANK FARM SOIL FIELD SAMPLING PLAN (FSP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10764 00
20-DEC-00 PREUSSNER, B. D. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE INVENTORY DESIGN BASIS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 1 OF 3 EDF-1540(30%) 00
20-DEC-00 FORSYTHE, H. S. INJECTION WELL HEALTH AND SAFETY PLAN (HSP OR HASP) FOR PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-2000-00528 00
20-DEC-00 FORSYTHE, H. S. TANK FARM SOIL HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-2000-00529 00
20-DEC-00 FORSYTHE, H. S. WASTE MANAGEMENT PLAN (WMP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-99-00361 00
19-DEC-00 GIANOTTO, D. F. PRELIMINARY CHARACTERIZATION PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 6 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) BURIED GAS CYLINDER SITES CPP-84 & CPP-94 (FORMERLY INEEL/EXT-2000-00398) - ATTACHMENT TO RD/RA WORK PLAN DOE/ID-10842 01
18-DEC-00 WALSH, S. S. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) AND INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONAL SCENARIO AND PROCESS FLOWS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 EDF-1547(30%) 00
15-DEC-00 PINTO, A. P. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) EVAPORATION POND WASTE ACCEPTANCE CRITERIA (WAC) BASIS & AQUEOUS WASTE MANAGEMENT - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 EDF-1549(30%) 00
15-DEC-00 PODGORNEY, A. K. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE ACCEPTANCE CRITERIA (WAC) - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 3 OF 3 EDF-1551(30%) 00
14-DEC-00 ABBOTT, C. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE TRANSPORT STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 EDF-1543(30%) 00
14-DEC-00 FRENCH, P. S. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE VERIFICATION AND TREATED WASTE STATISTICAL APPROACH - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 EDF-1544(30%) 00
14-DEC-00 KINGSFORD, C. O. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE STAGING AND STORAGE CRITERIA - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 EDF-1545(30%) 00
14-DEC-00 STEPHENS, D. L. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) PRELIMINARY HAZARD CLASSIFICATION ANALYSIS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 EDF-1546(30%) 00
14-DEC-00 STEPHENS, D. L. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) SITING STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 EDF-1548(30%) 00
13-DEC-00 HAIN, K. E. TRANSMITTAL OF FINAL CERCLA WASTE INVENTORY DATABASE FOR OPERABLE UNIT (OU) 3-13 WASTE DISPOSAL COMPLEX EM-ER-237-00 00
04-DEC-00 IVY, K. ADDITIONAL ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - DRAFT FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN; INJECTION WELL FIELD SAMPLING PLAN (FSP) 10945 00
04-DEC-00 HAIN, K. E. STATEMENT OF DISPUTE, SFE-20 TANK, REQUEST FOR DECEMBER 18, 2000 (12/18/2000) MEETING EM-ER-230-00 00
01-DEC-00 DAVISON, R. L. PROJECT PLANS - DRAWINGS FOR STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 1 OF 3 21395(30%) 00
01-DEC-00 BECHTEL CERCLA WASTE INVENTORY DATABASE REPORT FOR OPERABLE UNIT (OU) 3-13 WASTE DISPOSAL FACILITY (ICDF) DOE/ID-10803 00
01-DEC-00 BORSCHEL, T. F. GEOTECHNICAL REPORT FOR THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 DOE/ID-10812 00
01-DEC-00 DAVISON, R. L. PRELIMINARY DESIGN REPORT FOR THE STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 1 OF 3 DOE/ID-10825 00
30-NOV-00 IDEQ IDEQ COMMENTS & RESOLUTIONS ON THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) DRAFT 30% DESIGN - DOE/ID-10825 21417 00
30-NOV-00 HAIN, K. E. TRANSMITTAL OF FINAL CONCEPTUAL DESIGN REPORT FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) AND EVAPORATION POND, OPERABLE UNIT (OU) 3-13 EM-ER-225-00 00
29-NOV-00 EPA EPA COMMENTS & RESOLUTIONS ON THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) DRAFT 30% DESIGN - DOE/ID-10825 21416 00
29-NOV-00 KELLY, K. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED NOVEMBER 13, 2000 (11/13/2000) CONCERNING STATEMENT OF DISPUTE REGARDING SFE-20 TANK 22802 00
29-NOV-00 HAIN, K. E. TRANSMITTAL OF FINAL MONITORING SYSTEM INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - PER EM-ER-206-00 THIS DOCUMENT IS THE RD/RA WORK PLAN FOR THIS PROJECT EM-ER-223-00 00
28-NOV-00 GEARHEARD, M. F. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED NOVEMBER 13, 2000 (11/13/2000) CONCERNING STATEMENT OF DISPUTE REGARDING SFE-20 TANK, FROM KATHLEEN HAIN 22817 00
24-NOV-00 ENGLISH, M. IDAHO DEPARTMENT OF ENVORONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS ON THE DRAFT GEOTECHNICAL REPORT FOR THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 22501 00
22-NOV-00 IVY, K. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - DRAFT FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN 10944 00
22-NOV-00 ENGLISH, M. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS - DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 3-14, DOE/ID-10676 10948 00
13-NOV-00 HAIN, K. E. SUBMITTAL OF STATEMENT OF DISPUTE TO DISPUTE RESOLUTION COMMITTEE REGARDING SFE-20 TANK, WASTE AREA GROUP 3 (WAG-3), INEEL EM-ER-216-00 00
09-NOV-00 JENKINS, T. W. TRANSMITTAL OF THE DRAFT GEOTECHNICAL REPORT FOR THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 EM-ER-215-00 00
06-NOV-00 JENKINS, T. W. TRANSMITTAL OF DRAFT FINAL OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - TANK FARM SOIL AND GROUNDWATER - DOE/ID-10676 EM-ER-212-00 00
06-NOV-00 VERNON, D. K. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WASTE AREA GROUP 3 (WAG-3) INEEL CERCLA DISPOSAL FACILITY (ICDF) AND EVAPORATION POND - SUPERSEDES INEEL/EXT-2000-00810, REV.0A TFR-71 01
01-NOV-00 IDEQ IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS & RESOLUTIONS FOR DRAFT FINAL OU 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - DOE/ID-10676, REV. D (REV.0D) 22899 00
01-NOV-00 ROBERTS, C. J. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) DOE/ID-10782 01
01-NOV-00 ROBERTS, C. J. LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX B TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) - DOE/ID-10782, REV.01 & DOE/ID-10782, REV.02 DOE/ID-10783 01
01-NOV-00 ROBERTS, C. J. PLUME EVALUATION FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX A TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.01 DOE/ID-10784 01
01-NOV-00 LINDBERG, R. D. REVIEW OF REACTIVE MATERIALS TO SUPPORT THE DESIGN OF AN INEEL CERCLA DISPOSAL FACILITY (ICDF) ATTENUATION BARRIER WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 AT THE INEEL DOE/ID-10791 00
01-NOV-00 COLE, M. R. CONCEPTUAL DESIGN REPORT FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AND EVAPORATION POND DOE/ID-10806 00
01-NOV-00 LINDBERG, R. D. COMPILATION OF SORPTION COEFFICIENTS FOR SELECTED ELEMENTS ON BENTONITE AND SMECTITE CLAYS TO SUPPORT THE DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) ATTENUATION BARRIER WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 DOE/ID-10815 00
01-NOV-00 ROBERTS, C. J. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX H TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.01 DOE/ID-10829 01
01-NOV-00 MARTIAN, P. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) CONTAMINANT OF CONCERN (COC) IDENTIFICATION MODELING - SCREENING MODEL RESULTS OF A MIXED LOW LEVEL WASTE (MLLW) DISPOSAL FACILITY PROPOSED FOR THE INEEL - FUNCTIONAL FILE #2000-00 EDF-ER-170 00
31-OCT-00 HAIN, K. E. TRANSMITTAL OF DRAFT PRELIMINARY 30% DESIGN REPORT FOR STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) EM-ER-209-00 00
16-OCT-00 ENGLISH, M. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS ON THE DRAFT CONCEPTUAL DESIGN REPORT AND ASSOCIATED DOCUMENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AND EVAPORATION POND FOR OPERABLE UNIT (OU) 3-13 REMEDIAL ACTION ( 22508 00
14-OCT-00 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) DOCUMENT REVIEW COMMENTS AND RESOLUTIONS ON THE 10% REMEDIAL DESIGN (RD) PACKAGE - CONCEPTUAL DESIGN REPORT AND ASSOCIATED DOCUMENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT OPERABLE UNIT (OU) 3-13 22507 00
01-OCT-00 DAVISON, R. L. CONSTRUCTION SPECIFICATIONS (SPC) FOR 30% DESIGN - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) OU 3-13 (DRAFT) 23295 00
01-OCT-00 NOT SPECIFIED OPERABLE UNIT 3-13 GROUP 2 CLOSURE EVALUATION CRITERIA AND CHECKLIST DOE/ID-10775 1
01-OCT-00 DAVISON, R. L. TREATABILITY STUDY (TS) WORK PLAN FOR THE STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) STABILIZATION PROCESS (DRAFT) - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 3 OF 3 DOE/ID-10828 00
01-OCT-00 FORSYTHE, H. S. HEALTH AND SAFETY PLAN (HSP) FOR OU 3-13 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX G TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SRPA, DOE/ID-10782, REV.01 INEEL/EXT-2000-00817 00
20-SEP-00 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV DOE/ID-10587 06
20-SEP-00 ROBERTS, C. J. HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER PROJECT - THIS DOCUMENT IS APPENDIX H TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 INEEL/EXT-2000-00257 00
19-SEP-00 HURST, C. J. ENGINEERING DESIGN FILE (EDF) - OU 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) - EVAPORATION POND SIZING DESIGN - FUNCTIONAL FILE #INEEL/EXT-2000-00920 - APPENDIX C TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 EDF-ER-206 00
18-SEP-00 FRITZ, K. D. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) PHASE 1 AND PHASE 2 - OLIVE STREET STORM WATER LIFT STATION AT INTEC - APPENDIX B TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772 EDF-1379 00
18-SEP-00 FRITZ, K. D. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) PHASE 1 AND PHASE 2 - DRAINAGE DITCH CAPACITY VERIFICATION AT INTEC - APPENDIX A TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, EDF-1387 00
13-SEP-00 JENKINS, T. W. TRANSMITTAL OF DRAFT CERCLA WASTE INVENTORY DATABASE FOR OPERABLE UNIT (OU) 3-13 WASTE DISPOSAL COMPLEX EM-ER-176-00 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
13-SEP-00 JENKINS, T. W. TRANSMITTAL OF DRAFT CONCEPTUAL DESIGN REPORT FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) & EVAPORATION POND EM-ER-177-00 00
05-SEP-00 ENGLISH, M. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS ON THE DRAFT STAGING AND STORAGE ANNEX (SSA) WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 REMEDIAL ACTION (RA) 22506 00
01-SEP-00 ROBERTS, C. J. FIELD SAMPLING PLAN (FSP) FOR OU 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION - THIS DOCUMENT IS APPENDIX B TO DOE/ID-10774, REV.00 & REV.01 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 DOE/ID-10745 00
01-SEP-00 ROBERTS, C. J. LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER - THIS DOCUMENT IS APPENDIX E TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 4 DOE/ID-10746 00
01-SEP-00 ROBERTS, C. J. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER -THIS DOCUMENT IS A PART OF APPENDIX F TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 DOE/ID-10749 00
01-SEP-00 ROBERTS, C. J. TRACER TEST PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER - APPENDIX D TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 0 (REV.00), REVISION 1 (REV.01), REVISION 2 (REV.02), AND REVISION 3 (REV.03) DOE/ID-10762 00
01-SEP-00 ROBERTS, C. J. DATA MANAGEMENT PLAN (DMP) FOR FIELD AND NONCHEMICAL DATA FROM OU 3-13 GROUP 4 AND GROUP 5, WELL INSTALLATION AND MONITORING PROJECTS - APPENDIX D TO MSIP FOR OU 3-13 GROUP 5 SRPA, DOE/ID-10782, REV.01 & REV.02 & APPENDIX J TO GROUP 4 MSIP, DOE/ID-10 DOE/ID-10768 00
01-SEP-00 ROBERTS, C. J. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION DOE/ID-10774 00
01-SEP-00 FRENCH, P. S. WASTE MANAGEMENT PLAN (WMP) FOR STAGING & STORAGE ANNEX (SSA) - THIS DOCUMENT IS A PART OF APPENDIX F TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 DOE/ID-10800 00
31-AUG-00 ENGLISH, M. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS - DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN FOR OPERABLE UNIT (OU) 3-14, DOE/ID-10676 10947 00
28-AUG-00 IVY, K. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - OPERABLE UNIT (OU) 3-14 TANK FARM SOIL & GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) - DOE/ID-10676 10943 00
10-AUG-00 NYGARD, D. STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) EXTENDS COMMENT REVIEW PERIOD FOR DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN FOR OU 3-14 TANK FARM SOIL AND GROUNDWATER - DOE/ID-10676 21468 00
01-AUG-00 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - INVESTIGATION UNDER WAY FOR OPERABLE UNIT (OU) 3-14 AT WASTE AREA GROUP 3 (WAG-3) 21212 00
20-JUL-00 HAIN, K. E. TRANSMITTAL OF FINAL CONCEPTUAL DESIGN REPORT FOR STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) EM-ER-132-00 00
17-JUL-00 HAIN, K. E. TRANSMITTAL OF OPERABLE UNIT (OU) 3-13 GROUP 2 BUILDING DRAINAGE EVALUATION PLAN EM-ER-129-00 00
12-JUL-00 DAVISON, R. L. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) - THIS DOCUMENT IS REFERENCED AS APPENDIX B OF DOE/ID-10769, REV.01 - CONCEPTUAL DESIGN REPORT TFR-17,DRF 00
01-JUL-00 BECHTEL DRAINAGE EVALUATION PLAN FOR GROUP 2 - SOILS UNDER BUILDINGS AND STRUCTURES FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 DOE/ID-10759 00
01-JUL-00 DAVISON, R. L. CONCEPTUAL DESIGN REPORT FOR THE STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) - APPENDIX E CONTAINS EPA AND IDEQ COMMENTS AND RESOLUTIONS DOE/ID-10769 01
26-JUN-00 JENKINS, T. W. TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-120-00 00
06-JUN-00 JENKINS, T. W. TRANSMITTAL OF THE DRAFT REVIEW OF REACTIVE BARRIER MATERIALS TO SUPPORT THE DESIGN OF AN INEEL CERCLA DISPOSAL FACILITY (ICDF) ATTENUATION BARRIER WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 AT THE INEEL EM-ER-108-00 00
05-JUN-00 BORSCHEL, T. F. GEOTECHNICAL FIELD SAMPLING PLAN (FSP) TO SUPPORT CONCEPTUAL DESIGN OF INEEL CERCLA DISPOSAL FACILITY (ICDF) AT OPERABLE UNIT (OU) 3-13 DOE/ID-10787 00
26-MAY-00 ENGLISH, M. STATE OF IDAHO DIVISION OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON DRAFT CONCEPTUAL DESIGN REPORT FOR STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 REMEDIAL ACTION (RA) 22444 00
26-MAY-00 ENGLISH, M. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) TECHNICAL REVIEW COMMENTS ON THE DRAFT 10% CONCEPTUAL DESIGN REPORT FOR THE STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) AT INTEC OPERABLE UNIT (OU) 22505 00
17-MAY-00 HAIN, K. E. TRANSMITTAL OF FINAL INITIAL INSTITUTIONAL CONTROL MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 EM-ER-90-00 00
10-MAY-00 ENGLISH, M. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ)TECHNICAL REVIEW COMMENTS ON THE DRAFT GEOTECHNICAL FIELD SAMPLING PLAN (FSP) TO SUPPORT THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) OU 3-13 22503 00
10-MAY-00 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT 10% CONCEPTUAL REMEDIAL DESIGN (RD) REPORT FOR STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) - DOE/ID-10769 22841 00
10-MAY-00 RASCH, D. N. IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AS ONE WASTE MANAGEMENT UNIT FOR CLOSURES AND DEMONSTRATING COMPLIANCE WITH DRINKING WATER STANDARDS TS-ESTD-00-085 00
09-MAY-00 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) DOCUMENT REVIEW COMMENTS ON THE DRAFT GEOTECHNICAL FIELD SAMPLING PLAN (FSP) TO SUPPORT THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT OPERABLE UNIT (OU) 3-13 22502 00
09-MAY-00 RAUNIG, D. E. HAZARD CLASSIFICATION FOR REMEDIATION OF OPERABLE UNIT (OU) 3-13 GROUP 6 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) BURIED GAS CYLINDER SITES - CPP-84 & CPP-94 - ATTACHMENT 3 TO RD/RA WORK PLAN, REVISION 0 (REV.0), REVISION 1 (REV.01) AND REVISION 2 (R INEEL/EXT-2000-00254 00
01-MAY-00 FRENCH, P. S. INITIAL INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-10751 00
27-APR-00 HAIN, K. E. TRANSMITTAL OF DRAFT CONCEPTUAL DESIGN REPORT FOR STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF), REV.0A EM-ER-77-00 00
01-APR-00 INEEL COMMUNITY RELATIONS INEEL REPORTER - AGENCIES TO DECIDE FATE OF THE CALCINER - APRIL 2000 - MAY 2000 (04/2000 - 05/2000) 21216 00
29-FEB-00 HIGGINS, L. M. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 DOE/ID-10721 01
29-FEB-00 HAIN, K. E. TRANSMITTAL OF FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 EM-ER-28-00 00
01-DEC-99 INEEL COMMUNITY RELATIONS INEEL REPORTER - NOVEMBER 1999 AND DECEMBER 1999 (11/99 & 12/99) - INEEL INSERTS PROBE TUBE INTO BURIED WASTE PIT 10964 00
28-OCT-99 JENKINS, T. W. TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-175-99 00
25-OCT-99 HAIN, K. E. TRANSMITTAL OF DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 OPE-ER-162-99 00
18-OCT-99 ENGLISH, M. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON THE DRAFT FINAL SCOPE OF WORK (SOW) FOR WAG-3 OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/ 22695 00
14-OCT-99 AR COORDINATOR OPERABLE UNIT (OU) 3-13 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-13 AR.INDEX.OU.3-13 00
13-OCT-99 FRITZ, K. D. A-E CONSTRUCTION SPECIFICATION (SPC) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) CERCLA STORAGE PAD AREA CPP-92 AND LOW LEVEL WASTE (LLW) HOLDING AREA - PART OF APPENDIX E TO SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF SPC-218 00
07-OCT-99 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) INVOLVEMENT IN DEVELOPMENT AND REVIEW OF THE RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13, INTEC - CONTINGENT UPON SPECIFIED REGULATORY STANDARDS IDEQ IS SIGNATORY TO THE ROD WITH DOE AND EPA 24797 00
07-OCT-99 DOE FINAL RECORD OF DECISION (ROD) IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 DOE/ID-10660 00
01-OCT-99 DOE FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10653 00
01-OCT-99 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14, TANK FARM SOILS AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-99-141 00
20-SEP-99 JENKINS, T. W. INCLUSION OF DOCUMENTS INTO THE ADMINISTRATIVE RECORD (AR) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 - INDEX OF SAMPLING DATA DOCUMENTS 10707 00
09-SEP-99 EPA ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON SUPPLEMENTAL FEASIBILITY STUDY (FS) FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 18077 00
09-SEP-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) 18078 00
01-SEP-99 LMITCO EVALUATION & SITE SELECTION FOR A NEW SERVICE WASTE DISPOSAL FACILITY FOR IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) DOE/ID-10705 00
30-AUG-99 HAIN, K. E. TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) INEEL OPE-ER-119-99 00
10-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 3-02 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR CHEMICAL PROCESSING PLANT (CPP) OU 3-02 AR.INDEX.OU.3-02 00
10-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 3-03 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR CHEMICAL PROCESSING PLANT (CPP) OU 3-03 AR.INDEX.OU.3-03 00
10-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 3-05 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-05 AR.INDEX.OU.3-05 00
10-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 3-07 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-07 AR.INDEX.OU.3-07 00
10-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 3-09 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-09 AR.INDEX.OU.3-09 00
10-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 3-11 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-11 AR.INDEX.OU.3-11 00
10-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 3-12 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION OF OU 3-12 AR.INDEX.OU.3-12 00
09-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 3-01 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION OU 3-01 AR.INDEX.OU.3-01 00
05-AUG-99 PIERRE, W. REVIEW OF DRAFT FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT OU 3-13, IDAHO CHEMICAL PROCESSING PLANT (ICPP) - EPA COMMENTS ATTACHED 10683 00
04-AUG-99 KOCH, D. F. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - DOE/ID-10660 10682 00
29-JUL-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-14 - DOE/ID-10653 10942 00
20-JUL-99 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-99-99 00
30-JUN-99 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 TANK FARM SOILS & GROUNDWATER REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) OPE-ER-93-99 00
01-JUN-99 WAGNER, E. P. PROCESS DESCRIPTION AND OPERATING HISTORY FOR CPP-601, CPP-604 AND CPP-627 FUEL REPROCESSING COMPLEX AT INEEL INEEL/EXT-99-00400 00
14-MAY-99 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT RECORD OF DECISION (ROD) OPERABLE UNIT (OU) 3-13 IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) - DOE/ID-10660 10681 00
11-MAY-99 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-14 TANK FARM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 17265 00
14-APR-99 GREENWELL, R. D. SOIL RESTORATION DEPARTMENT MANAGEMENT ASSESSMENT OF WAG-3 CERCLA RADIOLOGICAL MANAGEMENT AREA (RMA) & STORAGE YARD RDG-03-99 00
04-APR-99 BROSCIOUS, C. PUBLIC COMMENTS ON ENVIRONMENTAL REMEDIATION AT INEEL IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 10696 00
31-MAR-99 JENKINS, T. W. RESPONSE TO RECOMMENDATION ON PROPOSED PLAN FOR REMEDIAL ACTION (RA) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) OPE-ER-48-99 00
29-MAR-99 JENKINS, T. W. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-44-99 00
01-MAR-99 IDHW IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 10679 00
22-FEB-99 RICHARDSON, B. RESPONSE TO HELEN CHENOWETH'S DECEMBER 18, 1998 (12/18/98) LETTER - PUBLIC COMMENT PERIOD ON PROPOSED PLAN FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) EXTENDED 18081 00
17-FEB-99 JENKINS, T. W. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-28-99 00
11-FEB-99 ROBERTSON, B. B. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10694 00
09-FEB-99 CRAPO, M. PUBLIC COMMENTS ON RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10693 00
08-FEB-99 HOBSON, S. PUBLIC COMMENTS ON INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 10692 00
08-FEB-99 KUEHN, R. M. PUBLIC COMMENT ON NUCLEAR WASTE CLEANUP AT INEEL - WASTE AREA GROUP 3 (WAG-3) OU 3-13 10695 00
01-FEB-99 OWENDOFF, J. M. RESPONSE TO CONGRESSWOMAN HELEN CHENOWETH'S DECEMBER 18, 1998 (12/18/98) REQUEST FOR EXTENSION OF PUBLIC COMMENT PERIOD ON PROPOSED PLAN FOR CLEANUP OF INEEL WASTE AREA GROUP 3 (WAG-3) IDAHO NUCLEAR TECHNNOLOGY AND ENGINEERING CENTER (INTEC) 18080 00
11-JAN-99 INEEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY - COMMENT PERIOD EXTENDED ON PROPOSED CLEANUP PLAN FOR IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) 16878 00
08-JAN-99 PRIESTLEY, F. PUBLIC COMMENTS ON INEEL CERCLA DISPOSAL FACILITY (ICDF) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10685 00
08-JAN-99 JENKINS, T. W. ADDITION OF OPERABLE UNIT (OU) 3-14 TO FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) OPE-ER-05-99 00
22-DEC-98 STEWART, M. M. PUBLIC COMMENTS ON CLEANUP PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEEL 10701 00
22-DEC-98 HENSEL, D. PUBLIC COMMENTS ON CHEMICAL PLANT CLEANUP FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10702 00
22-DEC-98 BOBO, R. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10703 00
22-DEC-98 BRAILSFORD, B. PUBLIC COMMENTS - SNAKE RIVER ALLIANCE ON PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEEL 10704 00
22-DEC-98 MCCARTHY, J. M. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10705 00
21-DEC-98 COPERFIELD, C. PUBLIC COMMENTS ON PROPOSED PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10700 00
18-DEC-98 LEMLEY, J. K. PUBLIC COMMENTS ON PROPOSED CLEANUP PLAN FOR INEEL CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10691 00
18-DEC-98 CHENOWETH, H. CONCERN OVER DEPARTMENT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) ICPP & TO REQUEST PERSONAL ATTENTION IN REDIRECTING CRITICAL ASPECTS OF EFFORT - REQUEST PUBLIC COMMENT PERIOD BE EXTENDED FOR THIRTY (30) DAYS 18079 00
17-DEC-98 CHRISTINNA PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10684 00
15-DEC-98 VANHORN, R. L. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10686 00
15-DEC-98 DOE NEW SITE IDENTIFICATION (NSI) - BOXED SOIL - CPP-99 16808 00
03-DEC-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT 18064 00
01-DEC-98 COMMANDER, J. PUBLIC COMMENTS ON IDAHO CHEMICAL PROCESSING PLANT (ICPP) PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10690 00
19-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - MOSCOW, IDAHO - NOVEMBER 19, 1998 (11/19/98) 10678 00
19-NOV-98 BROSCIOUS, C. PUBLIC COMMENTS ON DEPARTMENT OF ENERGY (DOE) INEEL IDAHO CHEMICAL PROCESSING PLANT (ICPP) PROPOSED CLEANUP PLAN OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10699 00
18-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - BOISE, IDAHO - NOVEMBER 18, 1998 (11/18/98) 10677 00
18-NOV-98 CITIZENS ADVISORY BOARD PUBLIC COMMENTS - CITIZENS ADVISORY BOARD (CAB) FOR PROPOSED PLAN FOR REMEDIAL ACTION (RA) AT OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) ICPP 10706 00
16-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - IDAHO FALLS, IDAHO - NOVEMBER 16, 1998 (11/16/98) 10675 00
16-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - IDAHO FALLS, IDAHO - NOVEMBER 17, 1998 (11/17/98) 10676 00
10-NOV-98 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCOPE OF WORK (SOW) WASTE AREA GROUP (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 INEEL 18065 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
03-NOV-98 DOE NEW SITE IDENTIFICATION (NSI) - TANK FARM SHORING BOXES - CPP-98 16807 00
01-NOV-98 INEEL COMMUNITY RELATIONS INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) 17370 00
31-OCT-98 ANSLEY, S. L. PUBLIC COMMENTS ON REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10687 00
27-OCT-98 RANDOLPH, P. PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 10689 00
22-OCT-98 INEEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY - MEETINGS SCHEDULED ON CLEANUP OF IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 10545 00
16-OCT-98 DOE NEW SITE IDENTIFICATION (NSI) - TANK FARM INTERSTITIAL SOILS - CPP-96 16750 00
16-OCT-98 DOE NEW SITE IDENTIFICATION (NSI) - TANK FARM SOIL STOCKPILES, CPP-97 16760 00
14-OCT-98 JESSMORE, P. J. IDAHO CHEMICAL PROCESSING PLANT (ICPP) WINDBLOW AREA - SECTION 9 OF EE/CA FOR OU 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT INEL - INEL-95/0259,VOL.01 10543 00
14-OCT-98 JENKINS, T. W. TRANSMITTAL OF FINAL PROPOSED PLAN, REVISION 6 (REV.06) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-159-98 00
14-OCT-98 JENKINS, T. W. TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B, FEASIBILITY STUDY (FS) SUPPLEMENT REPORT REVISION 2 (REV.02) OPE-ER-160-98 00
14-OCT-98 JENKINS, T. W. TRANSMITTAL OF SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - DRAFT OPE-ER-161-98 00
14-OCT-98 JENKINS, T. W. DEPARTMENT OF ENERGY - IDAHO OPERATIONS OFFICE (DOE-ID) REQUEST FOR ADDITION OF OPERABLE UNIT (OU) 3-14 TO FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) OPE-ER-162-98 00
01-OCT-98 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL 10542 00
01-OCT-98 GREENWELL, R. D. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT, VOLUME 1 (VOL.01) OF 2 DOE/ID-10619,VOL.01 02
01-OCT-98 GREENWELL, R. D. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT, VOLUME 2 (VOL.02) OF 2 DOE/ID-10619,VOL.02 02
29-SEP-98 DOE FINAL RECORD OF DECISION (ROD) ARGONNE NATIONAL LABORATORY - WEST (ANL-W) OPERABLE UNIT (OU) 9-04 AT INEEL W7500-000-ES-04 00
21-SEP-98 CHAMBERS, R. MULTI-AGENCY RADIATION SURVEY & SITE INVESTIGATION MANUAL (MARSSIM) INVESTIGATION FOR CPP-709 RADIONUCLIDES RC-10-98 00
15-SEP-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 5 (REV.05) FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-148-98 00
01-SEP-98 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - WASTE AREA GROUP 3 (WAG-3) ENVIRONMENTAL INVESTIGATION NEARLY COMPLETE FOR INTEC (FORMERLY ICPP) OU 3-13 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - FINDINGS OF BASELINE RISK ASSESSMENT (BRA) 14840 00
17-AUG-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 4 (REV.04) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) OPE-ER-133-98 00
14-AUG-98 TAYLOR, A. E. PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10688 00
14-AUG-98 BROSCIOUS, C. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10698 00
06-AUG-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL- PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT - REVISION 1 (REV.01) OPE-ER-128-98 00
05-AUG-98 ROSE, K. A. RESPONSE TO RECOMMENDATIONS FROM THE NATIONAL REMEDY REVIEW BOARD (NRRB) ON THE PROPOSED REMEDY FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 14842 00
14-JUL-98 BROSCIOUS, C. PUBLIC COMMENTS ON DRAFT CLEANUP PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10697 00
08-JUL-98 DOE PRELIMINARY DRAFT - ENVIRONMENTAL ASSESSMENT (EA) AND DEACTIVATION PLAN FOR OBSOLETE SPENT NUCLEAR FUEL (SNF) PROCESSING, STORAGE, AND SUPPORT FACILITIES AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) DOE/EA-1244 00
22-JUN-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 3 (REV.03) FOR WASTE AREA GROUP 3 (WAG-3) - IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-104-98 00
27-MAY-98 NYGARD, D. IDHW CONCURRENCE WITH ENFORCEABLE SCHEDULE EXTENSION FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) 10446 00
27-MAY-98 PIERRE, W. EPA CONCURRENCE ON REQUEST FOR EXTENSION OF ENFORCEABLE MILESTONE FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) 10447 00
15-MAY-98 JENKINS, T. W. REQUEST FOR EXTENSION OF OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) & RELATED DOCUMENTS OPE-ER-67-98 00
14-MAY-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 2 (REV.02) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL; PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-78-98 00
12-MAY-98 LMITCO INEEL STORM WATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITIES (SWPPP-CA) - GENERIC PLAN - THIS DOCUMENT IS APPENDIX M TO THE MONITORING SYSTEM & INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA), DOE/ID-10782, RE DOE/ID-10425(98) 02
29-APR-98 JENKINS, T. W. RESPONSE TO RECOMMENDATION ON PROPOSED SOILS REPOSITORY AT INEEL OPE-ER-73-98 00
17-APR-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN REVISION 1 (REV.01) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-68-98 00
26-MAR-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT 16293 00
12-MAR-98 JENKINS, T. W. TRANSMITTAL OF DOCUMENTS FOR REVIEW OF WASTE AREA GROUP 3 (WAG-3) COST ESTIMATES OPE-ER-40-98 00
06-MAR-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) 16292 00
13-FEB-98 HAIN, K. E. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-28-98 00
29-JAN-98 HAIN, K. E. TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 3-13 FEASIBILITY STUDY (FS) SUPPLEMENT TO FINAL OU 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OU 3-13 AT INEEL OPE-ER-18-98 00
26-JAN-98 RENO, S. L. COMPREHENSIVE FACILITY CLOSURE EVALUATION PROCESS 10799 00
09-JAN-98 RENO, S. L. IDHW-DEQ INFORMAL COMMENTS ON WORKING DRAFT OF PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) ICPP, JANUARY 5, 1998 (01/05/98) 15059 00
05-JAN-98 DEPPERSCHMIDT, J. D. TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL AND DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) - OPE-ER&SA-98-002 OPE-ER/SA-98-002 00
30-DEC-97 ROSE, K. A. REQUEST FOR 20 DAY EXTENSION OF COMMENT PERIOD ON DRAFT PROPOSED PLAN FOR ICPP AT INEEL 15057 00
04-DEC-97 JENKINS, T. W. TRANSMITTAL OF DRAFT PROPOSED PLAN FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL OPE-ER-261-97 00
01-DEC-97 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) DOE/ID-10587 05
25-NOV-97 JENKINS, T. W. TRANSMITTAL OF DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANR (ICPP) OPERABLE UNIT (OU) 3-13 AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-253-97 00
25-NOV-97 HAIN, K. E. TRANSMITTAL OF VALIDATED ANALYTICAL SAMPLING DATA FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS NON TIME CRITICAL REMOVAL ACTION (NTCRA) OPE-ER-254-97 00
14-NOV-97 ROBISON, S. A. DOE-HQ APPROVAL AND COMMENTS ON DRAFT PROPOSED PLAN FOR REMEDIATION OF INEEL WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13, ICPP COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY( RI/FS) 15054 00
14-NOV-97 RENO, S. L. IDHW-DEQ COMMENTS ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL (DRAFT FINAL) 15055 00
01-NOV-97 INEEL COMMUNITY RELATIONS INEEL REPORTER - NOVEMBER 1997 & DECEMBER 1997 (11/97 & 12/97) - CITIZENS ASK FOR INPUT ON FOUR COMPREHENSIVE INVESTIGATIONS, PIPELINE FOR TRANSURANIC (TRU) WASTE, TECHNOLOGY ON ACID PIT & NOTICE OF INTENT (NOI) FOR ENVIRONMENTAL IMPACT STATEMENT (EI 14284 00
01-NOV-97 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - COMPREHENSIVE INVESTIGATION IDENTIFIES EXTENT OF CONTAMINATION WITHIN WASTE AREA GROUP 3 (WAG-3) FOR INTEC (FORMERLY ICPP) OPERABLE UNIT (OU) 3-13 14841 00
01-NOV-97 BURCH, N. A. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 RODRIGUEZ, R. R COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 RODRIGUEZ, R. R COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 RODRIGUEZ, R. R COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL DOE/ID-10534,BINDER-01 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 - APPENDIX A THROUGH APPENDIX F - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL DOE/ID-10534,BINDER-02 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 - APPENDIX G THROUGH APPENDIX N - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL DOE/ID-10534,BINDER-03 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART B ; FEASIBILITY STUDY (FS) REPORT - BINDER 1 OF 2 - (SEE DOE/ID-10534,BINDER-01 & DOE/ID-10534,BINDER-02 DOE/ID-10534,BINDER-03 FOR PART A) - FINAL DOE/ID-10572,BINDER-01 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART B FEASIBILITY STUDY (FS) REPORT BINDER 2 OF 2 APPENDIX C THROUGH I (SEE DOE/ID-10534,BINDER-01 & DOE/ID-10534,BINDER-02 DOE/ID-10534,BINDER-03 FOR PART A) - FINAL DOE/ID-10572,BINDER-02 00
01-NOV-97 KAPTEIN, M. S. HEALTH & SAFETY PLAN (HSP) FOR HIGH LEVEL LIQUID WASTE TANK FARM (HLLWTF) SOILS SAMPLING INEEL/EXT-97-00987 00
30-OCT-97 JENKINS, T. W. TRANSMITTAL OF DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL OPE-ER-174-97 00
13-OCT-97 BURNS, D. E. SUMMARY OF ASSUMPTIONS USED DURING DEVELOPMENT OF WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) MICROSHIELD MODELING RESULTS DEB-20-97 00
07-OCT-97 HAIN, K. E. TWENTY (20) DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL OPE-ER-158-97 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
12-SEP-97 ORLEAN, H. ADDITIONAL ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 15053 00
03-SEP-97 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OU 3-13 AT INEEL (DRAFT) JUNE 1997 (06/97) 15051 00
21-AUG-97 AR COORDINATOR CHEMICAL PROCESSING PLANT (CPP) NO ACTION SITES - IDAHO NATIONAL ENGINEERING LABORATORY (INEL) ADMINISTRATIVE RECORD (AR) INDEX FOR NO ACTION SITES FOR CPP WASTE AREA GROUP 3 (WAG-3) AR.INDEX.CPP.3-NA 00
14-AUG-97 HAIN, K. E. DOE-ID TRANSMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OPERABLE UNIT (OU) 3-13 AT INEEL - DRAFT ICPP COMPREHENSIVE FACILITY CLOSURE EVALUATION PHASE II (APPENDIX H) FOR REVIEW OPE-ER-127-97 00
13-AUG-97 ORLEAN, H. EPA COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL 10429 00
11-AUG-97 RENO, S. L. IDHW-DEQ EXTENSION OF REVIEW PERIOD ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL - DOE/ID-10572 JUNE 1997 (06/97) 10430 00
01-AUG-97 JONES, R. W. FIELD SAMPLING PLAN (FSP) FOR D&D OF CPP-631 RALA BUILDING & CPP-709 & CPP-734 MONITORING STATIONS AT ICPP INEEL/EXT-97-00805 00
08-JUL-97 FALCONER, K. L. LISTING CODES APPLICABLE TO DISPOSITION OF INVESTIGATION DERIVED WASTE (IDW) ORIGINATING FROM IDAHO CHEMICAL PROCESSING PLANT (ICPP) KLF-150-97 00
27-JUN-97 JINES, A. TRANSMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OPERABLE UNIT (OU) 3-13 AT INEEL OPE-ER-106-97 00
24-JUN-97 JENSEN, N. R. TRANSMITTAL OF ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP OPE-ER-102-97 00
18-JUN-97 JENKINS, T. W. RESPONSE TO RECOMMENDATION ON TECHNOLOGY SCREENING & ALTERNATIVE DEVELOMENT FOR WAG-3 COMPREHENSIVE FEASIBILITY STUDY (FS) REPORT OPE-ER-101-97 00
12-JUN-97 JENSEN, N. R. TRANSMITTAL OF FIELD SAMPLING PLAN (FSP) AND REMOVAL ACTION PLAN FOR ICPP RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION OPE-ER-91-97 00
01-JUN-97 FRANCIS, C. S. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHENMICAL PROCESSING PLANT (ICPP) DOE/ID-10568 01
01-JUN-97 JONES, R. K. LIMITED SCOPE & HAZARD CHARACTERIZATION PLAN FOR SOIL DISTURBANCE CERCLA RADIOLOGICAL CHARACTERIZATION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) - CPP-701 PETROLEUM CONTAMINATED SOIL INEEL/EXT-97-00677 00
01-JUN-97 LABUY, S. A. HEALTH & SAFETY PLAN (HSP) FOR D&D OF CPP-631, CPP-709 & CPP-734 INEL-95/0292 01
01-JUN-97 CRAM, A. J. REMOVAL ACTION PLAN FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION INEL/EXT-97-00116 00
01-MAY-97 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION DOE/ID-10579 00
01-MAY-97 PARSONS ACTION MEMORANDUM FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION - RESPONSE TO PUBLIC COMMENTS ON THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) INCLUDED AS ATTACHMENT DOE/ID-10588 00
01-MAY-97 ARROWOOD, J. R. HEALTH & SAFETY PLAN (HSP OR HASP) FOR ICPP RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION INEL/EXT-97-00132 01
10-APR-97 WESSMAN, D. L. REGULATORY POSITION ON STATUS OF CPP-709 & CPP-734 AS THEY RELATE TO APPROVED CLOSURE OF IDAHO CHEMICAL PROCESSING PLANT (ICPP) PERCOLATION PONDS OPE-EP-131-97 00
27-MAR-97 RENO, S. L. IDHW-DEQ COMMENTS ON ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP - DOE/ID-10568 FEBRUARY 1997 (02/97) 14351 00
20-MAR-97 GREENWELL, R. D. WASTE AREA GROUP 3 (WAG-3) CORE SAMPLES RDG-03-97 00
05-MAR-97 JENSEN, N. R. TRANSMITTAL OF THE REVISED WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCHEDULE OPE-ER-33-97 00
01-MAR-97 JONES, R. K. LIMITED SCOPE & HAZARD CHARACTERIZATION PLAN FOR SOIL DISTURBANCE CERCLA RADIOLOGICAL CHARACTERIZATION AT ICPP INEL/EXT-97-00341 00
28-FEB-97 JENSEN, N. R. TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPE-ER-29-97 00
20-FEB-97 RAUNIG, D. E. NEW SITE IDENTIFICATION (NSI) FORM - BURIED CYLINDERS EAST OU 3-13 SITE CPP-94 {APPROVED BY AGENCIES IN FFA/CO PROJECT MANAGER MEETING MINUTES APRIL 2, 1997 (04/02/97)} 12899 00
01-FEB-97 NOT SPECIFIED APPROVAL MEMORANDUM FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION 10315 00
01-FEB-97 FRANCIS, C. S. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) DOE/ID-10568 00
30-JAN-97 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION ENGINEERING EVALUATION COST ANALYSIS (EE/CA) 18071 00
23-DEC-96 JENSEN, N. R. TRANSMITTAL OF THREE TECHNICAL MEMORANDA ON TECHNOLOGY SCREENING REMEDIAL ACTION (RA) OBJECTIVES AND APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARARS) OPE-ER-199-96 00
17-DEC-96 JINES, A. RESPONSE TO COMMENTS FOR WASTE AREA GROUP 3 (WAG-3) DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT- PART A OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT OPE-ER-196-96 00
13-NOV-96 KENOYER, D. J. TRANSITION OF RADIOLOGICALLY CONTAMINATED SURPLUS FACILITIES FROM EM-60 TO EM-40 DJK-09-96-A 00
13-NOV-96 JENKINS, T. W. TWENTY (20) DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL - PART A - REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT FINAL) OPE-ER-173-96 00
08-OCT-96 RENO, S. L. IDHW COMMENTS ON COMPREHENSIVE RI/FS FOR ICPP OU 3-13 AT INEL - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) - DRAFT DOE/ID-10534 12996 00
04-OCT-96 ORLEAN, H. EPA COMMENTS ON DRAFT COMPREHENSIVE RI/FS FOR ICPP OU 3-13 - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) - REPORT 12995 00
29-AUG-96 RENO, S. L. IDHW REQUEST FOR EXTENSION OF REVIEW PERIOD ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT) - (OPE-ER-122-96) 10298 00
27-AUG-96 JENSEN, N. R. TRANSMITTAL OF REVISED WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCHEDULE OPE-ER-131-96 00
05-AUG-96 JENSEN, N. R. DOE TRANSMITTAL OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL PART A REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT) OPE-ER-122-96 00
26-JUN-96 AR COORDINATOR OPERABLE UNIT (OU) 3-10 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-10 AR.INDEX.OU.3-10 00
23-APR-96 AR COORDINATOR OPERABLE UNIT (OU) 3-08 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-08 AR.INDEX.OU.3-08 00
05-DEC-95 GREEN, L. A. VALIDATED ANALYTICAL SAMPLING DATA FOR ICPP PERCHED WATER WELLS, SNAKE RIVER PLAIN AQUIFER (SRPA) WELLS, USGS-47 VERTICAL CONTAMINANT PROFILING AND SOIL SAMPLES CONDUCTED WASTE AREA GROUP (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY OPE-ER-95-222 00
23-OCT-95 JENKINS, T. W. DISPOSAL OF DRILL CUTTINGS FOR MONITORING WELL 18 (MW-18) 18017 00
19-OCT-95 GREEN, L. A. DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 10445 00
19-OCT-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) & DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY ( EPA) COMMENTS OPE-ER-201-95 00
01-OCT-95 GREENWELL, R. D. DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) INEL-94/0171 00
01-AUG-95 LITCO HEALTH AND SAFETY PLAN (HSP) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - FINAL INEL-95/0136 00
01-AUG-95 LITCO SAMPLING AND ANALYSIS PLAN (SAP) FOR WAG-3 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (FINAL) INEL-95/0137 00
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) INEL/95-0056, VOL 02 0
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, VOLUME I (VOL.01) INEL/95-0056, VOL. 01 0
05-JUL-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-127-95 00
01-JUL-95 MEYER, T. J. HEALTH & SAFETY PLAN (HSP) FOR WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILTY STUDY (RI/FS) INEL-95/0136 02
21-JUN-95 RODRIGUEZ, R. R. MODIFICATION TO WASTE AREA GROUP 3 (WAG-3) BASELINE RISK ASSESSMENT (BRA) APPROACH KLF-210-95 00
19-JUN-95 GREEN, L. A. TRANSMITTAL OF DRAFT WASTE AREA GROUP 3 (WAG-3) SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (SLERA) OPE-ER-117-95 00
05-JUN-95 GREEN, L. A. EXTENSION OF COMMENT RESOLUTION PERIOD ON WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-102-95 00
01-JUN-95 LABUY, S. A. HEALTH & SAFETY PLAN (HSP) FOR DECONTAMINATION AND DECOMMISSIONING (D&D) OF CPP-631, CPP-709 & CPP-734 INEL-95/0292 00
15-MAY-95 RAUNIG, D. E. WAG-3 INVESTIGATION DERIVED WASTE (IDW) AQUIFER WELL PURGE WATER KLF-159-95 00
01-MAY-95 RENO, S. L. IDHW-DEQ COMMENTS ON WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) 18023 00
20-APR-95 DOE ACTION DETERMINATION FOR OPERABLE UNIT (OU) 3-09 - TO BE FURTHER EVALUATED IN WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 3-13 10404 00
23-MAR-95 GREEN, L. A. TRANSMITTAL OF VALIDATED DATA FOR PERCHED WATER SAMPLING, DECEMBER 1994 (12/94) AND JANUARY 1995 (01/95) OPE-ER-052-95 00
01-MAR-95 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 INEL-95/0086 04
17-FEB-95 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW AND COMMENT PERIOD FOR DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INEL-95/0137 15045 00
01-FEB-95 LITCO REPORT OF 1993 AND 1994 TANK FARM DRILLING AND SAMPLING INVESTIGATION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL-95/0064 00
01-FEB-95 LITCO FINAL PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-09 INEL-95/0094 04
25-JAN-95 RAUNIG, D. E. NEW SITE IDENTIFICATION (NSI) FORM - SIMULATED CALCINE TRENCH NU-1.95 OPERABLE UNIT (OU) 3-13 SITE CODE CPP-93 [ACCEPTED BY AGENCIES IN FFA/CO PROJECT MANAGERS MEETING FEBRUARY 2, 1995 (02/02/95)] 14345 00
23-JAN-95 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE (IDHW) COMMENTS ON INEL TRACK 2 SUMMARY REPORT FOR OU 3-09 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 10032 00
09-JAN-95 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) INFORMAL COMMENTS ON DRAFT WASTE AREA GROUP 3 (WAG-3) SATURATED ZONE CONCEPTUAL MODEL 15044 00
19-DEC-94 JONES, E. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON INEL TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-09 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 10031 00
22-NOV-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON TECHNICAL MEMORANDUM ON THE HYDROGEOLOGY AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 15040 00
22-NOV-94 GREEN, L. A. TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-09 OPE-ER-308-94 00
18-NOV-94 JONES, E. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL WASTE AREA GROUP 3 (WAG-3) TECHNICAL MEMORANDUM FOR RADIOLOGICALLY CONTAMINATED SOILS - NEW UNIT NU-21.93 18066 00
18-NOV-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON TECHNICAL MEMORANDUM FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIOLOGICALLY CONTAMINATED SOILS (NEW UNIT NU-21.93) OU 3-13 18068 00
07-NOV-94 RENO, S. L. IDHW-DEQ COMMENTS ON DRAFT TEHCNICAL MEMORANDUM FOR WATER QUALITY TREND ANALYSIS IN SNAKE RIVER PLAIN AQUIFER (SRPA), IDAHO CHEMICAL PROCESSING PLANT (ICPP), OCTOBER 6, 1994 (10/06/94) 15039 00
04-NOV-94 AR COORDINATOR OPERABLE UNIT (OU) 3-04 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION OF OU 3-04 AR.INDEX.OU.3-04 00
04-NOV-94 AR COORDINATOR OPERABLE UNIT (OU) 3-06 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION OF OU 3-06 AR.INDEX.OU.3-06 00
01-NOV-94 RENO, S. L. IDHW COMMENTS ON DRAFT TECHNICAL MEMORANDUM, WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) METHODOLOGY OPERABLE UNIT (OU) 3-13 SEPTEMBER 28, 1994 (09/28/94) 15034 00
28-OCT-94 JENKINS, T. W. TRANSMITTAL OF DRAFT TECHNICAL MEMORANDUM ON THE HYDROGEOLOGY AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 17286 00
26-OCT-94 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT - ACTION DETERMINATION FOR OU 3-02 SITES - CPP-23 & CPP-37 SHOULD BE INCLUDED IN WAG-3 OPERABLE UNIT (OU) 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AND NO FURTHER ACTION DETERMINATION FOR CPP-59 5806 00
26-OCT-94 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT - ACTION DETERMINATION FOR OU 3-07 TANK FARM AREA, CPP-16, CPP-20, CPP-24, CPP-25, CPP-30 CPP-32E NO FURTHER ACTION DETERMINATION - CPP-26, CPP-28, CPP-31, CPP-32W, CPP-79 AND CPP-83 SHOULD BE INCLUDED IN WAG-3 COMPREHENSIV 5809 00
26-OCT-94 DOE, EPA, IDHW DECISION STATEMENT FOR TRACK 2 SUMMARY REPORT, OU 3-08 TANK FARM AREA II, REV.03 - CPP-15 CPP-29 NO FURTHER ACTION DETERMINATION - CPP-13, CPP-27, CPP-35 AND CPP-36 TO BE INCLUDED IN OU 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/ 5810 00
21-OCT-94 GREEN, L. A. TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-283-94 00
19-OCT-94 JONES, E. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL WASTE AREA GROUP 3 (WAG-3) TECHNICAL WORK PLAN FOR PERCHED WATER PUMPING AND TRACER TESTS 15038 00
18-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) PERCHED GROUNDWATER PUMPING AND TRACER TEST, SEPTEMBER 16, 1994 (09/16/94) 15037 00
14-OCT-94 WINCO FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5791 00
14-OCT-94 INEL COMMUNITY RELATIONS COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - CITIZENS INVITED TO GIVE EARLY INPUT 8028 00
12-OCT-94 MEYER, L. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 3-02 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 10033 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW) WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY (RI/FS) 15035 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW), WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5785 00
30-AUG-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) INFORMAL COMMENTS ON SEDIMENT LAYERING EFFECT ON CONTAMINANT TRANSPORT FOR NONPERCHED UNSATURATED AREAS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 5779 00
30-AUG-94 RENO, S. L. IDHW-DEQ INFORMAL COMMENTS ON TECHNICAL MEMORANDUM ASSESSMENT PORFLOW BOUNDARY CONDITIONS FOR USE IN THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) UNSATURATED ZONE MODEL & ATTACHMENT A CYLINDRICAL COORDINATE OPTION PORFLOW 5784 00
10-AUG-94 MEYER, L. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT AQUIFER CHARACTERISTICS TECHNICAL MEMORANDUM 5778 00
10-AUG-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5782 00
08-AUG-94 MEYER, L. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5783 00
05-AUG-94 WINCO TRACK 2 SUMMARY REPORT FOR CPP-23 CPP INJECTION WELL: CPP-37 GRAVEL PIT 1 & PIT 2 & CPP-59 KEROSENE TANK OVERFLOW WEST OF CPP-633, REV.02 5804 00
05-AUG-94 WINCO TRACK 2 SUMMARY REPORT REFERENCES FOR CPP-23 CPP INJECTION WELL; CPP-37 GRAVEL PIT 1 & PIT 2; & CPP-59 KEROSENE TANK OVERFLOW EAST OF CPP-633, REV.02 5805 00
15-JUL-94 BURNS, S. M. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REQUEST FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) STACK EMISSIONS DATA SMB-05-94 00
05-JUL-94 MEYER, L. EPA COMMENTS ON THE DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT, OU 3-02 5807 00
01-JUL-94 RENO, S. L. IDHW-DEQ COMMENTS, DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT, OU 3-02 IDAHO CHEMICAL PROCESSING PLANT (ICPP) 5808 00
01-JUL-94 LITCO TRACK 2 DRAFT FINAL SCOPING SUMMARY REPORT OPERABLE UNIT (OU) 3-10 - SITES & REFERENCES INEL-96/0197 02
27-JUN-94 WINCO TRACK 1 DECISION DOCUMENTATION PACKAGE - INVESTIGATION OF CPP-34, SOIL STORAGE AREA IN THE NE CORNER OF ICPP - ACTION DETERMINATION, TRACK 2 TREATABILITY STUDY (TS) IS JUSTIFIED 5756 00
17-JUN-94 MEYER, L. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE TECHNICAL MEMORANDUM CONCEPTUAL FLOW & TRANSPORT MODELS OF UNSATURATED ZONES FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILIITY STUDY (RI/FS) 5776 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
15-JUN-94 DOE, EPA, IDHW DECISION STATEMENT FOR THE TRACK 2 INVESTIGATION OF OPERABLE UNIT (OU) 3-05 - INCLUDE IN OU 3-13 COMPREHENSIVE REMEDIALINVESTIGATION FEASIBILITY STUDY (RI/FS) 5775 00
08-JUN-94 DOE, EPA, IDHW DECISION STATEMENTS FOR TRACK 2 SUMMARY REPORT FOR OU 3-11, CPP-621 AREA SPILLS, REV.02, NO FURTHER ACTION FOR CPP-45; CPP-58 SHOULD BE INCLUDED IN OU 3-13 RI/FS 5769 00
07-JUN-94 NOT SPECIFIED TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE FOR THE LIME PIT AT THE BASE OF THE CPP-601 BERM & FRENCH DRAIN, REVISION 1 (REV.01) - NO FURTHER ACTION DETERMINATION, REV.01 5732 00
07-JUN-94 NOT SPECIFIED TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE FOR CPP SEWAGE TREATMENT PLANT (STP) LAGOONS, REVISION 2 (REV.02) - SITE SHOULD BE SCOPED UNDER THE CPP COMPREHENSIVE RI/FS 5733 00
07-JUN-94 DOE TRACK 1 INVESTIGATION - DECISION DOCUMENTATION PACKAGE, REVISION 3 (REV.03) - CHEMICAL PROCESSING PLANT (CPP) PERCOLATION PONDS 1 & 2 SITE SHOULD BE SCOPED UNDER THE CPP COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5734 00
07-JUN-94 NOT SPECIFIED TRACK 1 INVESTIGATION FOR THE ABANDONED CPP-637 & CPP-620 OFF GAS (VOG) LINE - NO FURTHER ACTION DETERMINATION, REV.02 5735 00
01-MAY-94 DOE COMPREHENSIVE WELL SURVEY FOR INEL VOLUME II (VOL.02), REVISION 3 (REV.03) - EXPERIMENTAL BREEDER REACTOR (EBR) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) DOE/ID-10402,VOL.02 03
26-APR-94 LYLE, J. L. TRANSMITTAL OF DRAFT FINAL TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) OPE-ER-099-94 00
12-APR-94 WELLS, R. P. LIMITATIONS & VALIDATION (L&V) REPORT, IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-07 RADIOCHEMICAL ANALYSIS, SDG #3PG10301BG RPW-44-94 00
01-APR-94 BUGGER, B. DOE NEWS - ENGINEERS NEW SENSOR SYSTEM WITH ARMS CONTROL, CLEANUP APPLICATIONS 7595 00
30-MAR-94 BUGGER, B. DOE NEWS - RETECH SIGN AGREEMENT FOR TEST MELT OF CONTAMINATED METAL 7559 00
22-MAR-94 LANEY, P. T. COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP-10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) PTL-02-94 00
18-MAR-94 LIVERMAN, E. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WAG-3 & WAG-10 RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 5777 00
09-MAR-94 ROSENBERGER, M. S. IDHW-DEQ REVIEW OF DRAFT FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP (WAG-3) NORTH AREA REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPERABLE UNIT (OU) 3-08A - COMMENTS INCLUDED 18040 00
01-MAR-94 NOT SPECIFIED ADDENDUM FOR THE SAMPLING & ANALYSIS PLAN (SAP) FOR THE TRACK 2 CHARACTERIZATION OF ICPP OPERABLE UNIT (OU) 3-09 5795 00
28-FEB-94 WINCO BACKGROUND CONCENTRATIONS OF SELECTED METALS & RADIONUCLIDES IN BIG LOST RIVER ALLUVIUM AT ICPP, REVISION 1 (REV.01) 14143 00
18-FEB-94 LYLE, J. L. TRANSMITTAL OF DRAFT FINAL SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 3-08A IDAHO CHEMICAL PROCESSING PLANT (ICPP) NORTH AREA REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-047-94 00
01-FEB-94 WENZEL, D. R. RADIOLOGICAL SAFETY ANALYSIS COMPUTER PROGRAM (RSAC-5) USER'S MANUAL WINCO-1123 01
19-JAN-94 STOOPS, T. M. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW OF DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-08A IDAHO CHEMICAL PROCESSING PLANT (ICPP) - COMMENTS INCLUDED 18041 00
07-JAN-94 LIVERMAN, E. EPA REVIEW COMMENTS ON DRAFT SCOPE OF WORK (SOW) FOR THE ICPP NORTH AREA REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5612 00
01-DEC-93 WINCO SAMPLING & ANALYSIS PLAN (SAP) FOR THE TRACK 2 CHARACTERIZATION OF ICPP OPERABLE UNIT (OU) 3-09, REV.01 5746 00
01-DEC-93 HONEYCUTT, T. K. TECHNICAL MEMORANDUM FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) SOILS TREATABILITY STUDY (TS): PHYSICAL SEPARATION OF RADIONUCLIDES IN SOILS EGG-ER-11101 00
30-NOV-93 LIVERMAN, E. EPA REVIEW COMMENTS FOR DRAFT TRACK 2 SAMPLING & ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-09, ICPP 5774 00
23-NOV-93 DOE DOE RESPONSE TO EPA & IDHW COMMENTS FOR DRAFT TRACK 2 SUMMARY REPORT FOR OU 3-11 AT ICPP, WAG-3 5771 00
15-NOV-93 LYLE, J. L. TRANSMITTAL OF DRAFT SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 3-08A IDAHO CHEMICAL PROCESSING PLANT (ICPP) NORTH AREA REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-035-93 00
10-NOV-93 LIVERMAN, E. COMMENTS ON THE TRACK 2 SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-05 5600 00
01-NOV-93 WINCO TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-11, CPP-621 AREA SPILLS, REV.02 5753 00
28-OCT-93 WINCO DRAFT TRACK 2 SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-09 (CPP-603 AREA), REV.01 5747 00
15-OCT-93 BUGGER, B. DOE NEWS - WINCO PRIVATE VENDOR DEMONSTRATES TECHNOLOGY FOR CLEANER DECONTAMINATION 6836 00
12-OCT-93 STOOPS, T. M. IDHW-DEQ RECOMMENDATIONS FOR OU 3-05 TRACK 2 SUMMARY REPORT 5601 00
24-SEP-93 INEL COMMUNITY RELATIONS PUBLIC NOTICE - THE DEPARTMENT OF ENERGY (DOE) ANNOUNCES A 30 DAY PUBLIC COMMENT PERIOD ON THE REMOVAL ACTIONS AT OU 3-08, 3-09, AND OU 3-12 AT THE ICPP 5567 00
24-SEP-93 BUGGER, B. DOE NEWS - REMOVAL ACTIONS TO TAKE PLACE AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 6805 00
20-SEP-93 LIVERMAN, E. EPA REVIEW COMMENTS FOR DRAFT TRACK 2 SUMMARY REPORT FOR OU 3-11 AT ICPP 5768 00
14-SEP-93 STOOPS, T. M. IDHW REVIEW COMMENTS FOR DRAFT TRACK 2 SUMMARY REPORT FOR OU 3-11 AT ICPP 5767 00
30-AUG-93 WINCO ACTION MEMORANDUM FOR A REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP), WASTE AREA GROUP 3 (WAG-3), BIN SET #3, INEL, BUTTE COUNTY, IDAHO, REVISION 1 (REV.01) 5518 00
30-AUG-93 WINCO ACTION MEMORANDUM FOR A REMOVAL ACTION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) OU 3-09 CPP-740 SETTLING BASIN, INEL, BUTTE COUNTY, IDAHO, REVISION 1 (REV.01) 5519 00
30-AUG-93 WINCO ACTION MEMORANDUM FOR A REMOVAL ACTION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-12 SITE CPP-81, INEL, BUTTE COUNTY, IDAHO, REV.01 5520 00
05-AUG-93 COE, M. DOE NEWS - IDAHO CHEMICAL PROCESSING PLANT (ICPP) TRANSITION PLAN MADE AVAILABLE 6710 00
04-AUG-93 HUESTIS, G. M. SOIL TREATABILITY STUDY (TS) OF INEL SOILS INCLUDING ICPP SOILS GMH-01-93 00
02-AUG-93 BARRY, G. A. TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) 93MSE/ID-225 00
01-AUG-93 BARRY, G. A. SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 6744 00
01-AUG-93 NUTHAK, S. A. HEALTH & SAFETY PLAN (HSP) FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) EGG-ER-10922 00
28-JUL-93 WINCO QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR CHARACTERIZATION ACTIVITIES AT WASTE AREA GROUP 3 (WAG-3) QAPJP-E-035 01
16-JUL-93 WINCO FINAL TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-08, TANK FARM AREA II, REVISION 3 (REV.03) 5786 00
01-JUL-93 GOLDER ASSOCIATES, INC. SAMPLING AND ANALYSIS PLAN (SAP) FOR BOXED SOILS FROM SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-58 AND BASEMENT EXIT EXCAVATIONS AT CPP-604 AND CPP-605 AT ICPP, REVISION 1 (REV.01) 14084 00
24-JUN-93 GREEN, L. A. TRACK 1 DECISION DOCUMENTATION PACKAGE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-04 NO FURTHER ACTION, REV.01 - CPP-38 - TRANSITE ON CPP-601, CPP-602, CPP-603, CPP-604, CPP-605, CPP-606, CPP-640, CPP-644 AND CPP-648 5303 00
24-JUN-93 COE, M. DOE NEWS - DOE COMPLETES ENVIRONMENTAL ASSESSMENT (EA) ON UPGRADING CHEMICAL PLANT TANK FARM 6548 00
09-JUN-93 STOOPS, T. M. IDHW REVIEW COMMENTS ON DRAFT TRACK 2 SUMMARY REPORT FOR OU 3-08 AT ICPP WAG-3 18069 00
01-JUN-93 WINCO TRACK 1 DECISION DOCUMENTATION PACKAGE - WAG-3 OU 3-06 CONTINUE TO TRACK 2 SCOPING, REV.02 5304 00
01-JUN-93 BUGGER, B. DOE NEWS - WINCO COORDINATES EFFORT TO RECYLE CONTAMINATED METAL 6520 00
01-JUN-93 SEHLKE, G. WELL FITNESS EVALUATION FOR INEL, VOLUME 1 (VOL.01) DOE/ID-10392,VOL.01 00
01-JUN-93 SEHLKE, G. WELL FITNESS EVALUATION FOR INEL, VOLUME 2 (VOL.02) - ICPP DOE/ID-10392,VOL.02 00
01-JUN-93 SEHLKE, G. WELL FITNESS EVALUATION FOR INEL, VOLUME 3 (VOL.03) - ICPP CONT'D & INEL MIDDLE, NORTH & SOUTH DOE/ID-10392,VOL.03 00
28-MAY-93 EARLE, O. K. ACTION MEMORANDUM FOR A REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 OU 3-12 SITE CPP-81 INEL BUTTE COUNTY, IDAHO 5280 00
28-MAY-93 EARLE, O. K. ACTION MEMORANDUM FOR A REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP), BIN SET #3, IDAHO NATIONAL ENGINEERING LABORATORY (INEL), BUTTE COUNTY, IDAHO 5281 00
28-MAY-93 EARLE, O. K. TRANSMITTAL OF ACTION MEMORANDUM FOR TIME CRITICAL REMOVAL ACTIONS (TCRA) PLANNED FOR FY-93 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) FOR INCLUSION INTO THE ADMINISTRATIVE RECORD (AR) FILE OKE-64-93 00
12-MAY-93 LYLE, J. L. TRANSMITTAL OF FINAL TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-05, OLD SEWAGE TREATMENT PLANT WEST OF CPP-664 (CPP-14) AT THE INEL ERWM-RPO-433-93 00
08-MAY-93 WINCO TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-07, TANK FARM AREA I, REVISION 2 (REV.02) 5764 00
05-MAY-93 WINCO TRACK 2 SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-11 - CPP-45 CPP-621 CHEMICAL STORAGE AREA SPILL AND CPP-58 PEW OVERHEAD PIPELINE SPILL, REV.01 5302 00
16-APR-93 DOE FINAL COMMENT RESOLUTION ON THE SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-05 5602 00
14-APR-93 DOE RESPONSE TO IDHW AND EPA COMMENTS ON THE SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-05 5603 00
13-APR-93 NOT SPECIFIED TRACK 1 INVESTIGATION OF CPP-66, ICPP COAL FIRED STEAM GENERATION FACILITY (CFSGF) ASH PIT - NO FURTHER ACTION DETERMINATION 5688 00
09-APR-93 WINCO TRACK 1 NO FURTHER ACTION DETERMINATION - CPP-68, ABANDONED GASOLINE TANK CPP-VES-UTI-652, REV.02 5265 00
09-APR-93 WINCO TRACK 1 ACTION DETERMINATION, PROCEED TO SCOPING SESSION TO DETERMINE COURSE OF ACTION - CPP-601 TUNNEL DRAIN LEAK (VT-300), REVISION 2 (REV.02) 5266 00
09-APR-93 WINCO TRACK 1 DECISION DOCUMENTATION PACKAGE - NO FURTHER ACTION DETERMINATION - CPP-63 HEXONE SPILL BY CPP-710 5267 00
09-APR-93 WINCO TRACK 1 INVESTIGATION OF CPP-55 MERCURY CONTAMINATED AREA SOUTH OF CPP T-15 - NO FURTHER ACTION DETERMINATION, REV.02 5270 00
09-APR-93 WINCO TRACK 1 DECISION DOCUMENTATION PACKAGE - CPP-21 SOLID WASTE STORAGE BIN SOUTH OF CPP-601 - NO FURTHER ACTION DETERMINATION, REV.02 5271 00
06-APR-93 OWEN, A. H. PROPOSED AGENDA FOR CONFERENCE CALL BETWEEN DOE-ID, WINCO, IDHW AND EPA REGION X FOR SUMMARY REPORT FOR OU 3-05 5604 00
01-APR-93 WINCO TRACK 2 SUMMARY REPORT, WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-05, OLD SEWAGE TREATMENT PLANT WEST OF CPP-664 (CPP-14), REV.02 5606 00
24-MAR-93 WASTREN, INC. SAMPLING AND ANALYSIS PLAN (SAP) FOR ICPP PERCOLATION PONDS #1 AND #2 18021 00
28-FEB-93 WINCO REFERENCES FOR TRACK 2 SCOPING PACKAGE FOR OPERABLE UNIT (OU) 3-11, CPP-621 CHEMICAL STORAGE AREA ACID SPILLS (DOCUMENT 1) 5762 00
28-FEB-93 WINCO REFERENCES FOR THE TRACK 2 SCOPING PACKAGE FOR OPERABLE UNIT (OU) 3-11, CPP-621 CHEMICAL STORAGE AREA ACID SPILLS (DOCUMENT 2) 5762-A 00
24-FEB-93 MARTY, R. C. VALIDATION OF ORGANOCHLORINE HERBICIDE DATA FOURTH (4TH) QUARTER 1992 GROUNDWATER SAMPLING EFFORT AT WESTINGHOUSE IDAHO CHEMICAL PROCESSING PLANT (ICPP): SAMPLE DELIVERY GROUP (SDG) #GW00801W4 4GW00101W4 4GW00201W4 4GW01001W4 RM-06-93-A 00
08-JAN-93 RHODES, D. W. EVALUATION OF RECORDS FOR WASTE GENERATED AT ICPP & DISPOSED AT RWMC DURING THE PERIOD OF 1960 - 1983 DWR-01-93 00
07-JAN-93 NOT SPECIFIED TRACK 1 INVESTIGATION OF CPP-37 GRAVEL PITS #1 AND #2 ACTION DETERMINATION - PROCEED TO A TRACK 2 SCOPING 5256 00
04-JAN-93 LAPRAY, B. C. NO ACTION SITE - TRACK 1 DECISION DOCUMENTATION PACKAGES - CPP-49 PCB TRANSFORMER YARD (CPP-705); CPP-50 (CPP-731); CPP-51 PCB STAGING AREA WEST OF CPP-660; CPP-61 PCB SPILL IN CPP-718 TRANSFORMER YARD 5201 00
04-JAN-93 LAPRAY, B. C. TRACK 1 DECISION DOCUMENTATION PACKAGE - CPP-07 SOIL CONTAMINATION NW OF CPP-642, REV.01 5245 00
04-JAN-93 LAPRAY, B. C. TRACK 1 DECISION DOCUMENTATION PACKAGE - CPP-12 CONTAMINATED PAINT CHIPS & PAD SOUTH OF CPP-603, REV.01 5246 00
04-JAN-93 LAPRAY, B. C. TRACK 1 INVESTIGATION - CPP-53 PAINT & PAINT SOLVENT AREA SOUTH OF CPP-697, REV.01 5248 00
04-JAN-93 LAPRAY, B. C. TRACK 1 NO FURTHER ACTION DETERMINATION CPP-54 DRUM STORAGE AREA WEST OF CPP-660, REV.01 5249 00
04-JAN-93 WINCO TRACK 1 DECISION DOCUMENTATION PACKAGE - INVESTIGATION OF CPP-23 - ACTION DETERMINATION, PROCEED TO TRACK 2 SCOPING 5343 00
04-JAN-93 WINCO TRACK 1 DECISION DOCUMENTATION PACKAGE - INVESTIGATION OF CPP-59 - ACTION DETERMINATION PROCEED TO TRACK 2 SCOPING 5344 00
01-DEC-92 LAPRAY, B. C. TRACK 1 DECISION DOCUMENTATION PACKAGE - CPP-41 FIRE TRAINING PITS BETWEEN CPP-602 AND CPP-603, REV.01 5247 00
01-DEC-92 LAPRAY, B. C. TRACK 1 DECISION DOCUMENTATION PACKAGE - CPP-57 SULFURIC ACID SPILL EAST OF CPP-606, REV.01 5250 00
01-DEC-92 LAPRAY, B. C. TRACK 1 DECISION DOCUMENTATION PACKAGE - CPP-60 PAINT SHOP AT PRESENT LOCATION OF CPP-645, REV.01 5251 00
01-DEC-92 WINCO TRACK 1 - ABANDONED LINE 1.5 IN. - PLA-776 W. OF BEECH ST. REV.01 5292 00
23-NOV-92 DOE RESOLUTION FOR REVIEW COMMENTS FOR THE DRAFT SUMMARY REPORT FOR OU 3-05 5605 00
26-OCT-92 STOOPS, T. M. RECEIPT OF YOUR NOTICE OF DELAY DATED 09/28/92 FOR SUBMISSION OF TRACK 2 SUMMARY REPORT FOR OU 3-07 & 3-08 6115 00
22-OCT-92 DOORNBOS, M. H. EVALUATION OF A UNIDIRECTIONAL GAMMA DETECTOR FOR OPERABLE UNIT (OU) 3-07 6614 00
28-SEP-92 LYLE, J. L. NOTICE OF DELAY IN SCHEDULE FOR SUBMITTAL OF TWO SECONDARY DOCUMENTS: THE SUMMARY REPORTS FOR OPERABLE UNITS OU 3-07 AND 3-08 AM/ERWM-RPO-202-92 00
28-SEP-92 LYLE, J. L. NOTICE OF DELAY IN SCHEDULE FOR SUBMITTAL OF TWO SECONDARY DOCUMENTS: THE SUMMARY REPORTS FOR OPERABLE UNIT (OU) 3-07 AND 3-08 AM/ERWM-RPO-202-92-A 00
28-SEP-92 BATTAGLIA, P. J. FEASIBILITY STUDY (FS) FOR GAMMA PROFILING AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) FL-92-0234 00
14-SEP-92 LAPRAY, B. C. TRACK 1 DECISION DOCUMENTATION PACKAGE - GAS STORAGE BUILDING - SITE CPP-18 5197 00
14-SEP-92 LAPRAY, B. C. NO ACTION SITE - TRACK 1 DECISION DOCUMENTATION PACKAGE - PILOT PLANT STORAGE AREA WEST OF CPP-620, REV.01 5198 00
14-SEP-92 LAPRAY, B. C. TRACK 1 INVESTIGATION - MERCURY CONTAMINATED AREA NEAR CPP TB-4 5199 00
14-SEP-92 LAPRAY, B. C. TRACK 1 INVESTIGATION - HEXONE SPILL WEST OF CPP-660, REV.01 5200 00
17-AUG-92 MASCARENAS, C. S. SITE SPECIFIC HEALTH & SAFETY PLAN (HSP), REV.01 FY-92 DRILLING & SAMPLING PROGRAM TRACK 2 INVESTIGATION OF OU 3-07 TANK FARM & OU 3-08 TANK FARM II 6621 00
17-AUG-92 RETZLAFF, R. IDAHO CHEMICAL PROCESSING PLANT (ICPP) GEOPHYSICAL SURVEY 903-1188 00
06-AUG-92 WINCO FIELD IMPLEMENTATION DOCUMENT - OPERABLE UNITS (OU) 3-07, 3-08, AND BACKGROUND SOIL INVESTIGATIONS 5516 00
31-JUL-92 LYLE, J. L. TRANSMITTAL OF CLOSURE ADDENDUM FOR SAMPLING AND ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-07 AND 3-08 (TANK FARM II & III RESPECTIVELY) AND WASTE AREA GROUP 3 (WAG-3) QUALITY ASSURANCE PROJECT PLAN (QAPJP) AM/ERWM-RPO-173-92 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
21-JUL-92 WINCO QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR CHARACTERIZATION ACTIVITIES AT WASTE AREA GROUP 3 (WAG-3) QAPJP-E-035 00
10-JUL-92 LYLE, J. L. MODIFICATIONS TO OPERABLE UNIT (OU) 3-07 TANK FARM SAMPLING & ANALYSIS PLAN (SAP) AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 AM/ERWM-RPO-154-92 00
08-JUN-92 MALIK, L. E. REPORT ON PRELIMINARY REVIEW OF IMPACT ON TANK FARM DUE TO CHARACTERIZATION ACTIVITIES 6622 00
03-JUN-92 LYLE, J. L. TRANSMITTAL OF THE ADDENDUM FOR RESPONSE TO COMMENTS FOR THE DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-08 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 RPO-129-92 00
27-MAY-92 WINCO WINCO ENVIRONMENTAL RESTORATION (ER) ADDENDUM TO DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-08 TANK FARM AREA II (DATED 03/31/92) 4697 00
24-APR-92 LYLE, J. L. TRANSMITTAL OF THE ADDENDUM FOR THE RESPONSE TO EPA AND IDHW COMMENTS FOR THE DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-07 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 RPO-091-92 00
15-APR-92 GOLDER ASSOCIATES, INC. FINAL REPORT FOR ICPP SAMPLING & ANALYSIS PROGRAM AT SERVICE WASTE PERCOLATION POND #2 903-1171 00
07-APR-92 LYLE, J. L. TRANSMITTAL OF SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-08 AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) ERD1-098-92 00
31-MAR-92 WINCO SAMPLING AND ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-08 TANK FARM AREA II IDAHO CHEMICAL PROCESSING PLANT (ICPP), REV.01 5276 00
31-MAR-92 CULP, B. SITE ASSESSMENT DOCUMENT PACKAGES FOR OPERABLE UNIT (OU) 3-08 - CPP-13, CPP-15, CPP-27, CCP-29, CPP-35, CPP-36, CPP-58E AND CPP-58W 6637 00
02-MAR-92 LYLE, J. L. TRANSMITTAL OF THE SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-07 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 RPO-047-92 00
28-FEB-92 WINCO SEE OKE-75-92 FOR MODIFICATIONS - DRAFT IDAHO CHEMICAL PROCESSING PLANT (ICPP) SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-07 TANK FARM AREA 4413 00
19-FEB-92 URBANSKI, C. J. SUBSURFACE IMAGING RESULTS FOR HIGH LEVEL WASTE TANK FARM REPLACEMENT (HLWTFR) PROJECT CJU-05-92 00
14-JAN-92 JONES, K. L. STATE OF IDAHO, REQUEST FOR INFORMATION KXJ-9-92 00
10-JAN-92 LYLE, J. L. TRANSMITTAL OF SCOPE OF WORK (SOW) FOR TRACK 2 PRELIMINARY SCOPING STUDY AT OPERABLE UNIT (OU) 3-08 RPO-001-92 00
01-JAN-92 MOTAZED, B. PORTABLE PIPE MAPPER (PPM) FIELD TEST AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 6623 00
19-DEC-91 GOLDER ASSOCIATES, INC. REPORT OF ICPP DRILLING & SAMPLING PROGRAM AT HIGH LEVEL LIQUID WASTE (HLLW) TANK FARM & LDU CPP-33 893-1195.530 00
18-DEC-91 EARLE, O. K. DISPOSITION OF RADIOACTIVELY CONTAMINATED SOIL 6594 00
17-DEC-91 EARLE, O. K. SCOPE OF WORK FOR THE TRACK 2 STUDY OF OU 3-07: TANK FARM 1 5274 00
16-DEC-91 GOLDER ASSOCIATES, INC. SAMPLING & ANALYSIS PLAN (SAP) FOR SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-14 AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) - (TECHNICAL WORK PLAN) REV.02 6636 00
12-DEC-91 EARLE, O. K. SCOPE OF WORK FOR THE TRACK 2 STUDY OF OPERABLE UNIT (OU) 3-05: WASTE WATER TREATMENT PLANT WEST OF CPP-664 5275 00
02-DEC-91 JOSTEN, N. E. FINAL REPORT ON ROBOTIC GEOPHYSICAL SURVEY NEJ-28-91 00
06-NOV-91 EVANS, T. A. TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CFA 713-4, 713-5, 731, 732, 741-7, IRC-1, 01SSW 103, 01SSW 111, 01SSW 104, NRF 503, 511, TAN 783, 792, 707, CPP-SAA 152 & 153 SGS-464-91 00
29-OCT-91 MASCARENAS, C. S. SITES WITHIN OPERABLE UNIT (OU) 3-07 6596 00
18-OCT-91 MEJIA, C. REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07 TANK FARM 6590 00
18-OCT-91 MEJIA, C. REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07, TANK FARM 6591 00
18-OCT-91 MEJIA, C. REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07, TANK FARM 6592 00
13-OCT-91 EARLE, O. K. HIGH LEVEL WASTE TANK FARM REPLACEMENT (HLWTFR) PROJECT USING DEVICES TO LOCATE UNDERGROUND UTILITIES 6589 00
10-SEP-91 EVANS, T. A. TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBER: CHEMICAL PROCESSING PLANT (CPP) VES-YDA-106 SGS-353-91 00
09-SEP-91 WINCO NO ACTION SITE - CPP-76 SEPTIC TANK AND CESSPOOL WEST OF CPP-659 - NO ACTION DETERMINATION PACKAGE 3103 00
09-SEP-91 NOT SPECIFIED NO ACTION SITE - CPP-43 GREASE PIT SOUTH OF CPP-637 3575 00
09-SEP-91 WINCO NO ACTION SITE - CPP-52 PICKLING SHED EAST OF CPP-631 3576 00
09-SEP-91 WINCO NO ACTION SITE - CPP-70 SEPTIC TANK EAST OF CPP-655 AND CPP-71 SEEPAGE PITS WEST OF CPP-656 3577 00
09-SEP-91 WINCO NO ACTION SITE - CPP-72 CPP-758 CESSPOOL EAST OF CPP-651 3578 00
09-SEP-91 WINCO NO ACTION SITE - CPP-73 LEACHING CESSPOOL EAST OF CPP T-5 3579 00
09-SEP-91 WINCO NO ACTION SITE - CPP-74 SEEPAGE PIT WEST OF CPP-626 3580 00
09-SEP-91 WINCO NO ACTION SITE - CPP-75 SEPTIC TANK AND CESSPOOL WEST OF CPP-603 3581 00
09-SEP-91 WINCO NO ACTION SITE - CPP-77 SEEPAGE PIT AND CESSPOOL NORTH OF CPP-662 3582 00
04-SEP-91 GOLDER ASSOCIATES, INC. REPORT ON SURFACE GEOPHYSICAL SURVEYS AT ICPP 893-1195.950 00
22-AUG-91 EVANS, T. A. TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBER: CHEMICAL PROCESSING PLANT (CPP) VES-HBF-102 SGS-334-91 00
31-JUL-91 EVANS, T. A. TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CHEMICAL PROCESSING PLANT (CPP) VES-UTI-653, VES-UTI-655 & VES-UTI-654 SGS-289-91 00
16-JUL-91 FORD, J. S. DOCUMENT REVIEW: CLOSURE PLAN (CP) LAND DISPOSAL UNIT (LDU) CPP-40 IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL ERD-102-91 00
13-JUN-91 BURNS, T. F. TRANSMITTAL OF CLOSURE PLAN (CP) FOR CPP-48, EXCESS CHEMICAL DUMP TANK FRENCH DRAIN SOUTH OF CPP-633 FOR REVIEW & APPROVAL ERD-229-91 00
10-JUN-91 BURNS, T. F. FINAL CLOSURE PLAN (CP) LAND DISPOSAL UNIT (LDU) CPP-48 EXCESS CHEMICAL FRENCH DRAIN 3090 00
04-JUN-91 BURNS, T. F. CLOSURE PLAN (CP) FOR CPP-33 CONTAMINATED SOIL IN TANK FARM AREA NEAR WL-102 NE OF CPP-604 ERD-210-91 00
30-MAY-91 BURNS, T. F. RESPONSE TO REGULATORY COMMENTS ON CLOSURE PLAN (CP) CPP-59, KEROSENE TANK OVERFLOW ERD-209-91 00
21-MAY-91 BURNS, T. F. REQUEST FOR EXTENSION OF CPP-59 CLOSURE PLAN (CP) REVISION SCHEDULE ERD-197-91 00
09-MAY-91 LYLE, J. L. RESPONSE TO INFORMATION REQUESTED BY MR. WALKER HOWELL REGARDING SAMPLING DATA FOR CPP-55-06 SAMPLING & ANALYSIS DATA PACKAGE ERD-161-91 00
25-APR-91 BERGEMAN, N. L. INFORMATION REQUEST FOR WELLS IN VICINITY OF TEST REACTOR AREA (TRA), TEST AREA NORTH (TAN) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) SGS-127-91 00
28-MAR-91 BURNS, T. F. CHARACTERIZATION DATA & OTHER INFORMATION REGARDING COCA UNITS CPP-39, CPP-51, CPP-54, CPP-59, & CPP-64 ERD-105-91 00
14-MAR-91 BURNS, T. F. NOTIFICATION OF MODIFICATION OF PART A PERMIT FOR INEL - SUMMARY OF IDAHO CHEMICAL PROCESSING PLANT (ICPP) LAND DISPOSAL RESTRICTIONS (LDR) RECLASSIFICATIONS ERD-075-91 00
27-FEB-91 SOLECKI, J. E. SUBMITTAL OF SUMMARY ANALYTICAL DATA FOR INVESTIGATIONS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) ERD-036-91 00
04-FEB-91 EARLE, O. K. REVISED LAND DISPOSAL UNITS (LDU) QUESTIONNAIRES OKE-13-91 00
11-JAN-91 GOLDER ASSOCIATES, INC. TECHNICAL WORK PLAN - VOLUME I (VOL.01) SAMPLING & ANALYSIS PROGRAM AT SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-14 6658 00
11-JAN-91 GOLDER ASSOCIATES, INC. TECHNICAL WORK PLAN - VOLUME II QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR DRILLING & SAMPLING ACTIVITIES AT SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-14 6659 00
04-JAN-91 NOT SPECIFIED IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP (WAG) ASSESSMENT 6625 00
04-JAN-91 NOT SPECIFIED IDAHO CHEICAL PROCESSING PLANT (ICPP) TANK FARM CONTAMINATED SOIL INVESTIGATION 6632 00
01-JAN-91 GOLDER ASSOCIATES, INC. REPORT FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) DRILLING AND SAMPLING PROGRAM AT LAND DISPOSAL UNIT (LDU) CPP-39 893-1195.310 00
01-JAN-91 GOLDER ASSOCIATES, INC. IDAHO CHEMICAL PROCESSING PLANT (ICPP) DRILLING AND SAMPLING PROGRAM AT LAND DISPOSAL UNIT (LDU) CPP-59 893-1195.320 00
01-JAN-91 GOLDER ASSOCIATES, INC. IDAHO CHEMICAL PROCESSING PLANT (ICPP) DRILLING AND SAMPLING PROGRAM AT LAND DISPOSAL UNIT (LDU) CPP-64 893-1195.330 00
01-JAN-91 GOLDER ASSOCIATES, INC. CHEMICAL PROCESSING PLANT (CPP) DRILLING & SAMPLING PROGRAM AT SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-54 893-1195.360 00
01-JAN-91 SOLECKI, J. E. SUBMITTAL OF SUMMARY ANALYTICAL DATA INVESTIGATIONS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) ERD-011-91 00
06-DEC-90 EARLE, O. K. STRONTIUM-90 IN BOREHOLE CPP-55-06 OKE-21-90 00
05-DEC-90 SOLECKI, J. E. CLOSURE PLAN (CP) FOR CPP-39, HYDROFLUORIC (HF) ACID STORAGE TANK AND DRY WELL DATED DECEMBER 4, 1990 (12/04/90), TRANSMITTED FOR REVIEW & COMMENT 611 00
03-DEC-90 SOLECKI, J. E. FINAL CLOSURE REPORT FOR CPP-55, MERCURY CONTAMINATED AREA 610 00
19-NOV-90 EARLE, O. K. STRONTIUM-90 IN BOREHOLE CPP-55-06 OKE-18-90 00
08-NOV-90 EARLE, O. K. CPP-59 CLOSURE PLAN (CP) SUBMITTAL AMU-161-90 00
06-NOV-90 SOLECKI, J. E. CLOSURE PLAN (CP) FOR CPP-59 KEROSENE SPILL 965 00
25-OCT-90 ALCALDE, A. SITE SPECIFIC HEALTH & SAFETY PLAN (HSP) - LAND DISPOSAL UNIT (LDU) CPP-63 6656 00
16-OCT-90 ALCALDE, A. SITE SPECIFIC HEALTH & SAFETY PLAN (HSP) - SWMU CPP-14 6651 00
16-OCT-90 ALCALDE, A. SITE SPECIFIC HEALTH & SAFETY PLAN (HSP) SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-36 INEL 6652 00
16-OCT-90 ALCALDE, A. SITE SPECIFIC HEALTH & SAFETY PLAN (HSP) ICPP LAND DISPOSAL UNIT (LDU) CPP-37 6653 00
16-OCT-90 ALCALDE, A. SITE SPECIFIC HEALTH & SAFETY PLAN (HSP) LAND DISPOSAL UNIT (LDU) CPP-40 & CPP-47 6654 00
16-OCT-90 ALCALDE, A. SITE SPECIFIC HEALTH & SAFETY PLAN (HSP) ICPP LAND DISPOSAL UNIT (LDU) CPP-48 6655 00
22-AUG-90 SOLECKI, J. E. CALIPER LOGS FOR CPP-23 INJECTION WELL 2820 00
14-AUG-90 LANE, R. D. IDHW MEMORANDUM - CLOSURE PLAN (CP) FOR CPP-34 INEL 15036 00
03-AUG-90 GEARHEARD, M. F. INEL REQUEST FOR EXTENSION FOR CLOSURE PLANS (CP) FOR COCA UNITS CPP-64, CPP-59, AND CPP-39 905 00
25-JUL-90 GOLDER ASSOCIATES, INC. TECHNICAL WORK PLAN FOR ICPP DRILLING AND SAMPLING PROGRAM AT ICPP TANK FARM CPP-33, VOLUME I (VOL.0I) 893-1195.450,VOL.01 00
25-JUL-90 GOLDER ASSOCIATES, INC. TECHNICAL WORK PLAN VOLUME II (VOL.02) - QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR DRILLING AND SAMPLING ACTIVITIES AT ICPP TANK FARM CPP-33 893-1195.450,VOL.02 00
19-JUL-90 SOLECKI, J. E. CLOSURE PLAN (CP) FOR CPP-64 HEXONE SPILL WEST OF CPP-660 3077 00
19-JUN-90 SOLECKI, J. E. TRANSMITTAL OF CLOSURE PLAN (CP) FOR LDU CPP-34 SOIL STORAGE AREA IN THE NE CORNER OF THE ICPP FOR REVIEW AND APPROVAL 6722 00
23-MAY-90 BLUMBERG, D. J. OCTOBER 16, 1989 (10/16/89) ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR ADDITIONAL INFORMATION FOR DELETION OF SELECTED SOLID WASTE MANAGEMENT UNITS (SWMU'S) FROM THE CONSENT ORDER AND COMPLIANCE AGREEMENT (COCA) THROUGH SUMMARY ASSESSMENT PROC DJB-49-90 00
26-APR-90 GREEN, L. A. RESPONSE TO STATE QUESTIONS 6635 00
17-APR-90 KOSHUTA, C. R. REVIEW OF THE REVISED CLOSURE PLAN (CP) FOR CPP-23 6725 00
13-MAR-90 SOLECKI, J. E. SUPPORTING INFORMATION REQUESTED FOR SUMMARY ASSESSMENTS FOR SOLID WASTE MANAGEMENT UNITS (SWMU'S) 6036 00
07-MAR-90 SEHLKE, G. REVISION OF WINCO'S RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) REGION X'S REVIEW OF SUMMARY ASSESSMENTS CPP-41, CPP-43, CPP-70, CPP-71, CPP-76 AND CPP-77 GS-04-90 00
12-JAN-90 BLUMBERG, D. J. SUMMARY ASSESSMENT REVIEW LETTER FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) AND STATE DJB-09-90 00
11-JAN-90 SOLECKI, J. E. DETAILED SCHEDULES FOR PREPARATION OF CLOSURE PLANS (CP) FOR COCA WASTE MANAGEMENT UNITS 8206 00
22-DEC-89 BLUMBERG, D. J. STATUS REPORT FOR DECEMBER 1989 (12/89) CLOSURE PLAN (CP) PREPARATION KHK-147-89 00
11-DEC-89 MOZES, R. F. IDAHO CHEMICAL PROCESSING PLANT (ICPP) INJECTION WELL ABANDONMENT REPORT RFM-41-89 00
07-DEC-89 SOLECKI, J. E. IDHW REQUEST FOR INFORMATION CONCERNING STATUS OF "A SHALLOW SEEPAGE PIT ON WEST SIDE OF CPP-603" - CONCLUDED THAT THE SHALLOW PIT IS SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-2 (CPP-02), FRENCH DRAIN WEST OF CPP-603 906 00
15-NOV-89 SOLECKI, J. E. RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM EPA & STATE 10986 00
09-NOV-89 BLUMBERG, D. J. RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) AND STATE DJB-40-89 00
09-NOV-89 BLUMBERG, D. J. SUMMARY ASSESSMENT REVIEW LETTER FROM EPA & STATE DJB-41-89 00
08-NOV-89 SEHLKE, G. RESPONSE TO EPA'S NOTICE OF DEFICIENCY FOR WINCO'S ACCELERATED CLOSURE PLAN (CP) SCHEDULE GS-15-89 00
07-NOV-89 MATULE, A. J. EPA REGION X REVIEW OF SUMMARY ASSESSMENT CPP-41, CPP-43, CPP-70, CPP-71, CPP-76, AND CPP-77 6533 00
06-NOV-89 NYGARD, D. COCA UNIT DISCOVERY AT THE ICPP - SHALLOW SEEPAGE PIT ON WEST SIDE OF CPP-603 - CONCLUDED THAT THE SHALLOW PIT IS SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-2 (CPP-02), FRENCH DRAIN WEST OF CPP-603 6630 00
26-OCT-89 KOSHUTA, C. R. NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL - EPA AND IDHW REVIEWED DOE'S REVISED CLOSURE PLAN SCHEDULE AND FEEL THE SCHEDULE IS DEFICIENT 6709 00
16-OCT-89 GEARHEARD, M. F. SUMMARY ASSESSMENT REVIEWS 3537 00
01-OCT-89 FENIX SCISSON & MK-FIC REPORT ON PERFORATION & CEMENTING FOR ABANDONMENT OF THE INJECTION WELL MAH-FE-PL-304 6638 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
29-SEP-89 SOLECKI, J. E. REVISED CLOSURE PLAN (CP) SCHEDULE FOR EIGHT (8) LDU'S FOR EG&G AND THREE (3) LDU'S FOR WINCO 10110 00
27-SEP-89 FORSBERG, D. L. REVIEW OF PLAN FOR CPP-34 SOIL STORAGE AREA, CLOSURE PLAN (CP) FOR CPP-55, TECHNICAL SPECIFICATIONS (SPC) FOR DRILLING CONTRACTOR LDU CPP-34 & CPP-55, TECHNICAL SPECIFICATIONS FOR SAMPLING CONTRACTOR DLF-01-89 00
19-SEP-89 FINDLEY, C. E. PUBLIC COMMENT PERIOD FOR THE CLOSURE PLAN (CP) BY THE INEL FOR CPP-55 6112 00
01-SEP-89 SOLECKI, J. E. REVISED CLOSURE PLAN (CP) APPROACH FOR LAND DISPOSAL UNITS (LDU) 8472 00
22-AUG-89 SOLECKI, J. E. REVISION OF CLOSURE PLAN (CP) FOR LAND DISPOSAL UNIT (LDU) CPP-63, HEXONE LEAK NEAR BUILDING CPP-710 FOR REVIEW 6111 00
26-MAY-89 MATULE, A. J. EPA REGION X & IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) CONDITIONS FOR CLOSURE OF LAND DISPOSAL UNIT (LDU) CPP-55 - INCLUDES ERRATA LIST FOR CLOSURE PLAN (CP) AJM-23-89 00
27-JAN-89 SEHLKE, G. CLOSURE PLAN (CP) FOR CPP-55 MERCURY CONTAMINATED AREA SOUTH OF ICPP T-15 2959 00
01-NOV-88 THOMAS, T. R. MODELING HYPOTHETICAL GROUNDWATER TRANSPORT OF NITRATES, CHROMIUM, & CADMIUM AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WINCO-1060 00
14-SEP-88 HANSON, N. W. FINAL REPORT FOR CPP-42 - LOG NO. 8809145 6628 00
05-JAN-88 FEIGNER, K. D. REVIEW OF SELECTED SUMMARY ASSESSMENTS 2494 00
24-DEC-87 FEIGNER, K. D. INEL INITIAL ASSESSMENT RANKING UPDATE ON CPP-55 CLOSURE PLAN (CP) REVIEW & CPP-77 SUMMARY ASSESSMENT REVIEW 2317 00
27-OCT-87 FEIGNER, K. D. INEL CLOSURE PLAN (CP) REVIEWS FOR TAN-726, ION EXCHANGE TREATMENT UNIT, TAN-674 TANK, IET CONTAINER STORAGE UNIT, AND HG CONTAMINATED AREA CPP-55 2668 00
01-OCT-87 TETRA TECH, INC. INITIAL REVIEW OF RCRA CLOSURE PLAN (CP) MERCURY CONTAMINATED AREA CPP-55 INEL 6318 00
27-AUG-87 MANN, L. J. USGS COMMENTS - CLOSURE PLAN (CP) FOR CPP-63 HEXONE SPILL BY CPP-710 2549 00
27-JUL-87 HUNTER, B. R. FINAL REPORT FOR 2ND (SECOND) PECR - LOG NO. 87072729 6629 00
08-JUL-87 WINCO INITIAL ASSESSMENT - CPP-604 RADIOACTIVE WASTE UNLOADING AREA 5384 00
08-JUL-87 WINCO INITIAL ASSESSMENT - CPP HF STORAGE TANK (YDB-105) & DRY WELL 5403 00
08-JUL-87 WINCO INITIAL ASSESSMENT - LIME PIT AT THE BASE OF THE CPP-601 BERM AND FRENCH DRAIN 5404 00
08-JUL-87 WINCO INITIAL ASSESSMENT - KEROSENE TANK OVERFLOW OF CPP-633 5423 00
08-JUL-87 WINCO INITIAL ASSESSMENT - ABANDONED GASOLINE TANK CPP-VES-UTI-652 5432 00
08-JUL-87 POLAND, D. J. INITIAL ASSESSMENT - CPP PRESSURIZATION OF SOLID STORAGE CYCLONE NORTHEAST OF THE WASTE CALCINING FACILITY (WCF) 6679 00
08-JUL-87 POLAND, D. J. INITIAL ASSESSMENT - CPP-20 CPP-604 RADIOACTIVE WASTE UNLOADING AREA 6685 00
07-JUL-87 POLAND, D. J. INITIAL ASSESSMENT - PRESSURIZATION OF SOLID STORAGE CYCLONENE OF CPP-633 6645 00
01-JUN-87 MANN, L. J. USGS COMMENTS - CLOSURE PLAN (CP) FOR HEXONE SPILL WEST OF CPP-660 2560 00
27-MAY-87 MANN, L. J. USGS COMMENTS - GROUNDWATER MONITORING PLAN (GMP) ICPP INJECTION WELL 2558 00
27-MAY-87 MANN, L. J. USGS COMMENTS - CLOSURE PLAN (CP), ICPP INJECTION WELL 2559 00
21-MAY-87 FEIGNER, K. D. SUMMARY ASSESSMENT REVIEW 6497 00
29-APR-87 MANN, L. J. USGS COMMENTS - CLOSURE PLAN (CP) FOR CPP-55, MERCURY CONTAMINATED AREA SOUTH OF ICPP T-15 2801 00
18-NOV-86 GEARHEARD, M. F. NOTICE OF DEFICIENCIES (NOD) FOR SIXTEEN (16) INEL CLOSURE PLANS (CP) - CONTAINS ONLY CLOSURE PLAN REVIEWS FOR TSF DISPOSAL POND, CFA-03, CFA-02, TAN-629 AND CFA MOTOR POOL POND - EPA AND IDHW REVIEWS 8682 00
24-OCT-86 LEE, J. L. UNUSUAL OCCURRENCE REPORT (UOR) WL-212 CONTAMINATED LIQUID SPILL WIN-86-0032-CPP 00
22-OCT-86 LEE, J. L. UNUSUAL OCCURRENCE REPORT (UOR) INADVERTENT TRANSFER RESULTING IN LOSS OF WASTE SOLUTION WIN-86-0034-CPP 00
16-OCT-86 WINCO INITIAL ASSESSMENT - PCB TRANSFORMER YARD (CPP-731) 5414 00
16-OCT-86 WINCO INITIAL ASSESSMENT - PCB STAGING AREA WEST OF CPP-660 5415 00
16-OCT-86 WINCO INITIAL ASSESSMENT - PICKLING SHED EAST OF CPP-631 5416 00
16-OCT-86 WINCO INITIAL ASSESSMENT - PAINT AND PAINT SOLVENT AREA SOUTH OF CPP-697 5417 00
16-OCT-86 WINCO INITIAL ASSESSMENT - DRUM STORAGE AREA WEST OF CPP-660 5418 00
16-OCT-86 WINCO INITIAL ASSESSMENT - MERCURY CONTAMINATED AREA SOUTH OF CPP T-15 5419 00
16-OCT-86 WINCO INITIAL ASSESSMENT - NITRIC ACID CONTAMINATION SOUTH OF CPP-734 5420 00
16-OCT-86 WINCO INITIAL ASSESSMENT - SULFURIC ACID SPILL EAST OF CPP-606 5421 00
16-OCT-86 WINCO INITIAL ASSESSMENT - CPP PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR OVERHEAD PIPELINE SPILLS 5422 00
16-OCT-86 WINCO INITIAL ASSESSMENT - PAINT SHOP AT PRESENT LOCATION OF CPP-645 5424 00
16-OCT-86 WINCO INITIAL ASSESSMENT - PCB SPILL IN CPP-718 TRANSFORMER YARD 5425 00
16-OCT-86 WINCO INITIAL ASSESSMENT - MERCURY CONTAMINATED AREA NEAR CPP TB-4 5426 00
16-OCT-86 WINCO INITIAL ASSESSMENT - HEXONE SPILL BY CPP-710 5427 00
16-OCT-86 WINCO INITIAL ASSESSMENT - HEXONE SPILL BY CPP-660 5428 00
16-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL WEST OF CPP-693 EAST OF DRY FUEL STORAGE AREA 5442 00
15-OCT-86 WINCO INITIAL ASSESSMENT - FIRE TRAINING PITS BETWEEN CPP-602 & CPP-603 5405 00
15-OCT-86 WINCO INITIAL ASSESSMENT - DRAINAGE DITCH WEST OF CPP-637 5406 00
15-OCT-86 WINCO INITIAL ASSESSMENT - GREASE PIT SOUTH OF CPP-637 5407 00
15-OCT-86 WINCO INITIAL ASSESSMENT - GREASE PIT SOUTH OF CPP-608 5408 00
15-OCT-86 WINCO INITIAL ASSESSMENT - CPP-621 CHEMICAL STORAGE AREA SPILLS 5409 00
15-OCT-86 WINCO INITIAL ASSESSMENT - CPP-637 COURTYARD PILOT PLANT RELEASE 5410 00
15-OCT-86 WINCO INITIAL ASSESSMENT - PILOT PLANT STORAGE AREA WEST OF CPP-620 5411 00
15-OCT-86 WINCO INITIAL ASSESSMENT - FRENCH DRAIN SOUTH OF CPP-633 5412 00
15-OCT-86 WINCO INITIAL ASSESSMENT - PCB TRANSFORMER YARD (CPP-705) 5413 00
14-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA SW AND NW OF VALVE BOX B-4 5396 00
14-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN THE TANK FARM AREA NEAR WL-102 NE OF CPP-604 5397 00
14-OCT-86 WINCO INITIAL ASSESSMENT - SOIL STORAGE AREA IN THE NE CORNER OF THE CPP 5398 00
14-OCT-86 WINCO INITIAL ASSESSMENT - CPP-633 DECONTAMINATION SPILL 5399 00
14-OCT-86 WINCO INITIAL ASSESSMENT - TRANSFER LINE LEAK FROM CPP-633 TO WL-102 5400 00
14-OCT-86 WINCO INITIAL ASSESSMENT - CPP GRAVEL PITS #1 AND #2 5401 00
14-OCT-86 WINCO INITIAL ASSESSMENT - FRIABLE TRANSITE ON CPP-601, CPP-603, CPP-603, CPP-604, CPP-605, CPP-606, CPP-640, CPP-644, AND CPP-648 5402 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CPP INJECTION WELL (MAH-FE-304) 5387 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CPP CONTAMINATED SOIL TANK FARM AREA BUCKET SPILL 5388 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA NORTH OF CPP-604 5389 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA FROM STEAM FLUSHING 5390 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA EAST OF CPP-604 5391 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM SOUTH OF WM-181 BY VALVE BOX A-6 5392 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN NORTH & WEST OF THE MAIN STACK (CPP-708) 5393 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA NEAR VALVE BOX B-9 5394 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA SOUTH OF TANK WM-183 5395 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-01, CONCRETE SETTLING BASIN, VAULT, AND DRY WELLS E. OF CPP-603 5365 00
07-OCT-86 WINCO INITIAL ASSESSMENT - FRENCH DRAIN W. OF CPP-603 5366 00
07-OCT-86 WINCO INITIAL ASSESSMENT - TEMPORARY STORAGE AREA SE OF CPP-603 5367 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL AROUND CPP-603 SETTLING TANK 5368 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL AROUND CPP-603 SETTLING BASIN 5369 00
07-OCT-86 WINCO INITIAL ASSESSMENT - TRENCH E. OF CPP-603 FUEL STORAGE BASIN 5370 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SOIL CONTAMINATION NW OF CPP-642 5371 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-08, CPP-603 BASIN FILTER SYSTEM LINE FAILURE 5372 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SOIL CONTAMINATION NEAR THE NE CORNER OF CPP-603 S. BASIN 5373 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-603 PLASTIC PIPELINE BREAK 5374 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-603 SLUDGE AND WATER RELEASE 5375 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED PAINT CHIPS AND PAD SOUTH OF CPP-603 5376 00
07-OCT-86 WINCO INITIAL ASSESSMENT - PRESSURIZATION OF THE SOLID STORAGE CYCLONE NE OF CPP-633 5377 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SEWAGE TREATMENT PLANT SOUTH OF CPP-664 5378 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SOLVENT BURNER EAST OF CPP-605 5379 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL FROM LEAK IN LINE FROM CPP WM-181 TO PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR 5380 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SOIL STORAGE AREA SOUTH OF CPP PEACH BOTTOM FUEL STORAGE AREA 5381 00
07-OCT-86 WINCO INITIAL ASSESSMENT - GAS STORAGE BUILDING 5382 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-603 TO CPP-604 LINE LEAK 5383 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SOLID WASTE STORAGE BIN SOUTH OF CPP-601 5385 00
07-OCT-86 WINCO INITIAL ASSESSMENT - PARTICULATE AIR RELEASE SOUTH OF CPP-603 5386 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP SEWAGE PLANT LAGOONS 5429 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP COAL FIRED STEAM GENERATOR PROJECT (CFSGP) FLY ASH PIT 5430 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP PERCOLATION PONDS #1 AND #2 5431 00
07-OCT-86 WINCO INITIAL ASSESSMENT - ABANDONED LIQUID RADIOACTIVE WASTE STORAGE TANK CPP VES-SFE-20 5433 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SEPTIC TANK EAST OF CPP-655 5434 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SEEPAGE PIT WEST OF CPP-656 5435 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-758 CESSPOOL EAST OF CPP-651 5436 00
07-OCT-86 WINCO INITIAL ASSESSMENT - LEACHING CESSPOOL EAST OF CPP T-5 5437 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
07-OCT-86 WINCO INITIAL ASSESSMENT - SEWAGE PIT WEST OF CPP-626 5438 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SEPTIC TANK WEST OF CPP-603 5439 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SEPTIC TANK AND WEST OF CPP-659 5440 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SEEPAGE PIT AND CESSPOOL NORTH OF CPP-662 5441 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP SOIL CONTAMINATION NORTHWEST OF CPP-642 (EAST OF CPP-603) 6673 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP-603 BASIN FILTER SYSTEM LINE FAILURE 6674 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - SOIL CONTAINMENT NEAR NORTHEAST CORNER OF CPP-603 SOUTH BASIN 6675 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP-603 PLASTIC PIPELINE BREAK 6676 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP-603 SLUDGE & WATER RELEASE 6677 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP CONTAMINATED PAINT CHIPS & PAD SOUTH OF CPP-603 6678 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP SOLVENT BURNER EAST OF CPP-605 6680 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP CONTAMINATED SOIL FROM LEAK IN LINE FROM WM-181 TO PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR 6681 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP SOIL STORAGE AREA NEAR PEACH BOTTOM FUEL STORAGE AREA 6682 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP GAS STORAGE BUILDING 6683 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP-19, CPP-603 TO CPP-604 LINE LEAK 6684 00
08-MAY-86 VALENTINE, J. H. MEETING - INJECTION WELL - MAY 8, 1986 (05/08/86) 6626 00
02-FEB-86 NEBEKER, R. L. SOURCES OF INFORMATION FOR CERCLA STUDY NEB-3-86 00
15-JAN-86 WALLACE, M. T. HAZARDOUS WASTE STREAMS AT CPP 7756 00
09-AUG-85 SMITH, D. L. SUMMARY OF RALA D&D STATUS DLS-31-85 00
01-JUL-85 MOSER, C. L. RALA OFF GAS CELL AND STORAGE TANK (CPP-631 & VES-702) DECONTAMINATION AND DECOMMISSIONING (D&D) PLAN WINCO-1032 00
11-APR-85 NISHIMOTO, D. D. IDENTIFICATION OF RADIOACTIVE MIXED WASTE STREAMS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) DDN-01-85 00
26-OCT-84 MESERVEY, R. H. TRANSMITTAL OF CHEMICAL PROCESSING PLANT 601 (CPP-601) PROCESS CELLS A, B, C, D, & L - D&D FINAL REPORT RHM-33-84 00
01-SEP-84 SCHMIDT, D. A. RADIOLOGICAL CHARACTERIZATION & DECISION ANALYSIS FOR VES-SFE-20 WASTE TANK & VAULT WINCO-1021 00
19-JUL-84 IKENBERRY, T. A. RADIOLOGICAL CONTROLS FOR THE DECONTAMINATION OF LOW LEVEL WASTE (LLW) PROJECT EQUIPMENT TAI-05-84 00
16-APR-84 ERBEN, J. F. LOCATION OF CONTAMINATED DIRT BURIAL JFE-13-84 00
08-DEC-83 BINGHAM, G. E. DISPOSITION OF STOCKPILED SOIL BING-106-83 00
28-NOV-83 HICKS, F. E. DISPOSITION OF STOCKPILED LOW LEVEL CONTAMINATED SOIL EXCAVATED DURING THE LOW LEVEL WASTE (LLW) PROJECT PHASE I AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) - M-K PROJECT S-2258, ICWA 83-49 MK-83-E-1792 00
01-SEP-83 SCHMIDT, D. A. INTERNAL TECHNICAL REPORT - RADIOLOGICAL CHARACTERIZATION AND DECISION ANALYSIS FOR CHEMICAL PROCESSING PLANT 603 (CPP-603) FUEL - ELEMENT CUTTING FACILITY WM-F1-83-024 00
01-MAY-83 SCHMIDT, D. A. INTERNAL TECHNICAL REPORT - RADIOLOGICAL CHARACTERIZATION & DECISION ANALYSIS FOR CHEMICAL PROCESSING PLANT 603 (CPP-603) BIF FILTER ROOM WM-F1-83-006 00
04-FEB-83 SODERBERG, J. D. DEMOLITION OF ABANDONED SEWAGE PLANT CPP-703 & CPP-715 6648 00
01-MAY-82 LOW, J. O. INTERNAL TECHNICAL REPORT - RADIOACTIVE WASTE CHARACTERIZATION OF CHEMICAL PROCESSING PLANT 603 (CPP-603) CLEANUP BASIN SYSTEM CPP-740 WM-F1-81-023 01
01-MAY-81 BRADFORD, D. J. INTERNAL TECHNICAL REPORT - CHARACTERIZATION OF THE RALA OFF GAS CELL, CHEMICAL PROCESSING PLANT 631 (CPP-631) WM-F1-81-010 00
01-MAR-81 BRADFORD, D. J. INTERNAL TECHNICAL REPORT - CHEMICAL PROCESSING PLANT 633 (CPP-633) NAK FURNACE CHARACTERIZATION WM-F1-81-004 00
01-SEP-80 WINCO CHARACTERISTICS OF THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) SANITARY WASTE COLLECTION SYSTEMS 6650 00
01-MAY-80 WINCO MAPS FOR CPP-14 6660 00
16-JAN-76 LOHSE, G. E. ALLIED CHEMICAL CORPORATION OPERATING OCCURRENCE REPORT - WASTE TRANSFER LINE GASKET LEAK 6634 00
01-APR-73 NICCUM, M. R. FLOODING POTENTIAL AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 4962 00
01-JUN-72 PAIGE, B. E. BURIED WASTE (BW) LINE REGISTER NATIONAL REACTOR TESTING STATION (NRTS) PART IV CPP ACI-110 00
17-APR-62 LATCHUM, J. W. REPORT OF THE INVESTIGATING COMMITTEE CHEMICAL PROCESSING PLANT (CPP) WASTE TANK LEAKAGE OF MARCH 17, 1962 (03/17/62) LA-53-62A 00