Select By Waste Area Group (WAG)

For WAG 2

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
06-AUG-18 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY2017 RPT-1635 0
30-JUL-18 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - TRA COURTYARD AREA, TRA-80 PARTS A & B NSI-26011 0
11-JUN-18 NOT SPECIFIED ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2018 DOE/ID-11580 0
18-DEC-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 10
01-AUG-17 NOT SPECIFIED ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2017 DOE/ID-11567 0
01-MAY-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY2016 RPT-1543 0
01-JAN-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2015 RPT-1503 0
14-SEP-16 NOT SPECIFIED GROUNDWATER MONITORING PLAN FOR THE ADVANCED TEST REACTOR COMPLEX OPERABLE UNIT 2-13 DOE/ID-10626 9
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JUL-16 NOT SPECIFIED ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2016 DOE/ID-11553 0
01-JUN-16 NOT SPECIFIED QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 9, 10, AND REMOVAL ACTIONS DOE/ID-10587 11
19-MAY-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES FOR OPERABLE UNIT 10-08 RECORD OF DECISION FOR SITE-WIDE GROUNDWATER, MISCELLANEOUS SITES, AND FUTURE SITES DOE/ID-11547 0
01-MAR-16 KIMBRO, VALERIE M. FIELD SAMPLING PLAN FOR CERCLA SITES TRA-61 AND TRA-82 AT THE ADVANCED TEST REACTOR COMPLEX DOE/ID-11537 0
08-FEB-16 FAULK, DENNIS EPA CONCURRENCE ON THE IDAHO NATIONAL LAB 5 YEAR REVIEW 5282268 0
31-DEC-15 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2010-2014 DOE/ID-11513 0
09-SEP-15 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - TRA-712 WARM WASTE RETENTION BASIN SYSTEM (TRA-712 AND TRA-612), TRA-04 (PART A AND PART B) NSI-26002 1
01-SEP-15 NOT SPECIFIED ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2015 DOE/ID-11532 0
01-AUG-15 NOT SPECIFIED INL SITE COMMUNITY INVOLVEMENT PLAN DOE/ID-11518 0
01-JUN-15 NOT SPECIFIED ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT DOE/ID-11293 3
01-MAY-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2014 RPT-1361 0
01-APR-15 NOT SPECIFIED ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT DOE/ID-11293 2
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
01-SEP-14 NOT SPECIFIED ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2014 DOE/ID-11515 0
01-MAY-14 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2013 RPT-1268 0
01-OCT-13 NOT SPECIFIED GROUNDWATER MONITORING PLAN FOR THE ADVANCED TEST REACTOR COMPLEX OPERABLE UNIT 2-13 DOE/ID-10626 8
01-SEP-13 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 8
01-SEP-13 NOT SPECIFIED ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2013 DOE/ID-11486 0
01-JUN-13 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2012 RPT-1196 0
01-OCT-12 NOT SPECIFIED REMOVAL ACTION REPORT FOR DECOMMISSIONING OF THE TRA-632 HOT CELLS DOE/ID-11478 0
01-SEP-12 NOT SPECIFIED ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2012 DOE/ID-11471 0
01-AUG-12 NOT SPECIFIED REMOVAL ACTION REPORT FOR THE MATERIALS TEST REACTOR BUILDING AND DISPOSITION OF THE REACTOR VESSEL DOE/ID-11473 0
01-JUL-12 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2011 RPT-1001 0
29-JUN-12 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - TRA-712 WARM WASTE RETENTION BASIN SYSTEM (TRA-712 AND TRA-612) NSI-26002 0
01-JUN-12 CULP, A. BRUCE REMOVAL ACTION REPORT FOR THE ENGINEERING TEST REACTOR BUILDING AND DISPOSITION OF THE REACTOR VESSEL DOE/ID-11469 0
30-APR-12 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 7
01-SEP-11 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES TO REVISE INSTITUTIONAL CONTROLS IN VARIOUS RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11439 0
01-SEP-11 NOT SPECIFIED ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2011 RPT-823 0
31-AUG-11 NOT SPECIFIED GROUNDWATER MONITORING PLAN FOR THE ADVANCED TEST REACTOR COMPLEX OPERABLE UNIT 2-13 DOE/ID-10626 7
20-JUL-11 NOT SPECIFIED GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE ATR COMPLEX RETENTION BASIN SYSTEM EDF-10054 1
07-FEB-11 OPALSKI, DANIEL D. U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE ON THE FIVE-YEAR REVIEW FOR IDAHO NATIONAL LABORATORY FISCAL YEARS 2005-2009 4544925 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 1) DOE/ID-11429 (PART 1) 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 2) DOE/ID-11429 (PART 2) 0
13-JAN-11 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2010 RPT-759 0
20-OCT-10 NOT SPECIFIED ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2010 RPT-737 0
21-DEC-09 NOT SPECIFIED ACTION MEMORANDUM FOR DECOMMISSIONING OF THE TRA-632 HOT CELLS DOE/ID-11413 0
20-OCT-09 FORSYTHE, HOWARD S ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2009 RPT-651 0
21-SEP-09 NOT SPECIFIED ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2009 RPT-651 1
10-SEP-09 NOT SPECIFIED ENGINEERING EVALUATION/COST (EE/CA) ANALYSIS FOR DECOMMISSIONING OF THE TRA-632 HOT CELLS DOE/ID-11397 0
31-AUG-09 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 10, AND REMOVAL ACTIONS DOE/ID-10587 10
09-JAN-09 RENO, SCOTT L. ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (ICP) DOE/ID-11293 1
16-JUL-08 NOT SPECIFIED ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2008 RPT-509 0
05-FEB-08 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS DOE/ID-11042 04
30-OCT-07 NELSON, L. O. IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2007 DOE/ID-11350 00
21-SEP-07 RODDY, M. S. ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 (WAG-2) FOR FISCAL YEAR 2007 (FY-07) - SEPTEMBER 2007 RPT-406 00
30-AUG-07 RENO, S. L. ACTION MEMORANDUM FOR THE MATERIALS TEST REACTOR (MTR) FACILITY END-STATE AND VESSEL DISPOSAL DOE/ID-11340 00
12-JUL-07 RENO, S. L. ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE MATERIALS TEST REACTOR (MTR) FACILITY END-STATE AND VESSEL DISPOSAL DOE/ID-11328 00
11-JUL-07 HOWELL, W. F. ENGINEERING DESIGN FILE - MATERIALS TEST REACTOR (MTR) COMPLEX CHEMICAL CONSTITUENT SOURCE TERM EDF-6244 02
10-JUL-07 MCCARTHY, J. M. ENGINEERING DESIGN FILE - GROUNDWATER PATHWAY RISK ASSESSMENT FOR MATERIALS TEST REACTOR (MTR) CLOSURE EDF-5186 01
20-JUN-07 NESSHOEFER, C. A. MATERIALS TEST REACTOR (MTR) COMPLEX ACTIVITY VS. DEPTH EDF-6381 01
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
23-FEB-07 WELLS, R. P. GROUNDWATER MONITORING PLAN (GMP) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10626 06
01-FEB-07 PROVENCHER, R. B. ACTION MEMORANDUM FOR DECOMMISSIONING OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX UNDER THE IDAHO CLEANUP PROJECT (ICP) DOE/ID-11303 00
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
31-OCT-06 MCCARTHY, J. M. ENGINEERING DESIGN FILE (EDF) - GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE ENGINEERING TEST REACTOR (ETR) COMPLEX CLOSURE EDF-5142 02
31-OCT-06 STALEY, C. S. ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR DECONTAMINATING AND DISMANTLING (D&D) OF THE ENGINEERING TEST REACTOR (ETR) FACILITY EDF-7243 01
24-OCT-06 CULP, B. ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX DOE/ID-11272 00
02-OCT-06 OLAVESON, B. E. IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2006 DOE/ID-11294 00
02-OCT-06 PARRY, J. R. ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) BERYLLIUM REFLECTOR AND VESSEL TRANSURANIC INVENTORIES EDF-7222 00
13-SEP-06 NESSHOEFER, C. A. ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) RADIONUCLIDES AND THE RADIONUCLIDE RELATIVE RATIOS EDF-6958 01
12-SEP-06 NESSHOEFER, C. A. ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) VESSEL SOURCE TERM AND EXTERNAL DOSE RATES EDF-6133 02
12-SEP-06 NESSHOEFER, C. A. ENGINEERING DESIGN FILE (EDF) - RADIOLOGICAL CHARACTERIZATION OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX EXTERNAL SURFACES EDF-6138 02
12-SEP-06 NESSHOEFER, C. A. ENGINEERING DESIGN FILE (EDF) - RADIOLOGICAL CHARACTERIZATION OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX INTERNAL SURFACES EDF-6291 01
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
07-AUG-06 RODDY, M. S. ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 (WAG-2) FOR FISCAL YEAR 2006 (FY-06) RPT-237 00
27-JUL-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN DOE/ID-11042 03
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
10-APR-06 VANHORN, R. L. ENGINEERING DESIGN FILE (EDF) - SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (ERA) OF THE ENGINEERING TEST REACTOR AND MATERIALS TESTING REACTOR (ETR/MTR) REMOVAL ALTERNATIVES EDF-6705 00
30-JAN-06 HOWELL, W. F. ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) COMPLEX CHEMICAL CONSTITUENT SOURCE TERM EDF-6225 01
16-DEC-05 PROVENCHER, R. B. APPROVAL TO PROCEED WITH PREPARATION OF ENGINEERING EVALUATION COST ANALYSES (EE/CA) FOR THE FINAL DECOMMISSIONING AND DISMANTLEMENT (D&D) OF BOTH ENGINEERING TEST REACTOR (ETR) AND MATERIALS TEST REACTOR (MTR) AT THE IDAHO NATIONAL LABORATORY (INL) FMDP-RFDP-05-138 00
15-DEC-05 NESSHOEFER, C. A. ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) COMPLEX ACTIVITY VS. DEPTH EDF-6304 00
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
22-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2005 (FY-05) DOE/ID-11249 00
30-AUG-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2004 (FY-04) DOE/NE-ID-11200 00
17-AUG-05 RODDY, M. S. ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 (WAG-2) FOR FISCAL YEAR 2005 (FY-05) ICP/EXT-05-00967 00
06-MAY-05 HANEY, T. J. LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2005 ICP/EXT-05-00778 00
04-MAY-05 WHITMORE, E. J. RESPONSE TO THE FIRST FIVE YEAR REVIEW REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNIT (OU) 2-13, AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) DOE/NE-ID-11189 00
25-MAR-05 HELM-CLARK, C. M. BOREHOLE AND WELL MIDDLE-1823 AND ITS RELATIONSHIP TO THE STRATIGRAPHY OF THE SOUTH-CENTRAL IDAHO NATIONAL LABORATORY (INL) ICP/EXT-05-00790 00
09-SEP-04 SMITH, D. M. GROUNDWATER MONITORING PLAN (GMP) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10626 05
30-AUG-04 HOWICK, M. F. ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 (WAG-2) FOR FISCAL YEAR 2004 (FY-04) ICP/EXT-04-00484 00
23-MAR-04 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10587 08
22-MAR-04 WOOD, T. R. FIELD SAMPLING PLAN (FSP) FOR CHARACTERIZATION OF DIESEL CONTAMINATION IN THE TEST REACTOR AREA (TRA) PERCHED WATER WELL PW-13 ICP/EXT-04-00246 00
05-MAR-04 NELSON, G. E. SUBMITTAL OF CHARACTERIZATION PLAN FOR DIESEL CONTAMINATION IN TEST REACTOR AREA (TRA) PERCHED WATER WELL PW-13 - FEBRUARY 2004 (02/04) EM-ER-04-051 00
23-FEB-04 DOOLEY, K. J. GROUNDWATER MONITORING PLAN (GMP) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10626 04
23-FEB-04 WOOD, T. R. CHARACTERIZATION PLAN FOR DIESEL CONTAMINATION IN TEST REACTOR AREA (TRA) PERCHED WATER WELL PW-13 ICP/EXT-04-00131 00
30-OCT-03 JOLLEY, W. L. ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 (WAG-2) FOR FISCAL YEAR 2003 (FY-03) INEEL/EXT-03-01082 00
06-OCT-03 WELLS, R. P. FIRST FIVE YEAR REVIEW REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNIT (OU) 2-13, AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) DOE/ID-11099 00
30-SEP-03 WELLS, R. P. PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 2 (WAG-2), TEST REACTOR AREA (TRA) INEEL/EXT-03-00028 00
25-SEP-03 WELLS, R. P. GROUNDWATER MONITORING PLAN (GMP) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10626 03
30-JUL-03 JOLLEY, W. L. FY-2003 (FY-03) ANNUAL INSTITUTIONAL CONTROLS ASSESSMENT REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-11108 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
10-JUN-03 NELSON, G. E. DRAFT FIRST FIVE YEAR REVIEW REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) - DOE/ID-11099, REVISION C (REV.0C) JUNE 2003 (06/03) FOR REVIEW EM-ER-03-150 00
10-JUN-03 NELSON, G. E. IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 SUBMITTAL OF DRAFT SCOPE OF WORK (SOW) FOR POST FIVE YEAR REMEDY REVIEW WORK PLAN FOR REVIEW EM-ER-03-174 00
16-APR-03 NELSON, G. E. INEEL WASTE AREA GROUP 2 (WAG-2) - AGREEMENTS CONCERNING FINALIZING THE WAG-2 FIVE YEAR REMEDY REVIEW, TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 EM-ER-03-103 00
28-FEB-03 MCGUIRE, M. J. GROUNDWATER MONITORING PLAN (GMP) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10626 02
21-NOV-02 JAMES, R. E. FY-2002 (FY-02) ANNUAL INSTITUTIONAL CONTROLS INSPECTION REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNITS (OU) 2-13 AND 2-14 (FINAL) INEEL/EXT-02-00933 00
04-NOV-02 NELSON, G. E. TRANSMITTAL OF FY-2002 (FY-02) ANNUAL INSTITUTIONAL CONTROLS INSPECTION REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNITS (OU) 2-13 AND 2-14 (FINAL) EM-ER-02-187 00
12-SEP-02 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 DOE/ID-10587 07
21-MAY-02 AR COORDINATOR OPERABLE UNIT (OU) 2-14 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) TRACK 2 INVESTIGATION OF OU 2-14 AR.INDEX.OU.2-14 00
16-MAY-02 NELSON, G. E. INEEL - WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) - DISTRIBUTION OF ONE TRACK 1 DECISION DOCUMENTATION PACKAGE (SITE TRA-57) SIGNED BY ALL RESPONSIBLE PROGRAM MANAGERS EM-ER-02-092 00
09-MAY-02 DOE TRACK 1 DECISION DOCUMENTATION PACKAGE - OPERABLE UNIT 2-14 SITE TRA-57 - ABANDONED BURIED DIESEL FUEL LINE FROM TRA-727 AND TRA-775 TO ETR 10974 00
10-APR-02 MONSON, B. R. APPROVAL OF PUBLIC COMMENT PERIOD FOR PARTIAL CLOSURE PLANS (CP) AT TEST REACTOR AREA (TRA) AND WASTE EXPERIMENTAL REDUCTION FACILITY (WERF) LOCATED AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) - EPA ID #ID4890008952 24753 00
08-APR-02 MCGUIRE, M. J. FISCAL YEAR 2001 (FY-2001) INSTITUTIONAL CONTROL INSPECTION REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNIT (OU) 2-13 INEEL/EXT-01-00772 00
18-OCT-01 NELSON, G. E. OPERABLE UNIT (OU) 2-14 REVISED TRACK 1 DECISION DOCUMENTATION PACKAGE FOR SITE TRA-57 - ABANDONED, BURIED DIESEL FUEL LINE FROM TRA-727 AND TRA-775 TO ENGINEERING TEST REACTOR (ETR) EM-ER-01-172 00
25-MAY-01 DOE DETERMINATION FOR TRACK 1 INVESTIGATION OF TRA-57 - DECISION DOCUMENTATION PACKAGE 10937 00
25-MAY-01 DOE NO FURTHER ACTION DETERMINATION FOR TRACK 1 INVESTIGATION OF TRA-58 - DECISION DOCUMENTATION PACKAGE 10938 00
24-MAY-01 NELSON, G. E. DISTRIBUTION OF APPROVED FINAL TRACK 1 DECISION PACKAGES FOR NEW SITES TRA-57 AND TRA-58 EM-ER-01-088 00
26-FEB-01 SEELEY, V. T. INSTITUTIONAL CONTROLS ANNUAL MONITORING REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 INEEL/EXT-2000-01413 00
19-OCT-00 SHERWOOD, J. A. RESOLUTION OF EPA AND IDHW COMMENTS & TRANSMITTAL OF OPERABLE UNIT (OU) 2-14 TRACK 2 CHARACTERIZATION SCOPE OF WORK (SOW) INEEL/EXT-2000-00824 AND FIELD SAMPLING PLAN (FSP) INEEL/EXT-2000-00807 FOR SITES TRA-56 THROUGH TRA-60 FLS-741-00 00
19-OCT-00 SHERWOOD, J. A. OPERABLE UNIT (OU) 2-14 FIELD SAMPLING PLAN (FSP) FOR SITES TRA-56, TRA-57, TRA-58, TRA-59 & TRA-60 INEEL/EXT-2000-00807 00
09-OCT-00 SHERWOOD, J. A. SCOPE OF WORK FOR CHARACTERIZATION OF TRA-56, TRA-57, TRA-58, TRA-59 & TRA-60 INEEL/EXT-2000-00824 00
20-SEP-00 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV DOE/ID-10587 06
24-JUL-00 LANDIS, J. A. REMEDIAL ACTION (RA) REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10720 00
26-JUN-00 AR COORDINATOR OPERABLE UNIT (OU) 2-13 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 2-13 AR.INDEX.OU.2-13 00
13-JUN-00 POETON, R. W. EPA REVIEW OF EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FROM THE RECORD OF DECISION (ROD) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 - EPA STATING THAT THEY "CONCUR WITH THE RELEASE OF THIS ESD TO THE PUBLIC" 10836 00
17-MAY-00 SHERWOOD, J. A. EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) TO THE RECORD OF DECISION (ROD) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10744 00
10-MAR-00 WIGGINS, D. J. OPERATIONS AND MAINTENANCE (O&M) PLAN FOR FINAL SELECTED REMEDIES & INSTITUTIONAL CONTROLS AT TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10658 03
30-MAR-99 DOE, EPA, IDHW NEW SITE IDENTIFICATION (NSI) - ABANDONED BURIED ACID LINE TRA-631 TO TRA-671 - SITE TRA-59 10579 00
09-MAR-99 DOE, EPA, IDHW NEW SITE IDENTIFICATION (NSI) - TRA ACID TRANSFER LINE FROM TRA-631 TO TRA-645 - SITE TRA-56 10576 00
09-MAR-99 DOE, EPA, IDHW NEW SITE IDENTIFICATION (NSI) - ABANDONED BURIED DIESEL FUEL OIL LINE - SITE TRA-57 10577 00
09-MAR-99 DOE, EPA, IDHW NEW SITE IDENTIFICATION (NSI) - ABANDONED BURIED FUEL OIL LINES - SITE TRA-58 10578 00
23-SEP-98 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) FIVE YEAR REVIEW OF THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) TEST REACTOR AREA (TRA) WARM WASTE POND AT OPERABLE UNIT (OU) 2-10 24745 00
01-SEP-98 REESE, C. L. COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10643 00
01-SEP-98 REESE, C. L. FIELD SAMPLING PLAN (FSP) FOR CONFIRMATION SAMPLING & FIELD SCREENING OF SELECTED SITES AT WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 DOE/ID-10657 00
01-SEP-98 REESE, C. L. OPERATIONS & MAINTENANCE (O&M) PLAN FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10658 00
01-SEP-98 REESE, C. L. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 2-13 REMEDIAL ACTION FOR TEST REACTOR AREA (TRA) INEEL/EXT-98-00423 00
31-JUL-98 WINTER, G. IDHW REVIEW COMMENTS ON COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TRA OU 2-13 (DRAFT) REVISION B (REV.0B) 16780 00
30-JUL-98 POETON, R. W. EPA COMMENTS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 2-13 AT INEEL 16779 00
01-MAR-98 REESE, C. L. HEALTH & SAFETY PLAN (HSP) FOR POST RECORD OF DECISION (ROD) SAMPLING OF WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 INEEL/EXT-98-00229 00
24-FEB-98 UNDERWOOD, E. J. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REVIEW COMMENTS ON TEST REACTOR AREA (TRA) WASTE AREA GROUP 2 (WAG-2) DRAFT FIELD SAMPLING PLAN (FSP) 15112 00
20-FEB-98 POETON, R. W. EPA COMMENTS ON POST RECORD OF DECISION (ROD) SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) 15219 00
01-FEB-98 PARSONS TRA WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) DOE/ID-10592 02
23-JAN-98 UNDERWOOD, E. J. IDHW REVIEW COMMENTS ON WASTE AREA GROUP 2 (WAG-2) DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) 15104 00
22-JAN-98 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 AT INEEL 15105 00
07-JAN-98 DOE WORDING CHANGES MADE FOR CLARITY & CONSISTENCY TO FINAL RECORD OF DECISION (ROD) FOR OU 2-13 COMPREHENSIVE ROD FOR WAG-2 OPE-ER-02-98 00
22-DEC-97 DOE FINAL RECORD OF DECISION (ROD) FOR TEST REACTOR AREA (TRA) FOR OPERABLE UNIT (OU) 2-13 AT IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) DOE/ID-10586 00
03-DEC-97 HAIN, K. E. TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 2-13 COMPREHENSIVE ROD FOR WAG-2 AT INEEL OPE-ER-257-97 00
01-DEC-97 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) DOE/ID-10587 05
13-NOV-97 JENSEN, N. R. DOE RESPONSE TO EPA COMMENTS TO OPERABLE UNIT (OU) 2-13 DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) RECORD OF DECISION (ROD) 10438 00
13-NOV-97 JENSEN, N. R. DOE RESPONSE TO IDHW-DEQ COMMENTS TO OPERABLE UNIT (OU) 2-13 DRAFT FINAL RECORD OF DECISION (ROD) 10439 00
13-NOV-97 HAIN, K. E. FIFTEEN (15) DAY EXTENSION TO PERIOD FOR FINALIZING WAG-2 COMPREHENSIVE RECORD OF DECISION (ROD) OU 2-13 AT INEEL OPE-ER-214-97 00
04-NOV-97 KOSHUTA, C. R. TRA LISTED WASTE DETERMINATION REPORT CRK-92-97 00
31-OCT-97 UNDERWOOD, E. J. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REVIEW COMMENTS ON WASTE AREA GROUP 2 (WAG-2) DRAFT FINAL RECORD OF DECISION (ROD) 10436 00
29-OCT-97 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) RESULTING FROM WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPERABLE UNIT (OU) 2-13 AT INEEL 10435 00
15-OCT-97 HAIN, K. E. DOE RESPONSE TO EPA COMMENTS ON OU 2-13 DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) RECORD OF DECISION (ROD) 10433 00
15-OCT-97 HAIN, K. E. DOE RESPONSE TO IDHW-DEQ COMMENTS ON OU 2-13 DRAFT RECORD OF DECISION (ROD) 10434 00
15-OCT-97 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) FOR OU 2-13, THE COMPREHENSIVE ROD FOR WAG-2 AT INEEL OPE-ER-163-97 00
14-OCT-97 AR COORDINATOR OPERABLE UNIT (OU) 2-04 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF TEST REACTOR AREA (TRA) OU 2-04 AR.INDEX.OU.2-04 00
14-OCT-97 AR COORDINATOR OPERABLE UNIT (OU) 2-07 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) TRACK 2 INVESTIGATION OF OU 2-07 AR.INDEX.OU.2-07 00
14-OCT-97 AR COORDINATOR OPERABLE UNIT (OU) 2-08 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) TRACK 2 INVESTIGATION OF OU 2-08 AR.INDEX.OU.2-08 00
14-OCT-97 AR COORDINATOR OPERABLE UNIT (OU) 2-09 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) TRACK 2 INVESTIGATION OF OU 2-09 AR.INDEX.OU.2-09 00
14-OCT-97 AR COORDINATOR OPERABLE UNIT (OU) 2-11 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) TRACK 2 INVESTIGATION OF OU 2-11 AR.INDEX.OU.2-11 00
01-SEP-97 INEEL COMMUNITY RELATIONS INEEL REPORTER - SEPTEMBER & OCTOBER 1997 (09/97 & 10/97) - DOE TO SUBMIT PROPOSAL OF PIT 9 CLEANUP, AGENCIES SIGN TRA ROD, WROC INCREASES VOLUME OF WASTE TREATED & CITIZENS ADVISORY BOARD (CAB) REVIEWS, PROVIDES COMMENTS ON DRAFT ERP FACT SHEET 14283 00
11-AUG-97 UNDERWOOD, E. J. IDHW REVIEW COMMENTS ON WAG-2 DRAFT RECORD OF DECISION (ROD) 10427 00
01-AUG-97 POETON, R. W. EPA COMMENTS ON DRAFT RECORD OF DECISION (ROD) RESULTING FROM WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 2-13 AT INEEL 10426 00
25-JUN-97 JENSEN, N. R. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) RESULTING FROM WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), OU 2-13 AT INEEL OPE-ER-103-97 00
01-JUN-97 JESSMORE, P. J. HEALTH & SAFETY PLAN (HSP) FOR TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM OPERABLE UNIT (OU) 2-12 - PREVIOUS REVISION ISSUED AS INEL-96/0114 INEEL-96/0114 02
27-MAR-97 HUNTER, J. L. PUBLIC MEETING TRANSCRIPT - PUBLIC MEETING IN MOSCOW, IDAHO ON THE PROPOSED PLAN FOR TEST REACTOR AREA (TRA), MARCH 27, 1997 (03/27/97) 10424 00
26-MAR-97 INEEL COMMUNITY RELATIONS TRANSCRIPT FROM PUBLIC MEETING FOR WASTE AREA GROUP 2 (WAG -2) TRA PROPOSED PLAN HELD IN BOISE, IDAHO MARCH 26, 1997 (03/26/97) 10419 00
25-MAR-97 STEFFLER, L. TRANSCRIPT FROM PUBLIC MEETING FOR WASTE AREA GROUP 2 (WAG-2) TRA PROPOSED PLAN HELD IN IDAHO FALLS, IDAHO MARCH 25, 1997 (03/25/97) 10431 00
24-MAR-97 INEEL COMMUNITY RELATIONS PUBLIC NOTICE - COMMENT PERIOD EXTENDED - AGENCIES PROPOSE TO REMEDIATE EIGHT SITES AT THE TEST REACTOR AREA (TRA) 10405 00
23-MAR-97 INEEL COMMUNITY RELATIONS PUBLIC NOTICE - COMMENT PERIOD EXTENDED - MARCH 10 TO MAY 9, 1997 (03/10/97 - 05/09/97) AGENCIES PROPOSE TO REMEDIATE EIGHT SITES AT THE TEST REACTOR AREA (TRA) 10406 00
09-MAR-97 INEEL COMMUNITY RELATIONS PUBLIC NOTICE - NOTICE OF AVAILABILITY - AGENCIES PROPOSE TO REMEDIATE EIGHT SITES AT THE TEST REACTOR AREA (TRA) 10407 00
01-MAR-97 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR WASTE AREA GROUP 2 (WAG-2) - TEST REACTOR AREA (TRA) IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) 10408 00
01-MAR-97 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - AGENCIES COMPLETE LAST INVESTIGATION FOR TRA WAG-2 OU 2-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 13944 00
26-FEB-97 JENSEN, N. R. DOE-ID TRANSMITTAL OF RESPONSES TO EPA & IDHW REVIEW COMMENTS ON THE DRAFT PROPOSED PLAN FOR THE WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 2-13 AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-20-97 00
14-FEB-97 JENSEN, N. R. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON MARCH 1997 (03/97) DRAFT PROPOSED PLAN FOR THE WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPERABLE UNIT (OU) 2-13 AT INEEL 10397 00
07-FEB-97 JENSEN, N. R. TRANSMITTAL FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY, OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-11-97 00
03-FEB-97 JENSEN, N. R. TRANSMITTAL OF FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY, OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-10-97 00
01-FEB-97 BURNS, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) DOE/ID-10531 00
27-JAN-97 UNDERWOOD, E. J. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON WASTE AREA GROUP 2 (WAG-2) DRAFT PROPOSED PLAN OU 2-13 10313 00
24-JAN-97 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT PROPOSED PLAN FOR THE WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), OPERABLE UNIT (OU) 2-13, AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) 10314 00
15-JAN-97 JENSEN, N. R. FIFTEEN (15) DAY EXTENSION FOR FINALIZATION OF WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT OPERABLE UNIT (OU) 2-13 AT INEL OPE-ER-01-97 00
06-JAN-97 UNDERWOOD, E. J. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) OPERABLE UNIT (OU) 2-12 THIRD (3RD) ANNUAL TECHNICAL MEMORANDUM & THIRD YEAR REVIEW (OU 2-13 RECORD PER DOE-ID REQUEST) 10308 00
02-JAN-97 UNDERWOOD, E. J. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REVIEW COMMENTS ON WASTE AREA GROUP (WAG-2) DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT 10310 00
16-DEC-96 JENSEN, N. R. TRANSMITTAL OF DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY, OPERABLE UNIT (OU) 2-13, AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-191-96 00
13-NOV-96 KENOYER, D. J. TRANSITION OF RADIOLOGICALLY CONTAMINATED SURPLUS FACILITIES FROM EM-60 TO EM-40 DJK-09-96-A 00
12-NOV-96 JENSEN, N. R. TWENTY DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF WASTE AREA GROUP 2 (WAG-2) DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT, OPERABLE UNIT (OU) 2-13 AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-169-96 00
08-NOV-96 SMITH, R. F. U. S. EPA REGION 10 OFFICE OF ENVIRONMENTAL CLEANUP THREE YEAR REVIEW, IDAHO NATIONAL ENGINEERING LABORATORY (INEL) TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM OPERABLE UNIT (OU) 2-12 10304 00
10-OCT-96 UNDERWOOD, E. J. IDHW REVIEW COMMENTS ON WASTE AREA GROUP 2 (WAG-2) DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT 10301 00
09-OCT-96 POETON, R. W. EPA COMMENTS ON DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY REPORT FOR WAG-2 COMPREHENSIVE RI/FS OPERABLE UNIT (OU) 2-13 AT THE INEL 10300 00
04-SEP-96 RICE, R. S. CLOSURE REPORT FOR SAMPLING OF TRA COLD WASTE POND; EMS-010-96 RSR-79-96 00
22-AUG-96 JENSEN, N. R. TRANSMITTAL OF DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE RI/FS, OPERABLE UNIT (OU) 2-13, AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-129-96 00
01-AUG-96 ARNETT, R. C. POST RECORD OF DECISION (ROD) MONITORING FOR TRA PERCHED WATER SYSTEM OU 2-12 THIRD (3RD) ANNUAL TECHNICAL MEMORANDUM (OU 2-13 RECORD PER DOE-ID REQUEST) INEL-96/0305 00
12-JUL-96 UNDERWOOD, E. J. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT 10289 00
10-JUL-96 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT REMEDIAL INVESTIGATION (RI) REPORT FOR THE WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 2-13 AT INEL 10288 00
24-MAY-96 JENSEN, N. R. TRANSMITTAL OF DRAFT REMEDIAL INVESTIGATION (RI) REPORT FOR WASTE AREA GROUP (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), OPERABLE UNIT (OU) 2-13, AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-90-96 00
04-APR-96 SMITH, D. M. HEALTH & SAFETY PLAN (HSP) FOR TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM OU 2-12 - REVISION 2 (REV.02) ISSUED AS INEEL-96/0114 INEL-96/0114 00
19-OCT-95 GREEN, L. A. DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 10445 00
19-OCT-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) & DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY ( EPA) COMMENTS OPE-ER-201-95 00
05-OCT-95 UNDERWOOD, E. J. SECOND ANNUAL TECHNICAL MEMORANDUM - POST RECORD OF DECISION (ROD) MONITORING FOR THE TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM OPERABLE UNIT (OU) 2-12, IDHW COMMENTS (OU 2-13 RECORD PER DOE-ID REQUEST) 10149 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
01-OCT-95 GREENWELL, R. D. DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) INEL-94/0171 00
22-SEP-95 MEYER, L. SECOND ANNUAL TECHNICAL MEMORANDUM - POST RECORD OF DECISION (ROD) MONITORING FOR THE TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM OPERABLE UNIT (OU) 2-12, EPA COMMENTS (OU 2-13 RECORD PER DOE-ID REQUEST) 10148 00
01-AUG-95 ARNETT, R. C. POST RECORD OF DECISION (ROD) MONITORING FOR THE TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM OPERABLE UNIT (OU) 2-12 SECOND ANNUAL TECHNICAL MEMORANDUM (OU 2-13 RECORD PER DOE-ID REQUEST) INEL-95/0408 00
26-APR-95 JENSEN, N. R. TRANSMITTAL OF FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE RI/FS, OPERABLE UNIT (OU) 2-13 AT INEL OPE-ER-076-95 00
01-APR-95 SHERWOOD, J. A. HEALTH & SAFETY PLAN (HSP) FOR TRA OU 2-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT INEL INEL-94/0002 00
01-APR-95 GREEN, T. S. WORK PLAN FOR WAG-2 OPERABLE UNIT (OU) 2-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-94/0026 00
01-MAR-95 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 INEL-95/0086 04
13-FEB-95 UNDERWOOD, E. J. IDHW-DEQ REVIEW COMMENTS ON WASTE AREA GROUP (WAG-2) DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN 10006 00
10-FEB-95 BLOOD, H. R. EPA COMMENTS ON DRAFT WORK PLAN FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10005 00
05-FEB-95 AR COORDINATOR OPERABLE UNIT (OU) 2-03 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF TEST REACTOR AREA (TRA) OU 2-03 AR.INDEX.OU.2-03 00
05-FEB-95 AR COORDINATOR OPERABLE UNIT (OU) 2-05 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) TRACK 2 INVESTIGATION OF OU 2-05 AR.INDEX.OU.2-05 00
05-FEB-95 AR COORDINATOR OPERABLE UNIT (OU) 2-06 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) TRACK 2 INVESTIGATION OF OU 2-06 AR.INDEX.OU.2-06 00
19-JAN-95 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT FOR OPERABLE (OU) 2-08 TRACK 2 SUMMARY REPORT FOR TEST REACTOR AREA (TRA) MATERIALS TEST REACTOR (MTR) CANAL - NO FURTHER ACTION DETERMINATION 5854 00
19-JAN-95 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT FOR OU 2-03 TRACK 2 SUMMARY REPORT FOR TRA-01, TRA-11, TRA-12, TRA-20, TRA-40, & TRA-614 - NO FURTHER ACTION DETERMINATION 5855 00
19-JAN-95 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT FOR OU 2-06 TRACK 2 SUMMARY REPORT FOR TRA-30, TRA-31, & TRA-35 - NO FURTHER ACTION DETERMINATION 5856 00
19-JAN-95 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT FOR OPERABLE UNIT (OU) 2-07 TRACK 2 SUMMARY REPORT FOR THE ENGINEERING TEST REACTOR (ETR), MATERIALS TEST REACTOR (MTR), AND ADVANCED TEST REACTOR (ATR) COOLING TOWERS & TRA-653 - NO FURTHER ACTION DETERMINATION 5857 00
19-JAN-95 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT FOR OU 2-05 TRACK 2 SUMMARY REPORT FOR TEST REACTOR AREA (TRA) TRA-16, TRA-15, TRA-19, TRA-603/605 TANK - NO FURTHER ACTION DETERMINATION 5858 00
19-JAN-95 DOE, EPA, IDHW DECISION STATEMENT FOR OU 2-11 TRACK 2 SUMMARY REPORT FOR THE TEST REACTOR AREA (TRA) TRA-03, TRA-04, & TRA-05 - ACTION & NO FURTHER ACTION DETERMINATION 5859 00
19-JAN-95 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT FOR OU 2-09 TRACK 2 SUMMARY REPORT FOR TRA-08 COLD WASTE POND & TRA SEWAGE TREATMENT AREA - ACTION DETERMINATION - FURTHER EVALUATION REQUIRED IN OU 2-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5860 00
19-JAN-95 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT FOR OU 2-04 TRACK 2 SUMMARY REPORT FOR TRA - TRA-653, TRA-626, TRA-619, PW-13, TRA-09, TRA-670, & TRA-627 - NO FURTHER ACTION DETERMINATION 5861 00
04-NOV-94 KOCH, D. F. IDHW-DEQ RECOMMENDATIONS FOR OU 2-08 TRACK 2 SUMMARY REPORT 5787 00
04-NOV-94 KOCH, D. F. IDHW-DEQ RECOMMENDATIONS FOR OU 2-07 TRACK 2 SUMMARY REPORT 5788 00
04-NOV-94 KOCH, D. F. IDHW-DEQ RECOMMENDATIONS FOR OU 2-05 TRACK 2 SUMMARY REPORT 5789 00
04-NOV-94 KOCH, D. F. IDHW-DEQ RECOMMENDATIONS FOR OU 2-04 TRACK 2 SUMMARY REPORT 5790 00
04-NOV-94 AR COORDINATOR OPERABLE UNIT (OU) 2-01 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION OF TEST REACTOR AREA (TRA) OU 2-01 AR.INDEX.OU.2-01 00
04-NOV-94 AR COORDINATOR OPERABLE UNIT (OU) 2-02 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION OF TEST REACTOR AREA (TRA) OU 2-02 AR.INDEX.OU.2-02 00
04-NOV-94 AR COORDINATOR TEST REACTOR AREA (TRA) NO ACTION SITES - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE NO ACTION SITES FOR TRA AR.INDEX.TRA.2-NA 00
01-NOV-94 LIENTZ, A. R. SCOPE OF WORK OPERABLE UNIT (OU) 2-13 WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-94/0013 00
14-OCT-94 INEL COMMUNITY RELATIONS COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - CITIZENS INVITED TO GIVE EARLY INPUT 8028 00
12-OCT-94 MEYER, L. EPA RECOMMENDATIONS FOR TRACK 2 SUMMARY REPORT FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-05 5796 00
11-OCT-94 MEYER, L. EPA RECOMMENDATIONS ON THE TRACK 2 SUMMARY REPORT FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-04 5513 00
11-OCT-94 MEYER, L. EPA RECOMMENDATIONS FOR TRACK 2 SUMMARY REPORT FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-07 5797 00
11-OCT-94 MEYER, L. EPA RECOMMENDATIONS FOR TRACK 2 SUMMARY REPORT FOR WAG-2 OPERABLE UNIT (OU) 2-08 5798 00
24-AUG-94 AR COORDINATOR OPERABLE UNIT (OU) 2-10 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) WARM WASTE POND (WWP) SEDIMENTS OU 2-10 AR.INDEX.OU.2-10 00
24-AUG-94 AR COORDINATOR OPERABLE UNIT (OU) 2-12 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 2-12 AR.INDEX.OU.2-12 00
18-AUG-94 DOE, EPA, IDHW WAG-2 COMPREHENSIVE SCOPING MEETING MINUTES - AUGUST 18 & AUGUST 19, 1994 (08/18/94 - 08/19/94) 5865 00
10-AUG-94 MEYER, L. EPA COMMENTS ON DRAFT TECHNICAL MEMORANDUM POST RECORD OF DECISION (ROD) MONITORING FOR TRA PERCHED WATER SYSTEM OU 2-12 9107 00
28-JUL-94 KOCH, D. F. IDHW TECHNICAL REVIEW COMMENTS FOR ANNUAL TECHNICAL MEMORANDUM FOR THE FIRST (1ST) YEAR OF POST RECORD OF DECISION (ROD) GROUNDWATER MONITORING TRA PERCHED WATER OU 2-12 OPE-ER-182-94 00
15-JUN-94 MK-FIC REMEDIAL ACTION (RA) REPORT TRA WARM WASTE POND (WWP) INTERIM ACTION (IA) OU 2-10 (OU 2-13 RECORD PER DOE-ID REQUEST) 02.010.2.1.209.01 01
01-JUN-94 JESSMORE, P. J. TECHNICAL MEMORANDUM POST RECORD OF DECISION (ROD) MONITORING FOR TRA PERCHED WATER SYSTEM OU 2-12 (OU 2-13 RECORD PER DOE-ID REQUEST) 7782 00
17-MAY-94 KOCH, D. F. IDHW-DEQ RECOMMENDATIONS FOR OU 2-09 TRACK 2 SUMMARY REPORT 7673 00
04-MAY-94 MAMEGHANI, M. DATA LIMITATIONS & VALIDATION (L&V) REPORT FOR EG&G IDAHO, INC., INEL TRA PERCHED WATER OU 2-12 SDG #0058R4, 0058F1, 0058LF & 0058CU GAMMA RAY ANALYSIS 7687 00
04-MAY-94 LYLE, J. L. TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 2-07 AND DOE-ID DECISION STATEMENT OPE-ER-109-94 00
04-MAY-94 LYLE, J. L. TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 2-05 AND THE DOE-ID DECISION STATEMENT OPE-ER-110-94 00
26-APR-94 LYLE, J. L. TRANSMITTAL OF DRAFT FINAL TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) OPE-ER-099-94 00
01-APR-94 JESSMORE, P. J. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 2-07 EGG-ER-11085 00
01-APR-94 HOLDREN, K. J. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 2-05 EGG-ER-11114 00
01-APR-94 LYLE, J. L. TRANSMITTAL OF THE REVISED TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 2-04 AND THE DOE-ID TRACK 2 DECISION STATEMENT OPE-ER-78-94 00
22-MAR-94 LANEY, P. T. COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP-10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) PTL-02-94 00
18-MAR-94 LIVERMAN, E. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WAG-3 & WAG-10 RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 5777 00
01-MAR-94 SHERWOOD, J. A. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR THE TRA OU 2-04: FUEL SPILLS EGG-ER-11110 02
01-MAR-94 FILEMYR, R. G. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 2-08 EGG-ER-11113 01
01-MAR-94 LYLE, J. L. TRANSMITTAL OF REVISED PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 2-08 AT TRA AT THE INEL OPE-ER-72-94 00
28-FEB-94 WELLS, R. P. DATA LIMITATIONS & VALIDATION (L&V) REPORTS FOR EG&G IDAHO, INC. INEL TRA PERCHED WATER OU 2-12 SDG #0077R4, 0077RB, 0077CR, 0105BX, 077FL & 077LF 7605 00
01-DEC-93 HONEYCUTT, T. K. TECHNICAL MEMORANDUM FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) SOILS TREATABILITY STUDY (TS): PHYSICAL SEPARATION OF RADIONUCLIDES IN SOILS EGG-ER-11101 00
22-NOV-93 JESSMORE, P. J. DATA LIMITATIONS & VALIDATION (L&V) REPORT FOR EG&G IDAHO, INC. TRA PERCHED WATER OU 2-12 SDG #0039RB RADIOCHEMICAL ANALYSES 7214 00
13-OCT-93 KOCH, D. F. IDHW RECOMMENDATION FOR THE TRACK 2 SUMMARY REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-03 5800 00
13-OCT-93 KOCH, D. F. IDHW-DEQ RECOMMENDATIONS FOR OPERABLE UNIT (OU) 2-06 TRACK 2 SUMMARY REPORT 5801 00
04-OCT-93 MEYER, L. EPA RECOMMENDATIONS ON THE TRACK 2 SUMMARY REPORT FOR THE TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-03 5506 00
04-OCT-93 MEYER, L. EPA RECOMMENDATION FOR THE TRACK 2 SUMMARY REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-06 5802 00
04-OCT-93 MEYER, L. EPA DECISION STATEMENT FOR THE TRACK 2 SUMMARY REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-11 5811 00
04-OCT-93 MEYER, L. EPA DECISION STATEMENT FOR TRACK 2 SUMMARY REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-09 5812 00
10-SEP-93 MK-FIC FINAL REMEDIAL DESIGN (RD) IMPLEMENTING REMEDIAL ACTION (RA) WORK PLAN TRA WARM WASTE POND (WWP) INTERIM ACTION (IA) OU 2-10 02.010.1.1.114.01 01
26-AUG-93 JESSMORE, P. J. DATA LIMITATIONS & VALIDATION (L&V) REPORT FOR EG&G IDAHO, INC. TRA PERCHED WATER OU 2-12 SDG #0017R4 & 0023RB RADIOCHEMICAL ANALYSIS 7213 00
13-AUG-93 LYLE, J. L. TRANSMITTAL OF THE REVISED TRACK 2 SUMMARY REPORTS FOR OPERABLE UNITS (OU) 2-03 AND 2-06 AND THE DOE-ID TRACK 2 DECISION STATEMENTS AM/ERWM-532-93 00
10-AUG-93 LYLE, J. L. DOE-ID DECISION STATEMENT FOR THE TRACK 2 SUMMARY REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-09 AM/ERWM-RPO-518-93 00
02-AUG-93 KOCH, D. F. IDHW-DEQ RECOMMENDATIONS FOR OU 2-11 SUMMARY REPORT 7051 00
02-AUG-93 BARRY, G. A. TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) 93MSE/ID-225 00
01-AUG-93 BARRY, G. A. SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 6744 00
01-AUG-93 DAMES & MOORE POST RECORD OF DECISION (ROD) MONITORING PLAN FOR TRA PERCHED WATER SYSTEM OU 2-12 (OU 2-13 RECORD PER DOE-ID REQUEST) EGG-ER-10547 01
01-AUG-93 SHERWOOD, J. A. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 2-03 EGG-ER-10736 00
01-AUG-93 SHERWOOD, J. A. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 2-06 EGG-ER-10806 00
01-JUL-93 NOT SPECIFIED WATER LEVEL MEASUREMENTS OU 2-12 QUARTERS 1, 2, & 3 7606 00
01-JUL-93 SALOMON, H. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 2-09 TRA SEWAGE TREATMENT AREA & COLD WASTE POND EGG-ER-10595 00
02-JUN-93 LYLE, J. L. TRANSMITTAL OF FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR WARM WASTE POND (WWP) SEDIMENTS INTERIM ACTION (IA) OPERABLE UNIT (OU) 2-10 AT TRA, INEL ERWM-RPO-449-93 00
01-JUN-93 RICE, R. S. HEALTH & SAFETY PLAN (HSP) FOR TRACK 2 CHARACTERIZATION OF OU 2-05 & 2-07 AT THE TRA EGG-ER-10634 02
25-MAY-93 MK-FIC REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK - REMEDIATION OF THE TRA WARM WASTE POND (WWP) OU 2-10 02.10.3.1.302.01 03
01-MAY-93 JESSMORE, J. J. TRACK 2 SAMPLING AND ANALYSIS PLAN (SAP) FOR THE CHARACTERIZATION OF WAG-2 OU TRA 2-05 AND OU 2-07 EGG-ER-10652 01
27-APR-93 LYLE, J. L. TRANSMITTAL OF REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR WARM WASTE POND (WWP) SEDIMENTS INTERIM ACTION (IA) OU 2-10 AT TRA ERWM-RPO-408-93 00
01-APR-93 SOELBERG, N. R. RESULTS OF THE PILOT SCALE TREATABILITY STUDY (TS) FOR THE TEST REACTOR AREA (TRA) WARM WASTE POND (WWP) VOLUME I (VOL.01) MAIN REPORT EGG-ER-10616,VOL.01 00
01-APR-93 SOELBERG, N. R. RESULTS OF THE PILOT SCALE TREATABILITY STUDY (TS) FOR THE TEST REACTOR AREA (TRA) WARM WASTE POND (WWP) VOLUME II (VOL.02): APPENDICES EGG-ER-10616,VOL.02 00
21-MAR-93 INEL COMMUNITY RELATIONS PUBLIC NOTICE: EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR TRA WARM WASTE POND (WWP) 5255 00
15-MAR-93 JENSEN, N. R. EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR THE WARM WASTE POND (WWP) SEDIMENTS RECORD OF DECISION (ROD) AT THE TEST REACTOR AREA (TRA) AT THE INEL 5253 00
11-MAR-93 LYLE, J. L. TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 2-11 AT THE TEST REACTOR AREA (TRA) AT THE INEL AM/ERWM-RPO-358-93 00
08-MAR-93 HOVLAND, R. D. IDHW TECHNICAL REVIEW COMMENTS FOR THE DRAFT TREATABILITY STUDY (TS) REPORT, TRA WARM WASTE POND (WWP) OPERABLE UNIT (OU) 2-10 5241 00
08-MAR-93 MEYER, L. EPA RESULTS OF THE PILOT SCALE TREATABILITY STUDY (TS) FOR THE TEST REACTOR AREA (TRA) WARM WASTE POND (WWP), VOLUME I AND II 5243 00
08-MAR-93 MONTGOMERY, R. A. PRESENTATION SLIDE COPIES ON THE TEST REACTOR AREA (TRA) WARM WASTE POND (WWP) 5244 00
01-MAR-93 GOLDER ASSOCIATES, INC. SCOPING TRACK 2 SUMMARY REPORT FOR OU 2-11 AT THE TRA EGG-ERD-10518 00
16-FEB-93 COE, M. DOE NEWS - AGENCIES SIGN THREE (3) RECORDS OF DECISION (ROD) FOR NO REMEDIAL ACTION (RA) 6149 00
06-JAN-93 NOT SPECIFIED TRACK 1, NO FURTHER ACTION DETERMINATION FOR TRA-22, TRA INACTIVE DIESEL FUEL TANK AT ETR-648 5287 00
06-JAN-93 NOT SPECIFIED TRACK 1, NO FURTHER ACTION DETERMINATION FOR TRA-21, TRA INACTIVE TANK, NORTH OF MTR-643 5288 00
06-JAN-93 NOT SPECIFIED TRACK 1, NO FURTHER ACTION DETERMINATION FOR TRA-17, TRA INACTIVE GASOLINE TANK AT TRA-616 5289 00
06-JAN-93 NOT SPECIFIED TRACK 1, NO FURTHER ACTION DETERMINATION FOR TRA-18 TRA INACTIVE GASOLINE TANK AT TRA-619 5290 00
01-DEC-92 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) FOR THE TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM 5230 00
05-OCT-92 NOT SPECIFIED TRACK 1 - NO FURTHER ACTION DETERMINATION FOR THE TRA INACTIVE GASOLINE TANK AT TRA-605 5206 00
01-SEP-92 NRT CORPORATION WARM WASTE POND (WWP) BENCH SCALE TREATABILITY STUDY (TS) 910521-N/C 00
01-SEP-92 MONTGOMERY, R. A. TRA WARM WASTE POND (WWP) AT INEL PILOT SCALE TREATABILITY STUDY (TS) WORK PLAN EGG-ERD-10435 00
15-AUG-92 ASI SUMMARY OF PUBLIC SCOPING COMMENTS CONCERNING PROPOSED CLEANUP OF PERCHED WATER AT TRA 6042 00
10-JUL-92 NOT SPECIFIED PUBLIC COMMENT TRANSCRIPTS - PROPOSED PLAN FOR THE TRA PERCHED WATER SYSTEM 5164-TRA 00
01-JUL-92 INEL COMMUNITY RELATIONS ATTENTION: AGENCIES SEEK PUBLIC COMMENT ON THREE (3) PLANS 5136 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
26-JUN-92 INEL COMMUNITY RELATIONS PROPOSED PLANS AND DEAR CITIZEN LETTER FOR MONITORING THE PERCHED WATER AT TRA, THE MOTOR POOL POND AT CFA, AND THE CHEMICAL EVAPORATION POND AT ARA - SEE DOCUMENT NUMBER 5141 FOR CORRECTED PAGE B-6 TO CFA PROPOSED PLAN 5130 00
01-JUN-92 INEEL COMMUNITY RELATIONS COMMUNITY RELATIONS PLAN FACT SHEET - STUDY ON PERCHED WATER SYSTEM AT TEST REACTOR AREA (TRA) CONTINUES 24826 00
01-JUN-92 DAMES & MOORE SELECTION OF GROUNDWATER AND CONTAMINANT TRANSPORT MODELS FOR THE TEST REACTOR AREA (TRA) AT THE INEL EGG-ERD-10313 00
01-JUN-92 LEWIS, S. M. REMEDIAL INVESTIGATION (RI) REPORT FOR THE TRA PERCHED WATER SYSTEM OU 2-12 EGG-WM-10002 00
10-FEB-92 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) AVAILABILITY FOR CLEANUP OF WARM WASTE POND (WWP) SEDIMENTS AT TRA - IDAHO PRESS TRIBUNE, NAMPA, IDAHO 4442 00
04-FEB-92 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) AVAILABILITY FOR CLEANUP OF WARM WASTE POND (WWP) SEDIMENTS AT TRA - TIMES NEWS, TWIN FALLS, IDAHO 4443 00
04-FEB-92 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) AVAILABILITY FOR CLEANUP OF WARM WASTE POND (WWP) SEDIMENTS AT TRA - IDAHO STATE JOURNAL, POCATELLO, IDAHO 4444 00
04-FEB-92 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) AVAILABILITY FOR CLEANUP OF WARM WASTE POND (WWP) SEDIMENTS AT TRA - POST REGISTER, IDAHO FALLS, IDAHO 4445 00
04-FEB-92 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) AVAILABILITY FOR CLEANUP OF WARM WASTE POND (WWP) SEDIMENTS AT TRA - IDAHOAN, MOSCOW, IDAHO 4446 00
04-FEB-92 INEL RECORD OF DECISION (ROD) AVAILABILITY FOR CLEANUP OF WARM WASTE POND (WWP) SEDIMENTS AT TRA - LEWISTON MORNING PRESS 4448 00
04-FEB-92 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) AVAILABILITY FOR CLEANUP OF WARM WASTE POND (WWP) SEDIMENTS AT TRA - IDAHO STATESMAN, BOISE, IDAHO 4462 00
03-FEB-92 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) AVAILABILITY FOR CLEANUP OF WARM WASTE POND (WWP) SEDIMENTS AT TRA - SOUTH IDAHO PRESS, BURLEY, IDAHO 4447 00
23-JAN-92 VANDEUSEN, L. C. DECISION DOCUMENTATION PACKAGE FOR TRACK 1 FOR CHEMICAL WASTE POND TRA-06 OU 2-13 - DRAFT, BACKGROUND INFORMATION ONLY 10269 00
05-DEC-91 BAUMER, A. R. DECLARATION FOR THE WARM WASTE POND AT THE TEST REACTOR AREA (TRA) AT THE IDAHO NATIONAL ENGINEERING LABORATORY--DECLARATION OF THE RECORD OF DECISION 3320 00
01-NOV-91 BELLER, J. M. TRA WARM WASTE POND (WWP) AT INEL SEDIMENT TREATABILITY STUDY (TS), PHASE I REPORT EGG-WM-10000 00
13-SEP-91 NOT SPECIFIED NO ACTION SITE - TRA-33 TRA WEST STAGING AREA DRAINAGE DITCH RUBBLE PILE 3163 00
13-SEP-91 NOT SPECIFIED NO ACTION SITE - TRA-24 TRA GUARDHOUSE CONSTRUCTION RUBBLE PILE 3502 00
13-SEP-91 NOT SPECIFIED NO ACTION SITE - TRA-25 TRA SEWER PLANT SETTLING POND RUBBLE PILE 3503 00
13-SEP-91 BLACKMORE, C. S. NO ACTION SITE - TRA-26 TRA RUBBLE PILE BY USGS OBSERVATION WELL 3504 00
13-SEP-91 NOT SPECIFIED NO ACTION SITE - TRA-27 NORTH STORAGE AREA RUBBLE PILE 3505 00
13-SEP-91 NOT SPECIFIED NO ACTION SITE - TRA-28 TRA NORTH (LANDFILL) RUBBLE SITE 3506 00
13-SEP-91 NOT SPECIFIED NO ACTION SITE - TRA-29 ATR CONSTRUCTION RUBBLE PILE 3507 00
13-SEP-91 NOT SPECIFIED NO ACTION SITE - TRA-32 TRA WEST ROAD RUBBLE PILE 3508 00
13-SEP-91 MCCORMICK, S. H. TRA PAINT SHOP DITCH - NO FURTHER ACTION DETERMINATION DECISION DOCUMENTATION PACKAGE (TRACK 1 SITES) 3601 00
13-SEP-91 NOT SPECIFIED NO ACTION SITE - TRA-10 MTR CONSTRUCTION EXCAVATION 3608 00
13-SEP-91 NOT SPECIFIED NO ACTION SITE - TRA-23 ETR EXCAVATION SITE RUBBLE PILE 3609 00
12-SEP-91 LYLE, J. L. TRANSMITTAL OF WORKING SCHEDULE FOR TRA PERCHED WATER RI/FS ERD-343-91 00
08-AUG-91 VERNON, D. K. PERCHED WATER RI/FS SCHEDULE REVISED AS OF 08/08/91, REV.05 3515 00
07-AUG-91 NOT SPECIFIED PUBLIC MEETING TRANSCRIPTS - PUBLIC COMMENT MEETINGS CONCERNING PROPOSED CLEANUP PROJECTS AT THE TRA AT THE INEL IDAHO FALLS, POCATELLO, TWIN FALLS, BOISE, & MOSCOW - 08/91 3540 01
29-JUL-91 INEL COMMUNITY RELATIONS CLEANUP WON'T BEGIN UNTIL PUBLIC COMMENTS ARE RECEIVED - PUBLIC SCOPING ON PERCHED WATER INVESTIGATION & PUBLIC COMMENT WARM WASTE POND (WWP) PROPOSED PLAN, IDAHO FALLS 08/07/91 3027 00
29-JUL-91 INEL COMMUNITY RELATIONS CLEANUP WON'T BEGIN UNTIL PUBLIC COMMENTS ARE RECEIVED - PUBLIC SCOPING ON PERCHED WATER INVESTIGATION & PUBLIC COMMENT WARM WASTE POND (WWP) PROPOSED PLAN, BOISE, IDAHO 08/14/91 3028 00
29-JUL-91 INEL COMMUNITY RELATIONS CLEANUP WON'T BEGIN UNTIL PUBLIC COMMENTS ARE RECEIVED - PUBLIC SCOPING ON PERCHED WATER INVESTIGATION & COMMENT ON WARM WASTE POND (WWP) PROPOSED PLAN, MOSCOW TOWN MEETING 08/15/91 3029 00
29-JUL-91 INEL COMMUNITY RELATIONS CLEANUP WON'T BEGIN UNTIL PUBLIC COMMENTS ARE RECEIVED - PUBLIC SCOPING ON PERCHED WATER INVESTIGATION & PUBLIC COMMENT WARM WASTE POND (WWP) PROPOSED PLAN, POCATELLO 08/08/91 3030 00
29-JUL-91 INEL COMMUNITY RELATIONS CLEANUP WON'T BEGIN UNTIL PUBLIC COMMENTS ARE RECEIVED - PUBLIC SCOPING ON PERCHED WATER INVESTIGATION & PUBLIC COMMENT WARM WASTE POND (WWP) PROPOSED PLAN, TWIN FALLS, 08/13/91 3031 00
26-JUL-91 BUGGER, B. DOE NEWS - PUBLIC INPUT SOUGHT ON TWO INEL CLEANUP PROJECTS 3560 00
01-JUL-91 INEL COMMUNITY RELATIONS FACT SHEET - INEL STUDIES PERCHED WATER CONTAMINATION AT TRA 3025 00
01-JUL-91 BAUMER, A. R. PROPOSED PLAN FOR CLEANUP OF WARM WASTE POND (WWP) SEDIMENTS AT TRA INEL 3558 00
01-JUN-91 KING, J. J. INTERIM ACTION (IA) RISK ASSESSMENT FOR TRA WARM WASTE LEACH POND (WWP) SEDIMENTS (OU 2-10) EGG-WM-9622 00
23-MAY-91 VERNON, D. K. FINAL SCOPE OF WORK PERCHED WATER SYSTEM RI/FS, REV.04 2377 04
25-APR-91 BERGEMAN, N. L. INFORMATION REQUEST FOR WELLS IN VICINITY OF TEST REACTOR AREA (TRA), TEST AREA NORTH (TAN) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) SGS-127-91 00
01-MAR-91 BAUMER, A. R. SCOPE OF WORK AN INTERIM ACTION (IA) FOR TRA WARM WASTE POND (WWP) SEDIMENTS 2916 00
01-OCT-90 STANISICH, S. N. CLOSURE PLAN (CP) FOR TRA CHEMICAL WASTE POND COCA UNIT TRA-06 EGG-WM-9193 00
01-MAR-90 MOSELEY, R. RARE, THREATENED AND ENDANGERED PLANTS AND ANIMALS OF IDAHO 2915 00
11-JAN-90 SOLECKI, J. E. DETAILED SCHEDULES FOR PREPARATION OF CLOSURE PLANS (CP) FOR COCA WASTE MANAGEMENT UNITS 8206 00
01-JAN-90 INEL COMMUNITY RELATIONS INEL STUDIES TRA'S WARM WASTE POND (WWP) AND DISPOSAL WELL 53 00
01-JAN-90 EPA ASSESSMENT OF TECHNOLOGIES FOR REMEDIATION OF RADIOACTIVELY CONTAMINATED SUPERFUND SITES EPA/540/2-90/001 00
22-DEC-89 BLUMBERG, D. J. STATUS REPORT FOR DECEMBER 1989 (12/89) CLOSURE PLAN (CP) PREPARATION KHK-147-89 00
15-NOV-89 SOLECKI, J. E. RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM EPA & STATE 10986 00
09-NOV-89 BLUMBERG, D. J. RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) AND STATE DJB-40-89 00
26-OCT-89 KOSHUTA, C. R. NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL - EPA AND IDHW REVIEWED DOE'S REVISED CLOSURE PLAN SCHEDULE AND FEEL THE SCHEDULE IS DEFICIENT 6709 00
01-OCT-89 HULL, L. C. CONCEPTUAL MODEL & DESCRIPTION OF AFFECTED ENVIRONMENT FOR TRA WARM WASTE POND (WWP) - (WM UNIT TRA-03) EGG-ER-8644 00
29-SEP-89 SOLECKI, J. E. REVISED CLOSURE PLAN (CP) SCHEDULE FOR EIGHT (8) LDU'S FOR EG&G AND THREE (3) LDU'S FOR WINCO 10110 00
01-SEP-89 SOLECKI, J. E. REVISED CLOSURE PLAN (CP) APPROACH FOR LAND DISPOSAL UNITS (LDU) 8472 00
08-FEB-89 PIGOTT, W. R. INITIAL ASSESSMENT FORM - TRA-731 PIPE TUNNEL - FRENCH DRAIN 578 00
01-AUG-88 EPA TECHNOLOGICAL APPROACHES TO CLEANUP OF RADIOLOGICALLY CONTAMINATED SUPERFUND SITES EPA/540/2-88/002 00
12-JAN-88 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-39 COOLING TOWER N OF TRA-607 2215 00
12-JAN-88 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-38 ATR COOLING TOWER TRA-771 2239 00
12-JAN-88 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-37 MATERIALS TEST REACTOR (MTR) CANAL IN BASEMENT TRA-603 2240 00
11-JAN-88 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-35 RUBBLE SITE EAST OF WEST ROAD NEAR BETA BUILDING RUBBLE PILE 2253 00
11-JAN-88 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-36 ETR COOLING TOWER BASIN TRA-751 2254 00
05-JAN-88 FEIGNER, K. D. REVIEW OF SELECTED SUMMARY ASSESSMENTS 2494 00
08-JUL-87 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-34 NORTH STORAGE AREA 2844 00
16-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-15 HOT WASTE TANKS #2, #3, #4 AT TRA-613 2872 00
16-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-19 RAD TANKS 1 & 4 AT TRA-630, REPLACED BY TANKS 1, 2, 3, & 4 2876 00
15-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-06 CHEMICAL WASTE POND TRA-701 2863 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-33 WEST STAGING AREA - DRAINAGE DITCH RUBBLE SITE 2845 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-32 WEST ROAD RUBBLE PILE 2846 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-31 WEST RUBBLE SITE 2847 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-30 BETA BUILDING RUBBLE SITE 2848 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-29 ATR CONSTRUCTION RUBBLE 2849 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-28 NORTH LANDFILL RUBBLE SITE 2850 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-27 NORTH STORAGE AREA RUBBLE PILE 2851 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-26 RUBBLE SITE BY USGS OBSERVATION WELL 2852 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-25 SEWER PLANT SETTLING POND RUBBLE PILE 2853 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-24 GUARDHOUSE CONSTRUCTION RUBBLE PILE 2854 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-23 ETR EXCAVATION SITE RUBBLE PILE 2855 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-22 INACTIVE DIESEL FUEL TANK AT ETR-648 2856 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-21 INACTIVE TANK, NORTH SIDE OF MTR-643 2857 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-07 SEWAGE TREATMENT PLANT TRA-732 & SLUDGE PIT TRA-732 2864 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-10 MATERIALS TEST REACTOR (MTR) CONSTRUCTION EXCAVATION PILE 2867 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-11 FRENCH DRAIN AT TRA-645 2868 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-12 FUEL OIL TANK SPILL TRA-727B 2869 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-13 FINAL SEWAGE LEACH PONDS (2) BY TRA-732 2870 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-14 INACTIVE GASOLINE TANK AT TRA-605 2871 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-17 INACTIVE GASOLINE TANK AT TRA-616 2873 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-16 INACTIVE RADIOACTIVE CONTAMINATED TANK AT TRA-614 2874 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-18 INACTIVE GASOLINE TANK AT TRA-619 2875 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-20 BRINE TANK TRA-731 AT TRA-631 2879 00
16-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-01 ACID SPILL DISPOSAL PIT TRA-608 2858 00
16-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-02 PAINT SHOP DITCH TRA-606 2859 00
12-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA WARM WASTE LEACH POND (WWP) TRA-758 2860 00
12-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-08 COLD WASTE DISPOSAL POND TRA-702 2865 00
11-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-04 WARM WASTE RETENTION BASIN TRA-712 2861 00
11-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-05 WASTE DISPOSAL WELL, SAMPLING PIT TRA-764 SUMP TRA-703 2862 00
11-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-09 SPILLS AT TRA LOADING DOCK TRA-722 2866 00
13-NOV-85 SHELDON, D. E. UNUSUAL OCCURRENCE REPORT (UOR) - FACILITY NUMBER ATR-85-3 EGG-85-17 00
13-NOV-85 SHELDON, D. E. UNUSUAL OCCURRENCE REPORT (UOR) - FACILITY NUMBER ATR-85-8 EGG-85-41 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page