Select By Waste Area Group (WAG)

For WAG 10

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
10-SEP-18 NOT SPECIFIED MEMORANDUM TO THE WASTE AREA GROUP 10, OPERABLE UNIT 10-08 PROJECT ADMINISTRATIVE RECORD-POST DECISION DOCUMENT FILES FOR SITE ANL-04 CONTAINED IN THE OPERABLE UNIT 10-08 RECORD OF DECISION FOR SITE-WIDE GROUNDWATER, DOE/ID-11585 0
06-AUG-18 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY2017 RPT-1635 0
31-JUL-18 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - MONITORING WELL MIDDLE-2051, MISC-50 (PART A & B) NSI-26030 0
30-JUL-18 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - HOT WASTE MANAGEMENT SYSTEM PARTS A & B NSI-26003 0
30-JUL-18 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - TRA COURTYARD AREA, TRA-80 PARTS A & B NSI-26011 0
30-JUL-18 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - HOT ANT NEST AND SOIL CONTAMINATION ASSOCIATED WITH THE WARM WASTE LINE, TRA-82 PARTS A & B NSI-26016 00
30-JUL-18 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - GAMMA BUILDING (TRA-641) WARM WASTE LINE TO THE CATCH TANK VAULT (TRA-730), TRA-61 PARTS A & B NSI-26018 0
11-JUL-18 NOT SPECIFIED OU 10-08 RISK EVALUATION FOR CERCLA SITES TRA/61-82, TRA-79, AND TRA-80 RPT-1557 0
06-FEB-18 FORBES, JEFFERY R. FINAL REPORT ON THE WESTBAY WELL MIDDLE-2051 INVESTIGATION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11571 0
06-FEB-18 LAWRENCE, SARAH D. FINAL REPORT ON THE WESTBAY WELL MIDDLE-2051 INVESTIGATION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11571 0
01-JAN-18 NOT SPECIFIED WASTE AREA GROUP 10, OPERABLE UNIT 10-08, MONITORING REPORT FOR FISCAL YEAR 2017 DOE/ID-11574 0
18-DEC-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 10
28-AUG-17 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - CFA STORM WATER INJECTION WELL, CFA DISPOSAL WELL, CFA-56 (PART B) NSI-26022 00
28-AUG-17 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - STORM WATER INJECTION WELL, SPERT DISP 2, PBF-41 (PART B) NSI-26026 00
05-JUN-17 NICKLAUS, DONNA M. CERCLA NEW SITE ANL-67 (OU 10-08) MFC-767 CONCRETE PAD CCN 320824 0
01-MAY-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY2016 RPT-1543 0
31-JAN-17 NOT SPECIFIED FIELD SAMPLING PLAN FOR WELL MIDDLE-2051 INVESTIGATION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11560 0
01-JAN-17 KIMBRO, VALERIE REMEDIAL ACTION COMPLETION REPORT FOR TRA-75, OPERABLE UNIT 10-08 DOE/ID-11554 0
01-JAN-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2015 RPT-1503 0
14-NOV-16 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI)- SIW 36-TRA AT THE FORMER NEUTRON CHOPPER 20 METER HOUSE (TRA-665), TRA-86 (PART A) NSI-26032 0
01-OCT-16 NOT SPECIFIED POST-RECORD OF DECISION GROUNDWATER MONITORING AND FIELD SAMPLING PLAN FOR OPERABLE UNIT 10-08 DOE/ID-11420 2
01-OCT-16 KIMBRO, VALERIE M. FIELD SAMPLING PLAN FOR CERCLA SITE ANL-04 AT THE MATERIALS AND FUELS COMPLEX DOE/ID-11552 0
22-AUG-16 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - GEEL AIR EXHAUST SYSTEM, TRA-85 (PART A) NSI-26031 0
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JUL-16 NOT SPECIFIED WASTE AREA GROUP 10, OPERABLE UNIT 10-08, MONITORING REPORT FOR FISCAL YEAR 2015 DOE/ID-11551 0
01-JUN-16 NOT SPECIFIED QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 9, 10, AND REMOVAL ACTIONS DOE/ID-10587 11
19-MAY-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES FOR OPERABLE UNIT 10-08 RECORD OF DECISION FOR SITE-WIDE GROUNDWATER, MISCELLANEOUS SITES, AND FUTURE SITES DOE/ID-11547 0
17-MAR-16 NOT SPECIFIED TRA-75 EXPLANATION OF SIGNIFICANT DIFFERENCES FOR THE OPERABLE UNIT 10-08 RECORD OF DECISION FOR SITE-WIDE GROUNDWATER, MISCELLANEOUS SITES, AND FUTURE SITES DOE/ID-11539 0
01-MAR-16 KIMBRO, VALERIE M. FIELD SAMPLING PLAN FOR CERCLA SITES TRA-61 AND TRA-82 AT THE ADVANCED TEST REACTOR COMPLEX DOE/ID-11537 0
01-MAR-16 NOT SPECIFIED PLUG-IN REMEDY MEMORANDUM FOR TRA-75 IN OPERABLE UNIT 10-08 DOE/ID-11538 0
08-FEB-16 FAULK, DENNIS EPA CONCURRENCE ON THE IDAHO NATIONAL LAB 5 YEAR REVIEW 5282268 0
21-JAN-16 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - CFA STORM WATER INJECTION WELL, CFA DISPOSAL WELL, CFA-56 (PART A) NSI-26022 0
21-JAN-16 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - STORM WATER INJECTION WELL, SPERT DISP 2, PBF-41 (PART A) NSI-26026 0
06-JAN-16 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - STORM WATER INJECTION WELL, SPERT DISP 1, PBF-40 (PART A) NSI-26023 0
06-JAN-16 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - STORM WATER INJECTION WELL, TAN D1, TSF-62 (PART A) NSI-26024 0
06-JAN-16 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - STORM WATER INJECTION WELL, SPERT DISP 3, PBF-42 (PART A) NSI-26027 0
06-JAN-16 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - STORM WATER INJECTION WELL, TAN-D2, TSF-63 (PART A) NSI-26028 0
06-JAN-16 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - STORM WATER INJECTION WELL, TAN-D3, TSF-64 (PART A) NSI-26029 0
31-DEC-15 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2010-2014 DOE/ID-11513 0
02-DEC-15 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - DRY SHALLOW INJECTION WELL SOUTH OF CPP-603B, IFSF - CPP-142 (PART A) NSI-26025 0
26-OCT-15 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - PBF REACTOR LOCATION, PBF-39 (PART A) NSI-26019 0
26-OCT-15 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - ETR REACTOR LOCATION, TRA-84 (PART A) NSI-26021 0
22-OCT-15 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - MTR REACTOR LOCATION, TRA-83 (PART A) NSI-26020 0
14-SEP-15 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - V-TANKS AND TAN-607 SOIL CONTAMINATION AREA, TSF-61 (PART B) NSI-26012 00
01-AUG-15 NOT SPECIFIED INL SITE COMMUNITY INVOLVEMENT PLAN DOE/ID-11518 0
01-JUN-15 NOT SPECIFIED ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT DOE/ID-11293 3
01-MAY-15 KIMBRO, VALERIE M. FIELD SAMPLING PLAN FOR CERCLA SITE CPP-138 AT INTEC DOE/ID-11524 0
01-MAY-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2014 RPT-1361 0
01-APR-15 NOT SPECIFIED ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT DOE/ID-11293 2
01-MAR-15 KIMBRO, VALERIE M. FIELD SAMPLING PLAN FOR TRA-80 AT THE ADVANCED TEST REACTOR COMPLEX DOE/ID-11512 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
01-OCT-14 NOT SPECIFIED POST-RECORD OF DECISION GROUNDWATER MONITORING AND FIELD SAMPLING PLAN FOR OPERABLE UNIT 10-08 DOE/ID-11420 1
03-SEP-14 NOT SPECIFIED NEW SITE IDENTIFICATION - (NSI) - FORMER BUILDING CPP-654 MANHOLE AND SEWER LINE - CPP-137 (PART A) NSI-26004 1
03-SEP-14 NOT SPECIFIED NEW SITE IDENTIFICATION - (NSI) - SHALLOW INJECTION WELL 47-CPP (WELL ID 2017) CPP-140 (PART B) NSI-26013 00
03-SEP-14 NOT SPECIFIED NEW SITE IDENTIFICATION - (NSI) - SHALLOW INJECTION WELL 35-CPP (WELL ID 1890) CPP-141 (PART B) NSI-26014 00
28-AUG-14 FAULK, DENNIS EPA LETTER OF APPROVAL OF THE OU 10-04 REMEDIAL ACTION REPORT 4713378 0
04-AUG-14 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - SHALLOW INJECTION WELLS (32-TRA AND 33-TRA) AT TRA-655 (PARTS A & B) NSI-25188 00
01-AUG-14 KIMBRO, VALERIE M. REMEDIAL ACTION REPORT FOR OPERABLE UNITS 6-05 AND 10-04, PHASE IV DOE/ID-11498 0
24-JUL-14 LIVIERATOS, TED DEQ COMMENTS ON THE OU 10-04 PHASE IV REMEDIAL ACTION REPORT 4682814 0
24-JUL-14 FAULK, DENNIS EPA COMMENTS ON THE OU 10-04 PHASE IV REMEDIAL ACTION REPORT 4682815 0
01-MAY-14 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2013 RPT-1268 0
01-MAR-14 MEAGHER, BRANDT G. REMEDIAL ACTION COMPLETION REPORT FOR ANL-65, OPERABLE UNIT 10-08 DOE/ID-11505 0
01-MAR-14 CAHN, LORIE S. REMEDIAL ACTION COMPLETION REPORT FOR ANL-65, OPERABLE UNIT 10-08 DOE/ID-11505 0
01-MAR-14 MAHNAMI, DANIEL D. REMEDIAL ACTION COMPLETION REPORT FOR ANL-65, OPERABLE UNIT 10-08 DOE/ID-11505 0
01-MAR-14 SCHWENDIMAN, G. LYNN REMEDIAL ACTION COMPLETION REPORT FOR ANL-65, OPERABLE UNIT 10-08 DOE/ID-11505 0
04-FEB-14 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - CFA FRENCH DRAIN NORTH OF CFA-633 NSI-26015 0
01-FEB-14 NOT SPECIFIED WASTE AREA GROUP 10, OPERABLE UNIT 10-08, MONITORING REPORT FOR FISCAL YEAR 2013 DOE/ID-11501 0
18-DEC-13 NOT SPECIFIED ANL-65 PRE-FINAL INSPECTION CHECKLIST 4449310 0
01-OCT-13 KIMBRO, VALERIE M. FIELD SAMPLING PLAN FOR THE MASS DETONATION AREA DISPOSAL CRATER DOE/ID-11487 0
01-SEP-13 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 8
01-SEP-13 CAHN, LORIE S. FIELD SAMPLING PLAN FOR TRA-79 DOE/ID-11493 0
08-AUG-13 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - SHALLOW INJECTION WELL 47-CPP (WELL ID 2017) - CPP-140 (PART A) NSI-26013 0
08-AUG-13 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - SHALLOW INJECTION WELL 35-CPP (WELL ID 1890) - CPP-141 (PART A) NSI-26014 0
01-AUG-13 VANHORN, ROBIN L. REFINED WASTE AREA GROUP ECOLOGICAL RISK ASSESSMENTS AT THE INL SITE RPT-969 1
31-JUL-13 CAHN, L. S. PLUG-IN REMEDY MEMORANDUM FOR ANL-65 IN OPERABLE UNIT 10-08 DOE/ID-11489 00
31-JUL-13 NOT SPECIFIED ANL-65 EXPLANATION OF SIGNIFICANT DIFFERENCES FOR THE OPERABLE UNIT 10-08 RECORD OF DECISION FOR FUTURE SITES DOE/ID-11490 00
01-JUN-13 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2012 RPT-1196 0
01-APR-13 HOLDREN, K. JEAN PHASE I REMEDIAL ACTION REPORT FOR OPERABLE UNITS 6-05 AND 10-04 DOE/ID-11480 0
08-JAN-13 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - V-TANKS AND TAN-607 SOIL CONTAMINATION AREA, TSF-61 (PART A) NSI-26012 0
07-JAN-13 NOT SPECIFIED NEW SITE IDENTIFICATION - BUILDINGS MFC-676 AND MFC-795 NSI-26007 0
19-NOV-12 NOT SPECIFIED NEW SITE IDENTIFICATION - STAINED SOIL BENEATH MFC-750A NSI-26006 0
01-SEP-12 SCHWENDIMAN, G. LYNN REMEDIAL DESIGN / REMEDIAL ACTION WORK PLAN FOR OPERABLE UNITS 6-05 AND 10-04, PHASE IV DOE/ID-11261 1
01-SEP-12 KIMBRO, VALERIE M. REMEDIAL DESIGN / REMEDIAL ACTION WORK PLAN FOR OPERABLE UNITS 6-05 AND 10-04, PHASE IV DOE/ID-11261 1
01-SEP-12 HOLDREN, K. JEAN REMEDIAL DESIGN / REMEDIAL ACTION WORK PLAN FOR OPERABLE UNITS 6-05 AND 10-04, PHASE IV DOE/ID-11261 1
01-SEP-12 VANHORN, ROBIN L. REFINED WASTE AREA GROUP ECOLOGICAL RISK ASSESSMENTS AT THE INL SITE RPT-969 0
30-AUG-12 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - FORMER BUILDING CPP-654 MANHOLE AND SEWER LINE - CPP-137 (PART A) NSI-26004 0
30-AUG-12 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - CONTAMINATED SOIL NEAR FIRE HYDRANT (HYD-UTI-4500), NORTH OF CPP-633 NSI-26005 0
01-JUL-12 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2011 RPT-1001 0
13-JUN-12 BROWN, M. E. TRANSMITTAL OF THE NEW SITE IDENTIFICATION FORM (NSI) FOR SITE TRA-75 (SHALLOW INJECTION WELLS (32-TRA AND 33-TRA) AT TRA-655 NSI-25188 0
05-JUN-12 LIVIERATOS, TED TRANSMITTAL OF THE OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008, REVISION 1 (DOE/ID-11390) (WDP-RWMC-12-024) 3999975 0
01-JUN-12 KIMBRO, VALERIE M. OU 10-04 CONCEPTUAL SITE MODELS: MUNITIONS AND EXPLOSIVES OF CONCERN ON THE INL SITE DOE/ID-11470 0
31-MAY-12 FAULK, DENNIS OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008, REVISION 1 (DOE/ID-11390) (WDP-RWMC-122-024) 3999978 0
21-MAY-12 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - PBF CONTROL AREA SEPTIC TANK (PBF-724), SEEPAGE PIT (PBF-735) NSI-25247 0
08-MAY-12 HAIN, KATHLEEN E. TRANSMITTAL OF THE OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008, REVISION 1 (DOE/ID-11390) (WDP-RWMC-12-024) WDP-RWMC-12-024 0
30-APR-12 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 7
01-APR-12 HOLDREN, K. JEAN OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 1) 1
01-APR-12 KIMBRO, VALERIE M. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 1) 1
01-APR-12 VANHORN, ROBIN L. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 1) 1
01-APR-12 CAHN, LORIE S. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 1) 1
01-APR-12 VAN HORN, ROBIN L. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 2) 1
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
01-APR-12 HOLDREN, K. JEAN OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 2) 1
01-APR-12 CAHN, LORIE S. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 2) 1
01-APR-12 KIMBRO, VALERIE M. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 2) 1
01-APR-12 VANHORN, ROBIN L. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 3) 1
01-APR-12 HOLDREN, K. JEAN OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 3) 1
01-APR-12 KIMBRO, VALERIE M. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 3) 1
01-APR-12 CAHN, LORIE S. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 3) 1
01-APR-12 VANHORN, ROBIN L. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 4) 1
01-APR-12 CAHN, LORIE S. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 4) 1
01-APR-12 HOLDREN, K. JEAN OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 4) 1
01-APR-12 KIMBRO, VALERIE M. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 4) 1
01-APR-12 VANHORN, ROBIN L. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 5) 1
01-APR-12 CAHN, LORIE S. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 5) 1
01-APR-12 HOLDREN, K. JEAN OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 5) 1
01-APR-12 KIMBRO, VALERIE M. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 5) 1
01-APR-12 VANHORN, ROBIN L. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 6) 1
01-APR-12 HOLDREN, K. JEAN OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 6) 1
01-APR-12 KIMBRO, VALERIE M. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 6) 1
01-APR-12 CAHN, LORIE S. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 6) 1
01-APR-12 KIMBRO, VALERIE M. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 7) 1
01-APR-12 HOLDREN, K. JEAN OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 7) 1
01-APR-12 VANHORN, ROBIN L. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 7) 1
01-APR-12 CAHN, LORIE S. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 7) 1
01-APR-12 VANHORN, ROBIN L. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 8) 1
01-APR-12 CAHN, LORIE S. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 8) 1
01-APR-12 HOLDREN, K. JEAN OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 8) 1
01-APR-12 KIMBRO, VALERIE M. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 8) 1
01-APR-12 VANHORN, ROBIN L. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 9) 1
01-APR-12 KIMBRO, VALERIE M. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 9) 1
01-APR-12 HOLDREN, K. JEAN OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 9) 1
01-APR-12 CAHN, LORIE S. OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003 TO 2008 DOE/ID-11390 (PART 9) 1
30-MAR-12 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - TRA-FD6/611 SHALLOW INJECTION WELL NSI-26001 0
05-MAR-12 LIVIERATOS, TED EMAIL - DEQ REVIEW OF WAG 10, OU 10-08, MONITORING REPORT FOR FY 2011 IR-25321 0
01-MAR-12 NOT SPECIFIED WASTE AREA GROUP 10, OPERABLE UNIT 10-08, MONITORING REPORT FOR FISCAL YEAR 2011 DOE/ID-11463 0
30-NOV-11 NOT SPECIFIED Operable Unit 10-08, Site-Wide Groundwater, Miscellaneous Sites, and Future Sites Remedial Action Completion Report for CFA-54 and TRA-74 DOE/ID-11448 0
16-NOV-11 DEQ; DOE; EPA NEW SITE IDENTIFICATION (NSI)- STEEL SHOT NORTH OF MFC NSI-25232 1
16-NOV-11 DEQ; DOE; EPA NEW SITE IDENTIFICATION (NSI)- TAN-650 - CONTAINMENT SERVICE BUILDING (LOFT AREA) NSI-25246 0
16-NOV-11 DEQ; DOE; EPA NEW SITE IDENTIFICATION (NSI) - LEAD FRAGMENTS IN FENCED AREA NORTH OF MFC NSI-26000 0
10-NOV-11 DEQ; DOE; EPA NEW SITE IDENTIFICATION (NSI) - MERCURY-CONTAMINATED 4-IN. CLAY PIPE OUTSIDE CFA-674 NSI-25248 0
10-NOV-11 DEQ; DOE; EPA NEW SITE IDENTIFICATION (NSI - PROJECTILES AND EXPLOSIVE MATERIAL NORTHWEST OF RYE GRASS FLATS NSI-25249 0
07-NOV-11 LIVIERATOS, TED DEQ REVIEW OF OU 10-08 COMPLETION REPORT FOR CFA-54 AND TRA-74 IR-25314 0
08-AUG-11 FAULK, DENNIS REQUEST FOR CONCURRENCE TO REMOVE REQUIREMENT TO PERFORM SITE WALKDOWNS AND VISUAL INSPECTIONS AS IDENTIFIED IN THE OPERABLE UNIT 10-04 RECORD OF DECISION, DOE LETTER DATED AUGUST 8, 2011 IR-15301 0
08-AUG-11 LIVIERATOS, TED REQUEST FOR CONCURRENCE TO REMOVE REQUIREMENT TO PERFORM SITE WALKDOWNS AND VISUAL INSPECTIONS AS IDENTIFIED IN THE OPERABLE UNIT 10-04 RECORD OF DECISION (WDP-RWMC-11-052) DOE LETTER DATED 08-08-11 IR-25302 0
08-AUG-11 HAIN, KATHLEEN E. REQUEST FOR CONCURRENCE TO REMOVE REQUIREMENT TO PERFORM SITE WALKDOWNS AND VISUAL INSPECTIONS AS IDENTIFIED IN THE OPERABLE UNIT 10-04 RECORD OF DECISION (WDP-RWMC-11-052) WDP-RWMC-11-052 0
04-APR-11 NOT SPECIFIED PREFINAL INSPECTION REPORT FOR THE OPERABLE UNIT 10-08 SITES CFA-54 AND TRA-74 DOE/ID-11443 0
01-MAR-11 VAN HORN, CAHN, KIMBRO, H OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 DOE/ID-11390 (PART 1) 0
01-MAR-11 NOT SPECIFIED OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 (APPENDIX F) DOE/ID-11390 (PART 10) 0
01-MAR-11 NOT SPECIFIED OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 (APPENDIX G) DOE/ID-11390 (PART 11) 0
01-MAR-11 NOT SPECIFIED OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 (APPENDIC G - K) DOE/ID-11390 (PART 12) 0
01-MAR-11 NOT SPECIFIED OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 (APPENDIX L) DOE/ID-11390 (PART 13) 0
01-MAR-11 NOT SPECIFIED OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 (APPENDIX L) DOE/ID-11390 (PART 14) 0
01-MAR-11 NOT SPECIFIED OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 (APPENDIX L) DOE/ID-11390 (PART 15) 0
01-MAR-11 NOT SPECIFIED OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 DOE/ID-11390 (PART 2) 0
01-MAR-11 NOT SPECIFIED OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 DOE/ID-11390 (PART 3) 0
01-MAR-11 NOT SPECIFIED OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 DOE/ID-11390 (PART 4) 0
01-MAR-11 NOT SPECIFIED OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 DOE/ID-11390 (PART 5) 0
01-MAR-11 NOT SPECIFIED OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 (APPENDICES A- B) DOE/ID-11390 (PART 6) 0
01-MAR-11 NOT SPECIFIED OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 (APPENDICES C-C5) DOE/ID-11390 (PART 7) 0
01-MAR-11 NOT SPECIFIED OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 (APPENDICES C6-D2) DOE/ID-11390 (PART 8) 0
01-MAR-11 NOT SPECIFIED OPERABLE UNIT 10-04 LONG-TERM ECOLOGICAL MONITORING REPORT FOR FISCAL YEARS 2003-2008 (APPENDICES E - E4) DOE/ID-11390 (PART 9) 0
07-FEB-11 OPALSKI, DANIEL D. U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE ON THE FIVE-YEAR REVIEW FOR IDAHO NATIONAL LABORATORY FISCAL YEARS 2005-2009 4544925 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 1) DOE/ID-11429 (PART 1) 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 2) DOE/ID-11429 (PART 2) 0
13-JAN-11 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2010 RPT-759 0
16-NOV-10 DEQ, DOE, EPA, CWI TRA-74 PREFINAL INSPECTION CHECKLIST PFI-1007 0
25-OCT-10 CAHN, L. S. ORD-23 LOCATION CORRECTION ORD-23 0
14-OCT-10 NOT SPECIFIED FIELD SAMPLING PLAN FOR THE OPERABLE UNITS 6-05 AND 10-04 REMEDIAL ACTION, PHASE IV DOE/ID-11280 1
12-AUG-10 NOT SPECIFIED OPERABLE UNIT 10-08 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/ID-11418 0
12-AUG-10 NOT SPECIFIED POST-RECORD OF DECISION GROUNDWATER MONITORING AND FIELD SAMPLING PLAN FOR OPERABLE UNIT 10-08 DOE/ID-11420 0
12-AUG-10 NOT SPECIFIED FIELD SAMPLING PLAN OPERABLE UNIT FOR 10-08, CFA-54 (6-IN. CLAY PIPE) POST-EXCAVATION SOIL CONFIRMATION DOE/ID-11424 0
12-AUG-10 NOT SPECIFIED FIELD SAMPLING PLAN FOR OPERABLE UNIT 10-08 TRA-74 POST-EXCAVATION SOIL CONFIRMATION DOE/ID-11425 0
04-FEB-10 NOT SPECIFIED WASTE AREA GROUP 10, OPERABLE UNIT 10-08, ANNUAL MONITORING STATUS REPORT FOR FISCAL YEAR 2009 DOE/ID-11417 0
21-JAN-10 NOT SPECIFIED REMOVAL ACTION REPORT FOR TEST AREA NORTH TECHNICAL SUPPORT FACILITY (TSF)-07 WASTEWATER DISPOSAL POND DOE/ID-11411 0
20-JAN-10 NOT SPECIFIED DOCUMENTATION OF MINOR CHANGE TO THE OU 10-08 RECORD OF DECISION FOR SITE-WIDE GROUNDWATER, MISCELLANEOUS SITES, AND FUTURE SITES, INL SITE, IDAHO--REMOVAL OF INSTITUTIONAL CONTROLS FOR TSF-07 AR-25278 0
25-NOV-09 NOT SPECIFIED OPERABLE UNIT 10-08 REMEDIAL DESIGN/REMEDIAL ACTION SCOPE OF WORK FOR SITE-WIDE GROUNDWATER, MISCELLANEOUS SITES, AND FUTURE SITES DOE/ID-11407 0
18-NOV-09 VAN HORN, R. L. FISCAL YEAR 2006 ECOLOGICAL MONITORING ANNUAL REPORT RPT-477 1
30-SEP-09 NOT SPECIFIED OPERABLE UNIT (OU) 10-08 - IDAHO CLEANUP PROJECT ADMINISTRATIVE RECORD (AR) INDEX FOR INEEL SITE-WIDE GROUNDWATER CONCERNS AND NEW SITES AR.INDEX.10.10-08 0
30-SEP-09 NOT SPECIFIED OPERABLE UNIT 10-08 RECORD OF DECISION FOR SITE-WIDE GROUNDWATER, MISCELLANEOUS SITES, AND FUTURE SITES DOE/ID-11385 0
21-SEP-09 KECK, JOHN F. OPERABLE UNIT 10-08 REMOVAL AND DISPOSAL (RD) REMEDY PROFILE DEVELOPMENT EDF-9312 0
31-AUG-09 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 10, AND REMOVAL ACTIONS DOE/ID-10587 10
08-JUL-09 NOT SPECIFIED ACTION MEMORANDUM FOR TSF-07 DISPOSAL POND AT TEST AREA NORTH DOE/ID-11404 0
19-MAY-09 NOT SPECIFIED ENGINEERING EVALUATION/COST ANALYSIS FOR TSF-07 DISPOSAL POND AT TEST AREA NORTH DOE/ID-11401 0
28-APR-09 PROVENCHER, RICHARD B. APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION/COST ANALYSIS FOR THE IDAHO NATIONAL LABORATORY, TSF-07 DISPOSAL POND AT TEST AREA NORTH, OPERABLE UNIT 10-08 WDP-RWMC-09-025 0
20-MAR-09 WELLS, RICHARD P. REMEDIAL ACTION REPORT FOR OPERABLE UNITS 6-05 AND 10-04 PHASE II DOE/ID-11378 (PART 1) 0
14-JAN-09 WELLS, RICHARD P. WASTE AREA GROUP 10 ANNUAL OPERATIONS AND MAINTENANCE REPORT - FY 2008 DOE/ID-11380 0
07-NOV-08 NOT SPECIFIED LEAD FRAGMENTS AND STEEL SHOT NORTH OF MFC NSI-25232 0
30-OCT-08 HERNANDEZ, NICOLE K. REMEDIAL ACTION PREFINAL INSPECTION CHECKLIST OU 10-04, PHASE II TRINITROTOLUENE AND CYCLOTRIMETHYLENETRINITRAMINE CONTAMINATED SITES PFI-1002 0
04-SEP-08 CAHN, LORIE S. PROPOSED PLAN FOR SITEWIDE GROUNDWATER, MISCELLANEOUS SITES, AND PROCESS FOR FUTURE SITES, OPERABLE UNIT 10-08 DOE/ID-11366 0
04-SEP-08 LJUNGBERG, CHARLES REQUEST FOR EXTENSION OF THE SUBMITTAL OF THE DRAFT RECORD OF DECISION FOR SITEWIDE GROUNDWATER, MISCELLANEOUS SITES, AND PROCESS FOR FUTURE SITES, OPERABLE UNIT (OU) 10-08 WDP-RWMC-08-047 0
19-AUG-08 WELLS, RICHARD P. OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT (OU) 10-04 DOE/ID-11354 0
17-JUL-08 R. D. ROSELAND OPERABLE UNIT (OU) 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES PROPOSED PLAN/PREFERRED ALTERNATIVE REVISED PROJECT SUPPORT COST ESTIMATE RDR-05-08 0
27-MAY-08 NOT SPECIFIED LONG-TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN FOR 2008 DOE/ID-11357 0
23-APR-08 HOLDREN, K. J. OPERABLE UNIT (OU) 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES FEASIBILITY STUDY DOE/ID-11338 00
18-APR-08 CAHN, L. S. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 1 0
18-APR-08 RODDY, M. S. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 1 0
18-APR-08 JOLLEY, W. L. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 1 0
18-APR-08 MAGNUSON, S. O. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 1 0
18-APR-08 VAN HORN, R. L. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 1 0
18-APR-08 MAGNUSON, S. O. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 2 0
18-APR-08 JOLLEY, W. L. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 2 0
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
18-APR-08 CAHN, L. S. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 2 0
18-APR-08 VAN HORN, R. L. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 2 0
18-APR-08 RODDY, M. S. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 2 0
18-APR-08 MAGNUSON, S. O. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 3 0
18-APR-08 JOLLEY, W. L. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 3 0
18-APR-08 RODDY, M. S. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 3 0
18-APR-08 CAHN, L. S. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 3 0
18-APR-08 JOLLEY, W. L. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 4 0
18-APR-08 VAN HORN, R. L. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 4 0
18-APR-08 CAHN, L. S. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 4 0
18-APR-08 RODDY, M. S. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 4 0
18-APR-08 MAGNUSON, S. O. OPERABLE UNIT 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 PART 4 0
14-APR-08 CAHN, L. S. OPERABLE UNIT (OU) 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES REMEDIAL INVESTIGATION/BASELINE RISK ASSESSMENT (RI/BRA) DOE/ID-11332 00
25-MAR-08 FORSYTHE, H. S. WASTE AREA GROUP (WAG) 10, OPERABLE UNIT (OU) 10-08, ANNUAL MONITORING STATUS REPORT FOR FISCAL YEAR 2007 DOE/ID-11355 00
05-FEB-08 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS DOE/ID-11042 04
31-JAN-08 VAN HORN, R. FISCAL YEAR 2006 (FY-06) ECOLOGICAL MONITORING ANNUAL REPORT RPT-477 00
19-NOV-07 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - SOIL BENEATH TEST AREA NORTH (TAN)-603 NORTHWEST SUMP TSF-59 NSI-25159 00
01-NOV-07 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - EMPTY 55-GALLON DRUM WEST OF CENTRAL FACILITIES AREA (CFA)-689 NSI-25079 00
30-OCT-07 NELSON, L. O. IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2007 DOE/ID-11350 00
22-OCT-07 KOCH, D. F. SITE TRA-60 - TRACK 1 DECISION DOCUMENTATION PACKAGE - OPERABLE UNIT 10-08 - FENCED AREA NORTH OF TRA-608 25164 00
10-OCT-07 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI)--OPERABLE UNIT (OU) 10-08--INACTIVE UNDERGROUND FUEL LINES CONNECTING TEST AREA NORTH (TAN)-611 FUEL PUMP HOUSE TO THE FORMER TAN-625 INITIAL ENGINE TEST (IET) FUEL PUMP STATION AND FORMER TAN-609 EQUIPMENT MAINTENANCE S NSI-25061 00
02-OCT-07 VANHORN, R. L. LONG TERM ECOLOGICAL MONITORING PLAN FOR THE IDAHO NATIONAL LABORATORY (INL) INEEL/EXT-02-01191 03
01-OCT-07 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE II DOE/NE-ID-11127 01
01-OCT-07 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNITS (OU) 6-05 AND 10-04 REMEDIAL ACTION (RA), PHASE II DOE/NE-ID-11133 01
10-SEP-07 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) CLARIFICATION ON THE NO ACTION DESIGNATION FOR THE MISC-016 SITE UNDER THE FEDERAL FACILITY ACT/CONSENT ORDER (FFA/CO) 25140 00
31-AUG-07 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) CLARIFICATION ON THE NO ACTION DESIGNATION FOR THE MISC-016 SITE UNDER THE FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (FFA/CO) 25136 00
15-AUG-07 WELLS, R. P. REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE III DOE/ID-11315 00
31-JUL-07 HANEY, T. J. LONG-TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2007 DOE/ID-11316 01
09-JUL-07 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - THREE SHALLOW INJECTION WELLS SOUTH OF TEST REACTOR AREA (TRA)-609 (29-TRA, 30-TRA, AND 31-TRA) NSI-25101 00
09-JUL-07 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - TEST REACTOR AREA (TRA)-718 OVERHEAD WATER TANK SOIL CONTAMINATION NSI-25102 00
22-MAY-07 MCMANAMON, L. E. ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 03
14-MAY-07 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - SOIL BENEATH THE TEST AREA NORTH (TAN)-666 FILTER VAULT NSI-25093 00
09-MAY-07 RODDY, M. S. WASTE AREA GROUP 10 (WAG-10) , OPERABLE UNIT (OU) 10-08, REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS) ANNUAL STATUS REPORT FOR FISCAL YEAR 2006 (FY-06) DOE/ID-11297 00
01-MAY-07 RODDY, M. S. GROUNDWATER MONITORING AND FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 10-08 DOE/NE-ID-11210 02
08-MAR-07 NEHER, E. R. MISCELLANEOUS SITES FISCAL YEAR 2006 (FY-06) WELL SERVICES REPORT RPT-319 00
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
16-JAN-07 JOLLEY, W. L. SITE CLEANUP REPORT FOR SITES PBF-33 AND PBF-34 DOE/ID-11307 00
28-DEC-06 JENSEN, N. R. NEW SITE IDENTIFICATION (NSI) - ABANDONED RADIOACTIVE WASTE LINES BETWEEN PER-620 AND PER-732, TRUCK LOADING STATION AND THE WARM WASTE WELL (PBF-38) NSI-25065 00
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
14-NOV-06 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 6-05 AND 10-04 PHASE IV DOE/ID-11261 00
14-NOV-06 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR THE OPERABLE UNITS (OU) 6-05 AND 10-04 REMEDIAL ACTION (RA), PHASE IV DOE/ID-11280 00
31-OCT-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 02
17-OCT-06 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - SHALLOW INJECTION WELL 19-TRA IDWR#27 TRA FD19 SOUTH SIDE TRA-727 A NSI-25038 00
17-OCT-06 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - SHALLOW INJECTION WELL 20-TRA IDWR#28 TRA FD20 SOUTH SIDE TRA-727 B NSI-25039 00
17-OCT-06 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - SHALLOW INJECTION WELL 21-TRA IDWR#29 TRA FD21 NORTHWEST CORNER TRA-627 NSI-25040 00
17-OCT-06 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - SHALLOW INJECTION WELL 2-TAN IDWR#2 SOUTH OF FUEL OIL TANK TAN-724 NSI-25041 00
17-OCT-06 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - SHALLOW INJECTION WELL 1-TAN IDWR#1 SOUTH OF FUEL OIL TANK TAN-702 NSI-25042 00
17-OCT-06 HANEY, T. J. FISCAL YEAR 2005 (FY-05) ECOLOGICAL MONITORING ANNUAL REPORT RPT-273 00
02-OCT-06 OLAVESON, B. E. IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2006 DOE/ID-11294 00
19-SEP-06 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE III DOE/NE-ID-11202 01
30-AUG-06 KOCH, D. F. REQUEST FOR CLARIFICATION OF NO ACTION DESIGNATIONS FOR SEVERAL SITES UNDER THE FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (FFA/CO) 25011 00
22-AUG-06 NOT SPECIFIED IDAHO CLEANUP PROJECT (ICP) PUBLIC NOTICE - PUBLIC MEETINGS SCHEDULED ON PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 25016 00
21-AUG-06 MAXAND, J. SNAKE RIVER ALLIANCE REQUEST FOR EXTENSION TO COMMENT PERIOD ON THE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER 25015 00
16-AUG-06 NOT SPECIFIED IDAHO CLEANUP PROJECT (ICP) PUBLIC NOTICE - AGENCIES RELEASE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER 25014 00
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
02-AUG-06 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR THE OPERABLE UNITS (OU) 6-05 AND 10-04 REMEDIAL ACTION (RA), PHASE III DOE/NE-ID-11212 01
01-AUG-06 CAHN, L. S. PROPOSED PLAN FOR TANK FARM SOIL AND GROUNDWATER AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), OPERABLE UNIT (OU) 3-14 RPT-223 00
27-JUL-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN DOE/ID-11042 03
13-JUL-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 01
06-JUL-06 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - SHALLOW INJECTION WELL 5-TEST REACTOR AREA (5-TRA) IDAHO DEPARTMENT OF WATER RESOURCES (IDWR) #12 TRA FD5 DRY WELL CONNECTED TO VALVE PIT IN TRA-669 24980 00
06-JUL-06 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - SOIL BENEATH CENTRAL FACILITIES AREA 617 (CFA-617) WASTE WATER PIPING 24981 00
01-JUL-06 NOT SPECIFIED IDAHO CLEANUP PROJECT (ICP) FACT SHEET - TANK FARM SOIL AND IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER - AGENCIES TO RELEASE PROPOSED PLAN FOR CLEANUP 24977 00
01-JUL-06 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - SHALLOW INJECTION WELL 13-TEST REACTOR AREA (13-TRA) IDWR#21 TRA FD13 NORTHEAST CORNER TRA-614 24994 00
01-JUL-06 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - SHALLOW INJECTION WELL 14-TEST REACTOR AREA (13-TRA) IDWR#22 TRA FD14 NORTHWEST CORNER TRA-616 24995 00
01-JUL-06 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - SHALLOW INJECTION WELL 15-TEST REACTOR AREA (13-TRA) IDWR#23 TRA FD15 SOUTH SIDE TRA-667 24996 00
20-JUN-06 LOSINSKI, S. J. DRILLING, CORING AND INSTALLATION OF TWO (2) DEEP MONITORING WELLS (MIDDLE-2051 AND MIDDLE-2050A) IN FISCAL YEAR 2005 (FY-05) - APPENDIX E PHOTOGRAPHS ARE INCLUDED RPT-178 00
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
08-JUN-06 DOE NO ACTION SITE - TRACK 1 DECISION DOCUMENTATION PACKAGE - ABANDONED DEBRIS LOCATED NEAR THE MIXED WASTE STORAGE FACILITY (MWSF) - OPERABLE UNIT (OU) 10-08 POWER BURST FACILITY (PBF-34) DOE/ID-10989 00
06-JUN-06 FAULK, D. REQUEST FOR CLARIFICATION OF NO ACTION DESIGNATIONS FOR SEVERAL SITES UNDER THE FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (FFA/CO) (MISC-001, -002, -003, -005, -006, -007, -008, -011, -012, -013, -014, -015, -019, -020, -023, -024, -029, -039, -04 25010 00
06-JUN-06 JENSEN, N. R. REQUEST FOR CLARIFICATION OF NO ACTION DESIGNATIONS FOR SEVERAL SITES UNDER THE FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (FFA/CO) FMDP-RFDP-06-040 00
31-MAY-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 00
08-MAY-06 RODDY, M. S. WASTE AREA GROUP 10 (WAG-10), OPERABLE UNIT (OU) 10-08, REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS) ANNUAL STATUS REPORT FOR FISCAL YEAR 2005 (FY-05) DOE/ID-11274 01
04-MAY-06 RODDY, M. S. GROUNDWATER MONITORING AND FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 10-08 DOE/NE-ID-11210 01
01-MAY-06 HANEY, T. J. LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2006 ICP/EXT-06-01130 00
07-APR-06 RODDY, M. S. WASTE AREA GROUP 10 (WAG-10) , OPERABLE UNIT (OU) 10-08, REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS) ANNUAL STATUS REPORT FOR FISCAL YEAR 2005 (FY-05) DOE/ID-11274 00
24-MAR-06 OPALSKI, D. D. EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR RECORD OF DECISION (ROD) FOR EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES DOE/ID-11264 00
22-MAR-06 JENSEN, N. R. TRACK 1 DECISION DOCUMENTATION PACKAGE - ABANDONED DEBRIS TRENCH - POWER BURST FACILITY -33 (PBF-33), OPERABLE UNIT 10-08 (OU 10-08) DOE/ID-10988 00
08-FEB-06 WELLS, R. P. WASTE AREA GROUP 10 (WAG-10) ANNUAL OPERATIONS AND MAINTENANCE (O&M) REPORT - FY 2005 (FY-05) ICP/EXT-05-01014 01
06-FEB-06 VANHORN, R. L. FISCAL YEAR 2004 (FY-04) ECOLOGICAL MONITORING ANNUAL REPORT ICP/EXT-05-01051 00
01-NOV-05 JENSEN, N. R. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-128, 4" SWA-100532 LEAK NEAR THE INTERSECTION WITH 8" SWN-3001 24920 00
25-OCT-05 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-126 - 20 INCH SW-NS-110477 FLANGE LEAK EAST OF CPP-601 24918 00
25-OCT-05 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-125 - 2 INCH SWA-106450 FLANGE LEAK NORTH OF CPP-1618 24919 00
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
03-OCT-05 WOOD, T. R. OPERABLE UNIT (OU) 10-08 SUMMARY REPORT ON THE SUBREGIONAL SCALE TWO DIMENSIONAL AQUIFER MODEL ICP/EXT-05-00979 01
28-SEP-05 WELLS, R. P. WASTE AREA GROUP 10 (WAG-10) ANNUAL OPERATIONS AND MAINTENANCE (O&M) REPORT - FISCAL YEAR 2005 (FY-05) ICP/EXT-05-01014 00
26-SEP-05 WELLS, R. P. PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 5 (WAG-5) ICP/EXT-05-00973 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
23-SEP-05 JOLLEY, W. L. TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 10-08 SITES MISC-033, CFA-10A, TRA-60, AND TRA-63 DOE/NE-ID-11232 00
22-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2005 (FY-05) DOE/ID-11249 00
15-SEP-05 HAIN, K. E. NEW SITE IDENTIFICATION (NSI) - CONTAMINATED SOIL AROUND THE TAN-607 DECONTAMINATION SHOP DOOR - TSF-52 24912 00
15-SEP-05 HAIN, K. E. NEW SITE IDENTIFICATION (NSI) - SOIL IN PIPE TRENCH WEST OF TAN-666 - TSF-55 24913 00
14-SEP-05 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE III DOE/NE-ID-11202 00
14-SEP-05 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR THE OPERABLE UNITS (OU) 6-05 AND 10-04 REMEDIAL ACTION (RA), PHASE III DOE/NE-ID-11212 00
12-SEP-05 ROHE, M. J. SELECTING AQUIFER WELLS FOR PLANNED GYROSCOPIC LOGGING INEEL/EXT-02-00248 02
06-SEP-05 KOCH, D. F. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) POSITION ON A PATH FORWARD FOR OPERABLE UNIT (OU) 10-08 SITE TRA-62 24925 00
31-AUG-05 JOLLEY, W. L. FIELD SAMPLING PLAN (FSP) FOR WASTE AREA GROUP 10 (WAG-10) TRACK 2 INVESTIGATION OF SITES CFA-54, MISC-45, AND TRA-62 DOE/NE-ID-11224 02
22-AUG-05 HAIN, K. E. NO FURTHER ACTION DETERMINATION TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - NAVY DEBRIS IN CANAL BETWEEN TEST REACTOR AREA (TRA) & NAVAL REACTORS FACILITY (NRF) - SITE 015 DOE/ID-10918 01
22-AUG-05 PAARMANN, M. L. NO FURTHER ACTION DETERMINATION TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - EXCAVATION PIT AND MOUND AND DEBRIS EAST OF GUARD GATE 3 - SITE 005 DOE/ID-10934 01
09-AUG-05 JESSMORE, P. J. PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 4 (WAG-4), CENTRAL FACILITIES AREA (CFA) ICP/EXT-05-00955 00
25-JUL-05 HODEL, M. P. NEW SITE IDENTIFICATION (NSI) - SOIL BENEATH TAN-607 DECONTAMINATION SHOP SUMP - SITE CODE TSF-54 24910 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
25-JUL-05 JOLLEY, W. L. FIELD SAMPLING PLAN (FSP) FOR WASTE AREA GROUP 10 (WAG-10) TRACK 2 INVESTIGATION OF SITES CFA-54, MISC-45, AND TRA-62 DOE/NE-ID-11224 01
12-JUL-05 WELLS, R. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE OPERABLE UNITS (OU) 6-05 AND 10-04 REMEDIAL ACTION (RA), PHASE III ICP/EXT-04-00697 00
30-JUN-05 SAVKRANZ, W. T. CLOSURE PLAN (CP) FOR THE COAL FIRED STEAM GENERATING FACILITY (CFSG) ASH BURY PIT AT THE IDAHO NATIONAL LABORATORY (INL) ICP/EXT-05-00865 00
30-JUN-05 ROOD, A. S. WHITE PAPER - GROUNDWATER TRANSPORT MODELING USING RESPONSE SURFACE MODELING - PROOF OF PRINCIPLE ICP/EXT-05-00952 00
20-JUN-05 PAARMANN, M. L. NO FURTHER ACTION FOR THE TRACK 1 INVESTIGATION , OPERABLE UNIT (OU) 10-08 - DEBRIS NEAR INTERSECTION OF HIGHWAYS 33 AND 22 - SITE 008 DOE/ID-10868 00
26-MAY-05 HAIN, K. E. NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-048 (MISC-48), MUD LAKE LANDFILL MISC-48 00
24-MAY-05 PAARMANN, M. L. TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - EXCAVATION PIT AND MOUND AND DEBRIS EAST OF GUARD GATE 3 - SITE 005 DOE/ID-10934 00
19-MAY-05 HAIN, K. E. TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - NAVY DEBRIS IN CANAL BETWEEN TEST REACTOR AREA (TRA) & NAVAL REACTORS FACILITY (NRF) - SITE 015 - PROCEED TO TRACK 2 DOE/ID-10918 00
10-MAY-05 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) APPROVAL - EPA RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST TO DELETE OPERABLE UNIT (OU) 1-11 AND RE-ASSIGN SITES TO OU 1-10 OR OU 10-08 24902 00
10-MAY-05 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) APPROVAL - EPA RESPONSE TO REQUEST TO PLACE WASTE AREA GROUP 9 (WAG-9) SEWAGE LAGOONS IN OPERABLE UNIT (OU) 10-08 FOR ADMINISTRATIVE CONTROL 24903 00
06-MAY-05 HANEY, T. J. LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2005 ICP/EXT-05-00778 00
04-MAY-05 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) APPROVAL TO DEPARTMENT OF ENERGY (DOE) REQUEST TO DELETE OPERABLE UNIT (OU) 1-11 AND RE-ASSIGN SITES TO OU 1-10 OR OU 10-08 24901 00
03-MAY-05 HAIN, K. E. DEPARTMENT OF ENERGY (DOE) APPROVAL - DOE REQUEST TO DELETE OPERABLE UNIT (OU) 1-11 AND RE-ASSIGN SITES TO OU 1-10 OR OU 10-08 FMDP-RFDP-05-028 00
04-APR-05 FAULK, D. ENVIRONMENTAL PROTECTION AGENCY (EPA) APPROVAL - EPA RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST TO PLACE WASTE AREA GROUP 9 (WAG-9), RELEASE SITE ANL-04, SEWAGE LAGOON IN OPERABLE UNIT (OU) 10-08 FOR ADMINISTRATIVE CONTROL - ANL TRANSFER 24898 00
31-MAR-05 JOLLEY, W. L. SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 10 (WAG-10) TRACK 2 INVESTIGATIONS FOR SITES CFA-54, MISC-45, AND TRA-62 DOE/NE-ID-11215 00
29-MAR-05 HODEL, M. P. NEW SITE IDENTIFICATION (NSI) FOR CFA-54 - BURIED WASTE PIPE SOUTH OF CFA-674 24896 00
29-MAR-05 PODGORNEY, R. K. WASTE AREA GROUP 10 (WAG-10), OPERABLE UNIT (OU) 10-08, REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ANNUAL STATUS REPORT FOR FISCAL YEAR 2004 (FY-04) DOE/NE-ID-11198 00
15-MAR-05 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) APPROVAL - DEQ RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST TO PLACE WASTE AREA GROUP 9 (WAG-9), RELEASE SITE ANL-04, SEWAGE LAGOON IN OPERABLE UNIT (OU) 10-08 FOR ADMINISTRATIVE CONTROL 24897 00
15-MAR-05 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 10 (WAG-10) TRACK 2 INVESTIGATION OF SITES CFA-54, MISC-45, AND TRA-62 ICP/EXT-05-00804 00
07-MAR-05 HAIN, K. E. DEPARTMENT OF ENERGY (DOE) APPROVAL - DOE REQUEST WASTE AREA GROUP 9 (WAG-9), RELEASE SITE ANL-04, SEWAGE LAGOON, BE PLACED IN OPERABLE UNIT (OU) 10-08 FOR ADMINISTRATIVE CONTROL FMDP-FFA/CO-05-123 00
31-JAN-05 HODEL, M. P. NEW SITE IDENTIFICATION (NSI) FOR TAN-030 (TAN-30) - TAN TSF FIRE STATION WASTE WATER SYSTEM DISCHARGE DRAINAGE DITCH 24890 00
31-JAN-05 JENSEN, K. M. SITE TRA-63 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - TRA-605 WARM WASTE LINE DOE/NE-ID-11139 00
31-JAN-05 JOLLEY, W. L. SITE TRA-62 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - ABANDONED DISCHARGE PIPELINE BETWEEN TRA-608 AREA AND CHEMICAL WASTE POND TRA-701 - APPENDIX A ERRONEOUSLY REFERENCES FIGURE A-2 ICP/EXT-04-00588 00
19-JAN-05 WELLS, R. P. REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I DOE/NE-ID-11186 00
14-JAN-05 PAARMANN, M. L. SITE 010 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DEBRIS IN CANAL WEST OF GUARD GATE 3 DOE/ID-10869 00
14-JAN-05 PAARMANN, M. L. SITE 040 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - MOUND SOUTHEAST OF EXPERIMENTAL ORGANIC COOLED REACTOR (EOCR) SECURITY TRAINING FACILITY (STF) BUILDINGS - DEQ REVIEW COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10870 00
14-JAN-05 PAARMANN, M. L. SITE 021 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - STAINS ON ROAD T17 FROM PORTLAND AVENUE TO BACKSIDE OF FORMER EXPERIMENTAL ORGANIC COOLED REACTOR (EOCR) SECURITY TRAINING FACILITY (STF) DOE/ID-10887 00
14-JAN-05 PAARMANN, M. L. SITE 017 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - STAINING ON EAST BUTTE ROAD DOE/ID-10888 00
14-JAN-05 PAARMANN, M. L. SITE 028 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - CANAL BUILDER'S CAMPSITE DOE/ID-10892 00
14-JAN-05 FAULK, D. SITE 025 TRACK 1 DECISION DOCUMENTATION, OPERABLE UNIT (OU) 10-08 - MOUNDS, CANS AND DRUMS NORTHEAST OF NAVAL REACTORS FACILITY (NRF) DOE/ID-10893 00
14-JAN-05 PAARMANN, M. L. SITE 004 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DIESEL SATURATED DIRT PILE NEAR EXPERIMENTAL FIELD STATION DOE/ID-10894 00
14-JAN-05 PAARMANN, M. L. SITE 026 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DETONATION PIT BETWEEN NAVAL REACTORS FACILITY (NRF) & TEST REACTOR AREA (TRA) - DEQ REVIEW COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10895 00
14-JAN-05 PAARMANN, M. L. SITE 045 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DIRT PILE WITH NAVAL SMOKE CANS NEAR IDAHO NUCLEAR TECHNOLOGY ENGINEERING CENTER (INTEC) - DEQ REVIEW COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10897 00
14-JAN-05 PAARMANN, M. L. SITE 035 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DETONATION PITS NORTH OF EXPERIMENTAL ORGANIC COOLED REACTOR (EOCR) SECURITY TRAINING FACILITY (STF) - DEQ REVIEW COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10901 00
14-JAN-05 PAARMANN, M. L. SITE 034 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - HOWE PEAK DIESEL SPILL - DEQ REVIEW COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10906 00
14-JAN-05 PAARMANN, M. L. SITE 030 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DEBRIS ON RICHARD BUTTE - EPA REVIEW COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10923 00
14-JAN-05 PAARMANN, M. L. SITE 018 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - UNCAPPED WELL IN BIG LOST RIVER SINKS AREA - DEQ REVIEW COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10935 00
14-JAN-05 PAARMANN, M. L. SITE 031 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - TWO EIGHT INCH (8 IN.) DIAMETER ROUNDS - DEQ REVIEW COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10939 00
14-JAN-05 PAARMANN, M. L. SITE 037 TRACK 1 DECISION DOCUMENTATION PACKAGE - OPERABLE UNIT (OU) 10-08 - GALVANIZED METAL TRASH CAN LID AND EMPTY STAINLESS STEEL CONTAINER LOCATED NEAR FORMER EXPERIMENTAL FIELD STATION (DAIRY FARM) DOE/ID-10941 00
14-JAN-05 PAARMANN, M. L. SITE 038 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - UNCAPPED WELL EAST OF ARGONNE NATIONAL LABORATORY (ANL) DOE/ID-10942 00
14-JAN-05 PAARMANN, M. L. SITE 043 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - CONSTRUCTION PIT NORTHWEST OF EXPERIMENTAL ORGANIC COOLED REACTOR (EOCR) SECURITY TRAINING FACILITY (STF) DOE/ID-10943 00
14-JAN-05 PAARMANN, M. L. SITE 047 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - SMALL FUEL TANK NORTH OF IDAHO NUCLEAR TECHNOLOGY ENGINEERING CENTER (INTEC) - DEQ REVIEW COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10944 00
14-JAN-05 PAARMANN, M. L. SITE 027 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - MOUND NEAR EAST PORTLAND AND EAST OGDEN INTERSECTION - EPA REVIEW COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10945 00
14-JAN-05 PAARMANN, M. L. SITE 032 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - MOUND NEAR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) GRAVEL PIT - DEQ COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10946 00
14-JAN-05 PAARMANN, M. L. SITE 039 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - AMMUNITION REMAINS IN FORMER EXPERIMENTAL ORGANIC COOLED REACTOR (EOCR) SECURITY TRAINING FACILITY (STF) AREA - DEQ REVIEW COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10948 00
14-JAN-05 PAARMANN, M. L. SITE 041 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - PITS & MOUNDS NORTHEAST OF EXPERIMENTAL ORGANIC COOLED REACTOR (EOCR) SECURITY TRAINING FACILITY (STF) - DEQ REVIEW COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10949 00
14-JAN-05 PAARMANN, M. L. SITE 042 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - CONSTRUCTION DEBRIS NORTHEAST OF EXPERIMENTAL ORGANIC COOLED REACTOR (EOCR) SECURITY TRAINING FACILITY (STF) - DEQ REVIEW COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10950 00
14-JAN-05 PAARMANN, M. L. SITE 044 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - CONCRETE LINED DEPRESSION WEST OF CENTRAL FACILITIES AREA (CFA) DOE/ID-10951 00
14-JAN-05 HANEY, T. J. SITE PBF-35 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - ABANDONED POWER AND CONTROL CABLES BETWEEN BUILDINGS AT THE POWER BURST FACILITY (PBF) COMPLEX DOE/ID-10990 00
21-DEC-04 WOOD, T. R. IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPERABLE UNIT (OU) 10-08 SITE WIDE GROUNDWATER MODEL WORK PLAN DOE/NE-ID-11188 00
08-NOV-04 ENGLISH, M. CORRECTION OF PREVIOUSLY SIGNED DECISION STATEMENTS FOR TRACK ONES (TRACK 1'S) 24891 00
01-NOV-04 HANEY, T. J. FISCAL YEAR 2003 (FY-03) ECOLOGICAL MONITORING ANNUAL REPORT ICP/EXT-04-00548 00
26-OCT-04 SMITH, D. M. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR LONG TERM STEWARDSHIP (LTS) SITE WIDE GROUNDWATER MONITORING INEEL/EXT-01-01644 04
03-SEP-04 JOLLEY, W. L. SITE 009 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DEBRIS SOUTH OF HIGHWAY 33 EAST OF TEST AREA NORTH (TAN) DOE/ID-10913 00
03-SEP-04 PAARMANN, M. L. SITE 016 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - FARMING DEBRIS IN BIG LOST RIVER SINKS AREA DOE/ID-10919 00
03-SEP-04 JOLLEY, W. L. SITE 022 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - RUSTY METAL DEBRIS ADJACENT TO HIGHWAY 28 DOE/ID-10936 00
03-SEP-04 PAARMANN, M. L. SITE 029 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - ASPHALT NEAR MAIN GUARD GATE DOE/ID-10938 00
03-SEP-04 JOLLEY, W. L. SITE 036 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DEBRIS SOUTHWEST OF HIGHWAY 28 DOE/ID-10940 00
03-SEP-04 PAARMANN, M. L. SITE 046 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - TEST APPARATUS WEST OF CENTRAL FACILITIES AREA (CFA) - DEQ REVIEW COMMENTS AND RESOLUTIONS ATTACHED DOE/ID-10952 00
26-AUG-04 WOOD, T. R. WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-08 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SUPPLEMENTAL ANNUAL REPORT - FISCAL YEAR 2003 (FY-03) DOE/NE-ID-11116,SUPP 01
25-AUG-04 HANEY, T. J. SITE 002 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - CAR BODY SOUTH OF HIGHWAY 33 ON IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) BOUNDARY ROAD DOE/ID-10932 00
04-AUG-04 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE II DOE/NE-ID-11127 00
04-AUG-04 WELLS, R. P. OPERATIONS AND MAINTENANCE (O&M) PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE II DOE/NE-ID-11130 00
04-AUG-04 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNITS (OU) 6-05 AND 10-04 REMEDIAL ACTION (RA), PHASE II DOE/NE-ID-11133 00
30-JUL-04 HANEY, T. J. SUMMARY REPORT FOR THE 2004 TIME CRITICAL REMOVAL ACTION (TCRA) FOR UNEXPLODED ORDNANCE (UXO) AT OPERABLE UNIT (OU) 10-04 ICP/EXT-04-00437 00
28-JUL-04 SHAW, R. M. DOCUMENTATION OF AGENCY CONSENSUS ON WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-08 GROUNDWATER MODELING OBJECTIVES AND TRANSMITTAL OF MEETING PRESENTATION MATERIALS EM-ER-04-167 00
22-JUL-04 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE WASTE AREA GROUP 10 (WAG-10) REMEDIAL ACTIONS AT TRINITROTOLUENE (TNT) AND ROYAL DEMOLITION EXPLOSIVE (RDX) CONTAMINATED SITES (TNT/RDX) ICP/EXT-03-00119 00
19-JUL-04 MCCOY-BROWN, C. FINAL MANAGEMENT PLAN AND ENVIRONMENTAL ASSESSMENT (EA) ID-074-02-067 - FINDING OF NO SIGNIFICENT IMPACT (FONSI) - INEEL SAGEBRUSH STEPPE ECOSYSTEM RESERVE ID-074-02-067 00
23-JUN-04 JOLLEY, W. L. FIELD SAMPLING PLAN (FSP) FOR WASTE AREA GROUP 10 (WAG-10) TRACK 2 INVESTIGATION DOE/NE-ID-11151 00
02-JUN-04 SHAW, R. M. TRANSMITTAL OF THE SCOPE OF WORK FOR WASTE AREA GROUP 10 (WAG-10) TRACK 2 INVESTIGATIONS FOR CFA-10A, SITES MISC-33, TRA-60, AND TRA-63 EM-ER-04-114 00
01-JUN-04 HANEY, T. J. LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2004 ICP/EXT-04-00165 00
25-MAY-04 WINTER, G. TRANSMITTAL OF ENVIRONMENTAL PROTECTION AGENCY (EPA) AND DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) DECISION STATEMENTS ON TRACK 1 DECISION DOCUMENTATION PACKAGE FOR TRA-60 24864 00
18-MAY-04 SHAW, R. M. TRANSMITTAL OF NEW SITE IDENTIFICATION (NSI) FOR CFA-54 - BURIED WASTE PIPE SOUTH OF CFA-674 EM-ER-04-103 00
05-MAY-04 JOLLEY, W. L. SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 10 (WAG-10) TRACK 2 INVESTIGATIONS FOR CFA-10A, SITES MISC-33, TRA-60, AND TRA-63 DOE/NE-ID-11135 00
04-MAY-04 OWSLEY, D. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) APPROVAL OF THE MARCH 2, 2004 (03/02/04) REQUEST FOR THE NO LONGER CONTAINED IN DETERMINATION (NLCID) FOR SOILS IMPACTED BY RELEASE OF APPROXIMATELY 210 GALLONS OF PURGE WATER TO SNAKE RIVER PLAIN AQUIFER (SR 24862 00
26-APR-04 JOLLEY, W. L. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 10 (WAG-10) TRACK 2 INVESTIGATION SITES ICP/EXT-04-00218 00
01-APR-04 WELLS, R. P. WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-08 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ANNUAL REPORT FOR FISCAL YEAR 2003 (FY-03) DOE/ID-11116 00
01-APR-04 SMITH, D. M. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR LONG TERM STEWARDSHIP (LTS) SITE WIDE GROUNDWATER MONITORING INEEL/EXT-01-01644 03
23-MAR-04 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10587 08
09-FEB-04 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I DOE/ID-11101 00
05-FEB-04 WELLS, R. P. OPERATIONS AND MAINTENANCE (O&M) PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I DOE/ID-11102 01
16-JAN-04 VANHORN, R. L. LONG TERM ECOLOGICAL MONITORING PLAN FOR THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) INEEL/EXT-02-01191 01
18-DEC-03 WELLS, R. P. OPERATIONS AND MAINTENANCE (O&M) PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I DOE/ID-11102 00
06-NOV-03 GURNEY, L. W. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR LONG TERM STEWARDSHIP (LTS) SITE WIDE GROUNDWATER MONITORING INEEL/EXT-01-01644 02
30-SEP-03 ROHE, M. J. SELECTING AQUIFER WELLS FOR PLANNED GYROSCOPIC LOGGING INEEL/EXT-02-00248 01
30-SEP-03 WELLS, R. P. PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 2 (WAG-2), TEST REACTOR AREA (TRA) INEEL/EXT-03-00028 00
24-SEP-03 VANHORN, R. L. LONG TERM ECOLOGICAL MONITORING PLAN FOR THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) INEEL/EXT-02-01191 00
30-JUN-03 VANHORN, R. L. LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2003 INEEL/EXT-02-01546 01
13-JUN-03 WELLS, R. P. SUPERSEDED BY DOE/NE-ID-11210, REVISION 0 (REV.00) - FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING UNDER OPERABLE UNIT (OU) 10-08 FOR FISCAL YEARS 2002, 2003, AND 2004 (FY-02, FY-03, AND FY-04) INEEL/EXT-01-01529 04
10-JUN-03 NELSON, G. E. IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 SUBMITTAL OF DRAFT SCOPE OF WORK (SOW) FOR POST FIVE YEAR REMEDY REVIEW WORK PLAN FOR REVIEW EM-ER-03-174 00
09-JUN-03 ROBACK, R. C. INITIAL REPORT AQUIFER BACKGROUND STUDY: SUMMARY OF URANIUM AND PLUTONIUM DATA FROM INEEL GROUNDWATER SAMPLES INEEL/EXT-03-00655 00
02-JUN-03 LEECASTER, M. K. DETERMINATION OF BACKGROUND URANIUM CONCENTRATION IN THE SNAKE RIVER PLAIN AQUIFER (SRPA) UNDER THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY'S (INEEL) RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) INEEL/EXT-03-00367 00
28-MAY-03 HAIN, K. E. DISAGREEMENT OVER SCOPE OF THE DRAFT LONG TERM ECOLOGICAL MONITORING PLAN FOR 2003 - INEEL/EXT-02-01191, REVISION D (REV.0D), JANUARY 2003 (01/03) EM-ER-03-127 00
09-MAY-03 VANHORN, R. L. LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2003 INEEL/EXT-02-01546 00
24-APR-03 JOLLEY, W. L. INSTITUTIONAL CONTROLS STATUS REPORT FOR WASTE AREA GROUPS 6 AND 10 (WAG-6 AND WAG-10) INEEL/EXT-03-00199 00
13-APR-03 NYGARD, D. ENVIRONMENTAL PROTECTION AGENCY (EPA) AND IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) CONCERNS REGARDING THE LONG TERM ECOLOGICAL MONITORING PLAN FOR OPERABLE UNIT (OU) 10-04 RECORD OF DECISION (ROD) 24801 00
28-MAR-03 HAIN, K. E. ORDNANCE CLEANUP AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) BY THE U. S. ARMY CORPS OF ENGINEERS' FORMERLY USED DEFENSE SITES PROGRAM EM-ER-03-089 00
20-MAR-03 HOBSON, S. CITIZENS ADVISORY BOARD (CAB) REVIEW AND COMMENTS - RECOMMENDATION #92 FOR THE PROPOSED PLAN FOR OPERABLE UNIT (OU) 10-04 - WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) 02-CAB-031 00
12-MAR-03 MAAS, J. A. RESPONSE FROM U. S. ARMY CORPS OF ENGINEERS REGARDING ORDNANCE CLEANUP AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) BY THE U. S. ARMY CORPS OF ENGINEERS' FORMERLY USED DEFENSE SITES PROGRAM 24780 00
12-MAR-03 GURNEY, L. W. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR ENVIRONMENTAL RESTORATION (ER) LONG TERM SITE WIDE GROUNDWATER MONITORING INEEL/EXT-01-01644 01
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
04-MAR-03 NELSON, G. E. SUBMITTAL OF OPERABLE UNITS (OU) 6-05 AND 10-04 FINAL SCOPE OF WORK (SOW) FOR EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES EM-ER-03-063 00
27-FEB-03 HANEY, T. J. U. S. DEPARTMENT OF ENERGY IDAHO OPERATIONS OFFICE (DOE-ID) LEAD AGENCY ACTION MEMORANDUM TIME CRITICAL REMOVAL ACTION (TCRA) FOR UNEXPLODED ORDNANCE (UXO) OPERABLE UNIT (OU) 10-04, INEEL INEEL/EXT-02-01033 02
26-FEB-03 DOE NEW SITE IDENTIFICATION (NSI) FOR TRA-63 (TRA-605 WARM WASTE LINE) 24775 00
26-FEB-03 DOE NEW SITE IDENTIFICATION (NSI) FOR TRA-62 (ABANDONED DISCHARGE LINES, TRA-608 AREA TO TRA-701 CHEMICAL LEACH POND) 24776 00
26-FEB-03 DOE TRACK 1 DECISION DOCUMENTATION PACKAGE - TRA-56 - ACID TRANSFER LINE FROM TRA-631 T0 TRA-645 24777 00
26-FEB-03 DOE TRACK 1 DECISION DOCUMENTATION PACKAGE - TRA-59 - ABANDONED BURIED ACID LINE FROM TRA-631 TO TRA-671 24778 00
01-FEB-03 BROOMFIELD, B. J. OPERABLE UNITS (OU) 6-05 AND 10-04, EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES, REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) DOE/ID-11035 00
30-JAN-03 NELSON, G. E. SUBMITTAL OF OPERABLE UNITS (OU) 6-05 AND 10-04 REVISED DRAFT SCOPE OF WORK (SOW) FOR EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES EM-ER-03-031 00
10-JAN-03 HAIN, K. E. REQUEST FOR EVALUATION OF PORTIONS OF THE INEEL FOR INCORPORATION INTO THE U. S. ARMY CORPS OF ENGINEERS - FORMERLY USED DEFENSE SITES PROGRAM EM-ER-03-007 00
20-NOV-02 INEEL COMMUNITY RELATIONS PRESS RELEASE - AGENCIES SIGN RECORD OF DECISION (ROD) TO CLEANUP EXPLODED ORDNANCE AND OTHER SITES AT THE INEEL 24761 00
18-NOV-02 NELSON, G. E. TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 6-05 AND 10-04 EXPERIMENTAL BREEDER REACTOR I AND BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) EM-ER-02-192 00
13-NOV-02 HEHN, P. V. FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING UNDER OPERABLE UNIT (OU) 10-08 FOR FISCAL YEARS 2002, 2003, AND 2004 (FY-02, FY-03, AND FY-04) INEEL/EXT-01-01529 03
05-NOV-02 AR COORDINATOR OPERABLE UNIT (OU) 10-04 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR WASTE AREA GROUP 10 (WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 10-04 AR.INDEX.OU.10-04 00
05-NOV-02 BROOMFIELD, B. J. RECORD OF DECISION (ROD) FOR EXPERIMENTAL BREEDER REACTOR I & BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES - OPERABLE UNITS (OU) 6-05 AND 10-04 DOE/ID-10980 00
30-OCT-02 ROBERTS, J. D. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE REMOVAL AND DETONATION OF UNEXPLODED ORDNANCE (UXO) AT THE INEEL INEEL/EXT-02-01102 00
23-OCT-02 NELSON, G. E. IMPLEMENTATION AND MAINTENANCE OF SITE WIDE INSTITUTIONAL CONTROLS AS DISCUSSED IN THE RECORD OF DECISION (ROD) FOR EBR-I/BORAX AREA AND MISCELLANEOUS SITES - DOE/ID-10980, SEPTEMBER 2002 (09/02) EM-ER-02-181 00
24-SEP-02 NELSON, G. E. SUBMITTAL OF FINAL RECORD OF DECISION (ROD) FOR EXPERIMENTAL BREEDER REACTOR I BOILING REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES - OPERABLE UNIT (OU) 6-05 AND 10-04 (DOE/ID-10980) EM-ER-02-161 00
19-SEP-02 HIARING, C. M. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (FINAL) FOR WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-08 DOE/ID-10902 00
12-SEP-02 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 DOE/ID-10587 07
01-AUG-02 SMITH, R. P. VARIABILITY OF THE AQUIFER THICKNESS BENEATH THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) - ATTACHMENT TO DOE/ID-10902 INEEL/EXT-02-01022 00
30-JUL-02 DOE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS AND RESOLUTIONS ON DRAFT FINAL WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-08 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN 23947 00
24-JUL-02 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DOE REQUEST FOR EXTENSION FOR OPERABLE UNIT (OU) 10-08 FOR SUBMITTAL OF DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT AND DRAFT RECORD OF DECISION (ROD) 24752 00
22-JUL-02 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DOE REQUEST FOR EXTENSION FOR OPERABLE UNIT (OU) 10-08 FOR SUBMITTAL OF DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT AND DRAFT RECORD OF DECISION (ROD) 24751 00
16-JUL-02 FREI, M. W. EM-1 APPROVES MILESTONE CHANGE STRATEGY FOR INEEL OPERABLE UNIT (OU) 10-08 RECORD OF DECISION (ROD) EM-ER-02-114 00
11-JUL-02 HANEY, T. J. FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING UNDER OPERABLE UNIT (OU) 10-08 FOR FISCAL YEARS 2002, 2003 AND 2004 (FY-02, FY-03 & FY-04) - ATTACHMENT TO DOE/ID-10902 INEEL/EXT-01-01529 02
09-JUL-02 NELSON, G. E. OPERABLE UNIT (OU) 10-08 - REQUEST FOR CONCURRENCE WITH DEFERRING TWO (2) FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (FFA/CO) MILESTONES EM-ER-02-110 00
25-JUN-02 EPA EPA AND IDEQ COMMENT RESOLUTION FORMS - DRAFT RECORD OF DECISION (ROD) - EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I /BORAX) AND MISCELLANEOUS SITES - OPERABLE UNITS (OU) 6-05 & 10-04 - DOE/ID-10980 23839 00
20-JUN-02 DOE NEW SITE IDENTIFICATION (NSI) FORM - SOIL FILLED CONCRETE RING ADJACENT TO BUILDING CFA-667 DISCOVERED DURING REMEDIAL ACTION AT CFA-10 - NEW SITE TITLE: CFA-10A 24662 00
11-JUN-02 NELSON, G. E. TWENTY (20) DAY EXTENSION OF COMMENT RESOLUTION PERIOD FOR OPERABLE UNIT (OU) 10-04 DRAFT RECORD OF DECISION (ROD) EM-ER-02-101 00
06-JUN-02 NELSON, G. E. TWENTY (20) DAY EXTENSION OF COMMENT PERIOD FOR OPERABLE UNIT (OU) 10-08 DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-02-100 00
09-MAY-02 HANEY, T. J. TRACK 1 DECISION DOCUMENTATION PACKAGE - SITE 033 (MISC-33) OPERABLE UNIT (OU) 10-08 - EXPERIMENTAL TEST DRUM IN EOCR-01 LEACH POND 24882 00
07-MAY-02 NELSON, G. E. WASTE AREA GROUP 6 AND 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-08 - DISTRIBUTION OF 12 TRACK 1 DECISION DOCUMENTATION PACKAGES SIGNED BY ALL RESPONSIBLE PROGRAM MANAGERS EM-ER-02-081 00
26-APR-02 HAIN, K. E. DOE RESPONSE TO CAB COMMENTS - INEEL CITIZENS ADVISORY BOARD (CAB) SUBMITTAL OF RECOMMENDATION #92 EM-ER-02-057 00
18-APR-02 HANEY, T. J. FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING UNDER OPERABLE UNIT (OU) 10-08 FOR FISCAL YEARS 2002, 2003 AND 2004 (FY-02, FY-03 & FY-04) INEEL/EXT-01-01529 01
08-APR-02 MCGUIRE, M. J. FISCAL YEAR 2001 (FY-2001) INSTITUTIONAL CONTROL INSPECTION REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNIT (OU) 2-13 INEEL/EXT-01-00772 00
02-APR-02 EPA SITE 013 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DEBRIS NEXT TO THE CANAL INSIDE THE BOUNDARY OF THE NAVAL REACTOR FACILITY (NRF) DOE-ID-10916 00
02-APR-02 DEQ SITE 013 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DEBRIS NEXT TO THE CANAL INSIDE THE BOUNDARY OF THE NAVAL REACTOR FACILITY (NRF) DOE-ID-10916 00
02-APR-02 DOE SITE 013 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DEBRIS NEXT TO THE CANAL INSIDE THE BOUNDARY OF THE NAVAL REACTOR FACILITY (NRF) DOE-ID-10916 00
02-APR-02 DOE SITE 006 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - CISTERN NORTH OF THE NAVAL REACTOR FACILITY (NRF) DOE/ID-10911 00
02-APR-02 DOE SITE 007 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DEBRIS NEAR CINDER PIT ON THE INEEL SOUTHERN BORDER DOE/ID-10912 00
02-APR-02 DOE SITE 011 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - CISTERN NORTH OF THE NAVAL REACTOR FACILITY (NRF) DOE/ID-10914 00
02-APR-02 DOE SITE 012 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DEBRIS NORTH OF HIGHWAY 33 NEAR THE WEST ENTRANCE DOE/ID-10915 00
02-APR-02 DOE SITE 013 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DEBRIS NEXT TO THE CANAL INSIDE THE BOUNDARY OF THE NAVAL REACTOR FACILITY (NRF) DOE/ID-10916 00
02-APR-02 DOE SITE 014 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DEBRIS IN THE BIG LOST RIVER SINKS AREA DOE/ID-10917 00
02-APR-02 DOE SITE 019 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - HOMESTEAD SITE AT THE BIRCH CREEK AND CEDAR CANYON ROAD DOE/ID-10920 00
02-APR-02 DOE SITE 020 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - STAINED ROAD NEAR THE NAVAL REACTOR FACILITY (NRF) DOE/ID-10921 00
02-APR-02 DOE SITE 024 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - HOMESTEAD SITE NORTHWEST OF THE SPECIFIC MANUFACTURING CAPABILITY (SMC) AND TEST AREA NORTH (TAN) DOE/ID-10922 00
02-APR-02 DOE SITE 003 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - CAR BODY ADJACENT TO THE BIG LOST RIVER DOE/ID-10933 00
02-APR-02 DOE SITE 023 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DEBRIS IN THE BIRCH CREEK DRAINAGE GRAVEL PIT DOE/ID-10937 00
29-MAR-02 DOE SITE 001 TRACK 1 DECISION DOCUMENTATION PACKAGE, OPERABLE UNIT (OU) 10-08 - DEBRIS ALONG THE BIG LOST RIVER NEAR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) DOE/ID-10910 00
28-MAR-02 NELSON, G. E. SUBMITTAL OF DRAFT WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-08 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DOE/ID-10902) EM-ER-02-045 00
01-MAR-02 EPA ENVIRONMENTAL PROTECTION AGENCY (EPA), IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AND DOE-ID REVIEW COMMENTS AND RESOLUTIONS FOR DRAFT WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-08 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK P 23837 00
01-MAR-02 ROBERTS, J. D. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR ENVIRONMENTAL RESTORATION (ER) LONG TERM SITE WIDE GROUNDWATER MONITORING - ATTACHMENT TO DOE/ID-10902 INEEL/EXT-01-01644 00
13-FEB-02 HOBSON, S. CITIZENS ADVISORY BOARD (CAB) REQUEST FOR A 30 DAY EXTENSION TO PUBLIC COMMENT PERIOD ON OPERABLE UNIT (OU) 10-04 PROPOSED PLAN 02-CAB-008 00
12-FEB-02 SCHWARTZ, N. TRANSCRIPT FROM OPERABLE UNIT (OU) 10-04 PROPOSED PLAN PUBLIC MEETING HELD IN IDAHO FALLS, IDAHO FEBRUARY 12, 2002 (02/12/02) 24759 00
07-FEB-02 SCHWARTZ, N. TRANSCRIPT FROM OPERABLE UNIT (OU) 10-04 PROPOSED PLAN PUBLIC MEETING HELD IN BOISE, IDAHO FEBRUARY 7, 2002 (02/07/02) 24758 00
06-FEB-02 NELSON, G. E. OPERABLE UNIT (OU) 10-04 FFA/CO DEADLINE FOR SUBMITTAL OF DRAFT RECORD OF DECISION (ROD) - CONFIRMATION OF AGREEMENT REGARDING DEADLINE EXTENSION BY 30 CALENDAR DAYS EM-ER-02-019 00
25-JAN-02 NELSON, G. E. INEEL WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 PROPOSED PLAN - EXTENSION OF PUBLIC REVIEW PERIOD BY 30 CALENDAR DAYS EM-ER-02-014 00
01-JAN-02 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) ENVIRONMENTAL INVESTIGATION COMPLETE 10955 00
01-JAN-02 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR OPERABLE UNIT (OU) 10-04 - WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) 10956 00
13-SEP-01 HAIN, K. E. TRANSMITTAL OF INEEL WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 SUBMITTAL OF DRAFT PROPOSED PLAN FOR REVIEW AND COMMENT EM-ER-01-151 00
16-AUG-01 NELSON, G. E. SUBMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 - VOLUME 1 (VOL.01) AND VOLUME 2 (VOL.02) EM-ER-01-131 00
15-AUG-01 VANHORN, R. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 - VOLUME 1 (VOL.01) OF 2 DOE/ID-10807,VOL.01 00
15-AUG-01 VANHORN, R. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 - VOLUME 2 (VOL.02) OF 2 DOE/ID-10807,VOL.02 00
02-AUG-01 NELSON, G. E. WAG-10 - REQUEST FOR AGREEMENT WITH FIFTEEN (15) DAY SCHEDULE EXTENSION FOR ISSUING THE FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) IN ACCORDANCE WITH FFA/CO SECTION 8.18 EM-ER-01-126 00
05-JUL-01 NELSON, G. E. SUBMITTAL OF DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ASSESSMENT FOR WASTE AREA GROUPS 6 AND 10 (WAG-6 AND WAG-10) OPERABLE UNIT (OU) 10-04 FOR REVIEW AND COMMENT EM-ER-01-119 00
18-JUN-01 SNOOK, J. G. DRAFT DATA QUALITY OBJECTIVES (DQO) WORKBOOK FOR WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-08 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, REV.0C EM-ER-01-104 00
08-MAY-01 WINTER, G. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON THE DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 10934 00
07-MAY-01 DOE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS AND RESOLUTIONS TO COMMENTS ON THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WASTE AREA GROUP 6 AND 10 (WAG-6 & WAG-10) FOR OPERABLE UNIT (OU) 10-04 10940 00
04-MAY-01 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON THE DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 10933 00
04-MAY-01 NOT SPECIFIED ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS AND RESOLUTIONS TO COMMENTS ON THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 10-04 10939 00
14-MAR-01 LIVIERATOS, T. TRANSMITTAL OF SIGNED COPIES OF THREE (3) NEW SITE IDENTIFICATION (NSI) FORMS - POWER BURST FACILITY 33 (PBF-33), POWER BURST FACILITY 34 (PBF-34) AND POWER BURST FACILITY 35 (PBF-35) 10927 00
13-MAR-01 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 POWER BURST FACILITY 33 (PBF-33) - ABANDONED DEBRIS TRENCH 10928 00
13-MAR-01 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 POWER BURST FACILITY 34 (PBF-34) - ABANDONED DEBRIS LOCATED NEAR THE MIXED WASTE STORAGE FACILITY (MWSF) 10929 00
13-MAR-01 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 POWER BURST FACILITY 35 (PBF-35) - ABANDONED POWER AND CONTROL CABLES BETWEEN BUILDINGS AT THE POWER BURST FACILITY (PBF) COMPLEX 10930 00
22-FEB-01 HATHAWAY, C. TRANSMITTAL OF THREE (3) NEW SITE IDENTIFICATION (NSI) FORMS - POWER BURST FACILITY 33 (PBF-33), POWER BURST FACILITY 34 (PBF-34) AND POWER BURST FACILITY 35 (PBF-35) EM-ER-01-037 00
30-JAN-01 AR COORDINATOR OPERABLE UNIT (OU) 10-03 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF ORDNANCE AREAS - INCLUDING NAVAL ORDNANCE DISPOSAL AREA (NODA) AT THE INEEL OU 10-03 AR.INDEX.OU.10-03 00
27-NOV-00 MILLER, R. E. ENGINEERING DESIGN FILE (EDF) - DATA ACQUISITION METHODOLOGY & OPERABLE UNIT (OU) 10-04 DATABASE DEVELOPMENT - FUNTIONAL FILE NUMBER INEEL/EXT-2000-10422 EDF-ER-230 00
04-OCT-00 PIERRE, W. INEEL WASTE AREA GROUP 10 (WAG-10) NEW SITE LOCATIONS SUMMARY MAP 10839 00
20-SEP-00 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV DOE/ID-10587 06
31-AUG-00 KUHNS, D. J. NEW SITE IDENTIFICATION (NSI) - TEST AREA NORTH (TAN) INITIAL ENGINE TEST (IET) SOILS BENEATH SUB-GRADE SUMPS WITHIN TAN-620 & TAN-656 - IET-12 - OPERABLE UNIT (OU) 1-11 DELETED MAY 19, 2005 (05/19/05) 10932 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-01, DEBRIS ALONG BIG LOST RIVER NEAR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) MISC-01 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-02, CAR BODY SOUTH OF HIGHWAY 33 ON INEEL BOUNDARY ROAD MISC-02 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-03, CAR BODY ADJACENT TO BIG LOST RIVER MISC-03 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-04, DIESEL SATURATED DIRT PILE NEAR EXPERIMENTAL FIELD STATION MISC-04 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-05, EXCAVATION PIT AND MOUND AND DEBRIS EAST OF GUARD GATE 3 MISC-05 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-06, CISTERN NORTH OF NAVAL REACTORS FACILITY (NRF) MISC-06 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-07, DEBRIS NEAR CINDER PIT ON INEEL SOUTHERN BORDER MISC-07 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-08, DEBRIS NEAR INTERSECTION OF HIGHWAY 33 AND 22 MISC-08 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-09, DEBRIS SOUTH OF HIGHWAY 33 EAST OF TEST AREA NORTH (TAN) MISC-09 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-10, DEBRIS IN CANAL WEST OF GUARD GATE 3 MISC-10 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-11, DEBRIS WEST OF SOUTHERN END OF HIGHWAY 22 MISC-11 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-12, DEBRIS NORTH OF HIGHWAY 33 NEAR WEST ENTRANCE MISC-12 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-13, DEBRIS NEXT TO CANAL INSIDE BOUNDARY OF NAVAL REACTORS FACILITY (NRF) MISC-13 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-14, DEBRIS IN BIG LOST RIVER SINKS AREA MISC-14 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-15, NAVY DEBRIS IN CANAL BETWEEN TEST REACTOR AREA (TRA) AND NAVAL REACTORS FACILITY (NRF) MISC-15 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-16, FARMING DEBRIS IN BIG LOST RIVER SINKS AREA MISC-16 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-17, STAINING ON EAST BUTTE ROAD MISC-17 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-18, UNCAPPED WELL IN BIG LOST RIVER SINKS AREA MISC-18 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-19, HOMESTEAD SITE AT BIRCH CREEK AND CEDAR CANYON ROAD MISC-19 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-20, STAINED ROAD NEAR NAVAL REACTORS FACILITY (NRF) MISC-20 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-21, STAINING ON ROAD 17 FROM SECURITY TRAINING FACILITY (STF) TO PORTLAND ROAD MISC-21 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-22, RUSTY METAL DEBRIS NEXT TO HIGHWAY 28 MISC-22 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-23, DEBRIS IN BIRCH CREEK DRAINAGE GRAVEL PIT MISC-23 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-24, HOMESTEAD SITE NORTHWEST OF SPECIFIC MANUFACTURING CAPABILITY (SMC) MISC-24 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-25, MOUNDS, CANS AND DRUMS NORTHEAST OF NAVAL REACTORS FACILITY (NRF) MISC-25 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-26, DETONATION PIT BETWEEN NAVAL REACTORS FACILITY (NRF) AND TEST REACTOR AREA (TRA) MISC-26 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-27, MOUND NEAR EAST PORTLAND AND EAST OGDEN INTERSECTION MISC-27 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-28, CANAL BUILDER'S CAMPSITE MISC-28 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-29, ASPHALT NEAR MAIN GUARD GATE MISC-29 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-30, DEBRIS ON RICHARD BUTTE MISC-30 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-31, TWO 8-INCH DIAMETER ROUNDS MISC-31 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-32, MOUND NEAR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) GRAVEL PIT MISC-32 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-33, EXPERIMENTAL TEST DRUM IN EXPERIMENTAL ORGANIC COOLED REACTOR-01 (EOCR) LEACH POND MISC-33 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-34, HOWE PEAK DIESEL SPILL MISC-34 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-35, DETONATION PITS NORTH OF EXPERIMENTAL ORGANIC COOLED REACTOR (EOCR) MISC-35 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-36, DEBRIS SOUTHWEST OF HIGHWAY 28 MISC-36 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-37, LIDS BY EXPERIMENTAL FIELD STATION MISC-37 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-38, UNCAPPED WELL EAST OF ARGONNE MISC-38 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-39, AMMUNITION REMAINS IN EXPERIMENTAL ORGANIC COOLED REACTOR (EOCR) AREA MISC-39 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-40, MOUND SOUTHEAST OF EXPERIMENTAL ORGANIC COOLED REACTOR (EOCR) AREA BUILDINGS MISC-40 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-41, PITS AND MOUNDS NORTHEAST OF EXPERIMENTAL ORGANIC COOLED REACTOR (EOCR) MISC-41 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-42, CONSTRUCTION DEBRIS NORTHEAST OF EXPERIMENTAL ORGANIC COOLED REACTOR (EOCR) MISC-42 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-43, CONSTRUCTION PIT NORTHEAST OF EXPERIMENTAL ORGANIC COOLED REACTOR (EOCR) MISC-43 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-44, CONCRETE LINED DEPRESSION WEST OF CENTRAL FACILITIES AREA (CFA) MISC-44 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-45, DIRT PILE WITH NAVAL SMOKE CANS NEAR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) MISC-45 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-46, TEST APPARATUS WEST OF CENTRAL FACILITIES AREA (CFA) MISC-46 00
12-JUL-00 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 10-08 - MISC-47, SMALL FUEL TANK NORTH OF IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) MISC-47 00
05-JUL-00 PIERRE, W. TRANSMITTAL OF SIGNED WASTE AREA GROUP 10 (WAG-10) NEW SITE IDENTIFICATION (NSI) 10838 00
01-MAY-00 PERRY, S. W. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 10-04 FLY ASH PIT & BORAX INEEL/EXT-99-01053 00
23-MAR-00 ELLIOTT, M. D. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 10-04 SECURITY TRAINING FACILITY (STF) GUN RANGE INEEL/EXT-99-00737 01
23-MAR-00 RADTKE, C. W. WASTE AREA GROUP 10 (WAG-10) RDX AND TNT CERCLA TREATABILITY STUDY (TS) FINAL REPORT INEEL/EXT-99-01043 00
23-MAR-00 GIANOTTO, D. F. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-99-01253 00
16-FEB-00 ELLIOTT, M. D. FIELD SAMPLING PLAN (FSP) FOR OU 10-04 SECURITY TRAINING FACILITY (STF) GUN RANGE INEEL/EXT-99-00737 00
01-JAN-00 INEEL COMMUNITY RELATIONS INEEL FACT SHEET JANUARY 2000 (01/2000) - GROUNDWATER AT INEEL - WAG-6 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10828 00
21-DEC-99 AR COORDINATOR OPERABLE UNIT (OU) 10-06 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR RADIONUCLIDE CONTAMINATED SOILS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AR.INDEX.OU.10-06 00
20-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 10-05 - IDAHO NATIONAL ENGINEERING LABORATORY (INEL) ADMINISTRATIVE RECORD (AR) INDEX FOR INTERIM ACTION OF UNEXPLODED ORDNANCE (UXO) LOCATIONS AT THE INEL OU 10-05 AR.INDEX.OU.10-05 00
01-AUG-99 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - COMPREHENSIVE INVESTIGATION UNDER WAY FOR WASTE AREA GROUP 10 (WAG-10) 18049 00
29-JUN-99 KROUPA, P. C. REQUEST FOR EXTENSION OF WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCHEDULE & ADDITION OF NEW OU TITLED WAG-10 OU 10-08 OPE-ER-90-99 00
22-JUN-99 PIERRE, W. REQUEST FOR EXTENSION FOR OPERABLE UNIT (OU) 10-04 DEADLINE FOR DRAFT RECORD OF DECISION (ROD) 10663 00
17-JUN-99 BURNS, D. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-99-00166 01
16-JUN-99 NYGARD, D. RESPONSE TO REQUEST FOR EXTENSION OF OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) SCHEDULE & ADDITION OF NEW OPERABLE UNITS (OU) TITLED 10-08 & 10-09 10666 00
10-JUN-99 KROUPA, P. C. REQUEST FOR EXTENSION OF OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) SCHEDULE & ADDITION OF NEW OPERABLE UNITS (OUS) TITLED 10-08 & 10-09 OPE-ER-83-99 00
01-JUN-99 HANEY, T. J. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 10-04 ORGANIC MODERATED REACTOR EXPERIMENT (OMRE) SOIL & GROUNDWATER DOE/ID-10621 00
26-MAY-99 IDHW IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS & RESPONSES ON DOE/ID-10621 DRAFT FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 10-04 ORGANIC MODERATED REACTOR EXPERIMENT (OMRE) SOIL & GROUNDWATER 10662 00
14-MAY-99 WINTER, G. IDAHO DEPARTMENT HEALTH & WELFARE (IDHW) DIVISION ENVIRONMENTAL QUALITY (DEQ) REVIEW COMMENTS ON FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 10-04 ORGANIC MODERATED REACTOR EXPERIMENT (OMRE) SOIL & GROUNDWATER - DRAFT DOE/ID-10621 APRIL 1999 (04 10661 00
26-APR-99 BURNS, D. E. WORK PLAN FOR WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10554 00
26-APR-99 SHERWOOD, J. A. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 10-04 EXPLOSIVE COMPOUNDS DOE/ID-10624 00
01-APR-99 BURNS, D. E. HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-99-00166 00
01-MAR-99 SMITH, D. M. FIELD SAMPLING PLAN (FSP) FOR OU 10-04 ROYAL DEMOLITION EXPLOSIVE CYCLOTRIMETHYLENE TRINITORAMINE (RDX) TRINITROTOLUENE (TNT) CERCLA TREATABILITY STUDY (TS) OF BIOLOGICAL REMEDIATED SOILS CONTAMINATED WITH EXPLOSIVE MATERIALS AT INEEL (RDX/TNT) INEEL/EXT-98-00576 00
01-MAR-99 RADTKE, C. W. WORK PLAN FOR EX SITU BIOLOGICAL REMEDIATION TREATABILITY STUDY (TS) ON EXPLOSIVES CONTAMINATED SOILS (TNT/RDX) INEEL/EXT-98-00775 00
01-MAR-99 CLAYTON, H. E. HEALTH & SAFETY PLAN (HSP) FOR EX SITU BIOLOGICAL REMEDIATION TREATABILITY STUDY (TS) ON SOILS CONTAMINATED WITH EXPLOSIVE MATERIALS (TNT/RDX) INEEL/EXT-98-00847 00
05-FEB-99 KROUPA, P. C. WASTE AREA GROUP 10 (WAG-10) TIME EXTENSION ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-21-99 00
29-JAN-99 WINTER, G. CORRECTED REVIEW COMMENTS ON WORK PLAN FOR WASTE AREA GROUPS 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - (DRAFT) DOE/ID-10554 NOVEMBER 1998 (11/98) 10566 00
01-JAN-99 SHERWOOD, J. A. SUMMARY REPORT FOR 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) FOR ORDNANCE AT OPERABLE UNIT (OU) 10-03 INEEL/EXT-97-01354 00
29-DEC-98 POETON, R. W. EXTENSION OF REVIEW FOR WASTE AREA GROUPS 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT WORK PLAN 10565 00
19-OCT-98 DOE NEW SITE IDENTIFICATION (NSI) - SECURITY TRAINING FACILITY (STF) 02 GUN RANGE - STF-02 10549 00
19-OCT-98 DOE NEW SITE IDENTIFICATION (NSI) - SECURITY TRAINING FACILITY 601 (STF-601) SUMPS & PITS - STF-01 10550 00
13-AUG-98 KROUPA, P. C. TRANSMITTAL OF ORDNANCE DECISION STATEMENT FOR ORDNANCE TRACK 2 SUMMARY REPORT OPE-ER-131-98 00
01-APR-98 JONES, R. W. FIELD SAMPLING PLAN (FSP) FOR D&D OF SECURITY TRAINING FACILITY (STF) INEL/EXT-97-00664 01
01-JAN-98 SHERWOOD, J. A. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 10-03 ORDNANCE, VOLUME 1 (VOL.01) OF 2 DOE/ID-10566,VOL.01 00
01-JAN-98 SHERWOOD, J. A. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 10-03 ORDNANCE, VOLUME 2 (VOL.02) OF 2 - APPENDIX G - APPENDIX P DOE/ID-10566,VOL.02 00
01-DEC-97 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) DOE/ID-10587 05
29-SEP-97 AR COORDINATOR OPERABLE UNIT (OU) 10-01 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 10-01 AR.INDEX.OU.10-01 00
01-SEP-97 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) FOR OU 10-03 DOE/ID-10584 00
28-JUL-97 WINTER, G. COMMENTS ON DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 10-03 ORDNANCE AT INEEL 10567 00
01-JUL-97 HANEY, T. J. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 10-04 - APPENDIX B IS FIELD SAMPLING PLAN (FSP) IN SUPPORT OF ECOLOGICAL RISK ASSESSMENT DOE/ID-10564 01
01-JUL-97 GREEN, T. S. HEALTH & SAFETY PLAN (HSP) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) OU 10-03 INEL/EXT-97-00236 02
06-JUN-97 WINTER, G. IDHW COMMENTS ON APPENDIX B OPERABLE UNIT (OU) 10-04 FIELD SAMPLING PLAN (FSP) IN SUPPORT OF ECOLOGICAL RISK ASSESSMENT (ERA) 10420 00
03-JUN-97 SHERWOOD, J. A. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) FOR UNEXPLODED ORDNANCE AT INEEL OU 10-03 DOE/ID-10577 01
01-JUN-97 EPA APPROVAL MEMORANDUM FOR 1997 ORDNANCE REMOVAL ACTION AT OPERABLE UNIT (OU) 10-03 AT THE INEEL 10418 00
01-JUN-97 SHERWOOD, J. A. ACTION MEMORANDUM FOR 1997 ORDNANCE REMOVAL ACTION AT OU 10-03 AT INEEL 10421 00
01-JUN-97 GURNEY, L. W. HEALTH & SAFETY PLAN (HSP) FOR OU 10-04 INEL-96/0453 00
01-JUN-97 THIEL, T. N. D&D OF ARMY REENTRY VEHICLE FACILITY STATION (ARVFS) BUNKER B17-702 FINAL REPORT INEL/EXT-97-00469 00
27-MAY-97 RODMAN, G. R. FINAL REPORT - D&D OF BORAX V REACTOR BUILDING INEL-96/0325 00
16-MAY-97 ROSENBERGER, M. S. IDHW COMMENTS ON ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) FOR UNEXPLODED ORDNANCE AT INEEL OU 10-03 10417 00
15-MAY-97 YOUNG, N. C. DOE GRANTED APPROVAL FOR TEMPORARY USE OF INJECTION WELL NO. 34-W-3-5 FOR AQUIFER TEST REINJECTION 14316 00
05-MAY-97 POETON, R. W. EPA COMMENTS ON DRAFT TRACK 2 SUMMARY REPORT & FINAL REMOVAL ACTION REPORT FOR WAG-10 OU 10-03 10416 00
16-APR-97 SHERWOOD, J. A. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) FOR UNEXPLODED ORDNANCE AT THE IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) OPERABLE UNIT (OU) 10-03 DOE/ID-10577 00
01-APR-97 DOE APPROVAL MEMORANDUM FOR THE 1997 ORDNANCE REMOVAL ACTION AT OPERABLE UNIT (OU) 10-03 AT THE INEEL 10414 00
01-APR-97 FRANCIS, C. S. REMOVAL ACTION PLAN FOR 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) FOR UNEXPLODED ORDNANCE LOCATIONS AT INEEL OPERABLE UNIT (OU) 10-03 INEL/EXT-97-00326 00
14-MAR-97 BARNA, S. M. SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10553 00
01-MAR-97 SCIENTECH, INC. LETTER REPORT FOR UNEXPLODED ORDNANCE & ORDNANCE EXPLOSIVES CLEANUP AT GOVERNMENT & COMMERCIAL FACILITIES 18156 00
01-MAR-97 SCIENTECH, INC. REFERENCES - LETTER REPORT FOR UNEXPLODED ORDNANCE & ORDNANCE EXPLOSIVES CLEANUP AT GOVERNMENT & COMMERCIAL FACILITIES - VOLUME 1 (VOL.01) OF 3 18157 00
01-MAR-97 SCIENTECH, INC. REFERENCES - LETTER REPORT FOR UNEXPLODED ORDNANCE & ORDNANCE EXPLOSIVES CLEANUP AT GOVERNMENT & COMMERCIAL FACILITIES - VOLUME 2 (VOL.02) OF 3 18158 00
01-MAR-97 SCIENTECH, INC. REFERENCES - LETTER REPORT FOR UNEXPLODED ORDNANCE & ORDNANCE EXPLOSIVES CLEANUP AT GOVERNMENT & COMMERCIAL FACILITIES - VOLUME 3 (VOL.03) OF 3 18159 00
25-FEB-97 WINTER, G. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT FINAL SCOPE OF WORK FOR OU 10-04 WASTE AREA GROUP 6 (WAG-6) & 10 (WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10415 00
28-JAN-97 ALLIED TECHNOLOGY GROUP FINAL ACTION REPORT FOR TIME CRITICAL REMOVAL ACTION (TCRA) OPERABLE UNIT (OU) 10-03 21974 00
31-DEC-96 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT OU 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) STATEMENT OF WORK (SOW) - (OPE-ER-171-96) 10306 00
30-DEC-96 WINTER, G. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WAG-6 & WAG-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), DOE/ID-10553, NOVEMBER 1996 (11/96) 10307 00
13-DEC-96 DEPPERSCHMIDT, J. D. TRANSMITTAL OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) TO INEL NATURAL RESOURCE TRUSTEE COUNCIL MEMBERS OPE-EP-96-474 00
02-DEC-96 COTTEN, G. B. SUMMARY REPORT FOR OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL 10562 00
25-NOV-96 ROSENBERGER, M. S. IDHW-DEQ REVIEW OF ACTION MEMORANDUM TIME CRITICAL REMOVAL ACTION (TCRA) FOR THE ORDNANCE AREA OPERABLE UNIT (OU) 10-03 10305 00
01-SEP-96 ROOD, S. M. EXECUTIVE SUMMARY FOR BACKGROUND DOSE EQUIVALENT RATES & SURFICIAL SOIL METAL & RADIONUCLIDE CONCENTRATIONS FOR INEL INEL-94/0250(EXECSUM) 01
01-SEP-96 FRANCIS, C. S. HEALTH & SAFETY PLAN (HSP) FOR TIME CRITICAL REMOVAL ACTION (TCRA) OPERABLE UNIT (OU) 10-03 INEL-96/0088 02
01-SEP-96 LMITCO U. S. DEPARTMENT OF ENERGY, IDAHO OPERATIONS OFFICE (DOE-ID) LEAD AGENCY ACTION MEMORANDUM TIME CRITICAL REMOVAL ACTION (TCRA) ORDNANCE AREAS OPERABLE UNIT (OU) 10-03 IDAHO NATIONAL ENGINEERING LABORATORY (INEL) INEL-96/0313 00
07-AUG-96 WINTER, G. IDHW COMMENTS ON DRAFT OPERABLE UNIT (OU) 10-04 GROUNDWATER STRATEGY TECHNICAL MEMORANDUM, JUNE 1996 (06/96) INEL-96/0082, REVISION 0 (REV.00) 10296 00
01-AUG-96 HARRIS, G. A. BACKGROUND DOSE EQUIVALENT RATES & SURFICIAL SOIL METAL & RADIONUCLIDE CONCENTRATIONS FOR INEL INEL-94/0250 01
01-AUG-96 PEATROSS, R. G. HEALTH & SAFETY PLAN (HSP) FOR TRACK 2 ASSESSMENT OF ORDNANCE SITES AT INEL INEL-96/0293 01
01-JUL-96 FITCH, D. R. HEALTH & SAFETY PLAN (HSP) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION OPERABLE UNIT (OU) 10-06 INEL-95/0347 01
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
01-JUN-96 SHERWOOD, J. A. TRACK 2 SAMPLING & ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 10-03 ORDNANCE ASSESSMENT DOE/ID-10529 00
16-MAY-96 LMITCO REVISED FINAL OPERABLE UNIT (OU) 10-03 TRACK 2 INVESTIGATION SITE WIDE ORDNANCE ASSESSMENT AT INEL SCOPE OF WORK (SOW) 10442 00
01-MAY-96 BURNS, D. E. WHITE PAPER ON FOOD CROP INGESTION EXPOSURE ROUTE INEL-95/0275 02
01-MAY-96 PEATROSS, R. G. HEALTH & SAFETY PLAN (HSP) FOR ASSESSMENT & REMEDIATION OF ORDNANCE SITES AT INEL INEL-96/0088 00
29-FEB-96 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT FOR OPERABLE UNIT (OU) 10-01 - ACTION DETERMINATION - TO BE FURTHER EVALUATED DURING OU 10-04 REMEDIAL INVESTIGATION (RI) 10180 00
04-JAN-96 LITCO OPERABLE UNIT (OU) 10-03 TRACK 2 INVESTIGATION SITE WIDE ORDNANCE ASSESSMENT AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) SCOPE OF WORK 10152 00
07-DEC-95 JINES, A. AUXILIARY REACTOR AREA (ARA) WINDBLOWN SOILS EVALUATION OPE-ER-225-95 00
19-OCT-95 GREEN, L. A. DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 10445 00
19-OCT-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) & DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY ( EPA) COMMENTS OPE-ER-201-95 00
10-OCT-95 JORGENSEN, D. K. CHANGE IN TITLE & NAME OF DRAFT OU 10-06 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR PLACEMENT INTO ADMINISTRATIVE RECORD (AR) DKJ-13-95 00
01-OCT-95 GREENWELL, R. D. DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) INEL-94/0171 00
07-SEP-95 JORGENSEN, D. K. ENGINEERING DESIGN FILE (EDF) - ARA WINDBLOWN AREA RISK EVALUATION - (EDF SERIAL NUMBER IS INEL-95/103) ER-WAG5-54 02
01-AUG-95 DOE DOE-ID LEAD AGENCY ACTION MEMORANDUM FOR THE NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT OU 10-06 RADIONUCLIDE CONTAMINATED SOIL LOCATIONS AT THE INEL 10043 00
01-AUG-95 PARSONS CORPORATION HEALTH AND SAFETY PLAN (HSP) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION OU 10-06 (PARSONS #ES-21.6.12) INEL-95/0347 00
01-AUG-95 PARSONS CORPORATION FIELD SAMPLING PLAN (FSP) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION OU 10-06 (PARSONS #ES-21.6.3) INEL-95/0365 00
01-AUG-95 GREEN, L. A. TRANSMITTAL OF FINAL ACTION MEMORANDUM FOR OU 10-06 REMOVAL ACTION AT THE INEL OPE-ER-95-144 00
28-JUL-95 PARSONS CORPORATION ENVIRONMENTAL RESTORATION (ER) REMOVAL ACTION WORK PLAN FOR RADIONUCLIDE CONTAMINATED SOILS AT OU 10-06 INEL-95/0326 02
05-JUL-95 SATTGAST, L. PUBLIC COMMENT AND RESPONSE ON OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION 10046 00
05-JUL-95 KOCH, D. F. IDHW REVIEW COMMENTS OF BASELINE RISK ASSESSMENT (BRA) OF DRAFT RI/FS FOR OU 10-06 RADIONUCLIDE CONTAMINATED SOILS AT INEL 10051 00
20-JUN-95 UNDERWOOD, E. J. IDAHO DEPARTMENT OF HEALTH AND WELFARE, DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON ASSESSMENT OF SURFACE SOILS SURROUNDING THE SL-1 BURIAL GROUND AND ARA WINDBLOWN AREA RISK EVALUATION 10167 00
19-JUN-95 JONES, E. EPA REVIEW COMMENTS OF RADIONUCLIDE CONTAMINATED SOILS OU 10-06 DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10050 00
15-JUN-95 BURNS, S. M. OPERABLE UNIT (OU) 10-06 NON TIME CRITICAL REMOVAL ACTION (NTCRA) ENGINEERING EVALUATION COST ANALYSIS (EE/CA) APPROVAL MEMORANDUM 10021 00
10-JUN-95 MARTY, R. C. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT INEL, VOLUME III (VOL.03) INEL-95/0259,VOL.03 00
08-JUN-95 ROOD, S. M. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT INEL, VOLUME I, (VOL.01) INEL-95/0259,VOL.01 00
08-JUN-95 ROOD, S. M. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATION SOILS REMOVAL ACTION AT (INEL), VOLUME II, (VOL.02) INEL-95/0259,VOL.02 00
15-MAY-95 RAUNIG, D. E. WAG-3 INVESTIGATION DERIVED WASTE (IDW) AQUIFER WELL PURGE WATER KLF-159-95 00
09-MAY-95 BURNS, D. E. GUIDANCE PROTOCOL FOR THE PERFORMANCE OF CUMULATIVE RISK ASSESSMENTS AT THE INEL INEL-95/131 00
04-MAY-95 DOE, EPA, IDHW ACTION DETERMINATION FOR WAG-10 OU 10-06 RADIONUCLIDE CONTAMINATED SOIL SITES 10016 00
19-APR-95 ROSENBERGER, M. S. IDHW-DEQ RECOMMENDATIONS FOR OPERABLE UNIT (OU) 10-01 TRACK 2 SUMMARY REPORT - TO BE FURTHER EVALUATED IN OU 10-04 RI/FS 10181 00
23-MAR-95 PIERRE, W., NYGARD, D. DISPOSITION OF CENTRAL FACILITIES AREA 633 (CFA-633) TNT & RDX CONTAMINATED SOILS 10008 00
01-MAR-95 INEL COMMUNITY RELATIONS UPDATE FACT SHEET - CLEANUP PROJECTS ADDRESS ORDNANCE CONTAMINATION 9650 0
01-MAR-95 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 INEL-95/0086 04
20-JAN-95 JONES, E. TRACK 2 DECISION STATEMENT - LIQUID CORROSIVE CHEMICAL DISPOSAL AREA (LCCDA) OPERABLE UNIT (OU) 10-01 TRACK 2 SUMMARY REPORT 5850 00
21-NOV-94 LYLE, J. L. TRANSMITTAL OF THE REVISED FINAL TRACK 2 SUMMARY REPORT FOR THE LIQUID CORROSIVE CHEMICAL DISPOSAL AREA (LCCDA) & TRACK 2 DECISION STATEMENT OPE-ER-303-94 00
04-NOV-94 AR COORDINATOR OPERABLE UNIT (OU) 10-02 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OPERABLE UNIT (OU) 10-02 AR.INDEX.OU.10-02 00
04-NOV-94 AR COORDINATOR WASTE AREA GROUP 10 (WAG-10) NO ACTION SITES - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR NO ACTION SITES FOR WAG-10 AR.INDEX.WAG-10.NA 00
01-OCT-94 HULL, L. C. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR LIQUID CORROSIVE CHEMICAL DISPOSAL AREA (LCCDA) OU 10-01 - (FORMERLY EGG-ER-10956) INEL-94/0075 01
01-SEP-94 INEL COMMUNITY RELATIONS INEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - DOE STUDIES TWO (2) RADIONUCLIDE BURIAL GROUNDS 7865 00
24-AUG-94 AR COORDINATOR OPERABLE UNIT (OU) 10-07 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION OF OU 10-07 AR.INDEX.OU.10-07 00
28-JUL-94 NOT SPECIFIED TRACK 1 INVESTIGATION OF U. S. WEST BURIED TELECOMMUNICATIONS CABLE - NO FURTHER ACTION DETERMINATION DECISION DOCUMENTATION PACKAGE (DDP) 5737 00
22-JUL-94 WYLE LABORATORIES REMEDIAL ACTION WORK PLAN (RAWP) AND APPENDICES FOR OPERABLE UNIT (OU) 10-03 ORDNANCE REMOVAL ACTION - SUBCONTRACT #S-500992 23-ICP-05-1 02
12-JUL-94 MK-FIC DOE-ID LEAD AGENCY ACTION MEMORANDUM FOR THE NON TIME CRITICAL REMOVAL ACTION (NTCRA) OF TNT & RDX CONTAMINATED SOIL - ENGINEERING EVALUATION COST ANALYSIS (EE/CA) IS INCLUDED AS ATTACHMENT A 10.03.2.122.01 02
03-JUN-94 INEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY OF ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) REPORT 5709 00
01-JUN-94 MK-FIC DOE-ID LEAD AGENCY ACTION MEMORANDUM FOR THE NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT UNEXPLODED ORDNANCE LOCATIONS AT THE INEL 10.03.1.122.01 01
20-MAY-94 WYLE LABORATORIES REMEDIAL ACTION (RA) REPORT FOR THE INTERIM ACTION (IA) TO CLEANUP UNEXPLODED ORDNANCE LOCATIONS AT THE INEL OU 10-05 31-ICP-06 3
10-MAY-94 INEL COMMUNITY RELATIONS PUBLIC NOTICE OF AVAILABILITY OF ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR UNEXPLODED ORDNANCE REMOVAL ACTION 5673 00
01-MAY-94 EG&G IDAHO, INC. TECHNICAL MEMORANDUM BASELINE RISK ASSESSMENT (BRA) FOR OU 10-06 RADIONUCLIDE CONTAMINATED SOILS RI/FS DRAFT EGG-ER-11316 00
28-APR-94 MK-FIC ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT UNEXPLODED ORDNANCE LOCATIONS AT INEL 10.003.2.1.201.01 02
26-APR-94 LYLE, J. L. TRANSMITTAL OF DRAFT FINAL TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) OPE-ER-099-94 00
07-APR-94 LYLE, J. L. TRANSMITTAL OF THE DOCUMENT REVISION REQUEST (DRR) FOR OPERABLE UNIT (OU) 10-06 PHASE II SAMPLING & ANALYSIS PLAN (SAP) & HEALTH & SAFETY PLAN (HSP) OPE-ER-085-94 00
22-MAR-94 LANEY, P. T. COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP-10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) PTL-02-94 00
18-MAR-94 LIVERMAN, E. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WAG-3 & WAG-10 RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 5777 00
01-MAR-94 HANEY, T. J. HEALTH & SAFETY PLAN (HSP) FOR PHASE II OF THE OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EGG-ER-11231 01
07-FEB-94 LYLE, J. L. TRANSMITTAL OF THE PHASE II SAMPLING & ANALYSIS PLAN (SAP) FOR THE RADIONUCLIDE CONTAMINATED SOILS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 10-06 OPE-ER-030-94 00
01-JAN-94 HANEY, D. F. SAMPLING & ANALYSIS PLAN (SAP) FOR PHASE II OF OU 10-06 RADIONUCLIDE CONTAMINATED SOILS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EGG-ER-10971 00
21-DEC-93 WILLIAMS, R. C. AGENCY FOR TOXIC SUBSTANCES & DISEASE REGISTRY (ATSDR) HEALTH CONSULTATION OF INEL INTERIM ACTION (IA) FOR ORDNANCE OPERABLE UNIT (OU) 10-05 6993 00
07-DEC-93 PAARMANN, M. L. NO ACTION SITE FOR THE EOCR-01 LEACH POND 5580 00
07-DEC-93 PAARMANN, M. L. NO ACTION SITE FOR THE EOCR-02 INJECTION WELL 5581 00
07-DEC-93 PAARMANN, M. L. NO ACTION SITE FOR THE EOCR-03 OXIDATION POND 5582 00
07-DEC-93 PAARMANN, M. L. NO ACTION SITE FOR THE EOCR-04 SEPTIC TANK 5583 00
07-DEC-93 PAARMANN, M. L. NO ACTION SITE FOR THE EOCR-05 BLOWDOWN SUMP (EOCR-719) 5584 00
07-DEC-93 PAARMANN, M. L. NO ACTION SITE FOR THE ARVFS-02 CONTAMINATED TANK 5585 00
07-DEC-93 PAARMANN, M. L. NO ACTION SITE FOR THE DF-1 DAIRY FARM DISPOSAL PIT 5586 00
07-DEC-93 PAARMANN, M. L. NO ACTION SITE FOR THE ZPPR-1 WASTE PIT 5587 00
02-DEC-93 PAARMANN, M. L. NO FURTHER ACTION DETERMINATION FOR TRACK 1 INVESTIGATION OF RADIOACTIVELY CONTAMINATED SOIL IN VICINITY OF EBR-1 - DECISION DOCUMENTATION PACKAGE 5593 00
01-DEC-93 MSE, INC. FINAL SCOPE OF WORK FOR OU 10-06 RADIONUCLIDE CONTAMINATED SOILS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EGG-ER-10902 00
01-DEC-93 HONEYCUTT, T. K. TECHNICAL MEMORANDUM FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) SOILS TREATABILITY STUDY (TS): PHYSICAL SEPARATION OF RADIONUCLIDES IN SOILS EGG-ER-11101 00
02-AUG-93 BARRY, G. A. TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) 93MSE/ID-225 00
01-AUG-93 BARRY, G. A. SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 6744 00
01-AUG-93 NUTHAK, S. A. HEALTH & SAFETY PLAN (HSP) FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) EGG-ER-10922 00
10-JUN-93 WYLE LABORATORIES POST ROD - INTERIM ORDNANCE CLEANUP PROGRAM REMEDIAL DESIGN SAMPLING & ANALYSIS PLAN (SAP) AND QUALITY ASSURANCE PROJECT PLAN (QAPJP), SECTION 4 16-ICP-03 03
10-JUN-93 WYLE LABORATORIES INTERIM ORDNANCE CLEANUP PROGRAM REMEDIAL ACTION WORK PLAN (RAWP) - THIS MANUAL WAS RECEIVED AS A VENDOR DATA ITEM FROM WYLE LABORATORIES FOR OU 10-05 SUBMITTAL #S-500992-005(10-05), REVISION 4 (REV.04) 23-ICP-05 03
10-JUN-93 WYLE LABORATORIES INTERIM ORDNANCE CLEANUP PROGRAM REMEDIAL ACTION WORK PLAN (RAWP) - APPENDIX B - PROCEDURES - THIS MANUAL WAS RECEIVED AS A VENDOR DATA ITEM FROM WYLE LABORATORIES UNDER SUBMITTAL #S-500992-005(10-05), REVISION 4 (REV.04) 23-ICP-05-A 03
11-MAY-93 WYLE LABORATORIES INTERIM ORDNANCE CLEANUP PROGRAM REMEDIAL DESIGN 16-ICP-03 02
30-APR-93 WYLE LABORATORIES INTERIM ORDNANCE CLEANUP PROGRAM RECORD SEARCH REPORT - SUBCONTRACT #S-500992 WYLE LABORATORIES - SUPPORTS OPERABLE UNIT (OU) 10-05 INTERIM ACTION (IA) AND OU 10-02 21-ICP-02 02
01-DEC-92 ARAVE, A. E. FINAL REPORT - DECONTAMINATION AND DECOMMISSIONING (D&D) OF BORAX V FACILITY TURBINE BUILDING EGG-2683 00
24-JUL-92 NOT SPECIFIED REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK REMEDIAL DESIGN WORK PLAN (RDWP) INTERIM ACTION (IA) TO CLEANUP UNEXPLODED ORDNANCE OU 10-05, REV.04 7761 00
01-JUN-92 INEL COMMUNITY RELATIONS DECLARATION OF THE RECORD OF DECISION (ROD) FOR ORDNANCE INTERIM ACTION (IA) OPERABLE UNIT (OU) 10-05 5137 00
01-JUN-92 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) AVAILABILITY ON THE CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT THE INEL 5165 00
19-MAY-92 NYGARD, D. TECHNICAL REVIEW COMMENTS, DRAFT RECORD OF DECISION (ROD) FOR CLEANUP OF UNEXPLODED ORDNANCE OPERABLE UNIT (OU) 10-05 (LATE COMMENTS) 5138 00
14-MAY-92 MK-FIC WAG-10 ORDNANCE INTERIM ACTION (IA) COST ESTIMATE FOR ALTERNATIVES 2, 3, AND 4 5112 00
28-FEB-92 FIGUEROA, I. C. ENGINEERING DESIGN FILE (EDF) - RISK ANALYSIS DETERMINATION OF RISK BASED SOIL SCREENING CONCENTRATIONS POTENTIAL EXPLOSIVE RESIDUES AT ORDNANCE AREAS (OU 10-05) AT INEL ERP-WAG10-08 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN, IDAHO PRESS TRIBUNE NAMPA, IDAHO 4435 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN - TIMES NEWS, TWIN FALLS, IDAHO 4436 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN - IDAHO STATESMAN, BOISE, IDAHO 4437 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN - IDAHO FALLS, IDAHO 4438 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN, LEWISTON MORNING PRESS - IDAHO 4441 00
17-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION AND IN THE SURROUNDING GROUNDWATER AT TAN - POCATELLO, IDAHO 4434 00
17-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN - IDAHOAN, MOSCOW, IDAHO 4439 00
17-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION AND IN THE SURROUNDING GROUNDWATER AT TAN, BURLEY, IDAHO SOUTH IDAHO PRESS 4440 00
06-FEB-92 LEDBETTER, L. PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE BURLEY, IDAHO FEBRUARY 6, 1992 (02/06/92) 4608 00
05-FEB-92 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE BOISE, IDAHO FEBRUARY 2, 1992 (02/05/92) 4607 00
04-FEB-92 GRAHAM, D. PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE IDAHO FALLS, IDAHO FEBRUARY 4, 1992 (02/04/92) 4606 00
04-FEB-92 NOT SPECIFIED PUBLIC MEETING TRANSCRIPTS FROM IDAHO FALLS, BOISE, AND BURLEY ON THE PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE 5129 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHO STATESMAN, BOISE, IDAHO 4451 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE IDAHO STATE JOURNAL - POCATELLO, IDAHO 4452 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHO PRESS TRIBUNE, NAMPA, IDAHO 4453 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - POST REGISTER, IDAHO FALLS, IDAHO 4454 00
30-JAN-92 INEL PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - TIMES NEWS - TWIN FALLS, IDAHO 4458 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - SOUTH IDAHO PRESS, BURLEY, IDAHO 4461 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
08-JAN-92 INEL COMMUNITY RELATIONS DEAR CITIZEN LETTER - PROPOSED PLAN FOR INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN, PROPOSED PLAN FOR CLEANUP UNEXPLODED ORDNANCE LOCATIONS, COMMUNITY RELATIONS PLAN FACT SHEET - DOE STU 3532 00
06-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHO PRESS TRIBUNE, NAMPA, IDAHO 4449 00
05-JAN-92 INEL COMMUNITY RELATIONS CITIZENS ARE ASKED TO COMMENT - PUBLIC COMMENT ON TAN INJECTION WELL & UNEXPLODED ORDNANCE 3531 00
05-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - TIMES NEWS, TWIN FALLS, IDAHO 4450 00
05-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE, IDAHO STATE JOURNAL, POCATELLO, IDAHO 4455 00
05-JAN-92 INEL PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHO STATESMAN, BOISE, IDAHO 4459 00
05-JAN-92 INEL PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - SOUTH IDAHO PRESS, BURLEY, IDAHO 4460 00
05-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - LEWISTON MORNING PRESS, LEWISTON, IDAHO 4468 00
04-JAN-92 INEL PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHOAN, MOSCOW, IDAHO 4457 00
18-JUL-91 DOUTHAT, C. D. APPLICATION OF RISK ASSESSMENT TECHNIQUES TO EVALUATE PUBLIC RISK & ESTABLISH PRIORITIES FOR CLEANUP OF ORDNANCE AT FORMERLY USED DEFENSE SITE 3528 00
30-MAY-90 NOT SPECIFIED CONTAMINANT TRANSPORT VIDEO - SNAKE RIVER PLAIN AQUIFER - AUDIO PRINTOUT 2945 00
23-MAY-90 BLUMBERG, D. J. OCTOBER 16, 1989 (10/16/89) ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR ADDITIONAL INFORMATION FOR DELETION OF SELECTED SOLID WASTE MANAGEMENT UNITS (SWMU'S) FROM THE CONSENT ORDER AND COMPLIANCE AGREEMENT (COCA) THROUGH SUMMARY ASSESSMENT PROC DJB-49-90 00
16-OCT-89 GEARHEARD, M. F. SUMMARY ASSESSMENT REVIEWS 3537 00
01-SEP-89 MCCUSKER, T. K. FINAL REPORT: DECONTAMINATION & DECOMMISSIONING (D&D) OF HEAT TRANSFER REACTOR EXPERIMENT (HTRE) TEST ASSEMBLIES HTRE-2 & HTRE-3 EGG-2575 00
01-MAR-89 BURROWS, E. P. ORGANIC EXPLOSIVES & RELATED COMPOUNDS: ENVIRONMENTAL & HEALTH CONSIDERATIONS 8901 00
08-FEB-89 PIGOTT, W. R. INITIAL ASSESSMENT - DAIRY FARM - DISPOSAL PIT DF-1 1146 00
02-FEB-89 PIGOTT, W. R. INITIAL ASSESSMENT - ZPPR-1 DISPOSAL AREA 579 00
01-FEB-89 EG&G IDAHO, INC. ANSWERS ABOUT AQUIFER - A DISCUSSION OF ISSUES CONCERNING SNAKE RIVER PLAIN AQUIFER 2927 00
01-JAN-89 GORDON, L. HEALTH ADVISORY ON 2,4,6-TRINITROTOLUENE (TNT) 3527 00
01-NOV-88 HARTLEY, W. R. HEALTH ADVISORY FOR HEXAHYDRO-1,3,4-TRINITRO-1,3,5-TRIAZINE (RDX) 3529 00
01-SEP-88 MANN, L. J. IODINE-129 IN SNAKE RIVER PLAIN AQUIFER AT INEL, IDAHO U. S. GEOLOGICAL SURVEY (USGS) 88-4165 DOE/ID-22076 00
14-OCT-86 SAINT-LOUIS, M. L. INITIAL ASSESSMENT - ARVFS-02 TANK CONTAINING LOW LEVEL RAD WASTE (UNDER WHITE BLDG) 3002 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - LCCDA-02 LIMESTONE TREATMENT AND DISPOSAL PIT EAST END 2750 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - LCCDA-01 OLD DISPOSAL PIT WEST END 2751 00
18-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EOCR-01 LEACH POND 2607 00
18-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EOCR-02 INJECTION WELL 2608 00
18-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EOCR-03 OXIDATION POND 2609 00
18-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EOCR-04 SEPTIC TANK 2610 00
18-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - EOCR-05 BLOWDOWN SUMP EOCR-719 2611 00
18-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ORGANIC MODERATED REACTOR EXPERIMENT (OMRE) - OMRE-01 LEACH POND 2619 00
28-JAN-86 LUSK, M. W. ENGINEERING DESIGN FILE (EDF) - OU 10-05 INTERIM ACTION (IA) ERP-WAG10-06 00
01-JAN-86 NOT SPECIFIED INSTALLATION ASSESSMENT REPORT FOR EG&G IDAHO, INC. OPERATIONS AT INEL EGG-WM-6875 00
01-JAN-85 SMITH, D. L. FINAL REPORT DECONTAMINATION & DECOMMISSIONING (D&D) OF BORAX V LEACH POND EGG-2300 00
14-OCT-84 SAINT-LOUIS, M. L. INITIAL ASSESSMENT - ARVFS-01 CONTAINERS OF CONTAMINATED NAK 3001 00
01-MAR-81 BRADFORD, D. J. INTERNAL TECHNICAL REPORT - CHEMICAL PROCESSING PLANT 633 (CPP-633) NAK FURNACE CHARACTERIZATION WM-F1-81-004 00
01-SEP-80 HINE, R. E. DECONTAMINATION & DECOMMISSIONING (D&D) OF ORGANIC MODERATED REACTOR EQUIPMENT (OMRE) FACILITY EGG-2059 00
01-JUL-75 KENDALL, E. W. DECONTAMINATION & DECOMMISSIONING (D&D) OF EBR-I COMPLEX FINAL REPORT (ARVFS/NAK) ANCR-1242 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page