Select By Site Code

For Site Code WRRTF-01

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
17-APR-08 JESSMORE, J. J. REMEDIAL ACTION REPORT FOR OU 1-10 SITES AT TEST AREA NORTH, WAG 1 DOE/ID-11262 00
30-OCT-07 NELSON, L. O. IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2007 DOE/ID-11350 00
20-SEP-07 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT 25153 00
19-SEP-07 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT 25155 00
17-SEP-07 JENSEN, N. R. REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT FMDP-RFDP-07-023 00
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
02-OCT-06 OLAVESON, B. E. IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2006 DOE/ID-11294 00
28-SEP-06 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO REQUEST TO EXTEND THE ENFORCEABLE MILESTONES FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT 25023 00
28-SEP-06 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO REQUEST TO EXTEND THE ENFORCEABLE MILESTONES FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT 25024 00
27-SEP-06 JENSEN, N. R. REQUEST TO EXTEND THE ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT FMDP-RFDP-06-049 00
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
22-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2005 (FY-05) DOE/ID-11249 00
30-AUG-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2004 (FY-04) DOE/NE-ID-11200 00
10-MAY-05 JANTZ, A. E. WASTE MANAGEMENT PLAN (WMP) FOR GROUP 3, PM-2A TANKS AND BURN PITS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00284 03
24-JAN-05 YONK, A. K. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 07
11-JAN-05 AR COORDINATOR OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDES TECHNICAL SUPPORT FACILITY (TSF) PAINT SHOP FLOOR DARIN LEACH FIELD OU 1-10 AR.INDEX.OU.1-10 02
09-DEC-04 YONK, A. K. WASTE MANAGEMENT PLAN (WMP) FOR GROUP 3, PM-2A TANKS AND BURN PITS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00284 02
19-AUG-04 SCHWENDIMAN, G. L. GROUP 2 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM FOR THE ASSESSMENT AND CLEANUP OF V-TANK AREA NEW SITES, FOR THE TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 DOE/NE-ID-11152 00
21-JUN-04 JANTZ, A. E. WASTE MANAGEMENT PLAN (WMP) FOR GROUP 3, PM-2A TANKS AND BURN PITS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00284 01
10-JUN-04 ELLIOTT, M. D. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 06
25-MAR-04 ELLIOTT, M. D. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 05
16-MAR-04 ELLIOTT, M. D. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 04
15-MAR-04 AR COORDINATOR OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDING TECHNICAL SUPPORT FACILITY (TSF) PAINT SHOP FLOOR DRAIN LEACH FIELD OU 1-10 AR.INDEX.OU.1-10-AMENDMENT 00
06-DEC-03 BRUCE, J. E. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR GROUP 3, PM-2A TANKS AND BURN PITS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 - APPENDIX G CONTAINS AGENCY REVIEW COMMENTS DOE/ID-11073 00
06-DEC-03 BRUCE, J. E. WASTE MANAGEMENT PLAN (WMP) FOR GROUP 3, PM-2A TANKS AND BURN PITS, FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00284 00
05-DEC-03 BRUCE, J. E. CONSTRUCTION SPECIFICATION (SPC) - WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 3, WRRTF-01 BURN PITS REMEDIAL DESIGN - ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - DOE/ID-11073 SPC-477 00
30-OCT-03 LEWIS, T. F. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 03
19-AUG-03 FITCH, D. R. FY 2003 (FY-03) INSTITUTIONAL CONTROLS ASSESSMENT REPORT FOR WASTE AREA GROUP 1 (WAG-1) DOE/ID-11105 00
11-AUG-03 LEWIS, T. F. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 02
28-MAY-03 BRUCE, J. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 01
30-APR-03 AR COORDINATOR OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDES EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) DOCUMENT ID #DOE/ID-11050 AR.INDEX.OU.1-10 01
23-APR-03 SHAW, R. M. TRANSMITTAL OF EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 EM-ER-03-111 00
15-APR-03 DOE EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 DOE/ID-11050 00
11-MAR-03 LEWIS, T. F. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 00
12-FEB-03 DOE DOE, IDEQ AND EPA COMMENT RESOLUTION FORMS ON THE EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 24031 00
31-JUL-02 FITCH, D. R. 2002 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) DOE/ID-11011 00
02-NOV-01 FITCH, D. R. OPERATIONS & MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 DOE/ID-10711 01
29-AUG-01 SHAW, R. M. TRANSMITTAL OF 2001 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) EM-ER-01-146 00
28-AUG-01 FITCH, D. R. 2001 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) DOE/ID-10899 00
22-NOV-00 PIERRE, W. ACCELERATION OF THE V-TANK REMEDIAL ACTION 22185 00
04-OCT-00 SHAW, R. M. TRANSMITTAL OF FINAL INSTITUTIONAL CONTROL PLAN FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) EM-ER-194-00 00
28-SEP-00 KUHNS, D. J. INSTITUTIONAL CONTROL PLAN FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) INEEL/EXT-2000-00917 00
11-MAY-00 FITCH, D. R. INSTITUTIONAL CONTROL STATUS REPORT FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) DOE/ID-10750 00
22-FEB-00 SHAW, R. M. TRANSMITTAL OF TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) EM-ER-24-00 00
18-FEB-00 REESE, C. L. TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) DOE/ID-10723 00
19-JAN-00 AR COORDINATOR OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDES TECHNICAL SUPPORT FACILITY (TSF) PAINT SHOP FLOOR DRAIN LEACH FIELD OU 1-10 AR.INDEX.OU.1-10 00
18-JAN-00 DOE NOTICE OF AVAILABILITY - AGENCIES SIGN RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 10822 00
14-DEC-99 NOT SPECIFIED FINAL RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-10 DOE/ID-10682 0
18-NOV-99 SHAW, R. M. INCLUSION OF DOCUMENTS INTO THE ADMINISTRATIVE RECORD (AR) FOR TAN OPERABLE UNIT (OU) 1-10 - INDEX OF SAMPLING DATA DOCUMENTS 10802 00
25-OCT-99 HAIN, K. E. TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT INEEL - IDHW & EPA COMMENTS & RESOLUTIONS OPE-ER-165-99 00
23-SEP-99 FOLKER, J. D. COST ESTIMATE - TAN OPERABLE UNIT (OU) 1-10 COMPREHENSIVE ECONOMY OF SCALE JDF-26-99 00
23-SEP-99 FOLKER, J. D. COST ESTIMATE - TAN OPERABLE UNIT (OU) 1-10 INVESTIGATION DERIVED WASTE (IDW) JDF-27-99 00
07-SEP-99 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT INEEL - IDHW & EPA COMMENTS & RESOLUTIONS OPE-ER-125-99 00
24-MAY-99 SHAW, R. M. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR TAN OPERABLE UNIT (OU) 1-10 COMPREHENSIVE REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) AT INEEL OPE-ER-75-99 00
11-NOV-98 KUHNS, D. J. COST ESTIMATES FOR CONTAINMENT ALTERNATIVES FOR WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 SITES 10555 00
01-NOV-98 INEEL COMMUNITY RELATIONS UPDATE FACT SHEET - TEST AREA NORTH (TAN) REVISED PROPOSED PLAN TO BE ISSUED IN EARLY NOVEMBER - WASTE AREA GROUP 1 (WAG-1) 10552 00
01-NOV-98 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR WASTE AREA GROUP 1 (WAG-1) TEST AREA NORTH (TAN) AT INEEL 10553 00
01-NOV-98 INEEL COMMUNITY RELATIONS INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) 17370 00
01-NOV-98 MICHAEL, D. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SUPPLEMENT FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 AT INEEL DOE/ID-10557,SUPPLEMENT 00
02-OCT-98 AR COORDINATOR OPERABLE UNIT (OU) 1-03 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF TEST AREA NORTH (TAN) OU 1-03 AR.INDEX.OU.1-03 00
01-JUN-98 BLACKMORE, C. S. HEALTH AND SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 1-10 WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-95/0333 03
26-FEB-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT FOR TAN COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) PROPOSED PLAN HELD FEBRUARY 26, 1998 (02/26/98) AT MOSCOW, IDAHO 10815 00
24-FEB-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT FOR TAN COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) PROPOSED PLAN HELD FEBRUARY 24, 1998 (02/24/98) AT BOISE, IDAHO 10814 00
23-FEB-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT FOR TAN COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) PROPOSED PLAN HELD FEBRUARY 23, 1998 (02/23/98) AT IDAHO FALLS, IDAHO 10816 00
01-FEB-98 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR WASTE AREA GROUP 1 (WAG-1) TEST AREA NORTH (TAN) IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) OPERABLE UNIT (OU) 1-10 10443 00
18-DEC-97 HAIN, K. E. REGULATORY STATUS OF TAN V-TANKS & OU 1-10 PROPOSED PLAN SCHEDULE OPE-ER-286-97 00
06-NOV-97 HAIN, K. E. TRANSMITTAL OF FINAL COMPREHENSIVE FEASIBILITY STUDY (FS) FOR OU 1-10 OPE-ER-184-97 00
01-NOV-97 BLACKMORE, C. S. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TAN OU 1-10 AT INEEL DOE/ID-10557 00
07-OCT-97 HAIN, K. E. TRANSMITTAL OF DRAFT PROPOSED PLAN FOR TAN OU 1-10 OPE-ER-159-97 00
06-OCT-97 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL FEASIBILITY STUDY (FS) FOR TAN OU 1-10 OPE-ER-157-07 00
08-SEP-97 MICHAEL, D. L. REPLACEMENT PAGES FOR APPENDIX J (COST ESTIMATES) TO DOE/ID-10557, COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 AT INEEL 10817 00
16-JUN-97 JENSEN, N. R. TRANSMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TAN OU 1-10 OPE-ER-99-97 00
13-FEB-97 JENSEN, N. R. TRANSMITTAL OF THE COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 OPE-ER-15-97 00
15-MAY-96 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT FOR OPERABLE UNIT (OU) 1-03 HYDROCARBON CONTAMINATION SITES 10283 00
01-APR-93 MEYER, T. J. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 1-03 EGG-ER-10554 00
24-SEP-86 SAINT-LOUIS, M. L. INITIAL ASSESSMENT - WRRTF-01 BURN PIT 2623 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page