Select By Site Code

For Site Code TSF-28

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
19-MAY-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES FOR OPERABLE UNIT 10-08 RECORD OF DECISION FOR SITE-WIDE GROUNDWATER, MISCELLANEOUS SITES, AND FUTURE SITES DOE/ID-11547 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
15-JAN-13 NOT SPECIFIED NEW SITE IDENTIFICATION - TSF SEWAGE TREATMENT PLANT (TAN-623) AND SLUDGE DRY BEDS NSI-26009 0
28-OCT-11 DOE-ID FIELD INVESTIGATION AND RISK ASSESSMENT REPORT FOR TSF-28 AND TSF-43 CERCLA SITE CHARACTERIZATION, TEST AREA NORTH, IDAHO NATIONAL LABORATORY TPMC 11-008 0
27-OCT-11 VELLINGER, ROBERT J. TRANSMITTAL OF TAN TSF-28 AND 43 FIELD INVESTIGATION AND RISK ASSESSMENT REPORT TPMC 11-010 0
01-JUL-11 TERRANEAR PMC, LLC FIELD SAMPLING PLAN FOR TSF-28 AND TSF-43 CERCLA SITE CHARACTERIZATION TPMC 11-002 0
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
28-SEP-06 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO REQUEST TO EXTEND THE ENFORCEABLE MILESTONES FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT 25023 00
28-SEP-06 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO REQUEST TO EXTEND THE ENFORCEABLE MILESTONES FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT 25024 00
27-SEP-06 JENSEN, N. R. REQUEST TO EXTEND THE ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT FMDP-RFDP-06-049 00
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
11-JAN-05 AR COORDINATOR OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDES TECHNICAL SUPPORT FACILITY (TSF) PAINT SHOP FLOOR DARIN LEACH FIELD OU 1-10 AR.INDEX.OU.1-10 02
15-MAR-04 AR COORDINATOR OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDING TECHNICAL SUPPORT FACILITY (TSF) PAINT SHOP FLOOR DRAIN LEACH FIELD OU 1-10 AR.INDEX.OU.1-10-AMENDMENT 00
19-AUG-03 FITCH, D. R. FY 2003 (FY-03) INSTITUTIONAL CONTROLS ASSESSMENT REPORT FOR WASTE AREA GROUP 1 (WAG-1) DOE/ID-11105 00
30-APR-03 AR COORDINATOR OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDES EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) DOCUMENT ID #DOE/ID-11050 AR.INDEX.OU.1-10 01
31-JUL-02 FITCH, D. R. 2002 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) DOE/ID-11011 00
29-AUG-01 SHAW, R. M. TRANSMITTAL OF 2001 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) EM-ER-01-146 00
28-AUG-01 FITCH, D. R. 2001 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) DOE/ID-10899 00
28-SEP-00 KUHNS, D. J. INSTITUTIONAL CONTROL PLAN FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) INEEL/EXT-2000-00917 00
11-MAY-00 FITCH, D. R. INSTITUTIONAL CONTROL STATUS REPORT FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) DOE/ID-10750 00
19-JAN-00 AR COORDINATOR OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDES TECHNICAL SUPPORT FACILITY (TSF) PAINT SHOP FLOOR DRAIN LEACH FIELD OU 1-10 AR.INDEX.OU.1-10 00
18-JAN-00 DOE NOTICE OF AVAILABILITY - AGENCIES SIGN RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 10822 00
18-NOV-99 SHAW, R. M. INCLUSION OF DOCUMENTS INTO THE ADMINISTRATIVE RECORD (AR) FOR TAN OPERABLE UNIT (OU) 1-10 - INDEX OF SAMPLING DATA DOCUMENTS 10802 00
25-OCT-99 HAIN, K. E. TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT INEEL - IDHW & EPA COMMENTS & RESOLUTIONS OPE-ER-165-99 00
23-SEP-99 FOLKER, J. D. COST ESTIMATE - TAN OPERABLE UNIT (OU) 1-10 INVESTIGATION DERIVED WASTE (IDW) JDF-27-99 00
07-SEP-99 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT INEEL - IDHW & EPA COMMENTS & RESOLUTIONS OPE-ER-125-99 00
26-AUG-99 SIVILL, T. E. WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 INSTITUTIONAL CONTROL SITES COST ESTIMATE TES-07-99 00
06-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 1-08 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 1-08 AR.INDEX.OU.1-08 00
24-MAY-99 SHAW, R. M. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR TAN OPERABLE UNIT (OU) 1-10 COMPREHENSIVE REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) AT INEEL OPE-ER-75-99 00
11-NOV-98 KUHNS, D. J. COST ESTIMATES FOR CONTAINMENT ALTERNATIVES FOR WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 SITES 10555 00
01-NOV-98 INEEL COMMUNITY RELATIONS UPDATE FACT SHEET - TEST AREA NORTH (TAN) REVISED PROPOSED PLAN TO BE ISSUED IN EARLY NOVEMBER - WASTE AREA GROUP 1 (WAG-1) 10552 00
01-NOV-98 INEEL COMMUNITY RELATIONS INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) 17370 00
01-NOV-98 MICHAEL, D. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SUPPLEMENT FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 AT INEEL DOE/ID-10557,SUPPLEMENT 00
01-JUN-98 BLACKMORE, C. S. HEALTH AND SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 1-10 WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-95/0333 03
26-FEB-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT FOR TAN COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) PROPOSED PLAN HELD FEBRUARY 26, 1998 (02/26/98) AT MOSCOW, IDAHO 10815 00
24-FEB-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT FOR TAN COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) PROPOSED PLAN HELD FEBRUARY 24, 1998 (02/24/98) AT BOISE, IDAHO 10814 00
23-FEB-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT FOR TAN COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) PROPOSED PLAN HELD FEBRUARY 23, 1998 (02/23/98) AT IDAHO FALLS, IDAHO 10816 00
18-DEC-97 HAIN, K. E. REGULATORY STATUS OF TAN V-TANKS & OU 1-10 PROPOSED PLAN SCHEDULE OPE-ER-286-97 00
06-NOV-97 HAIN, K. E. TRANSMITTAL OF FINAL COMPREHENSIVE FEASIBILITY STUDY (FS) FOR OU 1-10 OPE-ER-184-97 00
01-NOV-97 BLACKMORE, C. S. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TAN OU 1-10 AT INEEL DOE/ID-10557 00
07-OCT-97 HAIN, K. E. TRANSMITTAL OF DRAFT PROPOSED PLAN FOR TAN OU 1-10 OPE-ER-159-97 00
06-OCT-97 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL FEASIBILITY STUDY (FS) FOR TAN OU 1-10 OPE-ER-157-07 00
08-SEP-97 MICHAEL, D. L. REPLACEMENT PAGES FOR APPENDIX J (COST ESTIMATES) TO DOE/ID-10557, COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 AT INEEL 10817 00
16-JUN-97 JENSEN, N. R. TRANSMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TAN OU 1-10 OPE-ER-99-97 00
13-FEB-97 JENSEN, N. R. TRANSMITTAL OF THE COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 OPE-ER-15-97 00
15-MAY-96 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT FOR OPERABLE UNIT (OU) 1-08 MISCELLANEOUS CONTAMINATION SITES 10286 00
01-SEP-95 LMITCO PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 1-08 INEL-94/0170 00
23-MAY-94 ENGLISH, M. IDHW REVIEW OF THE DRAFT TRACK 2 SAMPLING & ANALYSIS PLAN (SAP) FOR OU 1-08 5706 00
23-MAY-94 LIVERMAN, E. EPA COMMENTS ON DRAFT TRACK 2 FIELD SAMPLING PLAN (FSP) FOR OU 1-08 : TEST AREA NORTH (TAN) 5710 00
24-SEP-86 SAINT-LOUIS, M. L. INITIAL ASSESSMENT - TSF-28 SEWAGE TREATMENT PLANT TAN-623 2698 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page