Select By Site Code

For Site Code TSF-26

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
17-APR-08 JESSMORE, J. J. REMEDIAL ACTION REPORT FOR OU 1-10 SITES AT TEST AREA NORTH, WAG 1 DOE/ID-11262 00
30-OCT-07 NELSON, L. O. IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2007 DOE/ID-11350 00
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
18-JAN-07 EPA EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR THE TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 DOE/ID-11300 00
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
02-OCT-06 OLAVESON, B. E. IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2006 DOE/ID-11294 00
28-SEP-06 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO REQUEST TO EXTEND THE ENFORCEABLE MILESTONES FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT 25023 00
28-SEP-06 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO REQUEST TO EXTEND THE ENFORCEABLE MILESTONES FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT 25024 00
27-SEP-06 JENSEN, N. R. REQUEST TO EXTEND THE ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT FMDP-RFDP-06-049 00
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
30-AUG-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2004 (FY-04) DOE/NE-ID-11200 00
02-AUG-05 JANTZ, A. E. FIELD SAMPLING PLAN (FSP) FOR GROUP 3, PM-2A TANK V-14 TREATED CONTENTS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 ICP/EXT-05-00827 02
26-JUL-05 JANTZ, A. E. FIELD SAMPLING PLAN (FSP) FOR GROUP 3, PM-2A TANK V-14 TREATED CONTENTS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 ICP/EXT-05-00827 01
23-JUN-05 BONNEMA, B. E. ENGINEERING DESIGN FILE (EDF) - SUBSIDENCE EVALUATION FOR V-1, V-2, V-3, AND V-14 TANKS IN IDAHO CERCLA DISPOSAL FACILITY (ICDF) CELL - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.02 AND RE EDF-5786 00
26-MAY-05 EINAN, D. R. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST TO CHANGE THE EXISTING PM-2A V-14 STAGING AREA TO A TEMPORARY UNIT 24907 00
23-MAY-05 JANTZ, A. E. DATA QUALITY ASSESSMENT & DATA SUMMARY FOR THE HWMA RCRA CLOSURE OF THE TEST AREA NORTH (TAN) TECHNICAL SUPPORT FACILITY (TSF) INTERMEDIATE LEVEL RADIOACTIVE WASTE (ILRW) HOLDING TANK SUBSYSTEM (PM-2A TANKS) TSF-26, CERCLA OPERABLE UNIT (OU) 1-10 ICP/EXT-05-00876 00
19-MAY-05 YONK, A. K. GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 FOR TSF-26, PM-2A TANKS - PHASE 2 (PHASE II) TANK V-14 TREATMENT AND DISPOSAL FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 DOE/NE-ID-11233 00
19-MAY-05 ASHWORTH, S. C. ENGINEERING DESIGN FILE (EDF) - TANK V-14 AIR STRIPPING CALCULATIONS AND PROCESS SIZING - MAY ALSO BE FOUND AS ATTACHMENT 3 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 - DOE/NE-ID-11233 EDF-5558 02
11-MAY-05 SPOMER, M. DEPARTMENT OF ENVIRONMENTAL QUALITY'S (DEQ) RESPONSE TO DOE REQUEST TO CHANGE THE EXISTING PM-2A V-14 STAGING AREA TO A TEMPORARY UNIT 24906 00
11-MAY-05 JANTZ, A. E. DECONTAMINATION PLAN FOR GROUP 3, PM-2A TANK V-14 TREATMENT, TEST AREA NORTH (TAN), WASTE AREA GOUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 ICP/EXT-05-00819 00
10-MAY-05 JANTZ, A. E. WASTE MANAGEMENT PLAN (WMP) FOR GROUP 3, PM-2A TANKS AND BURN PITS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00284 03
26-APR-05 VERWOLF, M. C. TRANSMITTAL OF REQUEST TO CHANGE THE EXISTING PM-2A V-14 STAGING AREA TO TREATMENT UNIT AND PROPOSED NEW CONSTITUENTS TO ICDF LANDFILL AND EVAPORATION POND WASTE ACCEPTANCE CRITERIA (WAC) FMDP-RFDP-05-024 00
24-JAN-05 YONK, A. K. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 07
19-JAN-05 SHAW, R. M. COMPLETION OF ENFORCEABLE MILESTONE TO COMPLETE DISPOSAL OF TSF-06 AND TSF-26 SURFACE SOILS FOR WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 FMDP-FFA/CO-05-103 00
11-JAN-05 AR COORDINATOR OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDES TECHNICAL SUPPORT FACILITY (TSF) PAINT SHOP FLOOR DARIN LEACH FIELD OU 1-10 AR.INDEX.OU.1-10 02
05-JAN-05 DOE EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR THE TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 DOE/NE-ID-11199 00
13-DEC-04 SHAW, R. M. TRANSMITTAL OF EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 AND SIGNATURE READY COPIES OF ESD FOR THE ROD FOR POWER BURST FACILITY AUXILARY REACTOR AREA (PBF/ARA) OU 5 FMDP-FFA/CO-04-085 00
09-DEC-04 YONK, A. K. WASTE MANAGEMENT PLAN (WMP) FOR GROUP 3, PM-2A TANKS AND BURN PITS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00284 02
08-DEC-04 JANTZ, A. E. GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 1 FOR TSF-26, PM-2A TANKS - PHASE 1 (PHASE I) TANK REMOVAL & SITE REMEDIATION FOR TAN, WASTE AREA GROUP 1 (WAG-1), OU 1-10 - DOE, EPA & DEQ COMMENTS ARE INCLUDED IN APPENDIX F & APPEN DOE/NE-ID-11161 01
19-AUG-04 SCHWENDIMAN, G. L. GROUP 2 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM FOR THE ASSESSMENT AND CLEANUP OF V-TANK AREA NEW SITES, FOR THE TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 DOE/NE-ID-11152 00
21-JUN-04 JANTZ, A. E. FIELD SAMPLING PLAN (FSP) FOR GROUP 3, PM-2A TANKS FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 DOE/ID-11078 01
21-JUN-04 JANTZ, A. E. GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 1 FOR TSF-26, PM-2A TANKS - PHASE 1 (PHASE I) TANK REMOVAL AND SITE REMEDIATION FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 DOE/NE-ID-11161 00
21-JUN-04 JANTZ, A. E. WASTE MANAGEMENT PLAN (WMP) FOR GROUP 3, PM-2A TANKS AND BURN PITS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00284 01
10-JUN-04 ELLIOTT, M. D. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 06
17-MAY-04 EINAN, D. R. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE FOR VERIFICATION SAMPLING FOR ARSENIC AND THALLIUM IN TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) 24856 00
13-MAY-04 HATHAWAY, C. DISCUSSION OF VERIFICATION SAMPLING FOR ARSENIC AND THALLIUM IN TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) EM-ER-04-102 00
12-MAY-04 VANHORN, R. L. RISK BASED SCREENING AND ASSESSMENT APPROACH FOR WASTE AREA GROUP 1 (WAG-1) SOILS INEEL/EXT-03-00540 00
19-APR-04 MCDANNEL, G. E. FIELD SAMPLING PLAN (FSP) FOR THE REMEDIAL ACTION (RA) SAMPLING AND FIELD SCREENING OF GROUP 1 SITES AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 DOE/ID-10725 04
29-MAR-04 DOE NOTICE OF AVAILABILITY - AGENCIES ISSUE AMENDMENT TO INEEL OPERABLE UNIT (OU) 1-10 RECORD OF DECISION (ROD) 24835 00
25-MAR-04 ELLIOTT, M. D. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 05
17-MAR-04 NOT SPECIFIED RECORD OF DECISION (ROD) AMENDMENT FOR V-TANKS TSF-09 AND TSF-18 AND EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE PM-2A TANKS TSF-26 AND TSF-06, AREA 10, AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 DOE/ID-10682,AMENDMENT 0
17-MAR-04 HAIN, K. E. TRANSMITTAL OF RECORD OF DECISION (ROD) AMENDMENT FOR V-TANKS TSF-09 AND TSF-18 AND EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE PM-2A TANKS TSF-26 AND TSF-06, AREA 10, AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 EM-ER-04-058 00
16-MAR-04 ELLIOTT, M. D. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 04
15-MAR-04 ICP COMMUNITY RELATIONS IDAHO COMPLETION PROJECT (ICP) COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - AGENCIES ISSUE AMENDMENT TO RECORD OF DECISON (ROD) FOR TEST AREA NORTH (TAN) V-TANKS 24834 00
15-MAR-04 AR COORDINATOR OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDING TECHNICAL SUPPORT FACILITY (TSF) PAINT SHOP FLOOR DRAIN LEACH FIELD OU 1-10 AR.INDEX.OU.1-10-AMENDMENT 00
06-DEC-03 BRUCE, J. E. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR GROUP 3, PM-2A TANKS AND BURN PITS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 - APPENDIX G CONTAINS AGENCY REVIEW COMMENTS DOE/ID-11073 00
06-DEC-03 BRUCE, J. E. WASTE MANAGEMENT PLAN (WMP) FOR GROUP 3, PM-2A TANKS AND BURN PITS, FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00284 00
05-DEC-03 BRUCE, J. E. FIELD SAMPLING PLAN (FSP) FOR GROUP 3, PM-2A TANKS FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 DOE/ID-11078 00
05-DEC-03 BRUCE, J. E. CONSTRUCTION SPECIFICATION (SPC) - WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 3, TSF-26 PM-2A TANKS REMEDIAL DESIGN - ATTACHMENT 1 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - DOE/ID-11073 SPC-475 00
04-NOV-03 ELLIOTT, M. D. COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 1 SITES - DOE, IDEQ AND EPA REVIEW COMMENTS AND RESOLUTIONS ARE INCLUDED IN APPENDIX G DOE/ID-10712 02
04-NOV-03 MCDANNEL, G. E. FIELD SAMPLING PLAN (FSP) FOR THE REMEDIAL ACTION (RA) SAMPLING AND FIELD SCREENING OF GROUP 1 SITES AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 DOE/ID-10725 03
30-OCT-03 LEWIS, T. F. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 03
10-SEP-03 LEWIS, T. F. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR REMEDIAL ACTION (RA) SAMPLING, FIELD SCREENING, SOIL EXCAVATION, BACKFILL, PACKAGING AND SHIPMENT OF TSF-06 AND TSF-26 SITES AT WASTE AREA GROUP (WAG-1) OPERABLE UNIT (OU) 1-10 INEEL/EXT-02-01399 03
04-SEP-03 HANEY, D. F. FIELD SAMPLING PLAN (FSP) FOR THE TSF-26, PM-2A TANK CONTENTS AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 - APPENDIX B CONTAINS EPA, IDEQ AND DOE REVIEW COMMENTS AND RESOLUTIONS INEEL/EXT-03-00304 03
19-AUG-03 FITCH, D. R. FY 2003 (FY-03) INSTITUTIONAL CONTROLS ASSESSMENT REPORT FOR WASTE AREA GROUP 1 (WAG-1) DOE/ID-11105 00
14-AUG-03 HANEY, D. F. FIELD SAMPLING PLAN (FSP) FOR THE TSF-26, PM-2A TANK CONTENTS AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 - APPENDIX B CONTAINS EPA, IDEQ AND DOE REVIEW COMMENTS AND RESOLUTIONS INEEL/EXT-03-00304 02
11-AUG-03 LEWIS, T. F. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 02
12-JUN-03 HANEY, D. F. FIELD SAMPLING PLAN (FSP) FOR THE TSF-26, PM-2A TANK CONTENTS AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 - APPENDIX B INCLUDES EPA, IDEQ AND DOE REVIEW COMMENTS AND RESOLUTIONS INEEL/EXT-03-00304 01
29-MAY-03 HARRIS, J. D. WASTE MANAGEMENT PLAN (WMP) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 1 SITES REMEDIAL ACTION (RA) INEEL/EXT-99-00910 01
28-MAY-03 BRUCE, J. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 01
05-MAY-03 BRUCE, J. E. COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 1 SITES - DOE, IDEQ AND EPA REVIEW COMMENTS AND RESOLUTIONS ARE INCLUDED IN APPENDIX G DOE/ID-10712 01
30-APR-03 AR COORDINATOR OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDES EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) DOCUMENT ID #DOE/ID-11050 AR.INDEX.OU.1-10 01
03-APR-03 BRUCE, J. E. FIELD SAMPLING PLAN (FSP) FOR THE REMEDIAL ACTION (RA) SAMPLING AND FIELD SCREENING OF GROUP 1 SITES AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 DOE/ID-10725 02
11-MAR-03 LEWIS, T. F. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-03-00046 00
28-FEB-03 LEWIS, T. F. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR REMEDIAL ACTION (RA) SAMPLING, FIELD SCREENING, SOIL EXCAVATION, BACKFILL, PACKAGING AND SHIPMENT OF TSF-06 AND TSF-26 SITES AT WASTE AREA GROUP (WAG-1) OPERABLE UNIT (OU) 1-10 INEEL/EXT-02-01399 02
19-FEB-03 SHAW, R. M. TRANSMITTAL OF FIELD SAMPLING PLAN (FSP) FOR REMEDIAL ACTION (RA) SAMPLING AND FIELD SCREENING OF GROUP 1 SITES AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 EM-ER-03-051 00
11-FEB-03 BRUCE, J. E. FIELD SAMPLING PLAN (FSP) FOR THE REMEDIAL ACTION (RA) SAMPLING AND FIELD SCREENING OF GROUP 1 SITES AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 DOE/ID-10725 01
14-JAN-03 LEWIS, T. F. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR REMEDIAL ACTION (RA) SAMPLING, FIELD SCREENING, SOIL EXCAVATION, BACKFILL, PACKAGING AND SHIPMENT OF TSF-06 AND TSF-26 SITES AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-02-01399 01
14-JAN-03 MCDANNEL, G. E. CONCEPTUAL DESIGN STUDY REPORT FOR TSF-26 PM-2A TANKS FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 INEEL/EXT-02-01412 00
04-DEC-02 SHAW, R. M. TRANSMITTAL OF DRAFT CONCEPTUAL DESIGN STUDY REPORT FOR TSF-26 PM-2A TANKS FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 EM-ER-02-205 00
29-OCT-02 SHAW, R. M. TRANSMITTAL OF TECHNICAL SUPPORT FACILITY-06 (TSF-06) AND TECHNICAL SUPPORT FACILITY-26 (TSF-26) CALENDAR YEAR 2000 (CY-2000) SAMPLING AND REMEDIATION SUMMARY REPORT FOR WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 EM-ER-02-185 00
17-OCT-02 MCDANNEL, G. E. TECHNICAL SUPPORT FACILITY-06 (TSF-06) AND TECHNICAL SUPPORT FACILITY-26 (TSF-26) CALENDAR YEAR 2000 (CY-2000) SAMPLING AND REMEDIATION SUMMARY REPORT FOR WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 INEEL/EXT-02-01135 00
31-JUL-02 FITCH, D. R. 2002 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) DOE/ID-11011 00
02-NOV-01 FITCH, D. R. OPERATIONS & MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 DOE/ID-10711 01
29-AUG-01 SHAW, R. M. TRANSMITTAL OF 2001 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) EM-ER-01-146 00
28-AUG-01 FITCH, D. R. 2001 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) DOE/ID-10899 00
22-NOV-00 PIERRE, W. ACCELERATION OF THE V-TANK REMEDIAL ACTION 22185 00
04-OCT-00 SHAW, R. M. TRANSMITTAL OF FINAL INSTITUTIONAL CONTROL PLAN FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) EM-ER-194-00 00
28-SEP-00 KUHNS, D. J. INSTITUTIONAL CONTROL PLAN FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) INEEL/EXT-2000-00917 00
30-AUG-00 SHAW, R. M. TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 1-10 GROUP 1 SITES & SUPPORTING DOCUMENTS EM-ER-167 00
17-AUG-00 JANTZ, A. E. COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 1 SITES DOE/ID-10712 00
17-AUG-00 JANTZ, A. E. FIELD SAMPLING PLAN (FSP) FOR REMEDIAL ACTION (RA) SAMPLING & FIELD SCREENING OF GROUP 1 SITES AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 DOE/ID-10725 00
11-MAY-00 FITCH, D. R. INSTITUTIONAL CONTROL STATUS REPORT FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) DOE/ID-10750 00
22-FEB-00 SHAW, R. M. TRANSMITTAL OF TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) EM-ER-24-00 00
18-FEB-00 REESE, C. L. TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) DOE/ID-10723 00
19-JAN-00 AR COORDINATOR OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDES TECHNICAL SUPPORT FACILITY (TSF) PAINT SHOP FLOOR DRAIN LEACH FIELD OU 1-10 AR.INDEX.OU.1-10 00
18-JAN-00 DOE NOTICE OF AVAILABILITY - AGENCIES SIGN RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 10822 00
21-DEC-99 AR COORDINATOR OPERABLE UNIT (OU) 10-06 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR RADIONUCLIDE CONTAMINATED SOILS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AR.INDEX.OU.10-06 00
14-DEC-99 NOT SPECIFIED FINAL RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-10 DOE/ID-10682 0
18-NOV-99 SHAW, R. M. INCLUSION OF DOCUMENTS INTO THE ADMINISTRATIVE RECORD (AR) FOR TAN OPERABLE UNIT (OU) 1-10 - INDEX OF SAMPLING DATA DOCUMENTS 10802 00
25-OCT-99 HAIN, K. E. TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT INEEL - IDHW & EPA COMMENTS & RESOLUTIONS OPE-ER-165-99 00
23-SEP-99 FOLKER, J. D. COST ESTIMATE - TAN OPERABLE UNIT (OU) 1-10 COMPREHENSIVE ECONOMY OF SCALE JDF-26-99 00
23-SEP-99 FOLKER, J. D. COST ESTIMATE - TAN OPERABLE UNIT (OU) 1-10 INVESTIGATION DERIVED WASTE (IDW) JDF-27-99 00
07-SEP-99 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT INEEL - IDHW & EPA COMMENTS & RESOLUTIONS OPE-ER-125-99 00
01-AUG-99 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - COMPREHENSIVE INVESTIGATION UNDER WAY FOR WASTE AREA GROUP 10 (WAG-10) 18049 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
24-MAY-99 SHAW, R. M. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR TAN OPERABLE UNIT (OU) 1-10 COMPREHENSIVE REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) AT INEEL OPE-ER-75-99 00
11-NOV-98 KUHNS, D. J. COST ESTIMATES FOR CONTAINMENT ALTERNATIVES FOR WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 SITES 10555 00
01-NOV-98 INEEL COMMUNITY RELATIONS UPDATE FACT SHEET - TEST AREA NORTH (TAN) REVISED PROPOSED PLAN TO BE ISSUED IN EARLY NOVEMBER - WASTE AREA GROUP 1 (WAG-1) 10552 00
01-NOV-98 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR WASTE AREA GROUP 1 (WAG-1) TEST AREA NORTH (TAN) AT INEEL 10553 00
01-NOV-98 INEEL COMMUNITY RELATIONS INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) 17370 00
01-NOV-98 MICHAEL, D. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SUPPLEMENT FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 AT INEEL DOE/ID-10557,SUPPLEMENT 00
01-JUN-98 BLACKMORE, C. S. HEALTH AND SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 1-10 WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-95/0333 03
26-FEB-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT FOR TAN COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) PROPOSED PLAN HELD FEBRUARY 26, 1998 (02/26/98) AT MOSCOW, IDAHO 10815 00
24-FEB-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT FOR TAN COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) PROPOSED PLAN HELD FEBRUARY 24, 1998 (02/24/98) AT BOISE, IDAHO 10814 00
23-FEB-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT FOR TAN COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) PROPOSED PLAN HELD FEBRUARY 23, 1998 (02/23/98) AT IDAHO FALLS, IDAHO 10816 00
01-FEB-98 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR WASTE AREA GROUP 1 (WAG-1) TEST AREA NORTH (TAN) IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) OPERABLE UNIT (OU) 1-10 10443 00
18-DEC-97 HAIN, K. E. REGULATORY STATUS OF TAN V-TANKS & OU 1-10 PROPOSED PLAN SCHEDULE OPE-ER-286-97 00
06-NOV-97 HAIN, K. E. TRANSMITTAL OF FINAL COMPREHENSIVE FEASIBILITY STUDY (FS) FOR OU 1-10 OPE-ER-184-97 00
01-NOV-97 BLACKMORE, C. S. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TAN OU 1-10 AT INEEL DOE/ID-10557 00
07-OCT-97 HAIN, K. E. TRANSMITTAL OF DRAFT PROPOSED PLAN FOR TAN OU 1-10 OPE-ER-159-97 00
06-OCT-97 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL FEASIBILITY STUDY (FS) FOR TAN OU 1-10 OPE-ER-157-07 00
08-SEP-97 MICHAEL, D. L. REPLACEMENT PAGES FOR APPENDIX J (COST ESTIMATES) TO DOE/ID-10557, COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 AT INEEL 10817 00
16-JUN-97 JENSEN, N. R. TRANSMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TAN OU 1-10 OPE-ER-99-97 00
13-FEB-97 JENSEN, N. R. TRANSMITTAL OF THE COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 OPE-ER-15-97 00
02-DEC-96 COTTEN, G. B. SUMMARY REPORT FOR OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL 10562 00
22-JUL-96 AR COORDINATOR OPERABLE UNIT (OU) 1-05 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF TEST AREA NORTH (TAN) OU 1-05 AR.INDEX.OU.1-05 00
01-JUL-96 FITCH, D. R. HEALTH & SAFETY PLAN (HSP) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION OPERABLE UNIT (OU) 10-06 INEL-95/0347 01
15-MAY-96 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT FOR OPERABLE UNIT (OU) 1-05 RADIOACTIVE CONTAMINATION SITES 10285 00
01-MAR-96 MICHAEL, D. L. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 1-10: TEST AREA NORTH (TAN) INEL-95/0304 00
10-OCT-95 JORGENSEN, D. K. CHANGE IN TITLE & NAME OF DRAFT OU 10-06 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR PLACEMENT INTO ADMINISTRATIVE RECORD (AR) DKJ-13-95 00
01-AUG-95 DOE DOE-ID LEAD AGENCY ACTION MEMORANDUM FOR THE NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT OU 10-06 RADIONUCLIDE CONTAMINATED SOIL LOCATIONS AT THE INEL 10043 00
01-AUG-95 PARSONS CORPORATION HEALTH AND SAFETY PLAN (HSP) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION OU 10-06 (PARSONS #ES-21.6.12) INEL-95/0347 00
01-AUG-95 PARSONS CORPORATION FIELD SAMPLING PLAN (FSP) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION OU 10-06 (PARSONS #ES-21.6.3) INEL-95/0365 00
01-AUG-95 GREEN, L. A. TRANSMITTAL OF FINAL ACTION MEMORANDUM FOR OU 10-06 REMOVAL ACTION AT THE INEL OPE-ER-95-144 00
28-JUL-95 PARSONS CORPORATION ENVIRONMENTAL RESTORATION (ER) REMOVAL ACTION WORK PLAN FOR RADIONUCLIDE CONTAMINATED SOILS AT OU 10-06 INEL-95/0326 02
05-JUL-95 SATTGAST, L. PUBLIC COMMENT AND RESPONSE ON OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION 10046 00
05-JUL-95 KOCH, D. F. IDHW REVIEW COMMENTS OF BASELINE RISK ASSESSMENT (BRA) OF DRAFT RI/FS FOR OU 10-06 RADIONUCLIDE CONTAMINATED SOILS AT INEL 10051 00
19-JUN-95 JONES, E. EPA REVIEW COMMENTS OF RADIONUCLIDE CONTAMINATED SOILS OU 10-06 DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10050 00
15-JUN-95 BURNS, S. M. OPERABLE UNIT (OU) 10-06 NON TIME CRITICAL REMOVAL ACTION (NTCRA) ENGINEERING EVALUATION COST ANALYSIS (EE/CA) APPROVAL MEMORANDUM 10021 00
10-JUN-95 MARTY, R. C. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT INEL, VOLUME III (VOL.03) INEL-95/0259,VOL.03 00
08-JUN-95 ROOD, S. M. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT INEL, VOLUME I, (VOL.01) INEL-95/0259,VOL.01 00
08-JUN-95 ROOD, S. M. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATION SOILS REMOVAL ACTION AT (INEL), VOLUME II, (VOL.02) INEL-95/0259,VOL.02 00
04-MAY-95 DOE, EPA, IDHW ACTION DETERMINATION FOR WAG-10 OU 10-06 RADIONUCLIDE CONTAMINATED SOIL SITES 10016 00
17-JAN-95 IDHW REVISED IDAHO DEPARTMENT OF HEALTH AND WELFARE (IDHW) COMMENT RESOLUTION TABLES FOR OPERABLE UNIT (OU) 1-05 RADIOACTIVE SITES TRACK 2 SUMMARY REPORT 5867 00
01-OCT-94 ITC PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR TEST AREA NORTH (TAN) OU 1-05, RADIOACTIVE CONTAMINATION SITES INEL-94/0135 00
25-MAY-94 LIVERMAN, E. EPA REVIEW COMMENTS: DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR THE TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-05 5712 00
23-MAY-94 ENGLISH, M. IDHW REVIEW OF THE DRAFT TRACK 2 SUMMARY REPORT FOR OU 1-05 5705 00
12-APR-93 LIVERMAN, E. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT TRACK 2 FIELD SAMPLING PLAN (FSP) TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-04 & 1-05 10291 00
12-APR-93 ENGLISH, M. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) TECHNICAL REVIEW COMMENTS ON DRAFT TRACK 2 FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 1-04 & 1-05 10292 00
01-APR-93 MEYER, T. J. TRACK 2 FIELD SAMPLING PLAN (FSP) FOR OU 1-04 & 1-05: TAN EGG-ER-10679 00
22-JAN-93 DOE SCOPE OF WORK FOR OPERABLE UNITS (OU) 1-04 & 1-05 TRACK 2 INVESTIGATION 5293 00
23-SEP-86 SAINT-LOUIS, M. L. INITIAL ASSESSMENT - TSF-26 PM 2 TANKS TAN-710 A AND B 2696 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page