21-MAY-18 NOT SPECIFIED ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2017 DOE/ID-11576 0
30-JAN-18 JEWETT, MARC A. DELAY OF JANUARY 2018 GROUNDWATER SAMPLING OF TAN-47 UNTIL APRIL 2018 CCN 321721 0
22-JAN-18 FISCHER, NATHANIEL REQUEST FOR USE OF WELLS TAN-37, TAN-1860, AND TAN-28 FOR INJECTION OF AMENDMENTS IN SUPPORT OF IN-SITU BIOREMEDIATION AT TEST AREA NORTH OPERABLE UNIT 1-07B ON THE IDAHO NATIONAL LABORATORY CCN 321732 0
16-JAN-18 RENO, SCOTT L. REQUEST FOR USE OF WELLS TAN-37, TAN-1860, AND TAN-28 FOR INJECTION OF AMENDMENTS IN SUPPORT OF IN-SITU BIOREMEDIATION AT TEST AREA NORTH OPERABLE UNIT 1-07B ON THE IDAHO NATIONAL LABORATORY (INL) CCN 321664 0
12-JUN-17 MONSON, BRIAN R. DEQ RESPONSE TO REQUEST FOR "NO LONGER CONTAINED-IN" FOR WELL DRILLING WATER AND DRILLING CUTTINGS FOR OU 1-07B NEW WELL (TAN-2312) CCN 320864 0
06-JUN-17 RENO, SCOTT L. REQUEST FOR "NO LONGER CONTAINED-IN" DETERMINATION FOR WELL DRILLING WATER AND DRILLING CUTTINGS FOR OU 1-07B NEW WELL (TAN-2312) CCN 320813 0
01-APR-17 NOT SPECIFIED ISB REBOUND TEST PLAN FOR TAN GROUNDWATER REMEDIATION DOE/ID-11444 4
01-APR-17 NOT SPECIFIED ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2016 DOE/ID-11561 1
01-DEC-16 NOT SPECIFIED OPERATIONS AND MAINTENANCE PLAN FOR OU 1-07B TAN GROUNDWATER REMEDIATION DOE/ID-11558 0
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-MAR-16 NOT SPECIFIED ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2015 DOE/ID-11546 0
07-JAN-16 FISCHER, NETHANIEL REQUEST FOR USE OF MONITORING WELLS TAN-2271 AND TAN-2272 FOR INJECTING AMENDMENTS IN SUPPORT OF IN-SITU BIOREMEDIATION AT THE IDAHO NATIONAL LABORATORY CCN 318687 0
22-DEC-15 HUTCHISON, D. P. REQUEST FOR USE OF WELLS TAN-2271 AND TAN-2272 FOR INJECTION OF AMENDMENTS IN SUPPORT OF IN-SITU BIOREMEDIATION AT TEST AREA NORTH OPERABLE UNIT 1-07B CCN 318641 0
01-APR-15 RODDY, MICHAEL S. ISB REBOUND TEST PLAN FOR TAN GROUNDWATER REMEDIATION DOE/ID-11444 3
01-APR-15 CAHN, LORIE S. ISB REBOUND TEST PLAN FOR TAN GROUNDWATER REMEDIATION DOE/ID-11444 3
01-APR-15 NOT SPECIFIED ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2014 DOE/ID-11521 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
01-DEC-14 CAHN, LORIE S. MONITORING PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B DOE/ID-11412 3
01-DEC-14 RODDY, MICHAEL S. MONITORING PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B DOE/ID-11412 3
12-AUG-14 JOHANSEN, PETE DEQ CONCURRENCE ON PATH FORWARD FOR TEST AREA NORTH, OPERABLE UNIT 1-07B (WDP-RWMC-14-015) REVISED COMMENT RESPONSES 5137952 0
11-AUG-14 FAULK, DENNIS EPA CONCURRENCE ON PATH FORWARD FOR TEST AREA NORTH, OPERABLE UNIT 1-07B (WDP-RWMC-14-015) 5137953 0
07-AUG-14 JENSEN, NOLAN R. DEPARTMENT OF ENERGY, IDAHO OPERATIONS OFFICE - REQUEST FOR CONCURRENCE ON PATH FORWARD FOR TEST AREA NORTH, OPERABLE UNIT 1-07B (WDP-RWMC-14-015) WDP-RWMC-14-015 0
01-APR-14 NOT SPECIFIED ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2013 DOE/ID-11504 0
01-JUN-13 RODDY, MICHAEL S. MONITORING PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B DOE/ID-11412 2
01-JUN-13 CAHN, LORIE S. MONITORING PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B DOE/ID-11412 2
01-MAY-13 NOT SPECIFIED ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2012 DOE/ID-11481 0
01-MAR-13 CAHN, LORIE S. ISB REBOUND TEST PLAN FOR TAN GROUNDWATER REMEDIATION DOE/ID-11444 2
01-MAR-13 RODDY, MICHAEL S. ISB REBOUND TEST PLAN FOR TAN GROUNDWATER REMEDIATION DOE/ID-11444 2
08-AUG-12 JOHANSEN, PETE WASTE AREA GROUP 1, REQUEST TO INITIATE THE OU 1-07B REBOUND TEST 4055710 0
08-AUG-12 FAULK, DENNIS EPA CONCURRENCE FOR WDP-RWMC-12-036 REQUEST TO INITIATE THE OU 1-07B REBOUND TEST 4189786 0
01-AUG-12 HAIN, KATHLEEN DEPARTMENT OF ENERGY, IDAHO OPERATIONS OFFICE - REQUEST TO INITIATE THE OU 1-07B REBOUND TEST (WDP-RWMC-12-036) WDP-RWMC-12-036 0
01-MAY-12 NOT SPECIFIED NEW PUMP AND TREAT FACILITY OPERATIONS AND MAINTENANCE PLAN FOR TAN, OPERABLE UNIT 1-07B DOE/ID-10684 7
01-MAY-12 RODDY, MICHAEL S. ISB REBOUND TEST PLAN FOR TAN GROUNDWATER REMEDIATION DOE/ID-11444 1
01-MAY-12 CAHN, LORIE S. ISB REBOUND TEST PLAN FOR TAN GROUNDWATER REMEDIATION DOE/ID-11444 1
01-APR-12 NOT SPECIFIED ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2011 DOE/ID-11464 0
01-MAR-12 CAHN, LORIE S. MONITORING PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B DOE/ID-11412 1
01-MAR-12 RODDY, MICHAEL S. MONITORING PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B DOE/ID-11412 1
01-MAR-12 NOT SPECIFIED AIR STRIPPER TREATMENT UNIT OPERATIONS AND MAINTENANCE PLAN FOR TEST AREA NORTH OPERABLE UNIT 1-07B DOE/ID-11414 2
02-AUG-11 JOHANSEN, PETE EPA AND DEQ COMMENTS TO ISB REBOUND TEST PLAN FOR TAN GROUNDWATER MONITORING, MONITORING PLAN FOR TAN OU 1-07B, AND NEW PUMP AND TREAT FACILITY OPERATIONS AND MAINTENANCE PLAN FOR TAN, OU 1-07B IR-25315 0
02-AUG-11 FAULK, DENNIS EPA AND DEQ COMMENTS TO ISB REBOUND TEST PLAN FOR TAN GROUNDWATER MONITORING, MONITORING PLAN FOR TAN OU 1-07B, AND NEW PUMP AND TREAT FACILITY OPERATIONS AND MAINTENANCE PLAN FOR TAN, OU 1-07B IR-25315 0
01-AUG-11 NOT SPECIFIED NEW PUMP AND TREAT FACILITY OPERATIONS AND MAINTENANCE PLAN FOR TAN, OPERABLE UNIT 1-07B DOE/ID-10684 6
01-AUG-11 RODDY, MICHAEL S. MONITORING PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B DOE/ID-11412 0
01-AUG-11 CAHN, LORIE S. MONITORING PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B DOE/ID-11412 0
01-AUG-11 NOT SPECIFIED AIR STRIPPER TREATMENT UNIT OPERATIONS AND MAINTENANCE PLAN FOR TEST AREA NORTH OPERABLE UNIT 1-07B DOE/ID-11414 1
01-AUG-11 CAHN, LORIE S. ISB REBOUND TEST PLAN FOR TAN GROUNDWATER REMEDIATION DOE/ID-11444 0
01-AUG-11 RODDY, MICHAEL S. ISB REBOUND TEST PLAN FOR TAN GROUNDWATER REMEDIATION DOE/ID-11444 0
11-MAY-11 FORSYTHE, HOWARD NEW PUMP AND TREAT FACILITY FLUSHING CALCULATIONS EDF-10041 0
01-MAY-11 NOT SPECIFIED ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2010 DOE/ID-11440 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 1) DOE/ID-11429 (PART 1) 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 2) DOE/ID-11429 (PART 2) 0
31-DEC-10 NOT SPECIFIED WASTE MANAGEMENT PLAN FOR TEST AREA NORTH FINAL GROUNDWATER REMEDIATION OPERABLE UNIT 1-07B INEEL/EXT-98-00267 7
04-AUG-10 NOT SPECIFIED ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2009 DOE/ID-11428 1
26-JUL-10 FAULK, DENNIS ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE REGARDING IN SITU BIOREMEDIATION REMEDIAL ACTION REPORT, TEST AREA NORTH, OU 1-07B CCN 310562 0
15-JUL-10 JOHANSEN, PETE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) CONCURRENCE REGARDING IN SITU BIOREMEDIATION REMEDIAL ACTION REPORT, TEST AREA NORTH, OU 1-07B CCN 310517 0
01-JUL-10 NOT SPECIFIED AIR STRIPPER TREATMENT UNIT OPERATIONS AND MAINTENANCE PLAN FOR TEST AREA NORTH OPERABLE UNIT 1-07B DOE/ID-11414 0
30-JUN-10 ARENAZ, MARK R. NOTIFICATION FOR IN SITU BIOREMEDIATION REMEDIAL ACTION REPORT, TEST AREA NORTH, OPERABLE UNIT 1-07B WDP-RWMC-10-044 0
29-JUN-10 JOHANSEN, PETE AGENCY AGREEMENT TO DISCONTINUE AIR SAMPLING AT THE NEW PUMP AND TREAT FACILITY AT TEST AREA NORTH, OPERABLE UNIT 1-07B IR-25245 0
07-JUN-10 BROWN, MEL E. AGENCY AGREEMENT TO DISCONTINUE AIR SAMPLING AT THE NEW PUMP AND TREAT FACILITY AT TEST AREA NORTH, OPERABLE UNIT 1-07B CCN 310343 0
26-APR-10 RAGAN, BRIAN REQUEST FOR USE OF INJECTION WELL TAN-49 FOR INJECTING TREATED WATER FOR GROUND WATER REMEDIATION AT THE IDAHO NATIONAL LABORATORY IR-25304 0
10-APR-10 STALEY, CHRIS AIR EMISSIONS ANALYSIS FOR THE OU 1-07B AIR STRIPPER TREATMENT UNIT AND NEW PUMP AND TREAT FACILITY AT TAN EDF-9474 0
26-MAR-10 MONSON, BRIAN MARCH 3, 2010 REQUEST FOR A NO-LONGER CONTAINED-IN DETERMINATION FOR OPERABLE UNIT 1-07B REMEDIATED WATER FROM THE AIR STRIPPER TREATMENT UNIT (ASTU) IR-25289 0
20-JAN-10 NOT SPECIFIED DOCUMENTATION OF MINOR CHANGE TO ROD AMENDMENT FOR THE TSF-05 AND TSF-23 AND MISCELLANEOUS NO ACTION SITES, FINAL REMEDIAL ACTION, INL SITE, IDAHO AR-25279 0
17-AUG-09 NOT SPECIFIED MONITORED NATURAL ATTENUATION OPERATIONS, MONITORING, AND MAINTENANCE PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B DOE/ID-11066 3
17-AUG-09 NOT SPECIFIED IN SITU BIOREMEDIATION REMEDIAL ACTION GROUNDWATER MONITORING PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B INEEL/EXT-2002-00779 5
06-AUG-09 NELSON, LEE IN SITU BIOREMEDIATION (ISB) INTERIM REMEDIAL ACTION (RA) REPORT, TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B DOE/NE-ID-11221 3
21-JUL-09 NOT SPECIFIED ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2008 DOE/ID-11392 0
02-JUL-09 NELSON, LEE NEW PUMP AND TREAT FACILITY OPERATIONS AND MAINTENANCE PLAN FOR TEST AREA NORTH FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT 1-07B DOE/ID-10684 5
02-JUL-09 NOT SPECIFIED REMEDIAL DESIGN/REMEDIAL ACTION SCOPE OF WORK TEST AREA NORTH FINAL GROUNDWATER REMEDIATION OPERABLE UNIT 1-07B DOE/ID-10905 2
02-JUL-09 NOT SPECIFIED IN SITU BIOREMEDIATION OPERATIONS AND MAINTENANCE PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B DOE/ID-11012 3
02-JUL-09 NOT SPECIFIED IN SITU BIOREMEDIATION REMEDIAL ACTION WORK PLAN FOR TAN FINAL GROUNDWATER REMEDIATION, OU 1-07B DOE/ID-11015 3
02-JUL-09 NOT SPECIFIED MONITORED NATURAL ATTENUATION REMEDIAL ACTION WORK PLAN FOR TEST AREA NORTH FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT 1-07B DOE/ID-11055 1
02-JUL-09 NOT SPECIFIED MONITORED NATURAL ATTENUATION OPERATIONS, MONITORING, AND MAINTENANCE PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B DOE/ID-11066 2
02-JUL-09 NOT SPECIFIED IN SITU BIOREMEDIATION INTERIM REMEDIAL ACTION REPORT, TEST AREA NORTH, OPERABLE UNIT 1-07B DOE/NE-ID-11221 2
02-JUL-09 NOT SPECIFIED MONITORED NATURAL ATTENUATION INTERIM REMEDIAL ACTION REPORT, TEST AREA NORTH OPERABLE UNIT 1-07B DOE/NE-ID-11229 1
02-JUL-09 NOT SPECIFIED MONITORED NATURAL ATTENUATION INTERIM MONITORED NATURAL ATTENUATION FINAL INSPECTION REPORT ICP/EXT-03-00089 1
02-JUL-09 NOT SPECIFIED IN SITU BIOREMEDIATION FINAL INSPECTION REPORT ICP/EXT-03-00116 1
09-MAR-09 ARMSTRONG, A. T. MONITORED NATURAL ATTENUATION OPERATIONS, MONITORING, AND MAINTENANCE PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B DOE/ID-11066 1
09-MAR-09 NELSON, LEE O. IN SITU BIOREMEDIATION REMEDIAL ACTION GROUNDWATER MONITORING PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B INEEL/EXT-2002-00779 4
03-SEP-08 NELSON, LEE O. ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 107B RPT-488 01
28-MAY-08 NOT SPECIFIED ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 107B RPT-488 0
16-AUG-07 NELSON, L. O. REMEDY PERFORMANCE SUMMARY REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B, FISCAL YEAR 2006 (FY-06) RPT-430 00
12-JUN-07 NELSON, L. O. NEW PUMP AND TREAT FACILITY (NPTF) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B DOE/ID-10679 02
12-JUN-07 NELSON, L. O. NEW PUMP AND TREAT FACILITY (NPTF) OPERATIONS & MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B DOE/ID-10684 04
12-JUN-07 NELSON, L. O. MONITORED NATURAL ATTENUATION 2006 PERFORMANCE AND COMPLIANCE MONITORING ANNUAL REPORT FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B RPT-383 00
22-MAY-07 NELSON, L. O. ANNUAL PERFORMANCE REPORT FOR IN SITU BIOREMEDIATION (ISB) OPERATIONS OCTOBER 2005 TO SEPTEMBER 2006 (10/05 - 09/06), TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B RPT-372 00
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
22-JAN-07 NELSON, L. O. NEW PUMP AND TREAT FACILITY (NPTF) ANNUAL OPERATIONS REPORT, OCTOBER 2005 THROUGH SEPTEMBER 2006 (10/05 - 09/06), TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDY, OPERABLE UNIT (OU) 1-07B RPT-311 00
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
01-AUG-06 NELSON, L. O. FISCAL YEAR 2005 (FY-05) REMEDY PERFORMANCE SUMMARY REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B RPT-233 00
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
19-MAY-06 NELSON, L. O. MONITORED NATURAL ATTENUATION (MNA) 2005 PERFORMANCE AND COMPLIANCE MONITORING ANNUAL REPORT FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B RPT-199 00
16-MAY-06 NELSON, L. O. ANNUAL PERFORMANCE REPORT FOR IN SITU BIOREMEDIATION (ISB) OPERATIONS, OCTOBER 2004 TO SEPTEMBER 2005 (10/04 - 09/05), TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B RPT-192 00
19-DEC-05 NELSON, L. O. NEW PUMP AND TREAT FACILITY (NPTF) ANNUAL OPERATIONS REPORT, OCTOBER 2004 THROUGH SEPTEMBER 2005 (10/04 - 09/05), TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDY, OPERABLE UNIT (OU) 1-07B ICP/EXT-05-01088 00
19-DEC-05 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION (RA) GROUNDWATER MONITORING PLAN (GMP) FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B INEEL/EXT-2002-00779 03
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
22-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2005 (FY-05) DOE/ID-11249 00
30-AUG-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2004 (FY-04) DOE/NE-ID-11200 00
29-AUG-05 NELSON, L. O. WASTE MANAGEMENT PLAN (WMP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B INEEL/EXT-98-00267 06
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
24-AUG-05 NELSON, L. O. MONITORED NATURAL ATTENUATION (MNA) INTERIM REMEDIAL ACTION (RA) REPORT, TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B DOE/NE-ID-11229 00
26-JUL-05 CARROLL, R. E. TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B FINAL GROUNDWATER REMEDIAL ACTION (RA) HEALTH AND SAFETY PLAN (HSP OR HASP) INEEL/EXT-99-00020 03
21-JUN-05 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) INTERIM REMEDIAL ACTION (RA) REPORT, TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B DOE/NE-ID-11221 01
20-MAY-05 MACBETH, T. W. ANNUAL PERFORMANCE REPORT FOR IN SITU BIOREMEDIATION (ISB) OPERATIONS NOVEMBER 2003 TO SEPTEMBER 2004 (11/03 - 09/04), TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B ICP/EXT-05-00787 00
28-APR-05 NELSON, L. O. WASTE MANAGEMENT PLAN (WMP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B INEEL/EXT-98-00267 05
27-APR-05 HARRIS, K. L. MONITORED NATURAL ATTENUATION (MNA) 2004 PERFORMANCE AND COMPLIANCE MONITORING ANNUAL REPORT FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B ICP/EXT-05-00818 00
24-FEB-05 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) INTERIM REMEDIAL ACTION (RA) REPORT, TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B DOE/NE-ID-11221 00
12-JAN-05 NELSON, L. O. CLOSURE REPORT FOR THE GROUNDWATER TREATMENT FACILITY (GWTF), TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B ICP/EXT-04-00634 01
05-JAN-05 NELSON, L. O. NEW PUMP AND TREAT FACILITY (NPTF) ANNUAL OPERATIONS REPORT, OCTOBER 2003 THROUGH SEPTEMBER 2004 (10/03 - 09/04), TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDY, OPERABLE UNIT (OU) 1-07B ICP/EXT-04-00708 00
16-NOV-04 WYMORE, R. A. NEW PUMP AND TREAT FACILITY (NPTF) MEDIAL ZONE REBOUND TEST PLAN, OPERABLE UNIT (OU) 1-07B TEST AREA NORTH (TAN) ICP/EXT-04-00557 01
07-OCT-04 NELSON, L. O. CLOSURE REPORT FOR THE GROUNDWATER TREATMENT FACILITY (GWTF), TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B ICP/EXT-04-00634 00
08-SEP-04 NELSON, L. O. REMEDY PERFORMANCE SUMMARY REPORT FOR THE FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B, FISCAL YEAR 2003 (FY-03) ICP/EXT-04-00464 00
02-SEP-04 WYMORE, R. A. MEDIAL ZONE REBOUND TEST FOR OPERABLE UNIT (OU) 1-07B TEST AREA NORTH (TAN) ICP/EXT-04-00557 00
26-JUL-04 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B - APPENDIX A AND APPENDIX B ARE AGENCY REVIEW COMMENTS AND RESOLUTIONS FOR THE DRAFT AND DRAFT FINAL DOE/ID-11015 02
21-JUL-04 ESPINOSA, JOHN M. REEVALUATION OF APPLICABLE HAZARDOUS WASTE NUMBERS AT HISTORICAL TAN FACILITIES EDF-4714 01
12-JUL-04 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) OPERATIONS AND MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B DOE/ID-11012 02
15-JUN-04 NELSON, L. O. MONITORED NATURAL ATTENUATION (MNA) 2003 PERFORMANCE AND COMPLIANCE MONITORING ANNUAL REPORT FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B DOE/NE-ID-11148 00
27-APR-04 ARMSTRONG, A. T. ANNUAL PERFORMANCE REPORT FOR IN SITU BIOREMEDIATION (ISB) OPERATIONS NOVEMBER 2002 (11/02) TO OCTOBER 2003 (10/03), TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B ICP/EXT-04-00122 00
05-APR-04 HARRIS, K. L. ALTERNATE ELECTRON DONOR OPTIMIZATION PLAN FOR IN SITU BIOREMEDIATION (ISB) OPERATIONS AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B ICP/EXT-04-00243 00
12-MAR-04 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) OPERATIONS AND MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B DOE/ID-11012 01
23-FEB-04 NELSON, L. O. NEW PUMP AND TREAT FACILITY (NPTF) ANNUAL OPERATIONS REPORT - OCTOBER 2002 THROUGH SEPTEMBER 2003 (10/02 - 09/03) - TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDY - OPERABLE UNIT (OU) 1-07B ICP/EXT-04-00148 00
22-JAN-04 HALL, K. A. MONITORED NATURAL ATTENUATION (MNA) FINAL INSPECTION REPORT ICP/EXT-03-00089 00
22-JAN-04 KIMMELL, K. K. IN SITU BIOREMEDIATION (ISB) FINAL INSPECTION REPORT ICP/EXT-03-00116 00
22-DEC-03 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION (RA) GROUNDWATER MONITORING PLAN (GMP) FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B INEEL/EXT-2002-00779 02
25-NOV-03 ARMSTRONG, A. T. REMEDY PERFORMANCE SUMMARY REPORT FOR THE FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B, FISCAL YEAR 2002 (FY-02) INEEL/EXT-03-01086 00
01-NOV-03 WHITMIRE, DOUGLAS L. 2003 UPDATE TO THE TEST AREA NORTH LARGE-SCALE GROUNDWATER FLOW AND TRANSPORT MODEL FOR THE ASSESSMENT OF MONITORED NATURAL ATTENUATION INEEL/INT-03-00709 0
30-SEP-03 NELSON, L. O. NEW PUMP AND TREAT FACILITY (NPTF) OPERATIONS & MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B DOE/ID-10684 03
29-SEP-03 VANDEL, D. S. NEW PUMP AND TREAT FACILITY (NPTF) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B DOE/ID-10679 01
25-SEP-03 NELSON, L. O. DECONTAMINATION AND DISMANTLEMENT (D&D) PLAN FOR GROUNDWATER TREATMENT FACILITY (GWTF) INEEL/EXT-03-00286 00
15-SEP-03 WYMORE, R. A. ANNUAL PERFORMANCE REPORT FOR IN SITU BIOREMEDIATION (ISB) OPERATIONS AUGUST 2001 (08/2001) TO OCTOBER 2002 (10/02), TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-03-00371 00
31-AUG-03 NELSON, L. O. NEW PUMP AND TREAT FACILITY (NPTF) ANNUAL OPERATIONS REPORT OCTOBER 2001 THROUGH SEPTEMBER 2002 (10/2001-09/02), TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDY, OPERABLE UNIT (OU) 1-07B INEEL/EXT-03-00198 00
19-AUG-03 FITCH, D. R. FY 2003 (FY-03) INSTITUTIONAL CONTROLS ASSESSMENT REPORT FOR WASTE AREA GROUP 1 (WAG-1) DOE/ID-11105 00
13-AUG-03 SHANKLIN, D. E. FISCAL YEAR 2002 (FY-02) GROUNDWATER MONITORING ANNUAL REPORT, TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-03-00195 00
30-JUN-03 ORR, B. R. MONITORED NATURAL ATTENUATION (MNA) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B DOE/ID-11055 00
30-JUN-03 ARMSTRONG, A. T. MONITORED NATURAL ATTENUATION (MNA) OPERATIONS, MONITORING, AND MAINTENANCE (OM&M) PLAN FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B - APPENDIX C CONTAINS AGENCY COMMENTS AND RESOLUTIONS DOE/ID-11066 00
09-APR-03 SHAW, R. M. MANAGEMENT OF WASTES GENERATED DURING OPERABLE UNIT (OU) 1-07B WELL DRILLING EM-ER-03-102 00
03-FEB-03 SHAW, R. M. TRANSMITTAL OF DRAFT MONITORED NATURAL ATTENUATION (MNA) REMEDIAL ACTION WORK PLAN (RAWP) AND DRAFT MONITORED NATURAL ATTENUATION OPERATIONS, MONITORING AND MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B EM-ER-02-036-A 00
23-JAN-03 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) OPERATIONS AND MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B - APPENDIX D CONTAINS EPA AND IDEQ COMMENTS AND RESOLUTIONS DOE/ID-11012 00
23-JAN-03 MECHAM, G. D. IN SITU BIOREMEDIATION (ISB) REMEDIAL DESIGN (RD), TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B DOE/ID-11013 00
06-JAN-03 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION WORK PLAN (RAWP) FOR TAN FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B DOE/ID-11015 01
03-JAN-03 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION (RA) GROUNDWATER MONITORING PLAN (GMP) FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B INEEL/EXT-2002-00779 01
05-NOV-02 NELSON, L. O. TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B FINAL GROUNDWATER REMEDIAL ACTION (RA) HEALTH AND SAFETY PLAN (HSP OR HASP) INEEL/EXT-99-00020 02
01-NOV-02 NOT SPECIFIED TEST AREA NORTH LARGE SCALE GROUNDWATER MODEL TETRAD TO MODFLOW/MT3DMS CONVERSION TASK INEEL/EXT-02-00632 0
31-OCT-02 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION WORK PLAN (RAWP) FOR TAN FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B DOE/ID-11015 00
31-OCT-02 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION (RA) GROUNDWATER MONITORING PLAN (GMP) FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B INEEL/EXT-2002-00779 00
15-OCT-02 SHAW, R. M. CURTAILMENT OF GROUNDWATER TREATMENT FACILITY (GWTF) DAILY INSPECTIONS EM-ER-02-173 00
14-OCT-02 MECHAM, G. D. NEW PUMP AND TREAT FACILITY (NPTF) REMEDIAL ACTION (RA) REPORT, TAN FINAL GROUNDWATER REMEDIATION DOE/ID-11031 00
11-OCT-02 SHAW, R. M. TRANSMITTAL OF NEW PUMP AND TREAT FACILITY (NPTF) REMEDIAL ACTION (RA) REPORT, TAN FINAL GROUNDWATER REMEDIATION EM-ER-02-177 00
31-JUL-02 FITCH, D. R. 2002 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) DOE/ID-11011 00
15-JUL-02 SORENSON, K. S. IN SITU BIOREMEDIATION (ISB) PRE-DESIGN OPERATIONS WORK PLAN TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B - APPENDIX A IS THE 2002 TRACER TEST INEEL/EXT-2000-00647 01
20-JUN-02 NELSON, L. O. SECOND (2ND) QUARTER FY 2001 (FY-2001) OPERATIONS REPORT FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B INEEL/EXT-02-00468 00
20-JUN-02 NELSON, L. O. THIRD (3RD) QUARTER FISCAL YEAR 2001 (FY-2001) OPERATIONS REPORT FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B INEEL/EXT-02-00469 00
20-JUN-02 NELSON, L. O. WASTE MANAGEMENT PLAN (WMP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B INEEL/EXT-98-00267 04
26-FEB-02 SHAW, R. M. ADDITIONAL INFORMATION REGARDING THE CURTAILMENT OF AIR STRIPPER TREATMENT UNIT (ASTU) DAILY INSPECTIONS EM-ER-02-030 00
19-FEB-02 SHAW, R. M. CURTAILMENT OF AIR STRIPPER TREATMENT UNIT (ASTU) DAILY INSPECTIONS EM-ER-02-024 00
06-NOV-01 AR COORDINATOR OPERABLE UNIT (OU) 1-07B - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR TEST AREA NORTH (TAN) INJECTION WELL OU 1-07B RECORD OF DECISION (ROD) AMENDMENT AR.INDEX.OU.1-07B 01
01-NOV-01 ROTHERMEL, J. S. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B - REPLACEMENT PAGES 6 AND 8 ERRONEOUSLY DATED NOVEMBER 9, 2002 (11/09/02) - SHOULD BE NOVEMBER 9, 2001 (11/09/01) DOE/ID-10905 01
20-SEP-01 NOT SPECIFIED RECORD OF DECISION (ROD) AMENDMENT - TECHNICAL SUPPORT FACILITY INJECTION WELL TSF-05 AND SURROUNDING GROUNDWATER CONTAMINATION TSF-23 AND MISCELLANEOUS NO ACTION SITES, FINAL REMEDIAL ACTION (RA) DOE/ID-10139,AMENDMENT 0
20-SEP-01 FINDLEY, C. E. RECORD OF DECISION (ROD) AMENDMENT - TECHNICAL SUPPORT FACILITY INJECTION WELL TSF-05 AND SURROUNDING GROUNDWATER CONTAMINATION TSF-23 AND MISCELLANEOUS NO ACTION SITES, FINAL REMEDIAL ACTION (RA) DOE/ID-10139,AMENDMENT 00
10-SEP-01 NELSON, L. O. ENGINEERING DESIGN FILE (EDF) - RECORD OF DECISION (ROD) COST ESTIMATE SUPPORT DATA RECAPITULATION - WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-07B ROD AMENDMENT EDF-ER-201 02
01-SEP-01 SHANKLIN, D. E. FISCAL YEAR 2000 (FY-2000) GROUNDWATER MONITORING ANNUAL REPORT TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B INEEL/EXT-01-00767 00
29-AUG-01 SHAW, R. M. TRANSMITTAL OF 2001 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) EM-ER-01-146 00
28-AUG-01 FITCH, D. R. 2001 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) DOE/ID-10899 00
08-AUG-01 HAIN, K. E. TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) AMENDMENT FOR TECHNICAL SUPPORT FACILITY INJECTION WELL TSF-05 AND SURROUNDING GROUNDWATER CONTAMINATION TSF-23 AND MISCELLANEOUS NO ACTION SITES, FINAL REMEDIAL ACTION (RA) EM-ER-01-128 00
18-MAY-01 SHAW, R. M. TWENTY (20) DAY EXTENSION TO THE SUBMITTAL DATE OF THE RECORD OF DECISION (ROD) AMENDMENT FOR OPERABLE UNIT (OU) 1-07B EM-ER-01-081 00
01-MAY-01 KECK, J. F. SAMPLING AND ANALYSIS PLAN (SAP) FOR ENHANCED IN SITU BIOREMEDIATION (ISB) PRE-DESIGN OPERATIONS AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-2000-00925 01
30-APR-01 KECK, J. F. IN SITU BIOREMEDIATION (ISB) PRE-DESIGN OPERATIONS WORK PLAN TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-2000-00647 00
05-APR-01 NELSON, L. O. TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B FINAL GROUNDWATER REMEDIAL ACTION (RA) HEALTH AND SAFETY PLAN (HSP OR HASP) INEEL/EXT-99-00020 01
03-APR-01 DREHER, K. J. INJECTION OF AMENDMENTS AND TREATED GROUNDWATER INTO THE EASTERN SNAKE PLAIN AQUIFER (ESPA) IN SUPPORT OF REMEDIAL ACTIONS (RA) AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B, INEEL 10941 00
12-MAR-01 BULLOCK, H. SAMPLING AND ANALYSIS PLAN (SAP) FOR ENHANCED IN SITU BIOREMEDIATION (ISB) PRE-DESIGN OPERATIONS AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-2000-00925 00
28-FEB-01 HAIN, K. E. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) AMENDMENT FOR THE TECHNICAL SUPPORT FACILITY (TSF) INJECTION WELL (TSF-05) AND SURROUNDING GROUNDWATER CONTAMINATION (TSF-23) AND MISCELLANEOUS NO ACTION SITES, FINAL REMEDIAL ACTION EM-ER-01-042 00
06-FEB-01 ROTHERMEL, J. S. NECESSITY TO EXTEND ENFORCEABLE MILESTONE FOR OPERABLE UNIT (OU) 1-07B DRAFT RECORD OF DECISION (ROD) AMENDMENT FLS-114-01 00
25-JAN-01 NELSON, L. O. PRELIMINARY HAZARD ASSESSMENT TAN GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B INEL-95/0588 02
15-JAN-01 FOLKER, J. D. ENGINEERING DESIGN FILE (EDF) - WAG-1 OU 1-07B RECORD OF DECISION (ROD) AMENDMENT COST ESTIMATE SUPPORT DATA RECAPITULATION EDF-ER-201 01
02-JAN-01 WYMORE, R. A. SITE CONCEPTUAL MODEL: 1998 AND 1999 ACTIVITIES, DATA ANALYSIS, AND INTERPRETATION FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-2000-00188 00
13-DEC-00 NELSON, L. O. TRANSMITTAL OF AGENCY COMMENTS AND RESOLUTIONS ON DRAFT IN SITU BIOREMEDIATION (ISB) PRE-DESIGN OPERATIONS WORK PLAN TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B FLS-878-00 00
11-DEC-00 SHAW, R. M. GOOD CAUSE FOR EXTENDING ENFORCEABLE MILESTONE FOR OPERABLE UNIT (OU) 1-07B DRAFT RECORD OF DECISION (ROD) AMENDMENT EM-ER-233 00
05-DEC-00 SCHWIND, P. J. DEVELOPMENT OF A NUMERICAL MODEL WITH PHYSICALLY BASED VERTICAL DISCRETIZATION TO SUPPORT IN SITU BIOREMEDIATION (ISB) FIELD EVALUATION AT TEST AREA NORTH (TAN) INEEL/EXT-98-00367 00
05-DEC-00 SONDRUP, A. J. IN SITU BIOREMEDIATION (ISB) MODELING REPORT FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B INEEL/EXT-98-00418 00
17-NOV-00 NELSON, L. O. NO LONGER CONTAINED IN (NLCI) REQUEST FOR NEW PUMP AND TREAT FACILITY (NPTF) FLS-796-00 00
16-NOV-00 SHAW, R. M. REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR OPERABLE UNIT (OU) 1-07B DRAFT RECORD OF DECISION AMENDMENT EM-ER-219 00
14-NOV-00 BARNES, J. M. MICROBIAL STUDIES SUPPORTING IMPLEMENTATION OF IN SITU BIOREMEDIATION (ISB) AT TEST AREA NORTH (TAN) INEEL/EXT-98-00474 00
01-NOV-00 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR OPERABLE UNIT (OU) 1-07B - FINAL REMEDIAL ACTION (RA) AT TSF INJECTION WELL TSF-05 AND SURROUNDING GROUNDWATER CONTAMINATION TSF-23 21251 00
01-NOV-00 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - NEW REMEDY PROPOSED FOR TRICHLOROETHENE (TCE) PLUME AT WASTE AREA GROUP 1 (WAG-1) 21898 00
04-OCT-00 SHAW, R. M. TRANSMITTAL OF FINAL INSTITUTIONAL CONTROL PLAN FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) EM-ER-194-00 00
01-OCT-00 SORENSON, K. S. SAMPLING & ANALYSIS PLAN (SAP) FOR ENHANCED IN SITU BIOREMEDIATION (ISB) FIELD EVALUATION TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-98-00421 02
28-SEP-00 KUHNS, D. J. INSTITUTIONAL CONTROL PLAN FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) INEEL/EXT-2000-00917 00
25-SEP-00 NELSON, L. O. ENGINEERING DESIGN FILE (EDF) - METALS ANALYSIS OF SELECTED OPERABLE UNIT (OU) 1-07B GROUNDWATER MONITORING WELLS EDF-ER-200 00
21-SEP-00 NELSON, L. O. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 1-07B SAMPLE RESULTS SUMMARY FOR 40 CFR 264 APPENDIX IX VOLATILE ORGANIC COMPOUNDS (VOC) AND SEMI-VOLATILE ORGANIC COMPOUNDS (SVOC) - FUNCTIONAL FILE NUMBER INEEL/EXT-2000-00816 EDF-ER-197 00
11-SEP-00 DOE AGENCY COMMENTS AND RESOLUTIONS ON DRAFT IN SITU BIOREMEDIATION (ISB) PRE-DESIGN OPERATIONS WORK PLAN TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B 10925 00
01-SEP-00 NELSON, L. O. ENGINEERING DESIGN FILE (EDF) - WAG-1 OU 1-07B RECORD OF DECISION (ROD) AMENDMENT COST ESTIMATE SUPPORT DATA RECAPITULATION - FUNCTIONAL FILE #INEEL/EXT-2000-01105 EDF-ER-201 00
13-JUL-00 SORENSON, K. S. FIELD EVALUATION REPORT OF ENHANCED IN SITU BIOREMEDIATION (ISB), TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-2000-00258 00
12-JUL-00 CRAM, A. J. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 1-07B FIELD DEMONSTRATION REPORT - NEW GROUNDWATER TREATMENT FACILITY (NGWTF) PLANNING CONCEPTUAL DESIGN & COST ESTIMATE EDF-ER-185 00
12-JUL-00 CRAM, A. J. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 1-07B FIELD DEMONSTRATION REPORT - IN SITU BIOREMEDIATION (ISB) TREATMENT SYSTEM FACILITY PLANNING CONCEPTUAL DESIGN & COST ESTIMATE EDF-ER-186 00
11-JUL-00 SORENSON, K. S. TRANSMITTAL OF FIELD EVALUATION REPORT OF ENHANCED IN SITU BIOREMEDIATION (ISB), TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B FLS-451-00 00
10-JUL-00 ROTHERMEL, J. S. AGENCY COMMENTS AND CORRESPONDING INEEL RESOLUTIONS TO DRAFT PROPOSED PLAN FOR OPERABLE UNIT (OU) 1-07B 10837 00
10-JUL-00 ROTHERMEL, J. S. TRANSMITTAL OF AGENCY COMMENTS AND CORRESPONDING INEEL RESOLUTIONS TO DRAFT PROPOSED PLAN FOR OPERABLE UNIT (OU) 1-07B FLS-449-00 00
05-JUN-00 GUYMON, R. H. POSITION ON NO LONGER CONTAINED IN (NLCI) REQUIREMENTS FOR THREE (3) NEW WELLS AT TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B - DE-AC07-991D1327 RHG-83-00 00
01-JUN-00 JOLLEY, W. L. STATEMENT OF WORK (SOW) FOR FISCAL YEAR 2000 (FY-2000) - WELL DRILLING ACTIVITIES AT TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-07B INEEL/EXT-2000-00187 01
01-JUN-00 JOLLEY, W. L. SAMPLING AND ANALYSIS PLAN (SAP) FOR P-Q INTERBED TESTING AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-2000-00196 01
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
30-MAY-00 JOLLEY, W. L. SAMPLING AND ANALYSIS PLAN (SAP) FOR P-Q INTERBED TESTING AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-2000-00196 00
11-MAY-00 FITCH, D. R. INSTITUTIONAL CONTROL STATUS REPORT FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) DOE/ID-10750 00
11-MAY-00 MONTGOMERY, R. A. REQUEST FOR A NO LONGER CONTAINED IN (NLCI) DETERMINATION (NLCID) FOR WELL DRILLING WATER, DRILL CUTTINGS, & SECONDARY CONTAINMENT PADS FOR OPERABLE UNIT (OU) 1-07B RHG-71-00 00
06-APR-00 BARNES, J. M. AEROBIC BIODEGRADATION LABORATORY STUDIES AT TAN OU 1-07B INEEL/EXT-99-00736 00
01-APR-00 JOLLEY, W. L. STATEMENT OF WORK (SOW) FOR FISCAL YEAR 2000 (FY-2000) - WELL DRILLING ACTIVITIES AT TAN WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-07B INEEL/EXT-2000-00187 00
29-MAR-00 JANTZ, A. E. TRANSMITTAL OF FINAL FIELD DEMONSTRATION REPORT FOR OU 1-07B FLS-193-00 00
27-MAR-00 PETERSON, L. N. FIELD DEMONSTRATION REPORT TAN FINAL GROUNDWATER REMEDIATION OU 1-07B DOE/ID-10718 00
07-MAR-00 ROTHERMEL, J. S. NEW PUMP AND TREAT FACILITY (NPTF) REMEDIAL DESIGN (RD) TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B DOE/ID-10661 01
08-FEB-00 CRAM, A. J. ENGINEERING DESIGN FILE (EDF) - IN SITU BIOREMEDIATION (ISB) SODIUM LACTATE V. S. MOLASSES COST COMPARISON EDF-ER-127 00
26-JAN-00 BUKOWSKI, J. M. FISCAL YEAR 1999 (FY-99) GROUNDWATER MONITORING ANNUAL REPORT FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-99-01255 00
01-DEC-99 INEEL COMMUNITY RELATIONS UPDATE FACT SHEET - BIOREMEDIATION OF GROUNDWATER SPEEDS CLEANUP AT TEST AREA NORTH (TAN) 10963 00
01-NOV-99 JANTZ, A. E. IN SITU CHEMICAL OXIDATION (ISCO) FIELD EVALUATION WORK PLAN FOR TSF-05 HOT SPOT TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B DOE/ID-10698 00
01-OCT-99 INEEL COMMUNITY RELATIONS UPDATE FACT SHEET - BIOREMEDIATION OF GROUNDWATER PLUME SHOWS PROMISE AT WASTE AREA GROUP 1 (WAG-1) 10961 00
01-OCT-99 ROTHERMEL, J. S. PHASE C REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B DOE/ID-10679 00
01-OCT-99 ROTHERMEL, J. S. WASTE MANAGEMENT PLAN (WMP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B INEEL/EXT-98-00267 02
01-OCT-99 ROTHERMEL, J. S. TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B FINAL GROUNDWATER REMEDIAL ACTION (RA) HEALTH AND SAFETY PLAN (HSP OR HASP) INEEL/EXT-99-00020 00
01-OCT-99 ROTHERMEL, J. S. PHASE C GROUNDWATER MONITORING PLAN (GMP) TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-99-00021 00
29-SEP-99 SHAW, R. M. DECISION TO PROCEED WITH IN SITU BIOREMEDIATION (ISB) OPTIMIZATION PHASE AND TO DISCONTINUE IN SITU CHEMICAL OXIDATION (ISCO) OPE-ER-138-99 00
28-SEP-99 TALLMAN, JANE EXTENSION FOR TEMPORARY USE OF REMEDIATION WELLS FOR INJECTION OF ISB TREATABILITY STUDY AMENDMENTS AND TEMPORARY USE OF INJECTION WELL TAN-49 FOR INJECTING TREATED WATER DURING PHASE B REMEDIATION IR-25286 0
01-JUL-99 JANTZ, A. E. REMEDIAL ACTION WORK PLAN (RAWP) TAN FINAL GROUNDWATER REMEDIATION - PHASE B FOR OPERABLE UNIT (OU) 1-07B DOE/ID-10629 00
01-MAY-99 BUKOWSKI, J. M. FISCAL YEAR 1999 (FY-99) & 2000 (FY-2000) GROUNDWATER MONITORING PLAN (GMP) TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-99-00359 00
01-APR-99 PARSONS WASTE MANAGEMENT PLAN (WMP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B INEEL/EXT-98-00267 01
01-APR-99 STARR, R. C. LABORATORY EVALUATION OF IN SITU CHEMICAL OXIDATION (ISCO) FOR GROUNDWATER REMEDIATION, TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B, INEEL ORNL/TM-13711 00
01-JAN-99 MARTIAN, P. NUMERICAL MODELING SUPPORT OF NATURAL ATTENUATION FIELD EVALUATION FOR TRICHLOROETHENE (TCE) AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B AT INEEL INEEL/EXT-97-01284 01
30-NOV-98 AR COORDINATOR OPERABLE UNIT (OU) 1-07B - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR TEST AREA NORTH (TAN) INJECTION WELL REMEDIAL INVESTIGATION FEASABILITY STUDY (RI/FS) OU 1-07B AR.INDEX.OU.1-07B 00
01-OCT-98 TOMLINSON, P. F. WASTE MANAGEMENT PLAN (WMP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B INEEL/EXT-98-00267 00
10-SEP-98 PIERRE, W. SCHEDULE EXTENSION REQUEST FOR OPERABLE UNIT (OU) 1-07B DRAFT PHASE I & PHASE II FIELD DEMONSTRATION REPORTS (FDRS) 18053 00
03-SEP-98 ENGLISH, M. SCHEDULE EXTENSION REQUEST FOR OPERABLE UNIT (OU) 1-07B IN SITU BIOREMEDIATION (ISB) TREATABILITY STUDY (TS) 18060 00
01-SEP-98 JANTZ, A. E. ENHANCED IN SITU BIOREMEDIATION (ISB) FIELD EVALUATION WORK PLAN TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B DOE/ID-10639 00
31-AUG-98 SHAW, R. M. SCHEDULE EXTENSION REQUEST FOR OPERABLE UNIT (OU) 1-07B IN SITU BIOREMEDIATION (ISB) TREATABILITY STUDY (TS) OPE-ER-139-98 00
01-AUG-98 BUKOWSKI, J. M. SITE CONCEPTUAL MODEL 1997 ACTIVITIES, DATA ANALYSIS AND INTERPRETATION FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-98-00575 00
01-FEB-98 PETERSON, L. N. NATURAL ATTENUATION FIELD EVALUATION WORK PLAN FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU)1-07B DOE/ID-10606 00
01-FEB-98 BUKOWSKI, J. M. SITE CONCEPTUAL MODEL: 1996 ACTIVITIES DATA ANALYSIS & INTERPRETATION TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEL/EXT-97-00556 00
01-JAN-98 JANTZ, A. E. WELL CHARACTERIZATION & EVALUATION (WCE) REPORT SUPPORTING FUNCTIONAL & OPERATIONAL REQUIREMENTS (F&OR) FOR NEW PUMP AND TREAT FACILITY (NPTF) AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B INEEL/EXT-97-01356 00
01-NOV-97 JANTZ, A. E. EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FROM RECORD OF DECISION (ROD) FOR TSF INJECTION WELL (TSF-05) & SURROUNDING GROUNDWATER CONTAMINATION (TSF-23) & MISCELLANEOUS NO ACTION SITES, FINAL REMEDIAL ACTION (RA) INEEL/EXT-97-00931 00
01-AUG-97 ROTHERMEL, J. S. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B DOE/ID-10522 05
18-MAR-97 DOE, EPA, IDHW AGREEMENT TO RESOLVE DISPUTES 1088-06-29-120-A 00
01-MAR-97 PETERSON, L. N. TECHNOLOGY EVALUATION WORK PLAN TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B DOE/ID-10562 00
01-MAY-96 SORENSON, K. S. TEST AREA NORTH (TAN) SITE CONCEPTUAL MODEL & PROPOSED HYDROGEOLOGIC STUDIES OPERABLE UNIT (OU) 1-07B INEL-96/0105 00
08-DEC-95 NOT SPECIFIED DESIGN DOCUMENT REVIEW RECORD FOR DRAFT RD/RA SCOPE OF WORK FOR OU 1-07B, REVISION 3 (REV.03) 11378 00
01-DEC-95 NOT SPECIFIED REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK TAN FINAL GROUNDWATER REMEDIATION OU 1-07B DOE/ID-10522 04
18-AUG-95 DOE, EPA, IDHW RECORD OF DECISION (ROD) FOR TSF-05 INJECTION WELL AND SURROUNDING GROUNDWATER CONTAMINATION TSF-23 AND MISCELLANEOUS NO ACTION SITES FINAL REMEDIAL ACTION (RA) 10139 00
18-AUG-95 DOE, DEQ, EPA RECORD OF DECISION (ROD) FOR TSF-05 INJECTION WELL AND SURROUNDING GROUNDWATER CONTAMINATION TSF-23 AND MISCELLANEOUS NO ACTION SITES FINAL REMEDIAL ACTION (RA) 10139 0
01-JAN-95 INEL COMMUNITY RELATIONS UPDATE FACT SHEET - AGENCIES EVALUATE GROUNDWATER TREATMENT 8907 00
24-AUG-94 AR COORDINATOR OPERABLE UNIT (OU) 1-07A - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR TEST AREA NORTH (TAN) INJECTION WELL INTERIM ACTION (IA) OU 1-07A AR.INDEX.OU.1-07A 00
30-JUN-94 DOE SUPPLEMENTARY EVALUATION OF ENVIRONMENTAL CONSEQUENCES FOR TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) 1-07B AT THE INEL 5617 00
09-JUN-94 GRAHAM, D. TRANSCRIPTS - PUBLIC MEETING IN MOSCOW, IDAHO ON THE PROPOSED PLAN FOR TAN GROUNDWATER CONTAMINATION 5718 00
08-JUN-94 GRAHAM, D. TRANSCRIPTS - PUBLIC MEETING IN BOISE, IDAHO ON THE PROPOSED PLAN FOR TAN GROUNDWATER CONTAMINATION 5717 00
06-JUN-94 SCHWARTZ, N. TRANSCRIPTS - PUBLIC MEETING IN IDAHO FALLS ON THE PROPOSED PLAN FOR THE TAN GROUNDWATER CONTAMINATION 5716 00
20-MAY-94 INEL COMMUNITY RELATIONS DOE SEEKS PUBLIC COMMENT ON THE PROPOSED PLAN FOR TEST AREA NORTH (TAN) 5700 00
03-MAY-94 SHUNKO, D. P. POTENTIAL REMEDIATION STUDIES FOR ENHANCEMENT EXTRACTION TECHNOLOGIES MARKET SURVEY QUESTIONAIRE PACKAGE MK-FIC-94-P-364 00
01-MAY-94 INEL COMMUNITY RELATIONS PROPOSED PLAN FOR THE GROUNDWATER CONTAMINATION OPERABLE UNIT (OU) 1-07B AND NO ACTION SITES OU 1-01, 1-02, 1-06 AND 1-09 5711 00
15-APR-94 LYLE, J. L. TRANSMITTAL OF THE REVISED PLAN FOR THE TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B GROUNDWATER REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) OPE-ER-082-94 00
01-APR-94 HARELSON, D. B. SUPPLEMENT TO THE OPERABLE UNIT (OU) 1-07B REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) REPORT 5695 00
28-MAR-94 LIVERMAN, E. EPA REVIEW OF THE DRAFT PROPOSED PLAN FOR THE TEST AREA NORTH (TAN) GROUNDWATER, OPERABLE UNIT 1-07B 5698 00
17-MAR-94 GREEN, L. A. TRANSMITTAL OF THE SUPPLEMENT TO THE OPERABLE UNIT (OU) 1-07B REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-63-94 00
14-MAR-94 ENGLISH, M. IDHW REVIEW OF DRAFT PROPOSED PLAN FOR OPERABLE UNIT (OU) 1-07B 5683 00
28-JAN-94 NYGARD, D. IDHW COMMENTS ON EXTENSION REQUEST FOR TAN OU 1-07B DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/S) REPORT 5684 00
28-JAN-94 LYLE, J. L. RECISION OF THE DRAFT PROPOSED PLAN FOR THE TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B GROUNDWATER & PROPOSED PLAN FOR THE TRACK 1 SITES DESIGNATED FOR NO FURTHER ACTION OPE-ER-027-94 00
26-JAN-94 PIERRE, W. RESOLUTION OF EPA'S COMMENTS ON TAN OU 1-07B DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5682 00
17-JAN-94 WRIGHT, J. TECHNICAL MEMORANDUM FOR TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) 1-07B C10017 00
13-JAN-94 LYLE, J. L. TRANSMITTAL OF THE DRAFT PROPOSED PLAN FOR THE TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B GROUNDWATER INVESTIGATION OPE-ER-008-94 00
12-JAN-94 LIVERMAN, E. EPA REVIEW OF THE DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) 1-07B 5697 00
11-JAN-94 ENGLISH, M. IDHW REVIEW OF THE DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 1-07B 5699 00
01-JAN-94 KAMINSKY, J. F. REMEDIAL INVESTIGATION (RI) FINAL REPORT WITH ADDENDA FOR THE TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) 1-07B AT THE INEL VOLUME II (VOL.02) EGG-ER-10643,VOL.02 00
01-JAN-94 DUNNIVANT, F. M. FEASIBILITY STUDY (FS) REPORT FOR TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) 1-07B AT INEL EGG-ER-10802 00
12-DEC-93 ADTECHS CORPORATION FINAL REMEDIAL DESIGN TEST AREA NORTH (TAN) GROUNDWATER INTERIM ACTION (IA) OPERABLE UNIT (OU) 1-07A, REV.03 DFR-1310-064 03
30-NOV-93 GEOTRANS, INC. LETTER REPORT - TECHNICAL EVALUATION OF THE TAN OU 1-07B RI/FS & PROPOSED PLAN 5694 00
19-NOV-93 MK-FIC & ADTECHS CORP. FINAL REMEDIAL ACTION (RA) WORK PLAN FOR TEST AREA NORTH (TAN) GROUNDWATER INTERIM ACTION (IA) OPERABLE UNIT (OU) 1-07A 01.07A.2.1.201.01 03
05-NOV-93 LIVERMAN, E. REVIEW OF DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) 1-07B 5573 00
29-OCT-93 ENGLISH, M. REVIEW OF DRAFT REMEDIAL INVESTIGATION REPORT FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 1-07B 5574 00
29-SEP-93 ENGLISH, M. REVIEW OF THE DRAFT REMEDIAL (PRE-FINAL) DESIGN FOR OU 1-07A GROUNDWATER TREATMENT FACILITY (GWTF) 6896 00
09-JUL-93 LIVERMAN, E. REVIEW COMMENTS FOR DRAFT REMEDIAL INVESTIGATION (RI) REPORT WITH ADDENDA FOR THE TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) AT THE INEL 5341 00
02-JUL-93 ENGLISH, M. REVIEW OF THE DRAFT REMEDIAL INVESTIGATION (RI) REPORT FOR OPERABLE UNIT (OU) 1-07B 5340 00
14-JUN-93 MK-FIC SITE PREPARATION & UTILITIES DESIGN TECHNICAL MEMORANDUM FOR TAN INTERIM ACTION (IA) - OPERABLE UNIT (OU) 1-07A 01.07A.1.3.114.01 01
14-APR-93 NYGARD, D. SCHEDULE REVISION FOR OU 1-07A INJECTION WELL INTERIM ACTION (IA) 11379 00
05-APR-93 MK-FIC INEL ENVIRONMENTAL RESTORATION PROGRAM (ERP) GROUNDWATER COLLECTION SYSTEM DESIGN TECHNICAL MEMORANDUM WAG-1 OU 1-07A 6531 00
04-MAR-93 LIVERMAN, E. REVIEW COMMENTS OU 1-07A DRAFT TECHNICAL MEMORANDUM - GROUNDWATER COLLECTION SYSTEM 6763 00
26-FEB-93 ENGLISH, M. REVIEW OF DRAFT GROUNDWATER COLLECTION SYSTEM DESIGN TECHNICAL MEMORANDUM FOR OPERABLE UNIT (OU) 1-07A INTERIM ACTION (IA) 6764 00
25-NOV-92 HURTT, D. ENVIRONMENTAL ASSESSMENT (EA) & FINDING OF NO SIGNIFICANT IMPACT (FONSI) FOR AN INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR INJECTION WELL & SURROUNDING GROUNDWATER 6353 00
01-SEP-92 HARELSON, D. B. SUITABILITY EVALUATION FOR INTERIM ACTION (IA) DISCHARGE TO THE TSF-07 DISPOSAL POND 5171 00
01-SEP-92 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) FOR TECHNICAL SUPPORT FACILITY (TSF) INJECTION WELL & SURROUNDING GROUNDWATER CONTAMINATION 5202 00
30-JUL-92 NITSCHKE, R. L. SR-90 DISCHARGE CALCULATION RLN-51-92 00
29-JUL-92 NOT SPECIFIED ASSESSMENT OF THE GROUNDWATER PATHWAY FROM THE LEACHING OF SURFICIAL & BURIED CONTAMINATION 5169 00
01-JUL-92 MANN, L. J. PURGEABLE ORGANIC COMPOUNDS IN GROUNDWATER AT THE INEL, IDAHO 1990 & 1991 - USGS OPEN FILE REPORT 92-174 DOE/ID-22104 00
01-MAY-92 ZIMMERLE, J. R. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN AND ADDENDA FOR TAN GROUNDWATER OPERABLE UNIT (OU) AT INEL - INCLUDES EPA & STATE OF IDAHO COMMENTS & RESOLUTIONS EGG-WM-9905 00
20-APR-92 NOT SPECIFIED EVALUATION OF CHEMICALS USED AT TEST AREA NORTH (TAN) 5701 00
01-MAR-92 KNOBEL, L. L. CHEMICAL CONSTITUENTS IN THE DISSOLVED AND SUSPENDED FRACTIONS OF GROUNDWATER FROM SELECTED SITES, INEL AND VICINITY, IDAHO, 1989 - USGS OPEN FILE REPORT 92-51 DOE/ID-22101 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN, IDAHO PRESS TRIBUNE NAMPA, IDAHO 4435 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN - TIMES NEWS, TWIN FALLS, IDAHO 4436 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN - IDAHO STATESMAN, BOISE, IDAHO 4437 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN - IDAHO FALLS, IDAHO 4438 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN, LEWISTON MORNING PRESS - IDAHO 4441 00
17-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION AND IN THE SURROUNDING GROUNDWATER AT TAN - POCATELLO, IDAHO 4434 00
17-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN - IDAHOAN, MOSCOW, IDAHO 4439 00
17-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION AND IN THE SURROUNDING GROUNDWATER AT TAN, BURLEY, IDAHO SOUTH IDAHO PRESS 4440 00
06-FEB-92 LEDBETTER, L. PUBLIC MEETING TRANSCRIPT - TAN GROUNDWATER SCOPING, BURLEY, IDAHO 02/06/92 4599 00
06-FEB-92 LEDBETTER, L. PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN TO REDUCE CONTAMINATION NEAR THE INJECTION WELL & SURROUNDING GROUNDWATER AT TAN BURLEY, IDAHO 02/06/92 4605 00
05-FEB-92 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - TAN GROUNDWATER SCOPING, BOISE, IDAHO 02/05/92 4601 00
05-FEB-92 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN TO REDUCE CONTAMINATION NEAR THE INJECTION WELL & SURROUNDING GROUNDWATER AT TAN - BOISE, IDAHO - 02/05/92 4602 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
04-FEB-92 GRAHAM, D. PUBLIC MEETING TRANSCRIPT - TAN GROUNDWATER SCOPING, IDAHO FALLS, IDAHO 02/04/92 4600 00
04-FEB-92 GRAHAM, D. PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN TO REDUCE CONTAMINATION NEAR THE INJECTION WELL & SURROUNDING GROUNDWATER AT TAN, IDAHO FALLS 02/04/92 4603 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHO STATESMAN, BOISE, IDAHO 4451 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE IDAHO STATE JOURNAL - POCATELLO, IDAHO 4452 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHO PRESS TRIBUNE, NAMPA, IDAHO 4453 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - POST REGISTER, IDAHO FALLS, IDAHO 4454 00
30-JAN-92 INEL PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - TIMES NEWS - TWIN FALLS, IDAHO 4458 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - SOUTH IDAHO PRESS, BURLEY, IDAHO 4461 00
22-JAN-92 ZIMMERLE, J. R. TECHNOLOGIES ASSESSED IN THE DEVELOPMENT OF THE "PROPOSED PLAN FOR AN INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER" 3539 00
20-JAN-92 EG&G & MK-FIC TAN INTERIM ACTION (IA) PROPOSED PLAN COST ESTIMATE FOR ALTERNATIVES 2, 3, AND 4 5069 00
08-JAN-92 INEL COMMUNITY RELATIONS DEAR CITIZEN LETTER - PROPOSED PLAN FOR INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN, PROPOSED PLAN FOR CLEANUP UNEXPLODED ORDNANCE LOCATIONS, COMMUNITY RELATIONS PLAN FACT SHEET - DOE STU 3532 00
08-JAN-92 ZIMMERLE, J. R. CONTAMINANTS OF CONCERN IN TAN GROUNDWATER 3533 00
08-JAN-92 ZIMMERLE, J. R. SUMMARY OF RCRA FACILITY INVESTIGATION (RFI) ACTIVITIES AT TAN 3534 00
06-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHO PRESS TRIBUNE, NAMPA, IDAHO 4449 00
05-JAN-92 INEL COMMUNITY RELATIONS CITIZENS ARE ASKED TO COMMENT - PUBLIC COMMENT ON TAN INJECTION WELL & UNEXPLODED ORDNANCE 3531 00
05-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - TIMES NEWS, TWIN FALLS, IDAHO 4450 00
05-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE, IDAHO STATE JOURNAL, POCATELLO, IDAHO 4455 00
05-JAN-92 INEL PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHO STATESMAN, BOISE, IDAHO 4459 00
05-JAN-92 INEL PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - SOUTH IDAHO PRESS, BURLEY, IDAHO 4460 00
05-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - LEWISTON MORNING PRESS, LEWISTON, IDAHO 4468 00
04-JAN-92 INEL PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHOAN, MOSCOW, IDAHO 4457 00
01-SEP-91 ZIMMERLE, J. R. SCOPE OF WORK TAN GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EGG-WM-9809 02
14-AUG-91 ZIMMERLE, J. R. SCOPE OF WORK FOR AN INTERIM ACTION (IA) ON GROUNDWATER AT TAN - OU 1-07A 5070 00
01-JUL-90 MANN, L. J. PURGEABLE ORGANIC COMPOUNDS IN GROUNDWATER AT THE INEL, IDAHO 1988 & 1989 - USGS OPEN FILE REPORT 90-367 DOE/ID-22089 00
01-DEC-88 KNOBEL, L. L. RADIONUCLIDES IN GROUNDWATER AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL), IDAHO - USGS OPEN FILE REPORT 88-731 DOE/ID-22077 00
01-SEP-88 MARKHAM, O. D. PLUTONIUM, AM, CM & SR IN DUCKS MAINTAINED ON RADIOACTIVE LEACHING PONDS IN SOUTHEASTERN IDAHO 5172 00
01-DEC-87 MANN, L. J. REF - PURGEABLE ORGANIC COMPOUNDS IN GROUNDWATER AT INEL, IDAHO - USGS OPEN FILE REPORT 87-766 DOE/ID-22074 00
01-MAR-82 LEENHEER & JEFFERSON ORGANIC SOLUTES IN GROUNDWATER AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) IDO-22061 00
01-DEC-52 NACE, R. L. GEOLOGY, GROUNDWATER & WASTE DISPOSAL AT THE AIRCRAFT NUCLEAR PROPULSION PROJECT SITE, NATIONAL REACTOR TESTING STATION (NRTS), IDAHO IDO-22023 00
05-SEP-52 NACE, R. L. WATER SUPPLY AND FLUID WASTE DISPOSAL AT THE AIRCRAFT NUCLEAR PROPULSION REACTOR (ANPR) SITE IDO-22021 00