Select By Site Code

For Site Code TRA-15

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
04-MAY-05 WHITMORE, E. J. RESPONSE TO THE FIRST FIVE YEAR REVIEW REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNIT (OU) 2-13, AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) DOE/NE-ID-11189 00
06-OCT-03 WELLS, R. P. FIRST FIVE YEAR REVIEW REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNIT (OU) 2-13, AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) DOE/ID-11099 00
30-JUL-03 JOLLEY, W. L. FY-2003 (FY-03) ANNUAL INSTITUTIONAL CONTROLS ASSESSMENT REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-11108 00
10-JUN-03 NELSON, G. E. DRAFT FIRST FIVE YEAR REVIEW REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) - DOE/ID-11099, REVISION C (REV.0C) JUNE 2003 (06/03) FOR REVIEW EM-ER-03-150 00
10-JUN-03 NELSON, G. E. IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 SUBMITTAL OF DRAFT SCOPE OF WORK (SOW) FOR POST FIVE YEAR REMEDY REVIEW WORK PLAN FOR REVIEW EM-ER-03-174 00
16-APR-03 NELSON, G. E. INEEL WASTE AREA GROUP 2 (WAG-2) - AGREEMENTS CONCERNING FINALIZING THE WAG-2 FIVE YEAR REMEDY REVIEW, TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 EM-ER-03-103 00
21-NOV-02 JAMES, R. E. FY-2002 (FY-02) ANNUAL INSTITUTIONAL CONTROLS INSPECTION REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNITS (OU) 2-13 AND 2-14 (FINAL) INEEL/EXT-02-00933 00
04-NOV-02 NELSON, G. E. TRANSMITTAL OF FY-2002 (FY-02) ANNUAL INSTITUTIONAL CONTROLS INSPECTION REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNITS (OU) 2-13 AND 2-14 (FINAL) EM-ER-02-187 00
08-APR-02 MCGUIRE, M. J. FISCAL YEAR 2001 (FY-2001) INSTITUTIONAL CONTROL INSPECTION REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNIT (OU) 2-13 INEEL/EXT-01-00772 00
26-FEB-01 SEELEY, V. T. INSTITUTIONAL CONTROLS ANNUAL MONITORING REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 INEEL/EXT-2000-01413 00
24-JUL-00 LANDIS, J. A. REMEDIAL ACTION (RA) REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10720 00
26-JUN-00 AR COORDINATOR OPERABLE UNIT (OU) 2-13 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 2-13 AR.INDEX.OU.2-13 00
13-JUN-00 POETON, R. W. EPA REVIEW OF EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FROM THE RECORD OF DECISION (ROD) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 - EPA STATING THAT THEY "CONCUR WITH THE RELEASE OF THIS ESD TO THE PUBLIC" 10836 00
17-MAY-00 SHERWOOD, J. A. EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) TO THE RECORD OF DECISION (ROD) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10744 00
10-MAR-00 WIGGINS, D. J. OPERATIONS AND MAINTENANCE (O&M) PLAN FOR FINAL SELECTED REMEDIES & INSTITUTIONAL CONTROLS AT TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10658 03
01-SEP-98 REESE, C. L. COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10643 00
01-SEP-98 REESE, C. L. OPERATIONS & MAINTENANCE (O&M) PLAN FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10658 00
01-SEP-98 REESE, C. L. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 2-13 REMEDIAL ACTION FOR TEST REACTOR AREA (TRA) INEEL/EXT-98-00423 00
31-JUL-98 WINTER, G. IDHW REVIEW COMMENTS ON COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TRA OU 2-13 (DRAFT) REVISION B (REV.0B) 16780 00
30-JUL-98 POETON, R. W. EPA COMMENTS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 2-13 AT INEEL 16779 00
20-FEB-98 POETON, R. W. EPA COMMENTS ON POST RECORD OF DECISION (ROD) SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) 15219 00
01-FEB-98 PARSONS TRA WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) DOE/ID-10592 02
23-JAN-98 UNDERWOOD, E. J. IDHW REVIEW COMMENTS ON WASTE AREA GROUP 2 (WAG-2) DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) 15104 00
22-JAN-98 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 AT INEEL 15105 00
07-JAN-98 DOE WORDING CHANGES MADE FOR CLARITY & CONSISTENCY TO FINAL RECORD OF DECISION (ROD) FOR OU 2-13 COMPREHENSIVE ROD FOR WAG-2 OPE-ER-02-98 00
22-DEC-97 DOE FINAL RECORD OF DECISION (ROD) FOR TEST REACTOR AREA (TRA) FOR OPERABLE UNIT (OU) 2-13 AT IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) DOE/ID-10586 00
03-DEC-97 HAIN, K. E. TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 2-13 COMPREHENSIVE ROD FOR WAG-2 AT INEEL OPE-ER-257-97 00
13-NOV-97 JENSEN, N. R. DOE RESPONSE TO EPA COMMENTS TO OPERABLE UNIT (OU) 2-13 DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) RECORD OF DECISION (ROD) 10438 00
13-NOV-97 JENSEN, N. R. DOE RESPONSE TO IDHW-DEQ COMMENTS TO OPERABLE UNIT (OU) 2-13 DRAFT FINAL RECORD OF DECISION (ROD) 10439 00
13-NOV-97 HAIN, K. E. FIFTEEN (15) DAY EXTENSION TO PERIOD FOR FINALIZING WAG-2 COMPREHENSIVE RECORD OF DECISION (ROD) OU 2-13 AT INEEL OPE-ER-214-97 00
04-NOV-97 KOSHUTA, C. R. TRA LISTED WASTE DETERMINATION REPORT CRK-92-97 00
31-OCT-97 UNDERWOOD, E. J. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REVIEW COMMENTS ON WASTE AREA GROUP 2 (WAG-2) DRAFT FINAL RECORD OF DECISION (ROD) 10436 00
29-OCT-97 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) RESULTING FROM WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPERABLE UNIT (OU) 2-13 AT INEEL 10435 00
15-OCT-97 HAIN, K. E. DOE RESPONSE TO EPA COMMENTS ON OU 2-13 DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) RECORD OF DECISION (ROD) 10433 00
15-OCT-97 HAIN, K. E. DOE RESPONSE TO IDHW-DEQ COMMENTS ON OU 2-13 DRAFT RECORD OF DECISION (ROD) 10434 00
15-OCT-97 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) FOR OU 2-13, THE COMPREHENSIVE ROD FOR WAG-2 AT INEEL OPE-ER-163-97 00
11-AUG-97 UNDERWOOD, E. J. IDHW REVIEW COMMENTS ON WAG-2 DRAFT RECORD OF DECISION (ROD) 10427 00
01-AUG-97 POETON, R. W. EPA COMMENTS ON DRAFT RECORD OF DECISION (ROD) RESULTING FROM WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 2-13 AT INEEL 10426 00
25-JUN-97 JENSEN, N. R. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) RESULTING FROM WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), OU 2-13 AT INEEL OPE-ER-103-97 00
27-MAR-97 HUNTER, J. L. PUBLIC MEETING TRANSCRIPT - PUBLIC MEETING IN MOSCOW, IDAHO ON THE PROPOSED PLAN FOR TEST REACTOR AREA (TRA), MARCH 27, 1997 (03/27/97) 10424 00
26-MAR-97 INEEL COMMUNITY RELATIONS TRANSCRIPT FROM PUBLIC MEETING FOR WASTE AREA GROUP 2 (WAG -2) TRA PROPOSED PLAN HELD IN BOISE, IDAHO MARCH 26, 1997 (03/26/97) 10419 00
25-MAR-97 STEFFLER, L. TRANSCRIPT FROM PUBLIC MEETING FOR WASTE AREA GROUP 2 (WAG-2) TRA PROPOSED PLAN HELD IN IDAHO FALLS, IDAHO MARCH 25, 1997 (03/25/97) 10431 00
24-MAR-97 INEEL COMMUNITY RELATIONS PUBLIC NOTICE - COMMENT PERIOD EXTENDED - AGENCIES PROPOSE TO REMEDIATE EIGHT SITES AT THE TEST REACTOR AREA (TRA) 10405 00
23-MAR-97 INEEL COMMUNITY RELATIONS PUBLIC NOTICE - COMMENT PERIOD EXTENDED - MARCH 10 TO MAY 9, 1997 (03/10/97 - 05/09/97) AGENCIES PROPOSE TO REMEDIATE EIGHT SITES AT THE TEST REACTOR AREA (TRA) 10406 00
09-MAR-97 INEEL COMMUNITY RELATIONS PUBLIC NOTICE - NOTICE OF AVAILABILITY - AGENCIES PROPOSE TO REMEDIATE EIGHT SITES AT THE TEST REACTOR AREA (TRA) 10407 00
01-MAR-97 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR WASTE AREA GROUP 2 (WAG-2) - TEST REACTOR AREA (TRA) IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) 10408 00
01-MAR-97 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - AGENCIES COMPLETE LAST INVESTIGATION FOR TRA WAG-2 OU 2-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 13944 00
26-FEB-97 JENSEN, N. R. DOE-ID TRANSMITTAL OF RESPONSES TO EPA & IDHW REVIEW COMMENTS ON THE DRAFT PROPOSED PLAN FOR THE WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 2-13 AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-20-97 00
14-FEB-97 JENSEN, N. R. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON MARCH 1997 (03/97) DRAFT PROPOSED PLAN FOR THE WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPERABLE UNIT (OU) 2-13 AT INEEL 10397 00
07-FEB-97 JENSEN, N. R. TRANSMITTAL FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY, OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-11-97 00
03-FEB-97 JENSEN, N. R. TRANSMITTAL OF FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY, OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-10-97 00
01-FEB-97 BURNS, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) DOE/ID-10531 00
27-JAN-97 UNDERWOOD, E. J. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON WASTE AREA GROUP 2 (WAG-2) DRAFT PROPOSED PLAN OU 2-13 10313 00
24-JAN-97 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT PROPOSED PLAN FOR THE WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), OPERABLE UNIT (OU) 2-13, AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) 10314 00
15-JAN-97 JENSEN, N. R. FIFTEEN (15) DAY EXTENSION FOR FINALIZATION OF WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT OPERABLE UNIT (OU) 2-13 AT INEL OPE-ER-01-97 00
06-JAN-97 UNDERWOOD, E. J. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) OPERABLE UNIT (OU) 2-12 THIRD (3RD) ANNUAL TECHNICAL MEMORANDUM & THIRD YEAR REVIEW (OU 2-13 RECORD PER DOE-ID REQUEST) 10308 00
02-JAN-97 UNDERWOOD, E. J. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REVIEW COMMENTS ON WASTE AREA GROUP (WAG-2) DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT 10310 00
16-DEC-96 JENSEN, N. R. TRANSMITTAL OF DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY, OPERABLE UNIT (OU) 2-13, AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-191-96 00
12-NOV-96 JENSEN, N. R. TWENTY DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF WASTE AREA GROUP 2 (WAG-2) DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT, OPERABLE UNIT (OU) 2-13 AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-169-96 00
05-FEB-95 AR COORDINATOR OPERABLE UNIT (OU) 2-05 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) TRACK 2 INVESTIGATION OF OU 2-05 AR.INDEX.OU.2-05 00
19-JAN-95 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT FOR OU 2-05 TRACK 2 SUMMARY REPORT FOR TEST REACTOR AREA (TRA) TRA-16, TRA-15, TRA-19, TRA-603/605 TANK - NO FURTHER ACTION DETERMINATION 5858 00
04-NOV-94 KOCH, D. F. IDHW-DEQ RECOMMENDATIONS FOR OU 2-05 TRACK 2 SUMMARY REPORT 5789 00
12-OCT-94 MEYER, L. EPA RECOMMENDATIONS FOR TRACK 2 SUMMARY REPORT FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-05 5796 00
04-MAY-94 LYLE, J. L. TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 2-05 AND THE DOE-ID DECISION STATEMENT OPE-ER-110-94 00
01-APR-94 HOLDREN, K. J. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 2-05 EGG-ER-11114 00
01-JUN-93 RICE, R. S. HEALTH & SAFETY PLAN (HSP) FOR TRACK 2 CHARACTERIZATION OF OU 2-05 & 2-07 AT THE TRA EGG-ER-10634 02
01-MAY-93 JESSMORE, J. J. TRACK 2 SAMPLING AND ANALYSIS PLAN (SAP) FOR THE CHARACTERIZATION OF WAG-2 OU TRA 2-05 AND OU 2-07 EGG-ER-10652 01
16-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-15 HOT WASTE TANKS #2, #3, #4 AT TRA-613 2872 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page