Select By Site Code

For Site Code TRA-08

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
06-MAY-05 HANEY, T. J. LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2005 ICP/EXT-05-00778 00
04-MAY-05 WHITMORE, E. J. RESPONSE TO THE FIRST FIVE YEAR REVIEW REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNIT (OU) 2-13, AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) DOE/NE-ID-11189 00
06-OCT-03 WELLS, R. P. FIRST FIVE YEAR REVIEW REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNIT (OU) 2-13, AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) DOE/ID-11099 00
30-JUL-03 JOLLEY, W. L. FY-2003 (FY-03) ANNUAL INSTITUTIONAL CONTROLS ASSESSMENT REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-11108 00
10-JUN-03 NELSON, G. E. DRAFT FIRST FIVE YEAR REVIEW REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) - DOE/ID-11099, REVISION C (REV.0C) JUNE 2003 (06/03) FOR REVIEW EM-ER-03-150 00
10-JUN-03 NELSON, G. E. IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 SUBMITTAL OF DRAFT SCOPE OF WORK (SOW) FOR POST FIVE YEAR REMEDY REVIEW WORK PLAN FOR REVIEW EM-ER-03-174 00
16-APR-03 NELSON, G. E. INEEL WASTE AREA GROUP 2 (WAG-2) - AGREEMENTS CONCERNING FINALIZING THE WAG-2 FIVE YEAR REMEDY REVIEW, TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 EM-ER-03-103 00
21-NOV-02 JAMES, R. E. FY-2002 (FY-02) ANNUAL INSTITUTIONAL CONTROLS INSPECTION REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNITS (OU) 2-13 AND 2-14 (FINAL) INEEL/EXT-02-00933 00
04-NOV-02 NELSON, G. E. TRANSMITTAL OF FY-2002 (FY-02) ANNUAL INSTITUTIONAL CONTROLS INSPECTION REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNITS (OU) 2-13 AND 2-14 (FINAL) EM-ER-02-187 00
08-APR-02 MCGUIRE, M. J. FISCAL YEAR 2001 (FY-2001) INSTITUTIONAL CONTROL INSPECTION REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNIT (OU) 2-13 INEEL/EXT-01-00772 00
26-FEB-01 SEELEY, V. T. INSTITUTIONAL CONTROLS ANNUAL MONITORING REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 INEEL/EXT-2000-01413 00
24-JUL-00 LANDIS, J. A. REMEDIAL ACTION (RA) REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10720 00
26-JUN-00 AR COORDINATOR OPERABLE UNIT (OU) 2-13 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 2-13 AR.INDEX.OU.2-13 00
13-JUN-00 POETON, R. W. EPA REVIEW OF EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FROM THE RECORD OF DECISION (ROD) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 - EPA STATING THAT THEY "CONCUR WITH THE RELEASE OF THIS ESD TO THE PUBLIC" 10836 00
17-MAY-00 SHERWOOD, J. A. EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) TO THE RECORD OF DECISION (ROD) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10744 00
10-MAR-00 WIGGINS, D. J. OPERATIONS AND MAINTENANCE (O&M) PLAN FOR FINAL SELECTED REMEDIES & INSTITUTIONAL CONTROLS AT TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10658 03
01-SEP-98 REESE, C. L. COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10643 00
01-SEP-98 REESE, C. L. FIELD SAMPLING PLAN (FSP) FOR CONFIRMATION SAMPLING & FIELD SCREENING OF SELECTED SITES AT WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 DOE/ID-10657 00
01-SEP-98 REESE, C. L. OPERATIONS & MAINTENANCE (O&M) PLAN FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10658 00
01-SEP-98 REESE, C. L. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 2-13 REMEDIAL ACTION FOR TEST REACTOR AREA (TRA) INEEL/EXT-98-00423 00
31-JUL-98 WINTER, G. IDHW REVIEW COMMENTS ON COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TRA OU 2-13 (DRAFT) REVISION B (REV.0B) 16780 00
30-JUL-98 POETON, R. W. EPA COMMENTS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 2-13 AT INEEL 16779 00
01-MAR-98 REESE, C. L. HEALTH & SAFETY PLAN (HSP) FOR POST RECORD OF DECISION (ROD) SAMPLING OF WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 INEEL/EXT-98-00229 00
24-FEB-98 UNDERWOOD, E. J. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REVIEW COMMENTS ON TEST REACTOR AREA (TRA) WASTE AREA GROUP 2 (WAG-2) DRAFT FIELD SAMPLING PLAN (FSP) 15112 00
20-FEB-98 POETON, R. W. EPA COMMENTS ON POST RECORD OF DECISION (ROD) SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) 15219 00
01-FEB-98 PARSONS TRA WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) DOE/ID-10592 02
23-JAN-98 UNDERWOOD, E. J. IDHW REVIEW COMMENTS ON WASTE AREA GROUP 2 (WAG-2) DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) 15104 00
22-JAN-98 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 AT INEEL 15105 00
07-JAN-98 DOE WORDING CHANGES MADE FOR CLARITY & CONSISTENCY TO FINAL RECORD OF DECISION (ROD) FOR OU 2-13 COMPREHENSIVE ROD FOR WAG-2 OPE-ER-02-98 00
22-DEC-97 DOE FINAL RECORD OF DECISION (ROD) FOR TEST REACTOR AREA (TRA) FOR OPERABLE UNIT (OU) 2-13 AT IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) DOE/ID-10586 00
14-OCT-97 AR COORDINATOR OPERABLE UNIT (OU) 2-09 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) TRACK 2 INVESTIGATION OF OU 2-09 AR.INDEX.OU.2-09 00
23-MAR-97 INEEL COMMUNITY RELATIONS PUBLIC NOTICE - COMMENT PERIOD EXTENDED - MARCH 10 TO MAY 9, 1997 (03/10/97 - 05/09/97) AGENCIES PROPOSE TO REMEDIATE EIGHT SITES AT THE TEST REACTOR AREA (TRA) 10406 00
07-FEB-97 JENSEN, N. R. TRANSMITTAL FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY, OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-11-97 00
03-FEB-97 JENSEN, N. R. TRANSMITTAL OF FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY, OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-10-97 00
01-FEB-97 BURNS, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) DOE/ID-10531 00
04-SEP-96 RICE, R. S. CLOSURE REPORT FOR SAMPLING OF TRA COLD WASTE POND; EMS-010-96 RSR-79-96 00
19-JAN-95 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT FOR OU 2-09 TRACK 2 SUMMARY REPORT FOR TRA-08 COLD WASTE POND & TRA SEWAGE TREATMENT AREA - ACTION DETERMINATION - FURTHER EVALUATION REQUIRED IN OU 2-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5860 00
01-NOV-94 LIENTZ, A. R. SCOPE OF WORK OPERABLE UNIT (OU) 2-13 WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-94/0013 00
17-MAY-94 KOCH, D. F. IDHW-DEQ RECOMMENDATIONS FOR OU 2-09 TRACK 2 SUMMARY REPORT 7673 00
04-OCT-93 MEYER, L. EPA DECISION STATEMENT FOR TRACK 2 SUMMARY REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-09 5812 00
10-AUG-93 LYLE, J. L. DOE-ID DECISION STATEMENT FOR THE TRACK 2 SUMMARY REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-09 AM/ERWM-RPO-518-93 00
01-JUL-93 SALOMON, H. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 2-09 TRA SEWAGE TREATMENT AREA & COLD WASTE POND EGG-ER-10595 00
05-JAN-88 FEIGNER, K. D. REVIEW OF SELECTED SUMMARY ASSESSMENTS 2494 00
12-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-08 COLD WASTE DISPOSAL POND TRA-702 2865 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page