Select By Site Code

For Site Code TRA-07

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
04-MAY-05 WHITMORE, E. J. RESPONSE TO THE FIRST FIVE YEAR REVIEW REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNIT (OU) 2-13, AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) DOE/NE-ID-11189 00
10-JUN-03 NELSON, G. E. DRAFT FIRST FIVE YEAR REVIEW REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) - DOE/ID-11099, REVISION C (REV.0C) JUNE 2003 (06/03) FOR REVIEW EM-ER-03-150 00
10-JUN-03 NELSON, G. E. IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 SUBMITTAL OF DRAFT SCOPE OF WORK (SOW) FOR POST FIVE YEAR REMEDY REVIEW WORK PLAN FOR REVIEW EM-ER-03-174 00
14-OCT-97 AR COORDINATOR OPERABLE UNIT (OU) 2-09 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) TRACK 2 INVESTIGATION OF OU 2-09 AR.INDEX.OU.2-09 00
07-FEB-97 JENSEN, N. R. TRANSMITTAL FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY, OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-11-97 00
03-FEB-97 JENSEN, N. R. TRANSMITTAL OF FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY, OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) OPE-ER-10-97 00
01-FEB-97 BURNS, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) DOE/ID-10531 00
13-NOV-96 KENOYER, D. J. TRANSITION OF RADIOLOGICALLY CONTAMINATED SURPLUS FACILITIES FROM EM-60 TO EM-40 DJK-09-96-A 00
19-JAN-95 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT FOR OU 2-09 TRACK 2 SUMMARY REPORT FOR TRA-08 COLD WASTE POND & TRA SEWAGE TREATMENT AREA - ACTION DETERMINATION - FURTHER EVALUATION REQUIRED IN OU 2-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5860 00
01-NOV-94 LIENTZ, A. R. SCOPE OF WORK OPERABLE UNIT (OU) 2-13 WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-94/0013 00
17-MAY-94 KOCH, D. F. IDHW-DEQ RECOMMENDATIONS FOR OU 2-09 TRACK 2 SUMMARY REPORT 7673 00
04-OCT-93 MEYER, L. EPA DECISION STATEMENT FOR TRACK 2 SUMMARY REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-09 5812 00
10-AUG-93 LYLE, J. L. DOE-ID DECISION STATEMENT FOR THE TRACK 2 SUMMARY REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-09 AM/ERWM-RPO-518-93 00
01-JUL-93 SALOMON, H. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 2-09 TRA SEWAGE TREATMENT AREA & COLD WASTE POND EGG-ER-10595 00
03-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - TRA-07 SEWAGE TREATMENT PLANT TRA-732 & SLUDGE PIT TRA-732 2864 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page