Select By Site Code

For Site Code PBF-08

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
26-SEP-05 WELLS, R. P. PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 5 (WAG-5) ICP/EXT-05-00973 00
11-FEB-05 AR COORDINATOR OPERABLE UNIT (OU) 5-12 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - OU 5-12 - INCLUDES NEW SITE IDENTIFICATION (NSI) DOCUMENT AR.INDEX.OU.5-12 02
26-JAN-05 AR COORDINATOR OPERABLE UNIT (OU) 5-12 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - OU 5-12 - INCLUDES EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) DOCUMENT ID #DOE/ID-11017 AR.INDEX.OU.5-12 01
24-SEP-03 WELLS, R. P. FINAL DOCUMENTATION FOR OPERABLE UNIT (OU) 5-12 NO ACTION SITES DOE/ID-11058 00
01-APR-00 HIARING, C. M. POWER BURST FACILITY & AUXILIARY REACTOR AREA (PBF/ARA) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 DOE/ID-10722 00
06-MAR-00 AR COORDINATOR OPERABLE UNIT (OU) 5-12 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - OU 5-12 AR.INDEX.OU.5-12 00
07-FEB-00 DOE RECORD OF DECISION (ROD) FOR POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) OPERABLE UNIT (OU) 5-12 DOE/ID-10700 00
11-JAN-00 O'NEILL, K. C. TRANSMITTAL OF OPERABLE UNIT (OU) 5-12 RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPE-ER-06-00 00
05-JAN-00 DOE DEPARTMENT OF ENERGY (DOE) RESPONSE & RESOLUTIONS TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 10820 00
22-DEC-99 DOE DEPARTMENT OF ENERGY (DOE) RESPONSE & RESOLUTIONS TO IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 10821 00
16-DEC-99 O'NEILL, K. C. TIME EXTENSION REQUESTED TO INCORPORATE COMMENTS ON OPERABLE UNIT (OU) 5-12 DRAFT RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPE-ER-200-99 00
08-DEC-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 10818 00
08-DEC-99 KOCH, D. F. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 10819 00
18-NOV-99 NOT SPECIFIED SPERT II AIR COMPRESSOR - ELECTRONIC NOTES REGARDING LOCATION 10803 00
07-OCT-99 KOCH, D. F. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR POWER BURST FACILITY AND AUXILIARY REACTOR AREA (PBF/ARA) OPERABLE UNIT (OU) 5-12 - DOE/ID-10700, AUGUST 1999 (10/99) 10795 02
01-OCT-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL 10794 00
19-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 5-13 - IDAHO NATIONAL ENGINEERING LABORATORY (INEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE POWER BURST FACILITY (PBF) CORROSIVE WASTE SUMP AND EVAPORATION POND OU 5-13 AR.INDEX.OU.5-13 00
19-MAY-99 BERKE, J. S. TRANSCRIPT FROM INEEL PUBLIC MEETING ON PROPOSED CLEANUP PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) HELD ON MAY 19, 1999 (05/19/99) IN LEWISTON, IDAHO 10825 00
18-MAY-99 CARPENTER, K. TRANSCRIPT FROM INEEL PUBLIC MEETING ON PROPOSED CLEANUP PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) HELD ON MAY 18, 1999 (05/18/99) IN IDAHO FALLS, IDAHO 10823 00
18-MAY-99 SCHWARTZ, N. TRANSCRIPT FROM INEEL PUBLIC MEETING ON PROPOSED CLEANUP PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) HELD ON MAY 18, 1999 (05/18/99) IN BOISE, IDAHO 10824 00
03-MAY-99 IDHW RESOLUTIONS FOR IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) 17399 00
01-MAY-99 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) INEEL 17237 00
29-APR-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL 10664 00
29-APR-99 EPA ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) PROPOSED PLAN 17397 00
26-APR-99 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTORS AREA (PBF/ARA) 10665 00
01-APR-99 ROSE, K. A. WASTE AREA GROUP 5 (WAG-5) PROPOSED PLAN COMMENTS FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) 17395 00
18-MAR-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL 10569 00
15-MAR-99 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTORS AREA (PBF/ARA) MARCH 1999 (03/99) 10573 00
18-FEB-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVISED COMMENTS ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL 10813 00
16-FEB-99 O'NEILL, K. C. TRANSMITTAL OF DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) OPE-ER-27-99 00
11-FEB-99 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW OF COMMENTS ON DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10811 00
11-FEB-99 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE (IDHW-DEQ) REVIEW OF DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 17004 00
11-FEB-99 O'NEILL, K. C. TRANSMITTAL OF CORRECTED PAGES FOR DRAFT FINAL OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-25-99 00
09-FEB-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL 10812 00
21-JAN-99 O'NEILL, K. C. TRANSMITTAL OF DRAFT FINAL OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-15-99 00
01-JAN-99 INEEL COMMUNITY RELATIONS UPDATE FACT SHEET - WASTE AREA GROUP 5 (WAG-5) ENVIRONMENTAL INVESTIGATION NEARLY COMPLETE - JANUARY 1999 (01/99) 10563 00
01-JAN-99 HOLDREN, K. J. WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10607 00
15-DEC-98 DOE DEPARTMENT OF ENERGY (DOE) RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10711 02
14-DEC-98 DOE DOE RESPONSE TO IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12, COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10793 00
18-NOV-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10808 00
16-JUL-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION (RI) WITH BASELINE RISK ASSESSMENT, DOE/ID-10607, MAY 1998 (05/98) 10809 00
01-JUN-98 O'NEILL, K. C. TRANSMITTAL OF DRAFT REMEDIAL INVESTIGATION BASELINE RISK ASSESSSMENT (RI/BRA) FOR OPERABLE UNIT (OU) 5-12 WAG-5 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-89-98 00
01-MAY-98 DOE DEPARTMENT OF ENERGY (DOE) RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), DOE/ID-10607, DRAFT REVISION 0 (REV.0) 10807 00
01-MAY-98 DOE DOE RESPONSE TO IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON WAG-5 OPERABLE UNIT (OU) 5-12, COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10607, DRAFT REVISION 0 (REV.0) 10810 00
02-MAY-97 ANDERSON, B. S. TRANSMITTAL OF DRAFT FINAL WORK PLAN FOR WASTE AREA GROUP 5 WAG-5, OPERABLE UNIT (OU) 5-12, COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-72-97 00
01-MAY-97 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - COMPREHENSIVE INVESTIGATION BEGINS FOR POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) WAG-5 OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 13946 00
01-MAY-97 WEBBER, F. L. FINAL WORK PLAN FOR WAG-5 OU 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10555 00
01-JAN-97 HIARING, C. M. FINAL SCOPE OF WORK FOR OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10547 00
13-NOV-96 KENOYER, D. J. TRANSITION OF RADIOLOGICALLY CONTAMINATED SURPLUS FACILITIES FROM EM-60 TO EM-40 DJK-09-96-A 00
01-MAR-95 NOT SPECIFIED FINAL REMEDIAL ACTION REPORT POWER BURST FACILITY (PBF)-08 CORROSIVE WASTE SUMP AND PBF-10 EVAPORATION POND INTERIM ACTION OPERABLE UNIT 5-13 05.013.2.1.209.01 3
01-JAN-95 INEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY FOR THE EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR THE POWER BURST FACILITY (PBF) CORROSIVE WASTE SUNP & EVAPORATION POND RECORD OF DECISION (ROD) 5815 00
23-DEC-94 WILCYNSKI, J. M. EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) POWER BURST FACILITY (PBF) CORROSIVE WASTE SUMP AND EVAPORATION POND RECORD OF DECISION (ROD) 5814 00
10-JAN-94 PIERRE, W. EPA COMMENTS ON THE EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR THE POWER BURST FACILITY (PBF) CORROSIVE WASTE SUMP & EVAPORATION POND INTERIM ACTION (IA) OU 5-13 5851 00
22-NOV-93 MK-FIC FINAL REMEDIAL DESIGN (RD) IMPLEMENTING REMEDIAL ACTION (RA) WORK PLAN FOR PBF-08 CORROSIVE WASTE SUMP & PBF-10 EVAPORATION POND REMEDIATION OU 5-13 05.013.1.3.101.01 02
09-NOV-93 MK-FIC DOE, EPA AND IDHW REVIEW COMMENTS AND RESOLUTIONS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REV.01 FOR PBF INTERIM ACTION (IA) OU 5-13 7212 00
01-NOV-92 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) AVAILABILITY FOR THE PBF INTERIM ACTION (IA) 5212 00
01-SEP-92 INEL COMMUNITY RELATIONS POWER BURST FACILITY (PBF) RECORD OF DECISION (ROD) FOR CORROSIVE WASTE SUMP & EVAPORATION POND 5204 00
24-JUL-92 DOE RESPONSE TO STATE OF IDAHO AND EPA COMMENTS ON THE DRAFT POWER BURST FACILITY (PBF) RECORD OF DECISION (ROD) 5210 00
24-JUL-92 BLOOD, H. R. REVIEW COMMENTS FOR THE DRAFT RECORD OF DECISION (ROD) FOR THE POWER BURST FACILITY (PBF) EVAPORATION POND INTERIM ACTION (IA) - OU 5-13 5211 00
23-JUL-92 NYGARD, D. REVIEW COMMENTS FOR THE DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 5-13 AT THE AUXILIARY REACTOR AREA POWER BURST FACILITY (PBF/ARA) WAG-5 5209 00
08-APR-92 NOT SPECIFIED PUBLIC MEETING TRANSCRIPTS - PROPOSED PLAN FOR THE PBF CORROSIVE WASTE SUMP AND EVAPORATION POND, IDAHO FALLS, IDAHO 04/08/92 - BURLEY, IDAHO 04/09/92 5122 01
04-APR-92 INEL COMMUNITY RELATIONS CITIZENS ARE ASKED TO COMMENT ON A CLEANUP PROJECT AT THE INEL 5167 00
01-APR-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON THE PROPOSED PLAN FOR POWER BURST FACILITY (PBF) 5166 00
19-MAR-92 DOE DEAR CITIZEN LETTER AND PROPOSED PLAN FOR AN INTERIM ACTION (IA) OF PBF CORROSIVE WASTE SUMP & PBF EVAPORATION POND 5076 00
01-MAR-92 INEL COMMUNITY RELATIONS INEL REPORTER - 03/92 - AGENCIES TO DISCUSS POWER BURST FACILITIES (PBF) CLEANUP PROJECT 4612 00
01-MAR-92 STANISICH, S. N. PRELIMINARY RISK ASSESSMENT OF PBF-08 & PBF-10 SUMP & EVAPORATION POND 5077 00
01-NOV-91 BELLER, J. M. TRA WARM WASTE POND (WWP) AT INEL SEDIMENT TREATABILITY STUDY (TS), PHASE I REPORT EGG-WM-10000 00
01-MAY-90 LUDI, K. M. SECTION 4 - SAMPLING AND ANALYSIS PROGRAM FROM REPORT NO. EGG-WM-8996, CLOSURE PLAN (CP) FOR POWER BURST FACILITY (PBF) 5168 00
11-JAN-90 SOLECKI, J. E. DETAILED SCHEDULES FOR PREPARATION OF CLOSURE PLANS (CP) FOR COCA WASTE MANAGEMENT UNITS 8206 00
22-DEC-89 BLUMBERG, D. J. STATUS REPORT FOR DECEMBER 1989 (12/89) CLOSURE PLAN (CP) PREPARATION KHK-147-89 00
01-DEC-89 HARDY, C. K. PHASE I SAMPLING & ANALYSIS PLAN (SAP) FOR PBF EVAPORATION POND & WASTE SUMP (COCA UNITS PBF-08 & PBF-10) EGG-WM-8804 00
15-NOV-89 SOLECKI, J. E. RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM EPA & STATE 10986 00
09-NOV-89 BLUMBERG, D. J. RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) AND STATE DJB-40-89 00
26-OCT-89 KOSHUTA, C. R. NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL - EPA AND IDHW REVIEWED DOE'S REVISED CLOSURE PLAN SCHEDULE AND FEEL THE SCHEDULE IS DEFICIENT 6709 00
29-SEP-86 MILLER, C. L. EDF - ENGINEERING DESIGN FILE - RWMC SMALL SCALE SOIL GROUT TEST REPORT EDF-263 00
19-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - PBF-08 REACTOR AREA CORROSIVE WASTE DISPOSAL SUMP BRINE TANK PBF-731 2718 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page