Select By Site Code

For Site Code ORD-08

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
28-AUG-14 FAULK, DENNIS EPA LETTER OF APPROVAL OF THE OU 10-04 REMEDIAL ACTION REPORT 4713378 0
01-AUG-14 KIMBRO, VALERIE M. REMEDIAL ACTION REPORT FOR OPERABLE UNITS 6-05 AND 10-04, PHASE IV DOE/ID-11498 0
24-JUL-14 LIVIERATOS, TED DEQ COMMENTS ON THE OU 10-04 PHASE IV REMEDIAL ACTION REPORT 4682814 0
24-JUL-14 FAULK, DENNIS EPA COMMENTS ON THE OU 10-04 PHASE IV REMEDIAL ACTION REPORT 4682815 0
01-AUG-13 VANHORN, ROBIN L. REFINED WASTE AREA GROUP ECOLOGICAL RISK ASSESSMENTS AT THE INL SITE RPT-969 1
01-APR-13 HOLDREN, K. JEAN PHASE I REMEDIAL ACTION REPORT FOR OPERABLE UNITS 6-05 AND 10-04 DOE/ID-11480 0
01-SEP-12 SCHWENDIMAN, G. LYNN REMEDIAL DESIGN / REMEDIAL ACTION WORK PLAN FOR OPERABLE UNITS 6-05 AND 10-04, PHASE IV DOE/ID-11261 1
01-SEP-12 HOLDREN, K. JEAN REMEDIAL DESIGN / REMEDIAL ACTION WORK PLAN FOR OPERABLE UNITS 6-05 AND 10-04, PHASE IV DOE/ID-11261 1
01-SEP-12 KIMBRO, VALERIE M. REMEDIAL DESIGN / REMEDIAL ACTION WORK PLAN FOR OPERABLE UNITS 6-05 AND 10-04, PHASE IV DOE/ID-11261 1
01-SEP-12 VANHORN, ROBIN L. REFINED WASTE AREA GROUP ECOLOGICAL RISK ASSESSMENTS AT THE INL SITE RPT-969 0
08-AUG-11 FAULK, DENNIS REQUEST FOR CONCURRENCE TO REMOVE REQUIREMENT TO PERFORM SITE WALKDOWNS AND VISUAL INSPECTIONS AS IDENTIFIED IN THE OPERABLE UNIT 10-04 RECORD OF DECISION, DOE LETTER DATED AUGUST 8, 2011 IR-15301 0
08-AUG-11 LIVIERATOS, TED REQUEST FOR CONCURRENCE TO REMOVE REQUIREMENT TO PERFORM SITE WALKDOWNS AND VISUAL INSPECTIONS AS IDENTIFIED IN THE OPERABLE UNIT 10-04 RECORD OF DECISION (WDP-RWMC-11-052) DOE LETTER DATED 08-08-11 IR-25302 0
08-AUG-11 HAIN, KATHLEEN E. REQUEST FOR CONCURRENCE TO REMOVE REQUIREMENT TO PERFORM SITE WALKDOWNS AND VISUAL INSPECTIONS AS IDENTIFIED IN THE OPERABLE UNIT 10-04 RECORD OF DECISION (WDP-RWMC-11-052) WDP-RWMC-11-052 0
30-OCT-08 HERNANDEZ, NICOLE K. REMEDIAL ACTION PREFINAL INSPECTION CHECKLIST OU 10-04, PHASE II TRINITROTOLUENE AND CYCLOTRIMETHYLENETRINITRAMINE CONTAMINATED SITES PFI-1002 0
19-AUG-08 WELLS, RICHARD P. OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT (OU) 10-04 DOE/ID-11354 0
01-OCT-07 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE II DOE/NE-ID-11127 01
22-MAY-07 MCMANAMON, L. E. ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 03
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
31-OCT-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 02
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
13-JUL-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 01
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
31-MAY-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 00
24-MAR-06 OPALSKI, D. D. EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR RECORD OF DECISION (ROD) FOR EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES DOE/ID-11264 00
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
19-JAN-05 WELLS, R. P. REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I DOE/NE-ID-11186 00
04-AUG-04 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE II DOE/NE-ID-11127 00
04-AUG-04 WELLS, R. P. OPERATIONS AND MAINTENANCE (O&M) PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE II DOE/NE-ID-11130 00
22-JUL-04 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE WASTE AREA GROUP 10 (WAG-10) REMEDIAL ACTIONS AT TRINITROTOLUENE (TNT) AND ROYAL DEMOLITION EXPLOSIVE (RDX) CONTAMINATED SITES (TNT/RDX) ICP/EXT-03-00119 00
09-FEB-04 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I DOE/ID-11101 00
05-FEB-04 WELLS, R. P. OPERATIONS AND MAINTENANCE (O&M) PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I DOE/ID-11102 01
18-DEC-03 WELLS, R. P. OPERATIONS AND MAINTENANCE (O&M) PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I DOE/ID-11102 00
30-JUN-03 VANHORN, R. L. LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2003 INEEL/EXT-02-01546 01
09-MAY-03 VANHORN, R. L. LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2003 INEEL/EXT-02-01546 00
24-APR-03 JOLLEY, W. L. INSTITUTIONAL CONTROLS STATUS REPORT FOR WASTE AREA GROUPS 6 AND 10 (WAG-6 AND WAG-10) INEEL/EXT-03-00199 00
28-MAR-03 HAIN, K. E. ORDNANCE CLEANUP AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) BY THE U. S. ARMY CORPS OF ENGINEERS' FORMERLY USED DEFENSE SITES PROGRAM EM-ER-03-089 00
20-MAR-03 HOBSON, S. CITIZENS ADVISORY BOARD (CAB) REVIEW AND COMMENTS - RECOMMENDATION #92 FOR THE PROPOSED PLAN FOR OPERABLE UNIT (OU) 10-04 - WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) 02-CAB-031 00
12-MAR-03 MAAS, J. A. RESPONSE FROM U. S. ARMY CORPS OF ENGINEERS REGARDING ORDNANCE CLEANUP AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) BY THE U. S. ARMY CORPS OF ENGINEERS' FORMERLY USED DEFENSE SITES PROGRAM 24780 00
04-MAR-03 NELSON, G. E. SUBMITTAL OF OPERABLE UNITS (OU) 6-05 AND 10-04 FINAL SCOPE OF WORK (SOW) FOR EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES EM-ER-03-063 00
27-FEB-03 HANEY, T. J. U. S. DEPARTMENT OF ENERGY IDAHO OPERATIONS OFFICE (DOE-ID) LEAD AGENCY ACTION MEMORANDUM TIME CRITICAL REMOVAL ACTION (TCRA) FOR UNEXPLODED ORDNANCE (UXO) OPERABLE UNIT (OU) 10-04, INEEL INEEL/EXT-02-01033 02
01-FEB-03 BROOMFIELD, B. J. OPERABLE UNITS (OU) 6-05 AND 10-04, EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES, REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) DOE/ID-11035 00
30-JAN-03 NELSON, G. E. SUBMITTAL OF OPERABLE UNITS (OU) 6-05 AND 10-04 REVISED DRAFT SCOPE OF WORK (SOW) FOR EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES EM-ER-03-031 00
10-JAN-03 HAIN, K. E. REQUEST FOR EVALUATION OF PORTIONS OF THE INEEL FOR INCORPORATION INTO THE U. S. ARMY CORPS OF ENGINEERS - FORMERLY USED DEFENSE SITES PROGRAM EM-ER-03-007 00
20-NOV-02 INEEL COMMUNITY RELATIONS PRESS RELEASE - AGENCIES SIGN RECORD OF DECISION (ROD) TO CLEANUP EXPLODED ORDNANCE AND OTHER SITES AT THE INEEL 24761 00
18-NOV-02 NELSON, G. E. TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 6-05 AND 10-04 EXPERIMENTAL BREEDER REACTOR I AND BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) EM-ER-02-192 00
05-NOV-02 AR COORDINATOR OPERABLE UNIT (OU) 10-04 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR WASTE AREA GROUP 10 (WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 10-04 AR.INDEX.OU.10-04 00
05-NOV-02 BROOMFIELD, B. J. RECORD OF DECISION (ROD) FOR EXPERIMENTAL BREEDER REACTOR I & BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES - OPERABLE UNITS (OU) 6-05 AND 10-04 DOE/ID-10980 00
30-OCT-02 ROBERTS, J. D. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE REMOVAL AND DETONATION OF UNEXPLODED ORDNANCE (UXO) AT THE INEEL INEEL/EXT-02-01102 00
23-OCT-02 NELSON, G. E. IMPLEMENTATION AND MAINTENANCE OF SITE WIDE INSTITUTIONAL CONTROLS AS DISCUSSED IN THE RECORD OF DECISION (ROD) FOR EBR-I/BORAX AREA AND MISCELLANEOUS SITES - DOE/ID-10980, SEPTEMBER 2002 (09/02) EM-ER-02-181 00
24-SEP-02 NELSON, G. E. SUBMITTAL OF FINAL RECORD OF DECISION (ROD) FOR EXPERIMENTAL BREEDER REACTOR I BOILING REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES - OPERABLE UNIT (OU) 6-05 AND 10-04 (DOE/ID-10980) EM-ER-02-161 00
25-JUN-02 EPA EPA AND IDEQ COMMENT RESOLUTION FORMS - DRAFT RECORD OF DECISION (ROD) - EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I /BORAX) AND MISCELLANEOUS SITES - OPERABLE UNITS (OU) 6-05 & 10-04 - DOE/ID-10980 23839 00
11-JUN-02 NELSON, G. E. TWENTY (20) DAY EXTENSION OF COMMENT RESOLUTION PERIOD FOR OPERABLE UNIT (OU) 10-04 DRAFT RECORD OF DECISION (ROD) EM-ER-02-101 00
26-APR-02 HAIN, K. E. DOE RESPONSE TO CAB COMMENTS - INEEL CITIZENS ADVISORY BOARD (CAB) SUBMITTAL OF RECOMMENDATION #92 EM-ER-02-057 00
13-FEB-02 HOBSON, S. CITIZENS ADVISORY BOARD (CAB) REQUEST FOR A 30 DAY EXTENSION TO PUBLIC COMMENT PERIOD ON OPERABLE UNIT (OU) 10-04 PROPOSED PLAN 02-CAB-008 00
12-FEB-02 SCHWARTZ, N. TRANSCRIPT FROM OPERABLE UNIT (OU) 10-04 PROPOSED PLAN PUBLIC MEETING HELD IN IDAHO FALLS, IDAHO FEBRUARY 12, 2002 (02/12/02) 24759 00
07-FEB-02 SCHWARTZ, N. TRANSCRIPT FROM OPERABLE UNIT (OU) 10-04 PROPOSED PLAN PUBLIC MEETING HELD IN BOISE, IDAHO FEBRUARY 7, 2002 (02/07/02) 24758 00
06-FEB-02 NELSON, G. E. OPERABLE UNIT (OU) 10-04 FFA/CO DEADLINE FOR SUBMITTAL OF DRAFT RECORD OF DECISION (ROD) - CONFIRMATION OF AGREEMENT REGARDING DEADLINE EXTENSION BY 30 CALENDAR DAYS EM-ER-02-019 00
25-JAN-02 NELSON, G. E. INEEL WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 PROPOSED PLAN - EXTENSION OF PUBLIC REVIEW PERIOD BY 30 CALENDAR DAYS EM-ER-02-014 00
01-JAN-02 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) ENVIRONMENTAL INVESTIGATION COMPLETE 10955 00
01-JAN-02 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR OPERABLE UNIT (OU) 10-04 - WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) 10956 00
13-SEP-01 HAIN, K. E. TRANSMITTAL OF INEEL WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 SUBMITTAL OF DRAFT PROPOSED PLAN FOR REVIEW AND COMMENT EM-ER-01-151 00
16-AUG-01 NELSON, G. E. SUBMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 - VOLUME 1 (VOL.01) AND VOLUME 2 (VOL.02) EM-ER-01-131 00
15-AUG-01 VANHORN, R. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 - VOLUME 1 (VOL.01) OF 2 DOE/ID-10807,VOL.01 00
15-AUG-01 VANHORN, R. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 - VOLUME 2 (VOL.02) OF 2 DOE/ID-10807,VOL.02 00
02-AUG-01 NELSON, G. E. WAG-10 - REQUEST FOR AGREEMENT WITH FIFTEEN (15) DAY SCHEDULE EXTENSION FOR ISSUING THE FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) IN ACCORDANCE WITH FFA/CO SECTION 8.18 EM-ER-01-126 00
05-JUL-01 NELSON, G. E. SUBMITTAL OF DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ASSESSMENT FOR WASTE AREA GROUPS 6 AND 10 (WAG-6 AND WAG-10) OPERABLE UNIT (OU) 10-04 FOR REVIEW AND COMMENT EM-ER-01-119 00
08-MAY-01 WINTER, G. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON THE DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 10934 00
07-MAY-01 DOE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS AND RESOLUTIONS TO COMMENTS ON THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WASTE AREA GROUP 6 AND 10 (WAG-6 & WAG-10) FOR OPERABLE UNIT (OU) 10-04 10940 00
04-MAY-01 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON THE DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 10933 00
04-MAY-01 NOT SPECIFIED ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS AND RESOLUTIONS TO COMMENTS ON THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 10-04 10939 00
30-JAN-01 AR COORDINATOR OPERABLE UNIT (OU) 10-03 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF ORDNANCE AREAS - INCLUDING NAVAL ORDNANCE DISPOSAL AREA (NODA) AT THE INEEL OU 10-03 AR.INDEX.OU.10-03 00
27-NOV-00 MILLER, R. E. ENGINEERING DESIGN FILE (EDF) - DATA ACQUISITION METHODOLOGY & OPERABLE UNIT (OU) 10-04 DATABASE DEVELOPMENT - FUNTIONAL FILE NUMBER INEEL/EXT-2000-10422 EDF-ER-230 00
20-SEP-00 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV DOE/ID-10587 06
23-MAR-00 RADTKE, C. W. WASTE AREA GROUP 10 (WAG-10) RDX AND TNT CERCLA TREATABILITY STUDY (TS) FINAL REPORT INEEL/EXT-99-01043 00
23-MAR-00 GIANOTTO, D. F. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-99-01253 00
01-AUG-99 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - COMPREHENSIVE INVESTIGATION UNDER WAY FOR WASTE AREA GROUP 10 (WAG-10) 18049 00
29-JUN-99 KROUPA, P. C. REQUEST FOR EXTENSION OF WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCHEDULE & ADDITION OF NEW OU TITLED WAG-10 OU 10-08 OPE-ER-90-99 00
22-JUN-99 PIERRE, W. REQUEST FOR EXTENSION FOR OPERABLE UNIT (OU) 10-04 DEADLINE FOR DRAFT RECORD OF DECISION (ROD) 10663 00
17-JUN-99 BURNS, D. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-99-00166 01
16-JUN-99 NYGARD, D. RESPONSE TO REQUEST FOR EXTENSION OF OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) SCHEDULE & ADDITION OF NEW OPERABLE UNITS (OU) TITLED 10-08 & 10-09 10666 00
10-JUN-99 KROUPA, P. C. REQUEST FOR EXTENSION OF OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) SCHEDULE & ADDITION OF NEW OPERABLE UNITS (OUS) TITLED 10-08 & 10-09 OPE-ER-83-99 00
26-APR-99 BURNS, D. E. WORK PLAN FOR WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10554 00
26-APR-99 SHERWOOD, J. A. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 10-04 EXPLOSIVE COMPOUNDS DOE/ID-10624 00
01-APR-99 BURNS, D. E. HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-99-00166 00
01-MAR-99 SMITH, D. M. FIELD SAMPLING PLAN (FSP) FOR OU 10-04 ROYAL DEMOLITION EXPLOSIVE CYCLOTRIMETHYLENE TRINITORAMINE (RDX) TRINITROTOLUENE (TNT) CERCLA TREATABILITY STUDY (TS) OF BIOLOGICAL REMEDIATED SOILS CONTAMINATED WITH EXPLOSIVE MATERIALS AT INEEL (RDX/TNT) INEEL/EXT-98-00576 00
01-MAR-99 RADTKE, C. W. WORK PLAN FOR EX SITU BIOLOGICAL REMEDIATION TREATABILITY STUDY (TS) ON EXPLOSIVES CONTAMINATED SOILS (TNT/RDX) INEEL/EXT-98-00775 00
05-FEB-99 KROUPA, P. C. WASTE AREA GROUP 10 (WAG-10) TIME EXTENSION ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-21-99 00
29-JAN-99 WINTER, G. CORRECTED REVIEW COMMENTS ON WORK PLAN FOR WASTE AREA GROUPS 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - (DRAFT) DOE/ID-10554 NOVEMBER 1998 (11/98) 10566 00
01-JAN-99 SHERWOOD, J. A. SUMMARY REPORT FOR 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) FOR ORDNANCE AT OPERABLE UNIT (OU) 10-03 INEEL/EXT-97-01354 00
29-DEC-98 POETON, R. W. EXTENSION OF REVIEW FOR WASTE AREA GROUPS 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT WORK PLAN 10565 00
13-AUG-98 KROUPA, P. C. TRANSMITTAL OF ORDNANCE DECISION STATEMENT FOR ORDNANCE TRACK 2 SUMMARY REPORT OPE-ER-131-98 00
01-JAN-98 SHERWOOD, J. A. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 10-03 ORDNANCE, VOLUME 1 (VOL.01) OF 2 DOE/ID-10566,VOL.01 00
01-JAN-98 SHERWOOD, J. A. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 10-03 ORDNANCE, VOLUME 2 (VOL.02) OF 2 - APPENDIX G - APPENDIX P DOE/ID-10566,VOL.02 00
01-SEP-97 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) FOR OU 10-03 DOE/ID-10584 00
28-JUL-97 WINTER, G. COMMENTS ON DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 10-03 ORDNANCE AT INEEL 10567 00
01-JUL-97 GREEN, T. S. HEALTH & SAFETY PLAN (HSP) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) OU 10-03 INEL/EXT-97-00236 02
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
03-JUN-97 SHERWOOD, J. A. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) FOR UNEXPLODED ORDNANCE AT INEEL OU 10-03 DOE/ID-10577 01
01-JUN-97 EPA APPROVAL MEMORANDUM FOR 1997 ORDNANCE REMOVAL ACTION AT OPERABLE UNIT (OU) 10-03 AT THE INEEL 10418 00
01-JUN-97 SHERWOOD, J. A. ACTION MEMORANDUM FOR 1997 ORDNANCE REMOVAL ACTION AT OU 10-03 AT INEEL 10421 00
16-MAY-97 ROSENBERGER, M. S. IDHW COMMENTS ON ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) FOR UNEXPLODED ORDNANCE AT INEEL OU 10-03 10417 00
05-MAY-97 POETON, R. W. EPA COMMENTS ON DRAFT TRACK 2 SUMMARY REPORT & FINAL REMOVAL ACTION REPORT FOR WAG-10 OU 10-03 10416 00
16-APR-97 SHERWOOD, J. A. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) FOR UNEXPLODED ORDNANCE AT THE IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) OPERABLE UNIT (OU) 10-03 DOE/ID-10577 00
01-APR-97 DOE APPROVAL MEMORANDUM FOR THE 1997 ORDNANCE REMOVAL ACTION AT OPERABLE UNIT (OU) 10-03 AT THE INEEL 10414 00
01-APR-97 FRANCIS, C. S. REMOVAL ACTION PLAN FOR 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) FOR UNEXPLODED ORDNANCE LOCATIONS AT INEEL OPERABLE UNIT (OU) 10-03 INEL/EXT-97-00326 00
14-MAR-97 BARNA, S. M. SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10553 00
01-MAR-97 SCIENTECH, INC. LETTER REPORT FOR UNEXPLODED ORDNANCE & ORDNANCE EXPLOSIVES CLEANUP AT GOVERNMENT & COMMERCIAL FACILITIES 18156 00
01-MAR-97 SCIENTECH, INC. REFERENCES - LETTER REPORT FOR UNEXPLODED ORDNANCE & ORDNANCE EXPLOSIVES CLEANUP AT GOVERNMENT & COMMERCIAL FACILITIES - VOLUME 1 (VOL.01) OF 3 18157 00
01-MAR-97 SCIENTECH, INC. REFERENCES - LETTER REPORT FOR UNEXPLODED ORDNANCE & ORDNANCE EXPLOSIVES CLEANUP AT GOVERNMENT & COMMERCIAL FACILITIES - VOLUME 2 (VOL.02) OF 3 18158 00
01-MAR-97 SCIENTECH, INC. REFERENCES - LETTER REPORT FOR UNEXPLODED ORDNANCE & ORDNANCE EXPLOSIVES CLEANUP AT GOVERNMENT & COMMERCIAL FACILITIES - VOLUME 3 (VOL.03) OF 3 18159 00
25-FEB-97 WINTER, G. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT FINAL SCOPE OF WORK FOR OU 10-04 WASTE AREA GROUP 6 (WAG-6) & 10 (WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10415 00
31-DEC-96 POETON, R. W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT OU 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) STATEMENT OF WORK (SOW) - (OPE-ER-171-96) 10306 00
30-DEC-96 WINTER, G. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WAG-6 & WAG-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), DOE/ID-10553, NOVEMBER 1996 (11/96) 10307 00
13-DEC-96 DEPPERSCHMIDT, J. D. TRANSMITTAL OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) TO INEL NATURAL RESOURCE TRUSTEE COUNCIL MEMBERS OPE-EP-96-474 00
01-AUG-96 PEATROSS, R. G. HEALTH & SAFETY PLAN (HSP) FOR TRACK 2 ASSESSMENT OF ORDNANCE SITES AT INEL INEL-96/0293 01
01-JUN-96 SHERWOOD, J. A. TRACK 2 SAMPLING & ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 10-03 ORDNANCE ASSESSMENT DOE/ID-10529 00
16-MAY-96 LMITCO REVISED FINAL OPERABLE UNIT (OU) 10-03 TRACK 2 INVESTIGATION SITE WIDE ORDNANCE ASSESSMENT AT INEL SCOPE OF WORK (SOW) 10442 00
01-MAY-96 PEATROSS, R. G. HEALTH & SAFETY PLAN (HSP) FOR ASSESSMENT & REMEDIATION OF ORDNANCE SITES AT INEL INEL-96/0088 00
04-JAN-96 LITCO OPERABLE UNIT (OU) 10-03 TRACK 2 INVESTIGATION SITE WIDE ORDNANCE ASSESSMENT AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) SCOPE OF WORK 10152 00
12-JUL-94 MK-FIC DOE-ID LEAD AGENCY ACTION MEMORANDUM FOR THE NON TIME CRITICAL REMOVAL ACTION (NTCRA) OF TNT & RDX CONTAMINATED SOIL - ENGINEERING EVALUATION COST ANALYSIS (EE/CA) IS INCLUDED AS ATTACHMENT A 10.03.2.122.01 02
03-JUN-94 INEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY OF ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) REPORT 5709 00
20-MAY-94 WYLE LABORATORIES REMEDIAL ACTION (RA) REPORT FOR THE INTERIM ACTION (IA) TO CLEANUP UNEXPLODED ORDNANCE LOCATIONS AT THE INEL OU 10-05 31-ICP-06 3
21-DEC-93 WILLIAMS, R. C. AGENCY FOR TOXIC SUBSTANCES & DISEASE REGISTRY (ATSDR) HEALTH CONSULTATION OF INEL INTERIM ACTION (IA) FOR ORDNANCE OPERABLE UNIT (OU) 10-05 6993 00
10-JUN-93 WYLE LABORATORIES POST ROD - INTERIM ORDNANCE CLEANUP PROGRAM REMEDIAL DESIGN SAMPLING & ANALYSIS PLAN (SAP) AND QUALITY ASSURANCE PROJECT PLAN (QAPJP), SECTION 4 16-ICP-03 03
10-JUN-93 WYLE LABORATORIES INTERIM ORDNANCE CLEANUP PROGRAM REMEDIAL ACTION WORK PLAN (RAWP) - THIS MANUAL WAS RECEIVED AS A VENDOR DATA ITEM FROM WYLE LABORATORIES FOR OU 10-05 SUBMITTAL #S-500992-005(10-05), REVISION 4 (REV.04) 23-ICP-05 03
10-JUN-93 WYLE LABORATORIES INTERIM ORDNANCE CLEANUP PROGRAM REMEDIAL ACTION WORK PLAN (RAWP) - APPENDIX B - PROCEDURES - THIS MANUAL WAS RECEIVED AS A VENDOR DATA ITEM FROM WYLE LABORATORIES UNDER SUBMITTAL #S-500992-005(10-05), REVISION 4 (REV.04) 23-ICP-05-A 03
11-MAY-93 WYLE LABORATORIES INTERIM ORDNANCE CLEANUP PROGRAM REMEDIAL DESIGN 16-ICP-03 02
30-APR-93 WYLE LABORATORIES INTERIM ORDNANCE CLEANUP PROGRAM RECORD SEARCH REPORT - SUBCONTRACT #S-500992 WYLE LABORATORIES - SUPPORTS OPERABLE UNIT (OU) 10-05 INTERIM ACTION (IA) AND OU 10-02 21-ICP-02 02
24-JUL-92 NOT SPECIFIED REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK REMEDIAL DESIGN WORK PLAN (RDWP) INTERIM ACTION (IA) TO CLEANUP UNEXPLODED ORDNANCE OU 10-05, REV.04 7761 00
01-JUN-92 INEL COMMUNITY RELATIONS DECLARATION OF THE RECORD OF DECISION (ROD) FOR ORDNANCE INTERIM ACTION (IA) OPERABLE UNIT (OU) 10-05 5137 00
01-JUN-92 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) AVAILABILITY ON THE CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT THE INEL 5165 00
19-MAY-92 NYGARD, D. TECHNICAL REVIEW COMMENTS, DRAFT RECORD OF DECISION (ROD) FOR CLEANUP OF UNEXPLODED ORDNANCE OPERABLE UNIT (OU) 10-05 (LATE COMMENTS) 5138 00
14-MAY-92 MK-FIC WAG-10 ORDNANCE INTERIM ACTION (IA) COST ESTIMATE FOR ALTERNATIVES 2, 3, AND 4 5112 00
28-FEB-92 FIGUEROA, I. C. ENGINEERING DESIGN FILE (EDF) - RISK ANALYSIS DETERMINATION OF RISK BASED SOIL SCREENING CONCENTRATIONS POTENTIAL EXPLOSIVE RESIDUES AT ORDNANCE AREAS (OU 10-05) AT INEL ERP-WAG10-08 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN, IDAHO PRESS TRIBUNE NAMPA, IDAHO 4435 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN - TIMES NEWS, TWIN FALLS, IDAHO 4436 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN - IDAHO STATESMAN, BOISE, IDAHO 4437 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN - IDAHO FALLS, IDAHO 4438 00
18-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN, LEWISTON MORNING PRESS - IDAHO 4441 00
17-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION AND IN THE SURROUNDING GROUNDWATER AT TAN - POCATELLO, IDAHO 4434 00
17-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN - IDAHOAN, MOSCOW, IDAHO 4439 00
17-FEB-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE LOCATIONS AT INEL & INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION AND IN THE SURROUNDING GROUNDWATER AT TAN, BURLEY, IDAHO SOUTH IDAHO PRESS 4440 00
06-FEB-92 LEDBETTER, L. PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE BURLEY, IDAHO FEBRUARY 6, 1992 (02/06/92) 4608 00
05-FEB-92 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE BOISE, IDAHO FEBRUARY 2, 1992 (02/05/92) 4607 00
04-FEB-92 GRAHAM, D. PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE IDAHO FALLS, IDAHO FEBRUARY 4, 1992 (02/04/92) 4606 00
04-FEB-92 NOT SPECIFIED PUBLIC MEETING TRANSCRIPTS FROM IDAHO FALLS, BOISE, AND BURLEY ON THE PROPOSED PLAN FOR CLEANUP OF UNEXPLODED ORDNANCE 5129 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHO STATESMAN, BOISE, IDAHO 4451 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE IDAHO STATE JOURNAL - POCATELLO, IDAHO 4452 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHO PRESS TRIBUNE, NAMPA, IDAHO 4453 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - POST REGISTER, IDAHO FALLS, IDAHO 4454 00
30-JAN-92 INEL PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - TIMES NEWS - TWIN FALLS, IDAHO 4458 00
30-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - SOUTH IDAHO PRESS, BURLEY, IDAHO 4461 00
08-JAN-92 INEL COMMUNITY RELATIONS DEAR CITIZEN LETTER - PROPOSED PLAN FOR INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN, PROPOSED PLAN FOR CLEANUP UNEXPLODED ORDNANCE LOCATIONS, COMMUNITY RELATIONS PLAN FACT SHEET - DOE STU 3532 00
06-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHO PRESS TRIBUNE, NAMPA, IDAHO 4449 00
05-JAN-92 INEL COMMUNITY RELATIONS CITIZENS ARE ASKED TO COMMENT - PUBLIC COMMENT ON TAN INJECTION WELL & UNEXPLODED ORDNANCE 3531 00
05-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - TIMES NEWS, TWIN FALLS, IDAHO 4450 00
05-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE, IDAHO STATE JOURNAL, POCATELLO, IDAHO 4455 00
05-JAN-92 INEL PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHO STATESMAN, BOISE, IDAHO 4459 00
05-JAN-92 INEL PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - SOUTH IDAHO PRESS, BURLEY, IDAHO 4460 00
05-JAN-92 INEL COMMUNITY RELATIONS PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - LEWISTON MORNING PRESS, LEWISTON, IDAHO 4468 00
04-JAN-92 INEL PUBLIC COMMENT ON TEST AREA NORTH (TAN) INJECTION WELL & UNEXPLODED ORDNANCE - IDAHOAN, MOSCOW, IDAHO 4457 00
18-JUL-91 DOUTHAT, C. D. APPLICATION OF RISK ASSESSMENT TECHNIQUES TO EVALUATE PUBLIC RISK & ESTABLISH PRIORITIES FOR CLEANUP OF ORDNANCE AT FORMERLY USED DEFENSE SITE 3528 00
01-MAR-89 BURROWS, E. P. ORGANIC EXPLOSIVES & RELATED COMPOUNDS: ENVIRONMENTAL & HEALTH CONSIDERATIONS 8901 00
01-JAN-89 GORDON, L. HEALTH ADVISORY ON 2,4,6-TRINITROTOLUENE (TNT) 3527 00
01-NOV-88 HARTLEY, W. R. HEALTH ADVISORY FOR HEXAHYDRO-1,3,4-TRINITRO-1,3,5-TRIAZINE (RDX) 3529 00
28-JAN-86 LUSK, M. W. ENGINEERING DESIGN FILE (EDF) - OU 10-05 INTERIM ACTION (IA) ERP-WAG10-06 00
01-JAN-86 NOT SPECIFIED INSTALLATION ASSESSMENT REPORT FOR EG&G IDAHO, INC. OPERATIONS AT INEL EGG-WM-6875 00