Select By Site Code

For Site Code MISC-G

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
08-AUG-11 FAULK, DENNIS REQUEST FOR CONCURRENCE TO REMOVE REQUIREMENT TO PERFORM SITE WALKDOWNS AND VISUAL INSPECTIONS AS IDENTIFIED IN THE OPERABLE UNIT 10-04 RECORD OF DECISION, DOE LETTER DATED AUGUST 8, 2011 IR-15301 0
08-AUG-11 LIVIERATOS, TED REQUEST FOR CONCURRENCE TO REMOVE REQUIREMENT TO PERFORM SITE WALKDOWNS AND VISUAL INSPECTIONS AS IDENTIFIED IN THE OPERABLE UNIT 10-04 RECORD OF DECISION (WDP-RWMC-11-052) DOE LETTER DATED 08-08-11 IR-25302 0
08-AUG-11 HAIN, KATHLEEN E. REQUEST FOR CONCURRENCE TO REMOVE REQUIREMENT TO PERFORM SITE WALKDOWNS AND VISUAL INSPECTIONS AS IDENTIFIED IN THE OPERABLE UNIT 10-04 RECORD OF DECISION (WDP-RWMC-11-052) WDP-RWMC-11-052 0
22-MAY-07 MCMANAMON, L. E. ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 03
31-OCT-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 02
13-JUL-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 01
31-MAY-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 00
01-FEB-03 BROOMFIELD, B. J. OPERABLE UNITS (OU) 6-05 AND 10-04, EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES, REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) DOE/ID-11035 00
18-NOV-02 NELSON, G. E. TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 6-05 AND 10-04 EXPERIMENTAL BREEDER REACTOR I AND BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) EM-ER-02-192 00
26-APR-99 BURNS, D. E. WORK PLAN FOR WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10554 00
29-JAN-99 WINTER, G. CORRECTED REVIEW COMMENTS ON WORK PLAN FOR WASTE AREA GROUPS 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - (DRAFT) DOE/ID-10554 NOVEMBER 1998 (11/98) 10566 00
29-DEC-98 POETON, R. W. EXTENSION OF REVIEW FOR WASTE AREA GROUPS 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT WORK PLAN 10565 00
01-APR-98 JONES, R. W. FIELD SAMPLING PLAN (FSP) FOR D&D OF SECURITY TRAINING FACILITY (STF) INEL/EXT-97-00664 01
14-MAR-97 BARNA, S. M. SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10553 00
25-FEB-97 WINTER, G. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT FINAL SCOPE OF WORK FOR OU 10-04 WASTE AREA GROUP 6 (WAG-6) & 10 (WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10415 00
30-DEC-96 WINTER, G. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WAG-6 & WAG-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), DOE/ID-10553, NOVEMBER 1996 (11/96) 10307 00
13-DEC-96 DEPPERSCHMIDT, J. D. TRANSMITTAL OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) TO INEL NATURAL RESOURCE TRUSTEE COUNCIL MEMBERS OPE-EP-96-474 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page