CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
---|---|---|---|---|
29-JAN-18 | NOT SPECIFIED | CORRECTED TABLE B-3 DOE/ID-11462 REV 0 | 6087213 | 0 |
18-DEC-17 | NOT SPECIFIED | INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS | DOE/ID-11042 | 10 |
01-JUN-17 | FORBES, JEFFREY R. | FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11563 | 0 |
01-JUN-17 | LAWRENCE, SARAH D. | FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11563 | 0 |
01-JUN-17 | SHANKLIN, DEAN E. | FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11563 | 0 |
08-AUG-16 | NOT SPECIFIED | EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE | DOE/ID-11548 | 0 |
01-JUN-16 | FORBES, JEFFREY R. | FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11545 | 0 |
01-JUN-16 | JOLLEY, WENDELL L. | FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11545 | 0 |
01-JUL-15 | NOT SPECIFIED | FISCAL YEAR 2014 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11526 | 0 |
31-MAR-15 | FAULK, DENNIS | EPA CONCURRENCE FOR DISCHARGE OF IWTU WATER TO STORM WATER EVAPORATION | CCN 317610 | 0 |
17-MAR-15 | JOHANSEN, P.E. | DEQ CONCURRENCE FOR DISCHARGE OF WATER FROM IWTU TO CPP-1793 STORM WATER EVAPORATION POND | CCN 317584 | 0 |
09-MAR-15 | BROWN, M.E. | REQUEST FOR CONCURRENCE FOR DISCHARGE OF WATER FROM INTEGRATED WASTE TREATMENT UNIT(IWTU) TO CPP-1793 STORM WATER EVAPORATION POND | CCN 317526 | 0 |
01-JAN-15 | NOT SPECIFIED | INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS | DOE/ID-11042 | 9 |
01-JUN-14 | NOT SPECIFIED | FISCAL YEAR 2013 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11500 | 0 |
01-MAY-14 | NOT SPECIFIED | INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2013 | RPT-1268 | 0 |
01-SEP-13 | NOT SPECIFIED | INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS | DOE/ID-11042 | 8 |
01-JUN-13 | NOT SPECIFIED | FISCAL YEAR 2012 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11476 | 0 |
01-JUN-13 | NOT SPECIFIED | INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2012 | RPT-1196 | 0 |
31-JUL-12 | NOT SPECIFIED | FISCAL YEAR 2011 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11462 | 0 |
11-JUL-12 | KOCH, DARYL F. | DEPARTMENT OF ENERGY REVISED OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL (WDP-RWMC-12-027) LETTER DATED JULY 3, 2012 | 4025891 | 0 |
09-JUL-12 | FAULK, DENNIS | REVISED OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL | 4022644 | 0 |
01-JUL-12 | NOT SPECIFIED | INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2011 | RPT-1001 | 0 |
30-APR-12 | NOT SPECIFIED | INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS | DOE/ID-11042 | 7 |
19-MAR-12 | HAIN, KATHLEEN E. | TRANSMITTAL OF THE OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT (EDF-10116), REVISION 0 (WDP-RWMC-12-012) | WDP-RWMC-12-012 | 0 |
14-MAR-12 | JOHANSEN, PETE | COMMENTS ON THE OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN (DRAFT), DOE-ID-11337 | IR-25322 | 0 |
06-MAR-12 | SHANKLIN, DEAN E. | OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT | EDF-10116 | 0 |
31-JAN-12 | NOT SPECIFIED | PREFINAL INSPECTION REPORT FOR OPERABLE UNIT 3-14, PHASE I | DOE/ID-11461 | 0 |
31-AUG-11 | NOT SPECIFIED | FISCAL YEAR 2010 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11442 | 1 |
07-FEB-11 | OPALSKI, DANIEL D. | U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE ON THE FIVE-YEAR REVIEW FOR IDAHO NATIONAL LABORATORY FISCAL YEARS 2005-2009 | 4544925 | 0 |
13-JAN-11 | NOT SPECIFIED | INL SITE-WIDE INSTITUTIONAL CONTROLS AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2010 | RPT-759 | 0 |
09-JAN-09 | RENO, SCOTT L. | ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (ICP) | DOE/ID-11293 | 1 |
04-APR-99 | BROSCIOUS, C. | PUBLIC COMMENTS ON ENVIRONMENTAL REMEDIATION AT INEEL IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | 10696 | 00 |
08-FEB-99 | KUEHN, R. M. | PUBLIC COMMENT ON NUCLEAR WASTE CLEANUP AT INEEL - WASTE AREA GROUP 3 (WAG-3) OU 3-13 | 10695 | 00 |
14-OCT-98 | JESSMORE, P. J. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) WINDBLOW AREA - SECTION 9 OF EE/CA FOR OU 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT INEL - INEL-95/0259,VOL.01 | 10543 | 00 |
21-SEP-98 | CHAMBERS, R. | MULTI-AGENCY RADIATION SURVEY & SITE INVESTIGATION MANUAL (MARSSIM) INVESTIGATION FOR CPP-709 RADIONUCLIDES | RC-10-98 | 00 |
29-APR-98 | JENKINS, T. W. | RESPONSE TO RECOMMENDATION ON PROPOSED SOILS REPOSITORY AT INEEL | OPE-ER-73-98 | 00 |
01-DEC-97 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) | DOE/ID-10587 | 05 |
01-AUG-97 | JONES, R. W. | FIELD SAMPLING PLAN (FSP) FOR D&D OF CPP-631 RALA BUILDING & CPP-709 & CPP-734 MONITORING STATIONS AT ICPP | INEEL/EXT-97-00805 | 00 |
08-JUL-97 | FALCONER, K. L. | LISTING CODES APPLICABLE TO DISPOSITION OF INVESTIGATION DERIVED WASTE (IDW) ORIGINATING FROM IDAHO CHEMICAL PROCESSING PLANT (ICPP) | KLF-150-97 | 00 |
01-JUN-97 | JONES, R. K. | LIMITED SCOPE & HAZARD CHARACTERIZATION PLAN FOR SOIL DISTURBANCE CERCLA RADIOLOGICAL CHARACTERIZATION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) - CPP-701 PETROLEUM CONTAMINATED SOIL | INEEL/EXT-97-00677 | 00 |
01-JUN-97 | LABUY, S. A. | HEALTH & SAFETY PLAN (HSP) FOR D&D OF CPP-631, CPP-709 & CPP-734 | INEL-95/0292 | 01 |
23-DEC-96 | JENSEN, N. R. | TRANSMITTAL OF THREE TECHNICAL MEMORANDA ON TECHNOLOGY SCREENING REMEDIAL ACTION (RA) OBJECTIVES AND APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARARS) | OPE-ER-199-96 | 00 |
13-NOV-96 | KENOYER, D. J. | TRANSITION OF RADIOLOGICALLY CONTAMINATED SURPLUS FACILITIES FROM EM-60 TO EM-40 | DJK-09-96-A | 00 |
01-AUG-95 | NOT SPECIFIED | WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) | INEL/95-0056, VOL 02 | 0 |
19-JUN-95 | GREEN, L. A. | TRANSMITTAL OF DRAFT WASTE AREA GROUP 3 (WAG-3) SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (SLERA) | OPE-ER-117-95 | 00 |
01-JUN-95 | LABUY, S. A. | HEALTH & SAFETY PLAN (HSP) FOR DECONTAMINATION AND DECOMMISSIONING (D&D) OF CPP-631, CPP-709 & CPP-734 | INEL-95/0292 | 00 |
23-MAR-95 | GREEN, L. A. | TRANSMITTAL OF VALIDATED DATA FOR PERCHED WATER SAMPLING, DECEMBER 1994 (12/94) AND JANUARY 1995 (01/95) | OPE-ER-052-95 | 00 |
01-MAR-95 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 | INEL-95/0086 | 04 |
09-JAN-95 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) INFORMAL COMMENTS ON DRAFT WASTE AREA GROUP 3 (WAG-3) SATURATED ZONE CONCEPTUAL MODEL | 15044 | 00 |
22-NOV-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON TECHNICAL MEMORANDUM ON THE HYDROGEOLOGY AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 | 15040 | 00 |
28-OCT-94 | JENKINS, T. W. | TRANSMITTAL OF DRAFT TECHNICAL MEMORANDUM ON THE HYDROGEOLOGY AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 17286 | 00 |
30-AUG-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) INFORMAL COMMENTS ON SEDIMENT LAYERING EFFECT ON CONTAMINANT TRANSPORT FOR NONPERCHED UNSATURATED AREAS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 5779 | 00 |
30-AUG-94 | RENO, S. L. | IDHW-DEQ INFORMAL COMMENTS ON TECHNICAL MEMORANDUM ASSESSMENT PORFLOW BOUNDARY CONDITIONS FOR USE IN THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) UNSATURATED ZONE MODEL & ATTACHMENT A CYLINDRICAL COORDINATE OPTION PORFLOW | 5784 | 00 |
10-AUG-94 | MEYER, L. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT AQUIFER CHARACTERISTICS TECHNICAL MEMORANDUM | 5778 | 00 |
15-JUL-94 | BURNS, S. M. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REQUEST FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) STACK EMISSIONS DATA | SMB-05-94 | 00 |
01-MAY-94 | DOE | COMPREHENSIVE WELL SURVEY FOR INEL VOLUME II (VOL.02), REVISION 3 (REV.03) - EXPERIMENTAL BREEDER REACTOR (EBR) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DOE/ID-10402,VOL.02 | 03 |
01-APR-94 | BUGGER, B. | DOE NEWS - ENGINEERS NEW SENSOR SYSTEM WITH ARMS CONTROL, CLEANUP APPLICATIONS | 7595 | 00 |
30-MAR-94 | BUGGER, B. | DOE NEWS - RETECH SIGN AGREEMENT FOR TEST MELT OF CONTAMINATED METAL | 7559 | 00 |
01-FEB-94 | WENZEL, D. R. | RADIOLOGICAL SAFETY ANALYSIS COMPUTER PROGRAM (RSAC-5) USER'S MANUAL | WINCO-1123 | 01 |
15-OCT-93 | BUGGER, B. | DOE NEWS - WINCO PRIVATE VENDOR DEMONSTRATES TECHNOLOGY FOR CLEANER DECONTAMINATION | 6836 | 00 |
05-AUG-93 | COE, M. | DOE NEWS - IDAHO CHEMICAL PROCESSING PLANT (ICPP) TRANSITION PLAN MADE AVAILABLE | 6710 | 00 |
04-AUG-93 | HUESTIS, G. M. | SOIL TREATABILITY STUDY (TS) OF INEL SOILS INCLUDING ICPP SOILS | GMH-01-93 | 00 |
24-JUN-93 | COE, M. | DOE NEWS - DOE COMPLETES ENVIRONMENTAL ASSESSMENT (EA) ON UPGRADING CHEMICAL PLANT TANK FARM | 6548 | 00 |
01-JUN-93 | BUGGER, B. | DOE NEWS - WINCO COORDINATES EFFORT TO RECYLE CONTAMINATED METAL | 6520 | 00 |
01-JUN-93 | SEHLKE, G. | WELL FITNESS EVALUATION FOR INEL, VOLUME 2 (VOL.02) - ICPP | DOE/ID-10392,VOL.02 | 00 |
01-JUN-93 | SEHLKE, G. | WELL FITNESS EVALUATION FOR INEL, VOLUME 3 (VOL.03) - ICPP CONT'D & INEL MIDDLE, NORTH & SOUTH | DOE/ID-10392,VOL.03 | 00 |
08-JAN-93 | RHODES, D. W. | EVALUATION OF RECORDS FOR WASTE GENERATED AT ICPP & DISPOSED AT RWMC DURING THE PERIOD OF 1960 - 1983 | DWR-01-93 | 00 |
26-OCT-92 | STOOPS, T. M. | RECEIPT OF YOUR NOTICE OF DELAY DATED 09/28/92 FOR SUBMISSION OF TRACK 2 SUMMARY REPORT FOR OU 3-07 & 3-08 | 6115 | 00 |
14-JAN-92 | JONES, K. L. | STATE OF IDAHO, REQUEST FOR INFORMATION | KXJ-9-92 | 00 |
18-DEC-91 | EARLE, O. K. | DISPOSITION OF RADIOACTIVELY CONTAMINATED SOIL | 6594 | 00 |
06-NOV-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CFA 713-4, 713-5, 731, 732, 741-7, IRC-1, 01SSW 103, 01SSW 111, 01SSW 104, NRF 503, 511, TAN 783, 792, 707, CPP-SAA 152 & 153 | SGS-464-91 | 00 |
13-OCT-91 | EARLE, O. K. | HIGH LEVEL WASTE TANK FARM REPLACEMENT (HLWTFR) PROJECT USING DEVICES TO LOCATE UNDERGROUND UTILITIES | 6589 | 00 |
10-SEP-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBER: CHEMICAL PROCESSING PLANT (CPP) VES-YDA-106 | SGS-353-91 | 00 |
22-AUG-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBER: CHEMICAL PROCESSING PLANT (CPP) VES-HBF-102 | SGS-334-91 | 00 |
31-JUL-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CHEMICAL PROCESSING PLANT (CPP) VES-UTI-653, VES-UTI-655 & VES-UTI-654 | SGS-289-91 | 00 |
30-MAY-91 | BURNS, T. F. | RESPONSE TO REGULATORY COMMENTS ON CLOSURE PLAN (CP) CPP-59, KEROSENE TANK OVERFLOW | ERD-209-91 | 00 |
21-MAY-91 | BURNS, T. F. | REQUEST FOR EXTENSION OF CPP-59 CLOSURE PLAN (CP) REVISION SCHEDULE | ERD-197-91 | 00 |
25-APR-91 | BERGEMAN, N. L. | INFORMATION REQUEST FOR WELLS IN VICINITY OF TEST REACTOR AREA (TRA), TEST AREA NORTH (TAN) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | SGS-127-91 | 00 |
04-JAN-91 | NOT SPECIFIED | IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP (WAG) ASSESSMENT | 6625 | 00 |
01-JAN-91 | GOLDER ASSOCIATES, INC. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) DRILLING AND SAMPLING PROGRAM AT LAND DISPOSAL UNIT (LDU) CPP-59 | 893-1195.320 | 00 |
01-JAN-91 | GOLDER ASSOCIATES, INC. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) DRILLING AND SAMPLING PROGRAM AT LAND DISPOSAL UNIT (LDU) CPP-64 | 893-1195.330 | 00 |
01-JAN-91 | GOLDER ASSOCIATES, INC. | CHEMICAL PROCESSING PLANT (CPP) DRILLING & SAMPLING PROGRAM AT SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-54 | 893-1195.360 | 00 |
01-JAN-91 | SOLECKI, J. E. | SUBMITTAL OF SUMMARY ANALYTICAL DATA INVESTIGATIONS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | ERD-011-91 | 00 |
08-NOV-90 | EARLE, O. K. | CPP-59 CLOSURE PLAN (CP) SUBMITTAL | AMU-161-90 | 00 |
06-NOV-90 | SOLECKI, J. E. | CLOSURE PLAN (CP) FOR CPP-59 KEROSENE SPILL | 965 | 00 |
25-OCT-90 | ALCALDE, A. | SITE SPECIFIC HEALTH & SAFETY PLAN (HSP) - LAND DISPOSAL UNIT (LDU) CPP-63 | 6656 | 00 |
19-JUL-90 | SOLECKI, J. E. | CLOSURE PLAN (CP) FOR CPP-64 HEXONE SPILL WEST OF CPP-660 | 3077 | 00 |
26-APR-90 | GREEN, L. A. | RESPONSE TO STATE QUESTIONS | 6635 | 00 |
13-MAR-90 | SOLECKI, J. E. | SUPPORTING INFORMATION REQUESTED FOR SUMMARY ASSESSMENTS FOR SOLID WASTE MANAGEMENT UNITS (SWMU'S) | 6036 | 00 |
12-JAN-90 | BLUMBERG, D. J. | SUMMARY ASSESSMENT REVIEW LETTER FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) AND STATE | DJB-09-90 | 00 |
07-NOV-89 | MATULE, A. J. | EPA REGION X REVIEW OF SUMMARY ASSESSMENT CPP-41, CPP-43, CPP-70, CPP-71, CPP-76, AND CPP-77 | 6533 | 00 |
16-OCT-89 | GEARHEARD, M. F. | SUMMARY ASSESSMENT REVIEWS | 3537 | 00 |
22-AUG-89 | SOLECKI, J. E. | REVISION OF CLOSURE PLAN (CP) FOR LAND DISPOSAL UNIT (LDU) CPP-63, HEXONE LEAK NEAR BUILDING CPP-710 FOR REVIEW | 6111 | 00 |
01-NOV-88 | THOMAS, T. R. | MODELING HYPOTHETICAL GROUNDWATER TRANSPORT OF NITRATES, CHROMIUM, & CADMIUM AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) | WINCO-1060 | 00 |
14-SEP-88 | HANSON, N. W. | FINAL REPORT FOR CPP-42 - LOG NO. 8809145 | 6628 | 00 |
05-JAN-88 | FEIGNER, K. D. | REVIEW OF SELECTED SUMMARY ASSESSMENTS | 2494 | 00 |
27-AUG-87 | MANN, L. J. | USGS COMMENTS - CLOSURE PLAN (CP) FOR CPP-63 HEXONE SPILL BY CPP-710 | 2549 | 00 |
27-JUL-87 | HUNTER, B. R. | FINAL REPORT FOR 2ND (SECOND) PECR - LOG NO. 87072729 | 6629 | 00 |
01-JUN-87 | MANN, L. J. | USGS COMMENTS - CLOSURE PLAN (CP) FOR HEXONE SPILL WEST OF CPP-660 | 2560 | 00 |
21-MAY-87 | FEIGNER, K. D. | SUMMARY ASSESSMENT REVIEW | 6497 | 00 |
CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
---|---|---|---|---|
24-OCT-86 | LEE, J. L. | UNUSUAL OCCURRENCE REPORT (UOR) WL-212 CONTAMINATED LIQUID SPILL | WIN-86-0032-CPP | 00 |
22-OCT-86 | LEE, J. L. | UNUSUAL OCCURRENCE REPORT (UOR) INADVERTENT TRANSFER RESULTING IN LOSS OF WASTE SOLUTION | WIN-86-0034-CPP | 00 |
07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP SOIL CONTAMINATION NORTHWEST OF CPP-642 (EAST OF CPP-603) | 6673 | 00 |
07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP CONTAMINATED PAINT CHIPS & PAD SOUTH OF CPP-603 | 6678 | 00 |
07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP GAS STORAGE BUILDING | 6683 | 00 |
02-FEB-86 | NEBEKER, R. L. | SOURCES OF INFORMATION FOR CERCLA STUDY | NEB-3-86 | 00 |
15-JAN-86 | WALLACE, M. T. | HAZARDOUS WASTE STREAMS AT CPP | 7756 | 00 |
09-AUG-85 | SMITH, D. L. | SUMMARY OF RALA D&D STATUS | DLS-31-85 | 00 |
01-JUL-85 | MOSER, C. L. | RALA OFF GAS CELL AND STORAGE TANK (CPP-631 & VES-702) DECONTAMINATION AND DECOMMISSIONING (D&D) PLAN | WINCO-1032 | 00 |
11-APR-85 | NISHIMOTO, D. D. | IDENTIFICATION OF RADIOACTIVE MIXED WASTE STREAMS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DDN-01-85 | 00 |
26-OCT-84 | MESERVEY, R. H. | TRANSMITTAL OF CHEMICAL PROCESSING PLANT 601 (CPP-601) PROCESS CELLS A, B, C, D, & L - D&D FINAL REPORT | RHM-33-84 | 00 |
19-JUL-84 | IKENBERRY, T. A. | RADIOLOGICAL CONTROLS FOR THE DECONTAMINATION OF LOW LEVEL WASTE (LLW) PROJECT EQUIPMENT | TAI-05-84 | 00 |
28-NOV-83 | HICKS, F. E. | DISPOSITION OF STOCKPILED LOW LEVEL CONTAMINATED SOIL EXCAVATED DURING THE LOW LEVEL WASTE (LLW) PROJECT PHASE I AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) - M-K PROJECT S-2258, ICWA 83-49 | MK-83-E-1792 | 00 |
01-MAR-81 | BRADFORD, D. J. | INTERNAL TECHNICAL REPORT - CHEMICAL PROCESSING PLANT 633 (CPP-633) NAK FURNACE CHARACTERIZATION | WM-F1-81-004 | 00 |
01-APR-73 | NICCUM, M. R. | FLOODING POTENTIAL AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 4962 | 00 |
01-JUN-72 | PAIGE, B. E. | BURIED WASTE (BW) LINE REGISTER NATIONAL REACTOR TESTING STATION (NRTS) PART IV CPP | ACI-110 | 00 |
Previous Page | Administrative Record Home Page