CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
27-FEB-18 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I AND PHASE II, PART A INTERIM REMEDIAL ACTION REPORT DOE/ID-11475 1
01-JUN-17 SHANKLIN, DEAN E. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
01-JUN-17 LAWRENCE, SARAH D. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
01-JUN-17 FORBES, JEFFREY R. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JUN-16 FORBES, JEFFREY R. FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11545 0
01-JUN-16 JOLLEY, WENDELL L. FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11545 0
01-JUL-15 NOT SPECIFIED FISCAL YEAR 2014 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11526 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
01-JUN-14 NOT SPECIFIED FISCAL YEAR 2013 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11500 0
01-JUN-13 NOT SPECIFIED FISCAL YEAR 2012 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11476 0
01-MAR-13 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I, INTERIM REMEDIAL ACTION REPORT DOE/ID-11475 0
09-JAN-09 RENO, SCOTT L. ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (ICP) DOE/ID-11293 1
02-JUN-08 SHANNON L. ANSLEY INTEC GROUNDWATER MONITORING REPORT (2007) DOE/ID-11356 1
02-JUN-08 JEFFREY R. FORBES INTEC GROUNDWATER MONITORING REPORT (2007) DOE/ID-11356 1
03-OCT-07 FORSYTHE, H. S. MONITORING REPORT/DECISION SUMMARY FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER DOE/ID-11326 00
22-MAY-07 MCMANAMON, L. E. ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 03
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
31-OCT-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 02
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
09-AUG-06 CAHN, L. S. METHODS TO REDUCE WATER INFILTRATION AND RECHARGE OF THE NORTHERN SHALLOW PERCHED WATER ZONE AT IDAHO NUCLEAR TECHNOLOGIES AND ENGINEERING CENTER (INTEC) EDF-6868 00
13-JUL-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 01
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
31-MAY-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 00
13-JAN-06 FORBES, J. R. ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER MONITORING REPORT FOR GROUP 4 - PERCHED WATER (2005) DOE/ID-11259 00
14-NOV-05 FORBES, J. R. LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER DOE/ID-10746 02
02-NOV-05 VARVEL, M. D. IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER BALANCE REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER DOE/ID-11248 00
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
19-MAY-05 RODDY, M. S. ENGINEERING DESIGN FILE (EDF) - GEOCHEMICAL STUDY FOR PERCHED WATER SOURCE IDENTIFICATION AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) EDF-5758 00
07-APR-05 FORBES, J. R. IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 2005 MONITORING WELL INSTALLATION PLAN DOE/NE-ID-11207 01
12-JAN-05 FORBES, J. R. IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 2005 MONITORING WELL INSTALLATION PLAN - APPENDIX P TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/NE-ID-11207 00
06-JAN-05 RICE, R. S. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER - APPENDIX F TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10749 03
06-JAN-05 FORBES, J. R. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER WELL INSTALLATION DOE/ID-10774 03
21-DEC-04 MCMANAMON, L. E. HEALTH AND SAFETY PLAN (HSP OF HASP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER PROJECT - APPENDIX H TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) INEEL/EXT-2000-00257 02
17-DEC-04 FORBES, J. R. ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER MONITORING REPORT FOR GROUP 4 - PERCHED WATER (2004) DOE/NE-ID-11192 00
03-NOV-04 VERWOLF, M. C. RESPONSE TO SEPTEMBER 23, 2004 (09/23/04) LETTER REGARDING OPERABLE UNIT (OU) 3-13 GROUP 4 TC-99 INVESTIGATION AND OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FMDP-FFA/CO-04-053 00
12-OCT-04 VERWOLF, M. C. RESPONSE TO STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY'S (DEQ) LETTER CONCERNING IODINE-129 GROUNDWATER AND SOIL RESULTS LIMITATIONS AND VALIDATION (L&V) REPORTS, DATED OCTOBER 1, 2004 FMDP-FFA/CO-04-036 00
28-SEP-04 FORBES, J. R. EVALUATION OF TC-99 IN GROUNDWATER AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC): SUMMARY OF PHASE I (PHASE 1) RESULTS ICP/EXT-04-00244 00
01-APR-04 HALL, R. C. TRANSMITTAL OF DRAFT EVALUATION OF TC-99 IN GROUNDWATER AT INTEC - SUMMARY OF PHASE I RESULTS EM-ER-04-077 00
25-FEB-04 AR COORDINATOR OPERABLE UNIT (OU) 3-13 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-13 - INCLUDES EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) DOCUMENT ID #DOE/ID-11109 AR.INDEX.OU.3-13 01
10-FEB-04 GIANOTTO, D. F. LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER - APPENDIX E TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10746 01
09-FEB-04 HALL, R. C. SUBMITTAL OF REVISED LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER (2004) REVISION 1 (REV.01) EM-ER-04-031 00
23-DEC-03 VARVEL, M. D. IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER SYSTEM ENGINEERING STUDY DOE/ID-11115 00
18-DEC-03 HALL, R. C. DECEMBER 9, 2003 (12/09/03) AGENCY MEETING MINUTES - DECISIONS FROM ENVIRONMENTAL PROTECTION AGENCY (EPA), IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AND DEPARTMENT OF ENERGY (DOE) ON WASTE AREA GROUP 3 (WAG-3) ISSUES EM-ER-03-315 00
03-DEC-03 RODDY, M. S. ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER MONITORING REPORT FOR GROUP 4 - PERCHED WATER (2003) DOE/ID-11117 00
06-NOV-03 NEHER, E. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION DOE/ID-10774 02
23-OCT-03 FORSYTHE, H. S. SUPPLEMENTAL WORK PLAN FOR TC-99 EVALUATION IN GROUNDWATER, WASTE AREA GROUP 3 (WAG-3) GROUP 4 PERCHED WATER - APPENDIX O TO DOE/ID-10774, REVISION 2 (REV.02) AND REVISION 3 (REV.03) ICP/EXT-03-00029 00
30-SEP-03 GIANOTTO, D. F. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER - THIS DOCUMENT IS APPENDIX F TO DOE/ID-10774, REV.01 & REV.02 DOE/ID-10749 02
29-SEP-03 GIANOTTO, D. F. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION DOE/ID-10774 01
09-SEP-03 RODDY, M. S. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, GEOCHEMICAL STUDY FOR PERCHED WATER SOURCE IDENTIFICATION - APPENDIX N TO DOE/ID-10774, REVISION 1 (REV.01), REVISION 2 (REV.02), AND REVISION 3 (REV.03) DOE/ID-11100 00
01-JUN-03 NOT SPECIFIED PHASE 1 MONITORING WELL AND TRACER STUDY REPORT FOR OPERABLE UNIT 3-13, GROUP 4, PERCHED WATER DOE/ID-10967 (PART 1) 1
01-JUN-03 NOT SPECIFIED PHASE I MONITORING WELL AND TRACER STUDY REPORT FOR OPERABLE UNIT 3-13, GROUP 4, PERCHED WATER DOE/ID-10967 (PART 2) 1
01-JUN-03 NOT SPECIFIED PHASE I MONITORING WELL AND TRACER STUDY REPORT FOR OPERABLE UNIT 3-13, GROUP 4, PERCHED WATER DOE/ID-10967 (PART 3) 1
29-APR-03 HALL, R. C. DOCUMENTATION OF AGREEMENT TO DEFER INSTALLATION OF THE OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER PHASE II WELLS EM-ER-03-120 00
01-FEB-03 GIANOTTO, D. F. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER WELL INSTALLATION - APPENDIX B TO DOE/ID-10774, REVISION 2 (REV.02) AND DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10745 02
14-JAN-03 TUOTT, L. C. INSTITUTIONAL CONTROL PLAN FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13 DOE/ID-10729 03
14-JAN-03 TUOTT, L. C. THE 2002 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-11033 00
19-DEC-02 HALL, R. C. TRANSMITTAL OF FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION - REVISION 1 (REV.01), WASTE MANAGEMENT PLAN (WMP), REVISION 1 (REV.01) AND HEALTH & SAFETY PLAN (HSP OR HASP), REVISION 1 (REV.01) EM-ER-02-214 00
17-DEC-02 GIANOTTO, D. F. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER WELL INSTALLATION DOE/ID-10745 01
17-DEC-02 FORSYTHE, H. S. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER DOE/ID-10749 01
17-DEC-02 MCMANAMON, L. E. HEALTH AND SAFETY PLAN (HSP OF HASP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER PROJECT - THIS DOCUMENT IS APPENDIX H TO DOE/ID-10774, REV.01 & REV.02 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 PERCHED WATER SYSTEM INEEL/EXT-2000-00257 01
01-OCT-02 TUOTT, L. C. INSTITUTIONAL CONTROL PLAN FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13 DOE/ID-10729 02
06-MAY-02 FORSYTHE, H. S. PHASE I MONITORING WELL AND TRACER STUDY REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER DOE/ID-10967 00
18-APR-02 HAIN, K. E. TRANSMITTAL OF FINAL PHASE I MONITORING WELL AND TRACER STUDY REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 4 PERCHED WATER EM-ER-02-063 00
19-JUL-01 COLLINS, R. L. TRANSMITTAL OF THE 2001 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13, REVISION 1 (REV.01) - DOE/ID-10883 EM-ER-01-124 00
01-JUL-01 TUOTT, L. C. THE 2001 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-10883 01
20-SEP-00 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV DOE/ID-10587 06
20-SEP-00 ROBERTS, C. J. HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER PROJECT - THIS DOCUMENT IS APPENDIX H TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 INEEL/EXT-2000-00257 00
01-SEP-00 ROBERTS, C. J. FIELD SAMPLING PLAN (FSP) FOR OU 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION - THIS DOCUMENT IS APPENDIX B TO DOE/ID-10774, REV.00 & REV.01 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 DOE/ID-10745 00
01-SEP-00 ROBERTS, C. J. LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER - THIS DOCUMENT IS APPENDIX E TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 4 DOE/ID-10746 00
01-SEP-00 ROBERTS, C. J. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER -THIS DOCUMENT IS A PART OF APPENDIX F TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 DOE/ID-10749 00
01-SEP-00 ROBERTS, C. J. TRACER TEST PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER - APPENDIX D TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 0 (REV.00), REVISION 1 (REV.01), REVISION 2 (REV.02), AND REVISION 3 (REV.03) DOE/ID-10762 00
01-SEP-00 ROBERTS, C. J. DATA MANAGEMENT PLAN (DMP) FOR FIELD AND NONCHEMICAL DATA FROM OU 3-13 GROUP 4 AND GROUP 5, WELL INSTALLATION AND MONITORING PROJECTS - APPENDIX D TO MSIP FOR OU 3-13 GROUP 5 SRPA, DOE/ID-10782, REV.01 & REV.02 & APPENDIX J TO GROUP 4 MSIP, DOE/ID-10 DOE/ID-10768 00
01-SEP-00 ROBERTS, C. J. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION DOE/ID-10774 00
01-SEP-00 FRENCH, P. S. WASTE MANAGEMENT PLAN (WMP) FOR STAGING & STORAGE ANNEX (SSA) - THIS DOCUMENT IS A PART OF APPENDIX F TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 DOE/ID-10800 00
17-MAY-00 HAIN, K. E. TRANSMITTAL OF FINAL INITIAL INSTITUTIONAL CONTROL MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 EM-ER-90-00 00
01-MAY-00 FRENCH, P. S. INITIAL INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-10751 00
14-OCT-99 AR COORDINATOR OPERABLE UNIT (OU) 3-13 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-13 AR.INDEX.OU.3-13 00
07-OCT-99 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) INVOLVEMENT IN DEVELOPMENT AND REVIEW OF THE RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13, INTEC - CONTINGENT UPON SPECIFIED REGULATORY STANDARDS IDEQ IS SIGNATORY TO THE ROD WITH DOE AND EPA 24797 00
07-OCT-99 DOE FINAL RECORD OF DECISION (ROD) IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 DOE/ID-10660 00
09-SEP-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) 18078 00
30-AUG-99 HAIN, K. E. TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) INEEL OPE-ER-119-99 00
10-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 3-07 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-07 AR.INDEX.OU.3-07 00
05-AUG-99 PIERRE, W. REVIEW OF DRAFT FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT OU 3-13, IDAHO CHEMICAL PROCESSING PLANT (ICPP) - EPA COMMENTS ATTACHED 10683 00
04-AUG-99 KOCH, D. F. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - DOE/ID-10660 10682 00
20-JUL-99 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-99-99 00
14-MAY-99 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT RECORD OF DECISION (ROD) OPERABLE UNIT (OU) 3-13 IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) - DOE/ID-10660 10681 00
31-MAR-99 JENKINS, T. W. RESPONSE TO RECOMMENDATION ON PROPOSED PLAN FOR REMEDIAL ACTION (RA) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) OPE-ER-48-99 00
29-MAR-99 JENKINS, T. W. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-44-99 00
01-MAR-99 IDHW IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 10679 00
22-FEB-99 RICHARDSON, B. RESPONSE TO HELEN CHENOWETH'S DECEMBER 18, 1998 (12/18/98) LETTER - PUBLIC COMMENT PERIOD ON PROPOSED PLAN FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) EXTENDED 18081 00
17-FEB-99 JENKINS, T. W. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-28-99 00
09-FEB-99 CRAPO, M. PUBLIC COMMENTS ON RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10693 00
01-FEB-99 OWENDOFF, J. M. RESPONSE TO CONGRESSWOMAN HELEN CHENOWETH'S DECEMBER 18, 1998 (12/18/98) REQUEST FOR EXTENSION OF PUBLIC COMMENT PERIOD ON PROPOSED PLAN FOR CLEANUP OF INEEL WASTE AREA GROUP 3 (WAG-3) IDAHO NUCLEAR TECHNNOLOGY AND ENGINEERING CENTER (INTEC) 18080 00
11-JAN-99 INEEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY - COMMENT PERIOD EXTENDED ON PROPOSED CLEANUP PLAN FOR IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) 16878 00
22-DEC-98 STEWART, M. M. PUBLIC COMMENTS ON CLEANUP PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEEL 10701 00
22-DEC-98 HENSEL, D. PUBLIC COMMENTS ON CHEMICAL PLANT CLEANUP FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10702 00
22-DEC-98 BOBO, R. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10703 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
22-DEC-98 BRAILSFORD, B. PUBLIC COMMENTS - SNAKE RIVER ALLIANCE ON PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEEL 10704 00
22-DEC-98 MCCARTHY, J. M. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10705 00
21-DEC-98 COPERFIELD, C. PUBLIC COMMENTS ON PROPOSED PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10700 00
18-DEC-98 LEMLEY, J. K. PUBLIC COMMENTS ON PROPOSED CLEANUP PLAN FOR INEEL CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10691 00
18-DEC-98 CHENOWETH, H. CONCERN OVER DEPARTMENT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) ICPP & TO REQUEST PERSONAL ATTENTION IN REDIRECTING CRITICAL ASPECTS OF EFFORT - REQUEST PUBLIC COMMENT PERIOD BE EXTENDED FOR THIRTY (30) DAYS 18079 00
17-DEC-98 CHRISTINNA PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10684 00
15-DEC-98 VANHORN, R. L. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10686 00
01-DEC-98 COMMANDER, J. PUBLIC COMMENTS ON IDAHO CHEMICAL PROCESSING PLANT (ICPP) PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10690 00
19-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - MOSCOW, IDAHO - NOVEMBER 19, 1998 (11/19/98) 10678 00
19-NOV-98 BROSCIOUS, C. PUBLIC COMMENTS ON DEPARTMENT OF ENERGY (DOE) INEEL IDAHO CHEMICAL PROCESSING PLANT (ICPP) PROPOSED CLEANUP PLAN OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10699 00
18-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - BOISE, IDAHO - NOVEMBER 18, 1998 (11/18/98) 10677 00
18-NOV-98 CITIZENS ADVISORY BOARD PUBLIC COMMENTS - CITIZENS ADVISORY BOARD (CAB) FOR PROPOSED PLAN FOR REMEDIAL ACTION (RA) AT OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) ICPP 10706 00
16-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - IDAHO FALLS, IDAHO - NOVEMBER 16, 1998 (11/16/98) 10675 00
16-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - IDAHO FALLS, IDAHO - NOVEMBER 17, 1998 (11/17/98) 10676 00
31-OCT-98 ANSLEY, S. L. PUBLIC COMMENTS ON REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10687 00
27-OCT-98 RANDOLPH, P. PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 10689 00
22-OCT-98 INEEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY - MEETINGS SCHEDULED ON CLEANUP OF IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 10545 00
14-OCT-98 JENKINS, T. W. TRANSMITTAL OF FINAL PROPOSED PLAN, REVISION 6 (REV.06) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-159-98 00
14-OCT-98 JENKINS, T. W. TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B, FEASIBILITY STUDY (FS) SUPPLEMENT REPORT REVISION 2 (REV.02) OPE-ER-160-98 00
01-OCT-98 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL 10542 00
01-OCT-98 GREENWELL, R. D. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT, VOLUME 1 (VOL.01) OF 2 DOE/ID-10619,VOL.01 02
01-OCT-98 GREENWELL, R. D. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT, VOLUME 2 (VOL.02) OF 2 DOE/ID-10619,VOL.02 02
15-SEP-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 5 (REV.05) FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-148-98 00
17-AUG-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 4 (REV.04) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) OPE-ER-133-98 00
14-AUG-98 TAYLOR, A. E. PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10688 00
14-AUG-98 BROSCIOUS, C. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10698 00
05-AUG-98 ROSE, K. A. RESPONSE TO RECOMMENDATIONS FROM THE NATIONAL REMEDY REVIEW BOARD (NRRB) ON THE PROPOSED REMEDY FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 14842 00
14-JUL-98 BROSCIOUS, C. PUBLIC COMMENTS ON DRAFT CLEANUP PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10697 00
22-JUN-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 3 (REV.03) FOR WASTE AREA GROUP 3 (WAG-3) - IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-104-98 00
27-MAY-98 NYGARD, D. IDHW CONCURRENCE WITH ENFORCEABLE SCHEDULE EXTENSION FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) 10446 00
27-MAY-98 PIERRE, W. EPA CONCURRENCE ON REQUEST FOR EXTENSION OF ENFORCEABLE MILESTONE FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) 10447 00
15-MAY-98 JENKINS, T. W. REQUEST FOR EXTENSION OF OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) & RELATED DOCUMENTS OPE-ER-67-98 00
14-MAY-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 2 (REV.02) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL; PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-78-98 00
17-APR-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN REVISION 1 (REV.01) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-68-98 00
26-MAR-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT 16293 00
06-MAR-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) 16292 00
13-FEB-98 HAIN, K. E. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-28-98 00
09-JAN-98 RENO, S. L. IDHW-DEQ INFORMAL COMMENTS ON WORKING DRAFT OF PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) ICPP, JANUARY 5, 1998 (01/05/98) 15059 00
05-JAN-98 DEPPERSCHMIDT, J. D. TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL AND DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) - OPE-ER&SA-98-002 OPE-ER/SA-98-002 00
30-DEC-97 ROSE, K. A. REQUEST FOR 20 DAY EXTENSION OF COMMENT PERIOD ON DRAFT PROPOSED PLAN FOR ICPP AT INEEL 15057 00
04-DEC-97 JENKINS, T. W. TRANSMITTAL OF DRAFT PROPOSED PLAN FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL OPE-ER-261-97 00
14-NOV-97 ROBISON, S. A. DOE-HQ APPROVAL AND COMMENTS ON DRAFT PROPOSED PLAN FOR REMEDIATION OF INEEL WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13, ICPP COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY( RI/FS) 15054 00
01-NOV-97 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - COMPREHENSIVE INVESTIGATION IDENTIFIES EXTENT OF CONTAMINATION WITHIN WASTE AREA GROUP 3 (WAG-3) FOR INTEC (FORMERLY ICPP) OPERABLE UNIT (OU) 3-13 14841 00
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 RODRIGUEZ, R. R COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 RODRIGUEZ, R. R COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 RODRIGUEZ, R. R COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL DOE/ID-10534,BINDER-01 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 - APPENDIX A THROUGH APPENDIX F - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL DOE/ID-10534,BINDER-02 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 - APPENDIX G THROUGH APPENDIX N - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL DOE/ID-10534,BINDER-03 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART B ; FEASIBILITY STUDY (FS) REPORT - BINDER 1 OF 2 - (SEE DOE/ID-10534,BINDER-01 & DOE/ID-10534,BINDER-02 DOE/ID-10534,BINDER-03 FOR PART A) - FINAL DOE/ID-10572,BINDER-01 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART B FEASIBILITY STUDY (FS) REPORT BINDER 2 OF 2 APPENDIX C THROUGH I (SEE DOE/ID-10534,BINDER-01 & DOE/ID-10534,BINDER-02 DOE/ID-10534,BINDER-03 FOR PART A) - FINAL DOE/ID-10572,BINDER-02 00
12-SEP-97 ORLEAN, H. ADDITIONAL ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 15053 00
03-SEP-97 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OU 3-13 AT INEEL (DRAFT) JUNE 1997 (06/97) 15051 00
13-AUG-97 ORLEAN, H. EPA COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL 10429 00
11-AUG-97 RENO, S. L. IDHW-DEQ EXTENSION OF REVIEW PERIOD ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL - DOE/ID-10572 JUNE 1997 (06/97) 10430 00
20-MAR-97 GREENWELL, R. D. WASTE AREA GROUP 3 (WAG-3) CORE SAMPLES RDG-03-97 00
17-DEC-96 JINES, A. RESPONSE TO COMMENTS FOR WASTE AREA GROUP 3 (WAG-3) DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT- PART A OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT OPE-ER-196-96 00
13-NOV-96 JENKINS, T. W. TWENTY (20) DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL - PART A - REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT FINAL) OPE-ER-173-96 00
08-OCT-96 RENO, S. L. IDHW COMMENTS ON COMPREHENSIVE RI/FS FOR ICPP OU 3-13 AT INEL - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) - DRAFT DOE/ID-10534 12996 00
04-OCT-96 ORLEAN, H. EPA COMMENTS ON DRAFT COMPREHENSIVE RI/FS FOR ICPP OU 3-13 - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) - REPORT 12995 00
29-AUG-96 RENO, S. L. IDHW REQUEST FOR EXTENSION OF REVIEW PERIOD ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT) - (OPE-ER-122-96) 10298 00
05-AUG-96 JENSEN, N. R. DOE TRANSMITTAL OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL PART A REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT) OPE-ER-122-96 00
05-DEC-95 GREEN, L. A. VALIDATED ANALYTICAL SAMPLING DATA FOR ICPP PERCHED WATER WELLS, SNAKE RIVER PLAIN AQUIFER (SRPA) WELLS, USGS-47 VERTICAL CONTAMINANT PROFILING AND SOIL SAMPLES CONDUCTED WASTE AREA GROUP (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY OPE-ER-95-222 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
23-OCT-95 JENKINS, T. W. DISPOSAL OF DRILL CUTTINGS FOR MONITORING WELL 18 (MW-18) 18017 00
01-AUG-95 LITCO SAMPLING AND ANALYSIS PLAN (SAP) FOR WAG-3 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (FINAL) INEL-95/0137 00
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) INEL/95-0056, VOL 02 0
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, VOLUME I (VOL.01) INEL/95-0056, VOL. 01 0
05-JUL-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-127-95 00
05-JUN-95 GREEN, L. A. EXTENSION OF COMMENT RESOLUTION PERIOD ON WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-102-95 00
01-MAY-95 RENO, S. L. IDHW-DEQ COMMENTS ON WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) 18023 00
17-FEB-95 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW AND COMMENT PERIOD FOR DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INEL-95/0137 15045 00
01-NOV-94 RENO, S. L. IDHW COMMENTS ON DRAFT TECHNICAL MEMORANDUM, WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) METHODOLOGY OPERABLE UNIT (OU) 3-13 SEPTEMBER 28, 1994 (09/28/94) 15034 00
26-OCT-94 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT - ACTION DETERMINATION FOR OU 3-07 TANK FARM AREA, CPP-16, CPP-20, CPP-24, CPP-25, CPP-30 CPP-32E NO FURTHER ACTION DETERMINATION - CPP-26, CPP-28, CPP-31, CPP-32W, CPP-79 AND CPP-83 SHOULD BE INCLUDED IN WAG-3 COMPREHENSIV 5809 00
21-OCT-94 GREEN, L. A. TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-283-94 00
19-OCT-94 JONES, E. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL WASTE AREA GROUP 3 (WAG-3) TECHNICAL WORK PLAN FOR PERCHED WATER PUMPING AND TRACER TESTS 15038 00
18-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) PERCHED GROUNDWATER PUMPING AND TRACER TEST, SEPTEMBER 16, 1994 (09/16/94) 15037 00
14-OCT-94 WINCO FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5791 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW) WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY (RI/FS) 15035 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW), WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5785 00
10-AUG-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5782 00
08-AUG-94 MEYER, L. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5783 00
09-MAR-94 ROSENBERGER, M. S. IDHW-DEQ REVIEW OF DRAFT FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP (WAG-3) NORTH AREA REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPERABLE UNIT (OU) 3-08A - COMMENTS INCLUDED 18040 00
18-FEB-94 LYLE, J. L. TRANSMITTAL OF DRAFT FINAL SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 3-08A IDAHO CHEMICAL PROCESSING PLANT (ICPP) NORTH AREA REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-047-94 00
19-JAN-94 STOOPS, T. M. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW OF DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-08A IDAHO CHEMICAL PROCESSING PLANT (ICPP) - COMMENTS INCLUDED 18041 00
07-JAN-94 LIVERMAN, E. EPA REVIEW COMMENTS ON DRAFT SCOPE OF WORK (SOW) FOR THE ICPP NORTH AREA REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5612 00
15-NOV-93 LYLE, J. L. TRANSMITTAL OF DRAFT SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 3-08A IDAHO CHEMICAL PROCESSING PLANT (ICPP) NORTH AREA REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-035-93 00
08-MAY-93 WINCO TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-07, TANK FARM AREA I, REVISION 2 (REV.02) 5764 00
24-FEB-93 MARTY, R. C. VALIDATION OF ORGANOCHLORINE HERBICIDE DATA FOURTH (4TH) QUARTER 1992 GROUNDWATER SAMPLING EFFORT AT WESTINGHOUSE IDAHO CHEMICAL PROCESSING PLANT (ICPP): SAMPLE DELIVERY GROUP (SDG) #GW00801W4 4GW00101W4 4GW00201W4 4GW01001W4 RM-06-93-A 00
26-OCT-92 STOOPS, T. M. RECEIPT OF YOUR NOTICE OF DELAY DATED 09/28/92 FOR SUBMISSION OF TRACK 2 SUMMARY REPORT FOR OU 3-07 & 3-08 6115 00
22-OCT-92 DOORNBOS, M. H. EVALUATION OF A UNIDIRECTIONAL GAMMA DETECTOR FOR OPERABLE UNIT (OU) 3-07 6614 00
31-JUL-92 LYLE, J. L. TRANSMITTAL OF CLOSURE ADDENDUM FOR SAMPLING AND ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-07 AND 3-08 (TANK FARM II & III RESPECTIVELY) AND WASTE AREA GROUP 3 (WAG-3) QUALITY ASSURANCE PROJECT PLAN (QAPJP) AM/ERWM-RPO-173-92 00
10-JUL-92 LYLE, J. L. MODIFICATIONS TO OPERABLE UNIT (OU) 3-07 TANK FARM SAMPLING & ANALYSIS PLAN (SAP) AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 AM/ERWM-RPO-154-92 00
08-JUN-92 MALIK, L. E. REPORT ON PRELIMINARY REVIEW OF IMPACT ON TANK FARM DUE TO CHARACTERIZATION ACTIVITIES 6622 00
24-APR-92 LYLE, J. L. TRANSMITTAL OF THE ADDENDUM FOR THE RESPONSE TO EPA AND IDHW COMMENTS FOR THE DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-07 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 RPO-091-92 00
02-MAR-92 LYLE, J. L. TRANSMITTAL OF THE SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-07 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 RPO-047-92 00
28-FEB-92 WINCO SEE OKE-75-92 FOR MODIFICATIONS - DRAFT IDAHO CHEMICAL PROCESSING PLANT (ICPP) SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-07 TANK FARM AREA 4413 00
01-JAN-92 MOTAZED, B. PORTABLE PIPE MAPPER (PPM) FIELD TEST AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 6623 00
17-DEC-91 EARLE, O. K. SCOPE OF WORK FOR THE TRACK 2 STUDY OF OU 3-07: TANK FARM 1 5274 00
02-DEC-91 JOSTEN, N. E. FINAL REPORT ON ROBOTIC GEOPHYSICAL SURVEY NEJ-28-91 00
29-OCT-91 MASCARENAS, C. S. SITES WITHIN OPERABLE UNIT (OU) 3-07 6596 00
18-OCT-91 MEJIA, C. REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07 TANK FARM 6590 00
18-OCT-91 MEJIA, C. REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07, TANK FARM 6591 00
18-OCT-91 MEJIA, C. REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07, TANK FARM 6592 00
09-MAY-91 LYLE, J. L. RESPONSE TO INFORMATION REQUESTED BY MR. WALKER HOWELL REGARDING SAMPLING DATA FOR CPP-55-06 SAMPLING & ANALYSIS DATA PACKAGE ERD-161-91 00
06-DEC-90 EARLE, O. K. STRONTIUM-90 IN BOREHOLE CPP-55-06 OKE-21-90 00
19-NOV-90 EARLE, O. K. STRONTIUM-90 IN BOREHOLE CPP-55-06 OKE-18-90 00