10-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 3-02 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR CHEMICAL PROCESSING PLANT (CPP) OU 3-02 AR.INDEX.OU.3-02 00
25-NOV-97 HAIN, K. E. TRANSMITTAL OF VALIDATED ANALYTICAL SAMPLING DATA FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS NON TIME CRITICAL REMOVAL ACTION (NTCRA) OPE-ER-254-97 00
24-JUN-97 JENSEN, N. R. TRANSMITTAL OF ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP OPE-ER-102-97 00
12-JUN-97 JENSEN, N. R. TRANSMITTAL OF FIELD SAMPLING PLAN (FSP) AND REMOVAL ACTION PLAN FOR ICPP RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION OPE-ER-91-97 00
01-JUN-97 FRANCIS, C. S. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHENMICAL PROCESSING PLANT (ICPP) DOE/ID-10568 01
01-JUN-97 CRAM, A. J. REMOVAL ACTION PLAN FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION INEL/EXT-97-00116 00
01-MAY-97 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION DOE/ID-10579 00
01-MAY-97 PARSONS ACTION MEMORANDUM FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION - RESPONSE TO PUBLIC COMMENTS ON THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) INCLUDED AS ATTACHMENT DOE/ID-10588 00
01-MAY-97 ARROWOOD, J. R. HEALTH & SAFETY PLAN (HSP OR HASP) FOR ICPP RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION INEL/EXT-97-00132 01
27-MAR-97 RENO, S. L. IDHW-DEQ COMMENTS ON ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP - DOE/ID-10568 FEBRUARY 1997 (02/97) 14351 00
28-FEB-97 JENSEN, N. R. TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPE-ER-29-97 00
01-FEB-97 NOT SPECIFIED APPROVAL MEMORANDUM FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION 10315 00
01-FEB-97 FRANCIS, C. S. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) DOE/ID-10568 00
30-JAN-97 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION ENGINEERING EVALUATION COST ANALYSIS (EE/CA) 18071 00
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) INEL/95-0056, VOL 02 0
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, VOLUME I (VOL.01) INEL/95-0056, VOL. 01 0
05-JUL-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-127-95 00
05-JUN-95 GREEN, L. A. EXTENSION OF COMMENT RESOLUTION PERIOD ON WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-102-95 00
01-MAY-95 RENO, S. L. IDHW-DEQ COMMENTS ON WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) 18023 00
26-OCT-94 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT - ACTION DETERMINATION FOR OU 3-02 SITES - CPP-23 & CPP-37 SHOULD BE INCLUDED IN WAG-3 OPERABLE UNIT (OU) 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AND NO FURTHER ACTION DETERMINATION FOR CPP-59 5806 00
21-OCT-94 GREEN, L. A. TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-283-94 00
14-OCT-94 WINCO FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5791 00
12-OCT-94 MEYER, L. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 3-02 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 10033 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW) WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY (RI/FS) 15035 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW), WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5785 00
10-AUG-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5782 00
08-AUG-94 MEYER, L. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5783 00
05-AUG-94 WINCO TRACK 2 SUMMARY REPORT FOR CPP-23 CPP INJECTION WELL: CPP-37 GRAVEL PIT 1 & PIT 2 & CPP-59 KEROSENE TANK OVERFLOW WEST OF CPP-633, REV.02 5804 00
05-AUG-94 WINCO TRACK 2 SUMMARY REPORT REFERENCES FOR CPP-23 CPP INJECTION WELL; CPP-37 GRAVEL PIT 1 & PIT 2; & CPP-59 KEROSENE TANK OVERFLOW EAST OF CPP-633, REV.02 5805 00
05-JUL-94 MEYER, L. EPA COMMENTS ON THE DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT, OU 3-02 5807 00
01-JUL-94 RENO, S. L. IDHW-DEQ COMMENTS, DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT, OU 3-02 IDAHO CHEMICAL PROCESSING PLANT (ICPP) 5808 00
04-JAN-93 WINCO TRACK 1 DECISION DOCUMENTATION PACKAGE - INVESTIGATION OF CPP-59 - ACTION DETERMINATION PROCEED TO TRACK 2 SCOPING 5344 00
30-MAY-91 BURNS, T. F. RESPONSE TO REGULATORY COMMENTS ON CLOSURE PLAN (CP) CPP-59, KEROSENE TANK OVERFLOW ERD-209-91 00
21-MAY-91 BURNS, T. F. REQUEST FOR EXTENSION OF CPP-59 CLOSURE PLAN (CP) REVISION SCHEDULE ERD-197-91 00
28-MAR-91 BURNS, T. F. CHARACTERIZATION DATA & OTHER INFORMATION REGARDING COCA UNITS CPP-39, CPP-51, CPP-54, CPP-59, & CPP-64 ERD-105-91 00
14-MAR-91 BURNS, T. F. NOTIFICATION OF MODIFICATION OF PART A PERMIT FOR INEL - SUMMARY OF IDAHO CHEMICAL PROCESSING PLANT (ICPP) LAND DISPOSAL RESTRICTIONS (LDR) RECLASSIFICATIONS ERD-075-91 00
04-FEB-91 EARLE, O. K. REVISED LAND DISPOSAL UNITS (LDU) QUESTIONNAIRES OKE-13-91 00
01-JAN-91 GOLDER ASSOCIATES, INC. IDAHO CHEMICAL PROCESSING PLANT (ICPP) DRILLING AND SAMPLING PROGRAM AT LAND DISPOSAL UNIT (LDU) CPP-59 893-1195.320 00
01-JAN-91 SOLECKI, J. E. SUBMITTAL OF SUMMARY ANALYTICAL DATA INVESTIGATIONS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) ERD-011-91 00
08-NOV-90 EARLE, O. K. CPP-59 CLOSURE PLAN (CP) SUBMITTAL AMU-161-90 00
06-NOV-90 SOLECKI, J. E. CLOSURE PLAN (CP) FOR CPP-59 KEROSENE SPILL 965 00
03-AUG-90 GEARHEARD, M. F. INEL REQUEST FOR EXTENSION FOR CLOSURE PLANS (CP) FOR COCA UNITS CPP-64, CPP-59, AND CPP-39 905 00
11-JAN-90 SOLECKI, J. E. DETAILED SCHEDULES FOR PREPARATION OF CLOSURE PLANS (CP) FOR COCA WASTE MANAGEMENT UNITS 8206 00
22-DEC-89 BLUMBERG, D. J. STATUS REPORT FOR DECEMBER 1989 (12/89) CLOSURE PLAN (CP) PREPARATION KHK-147-89 00
15-NOV-89 SOLECKI, J. E. RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM EPA & STATE 10986 00
09-NOV-89 BLUMBERG, D. J. RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) AND STATE DJB-40-89 00
26-OCT-89 KOSHUTA, C. R. NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL - EPA AND IDHW REVIEWED DOE'S REVISED CLOSURE PLAN SCHEDULE AND FEEL THE SCHEDULE IS DEFICIENT 6709 00
29-SEP-89 SOLECKI, J. E. REVISED CLOSURE PLAN (CP) SCHEDULE FOR EIGHT (8) LDU'S FOR EG&G AND THREE (3) LDU'S FOR WINCO 10110 00
01-SEP-89 SOLECKI, J. E. REVISED CLOSURE PLAN (CP) APPROACH FOR LAND DISPOSAL UNITS (LDU) 8472 00
08-JUL-87 WINCO INITIAL ASSESSMENT - KEROSENE TANK OVERFLOW OF CPP-633 5423 00
18-NOV-86 GEARHEARD, M. F. NOTICE OF DEFICIENCIES (NOD) FOR SIXTEEN (16) INEL CLOSURE PLANS (CP) - CONTAINS ONLY CLOSURE PLAN REVIEWS FOR TSF DISPOSAL POND, CFA-03, CFA-02, TAN-629 AND CFA MOTOR POOL POND - EPA AND IDHW REVIEWS 8682 00