27-FEB-18 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I AND PHASE II, PART A INTERIM REMEDIAL ACTION REPORT DOE/ID-11475 1
07-FEB-18 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 4
29-JAN-18 NOT SPECIFIED CORRECTED TABLE B-3 DOE/ID-11462 REV 0 6087213 0
01-JUN-17 FORBES, JEFFREY R. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
01-JUN-17 LAWRENCE, SARAH D. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
01-JUN-17 SHANKLIN, DEAN E. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
01-JUN-16 JOLLEY, WENDELL L. FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11545 0
01-JUN-16 FORBES, JEFFREY R. FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11545 0
01-JUL-15 NOT SPECIFIED FISCAL YEAR 2014 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11526 0
01-JUN-15 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 3
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
01-JUN-14 NOT SPECIFIED FISCAL YEAR 2013 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11500 0
01-OCT-13 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/ID-11333 1
01-JUN-13 NOT SPECIFIED FISCAL YEAR 2012 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11476 0
01-MAR-13 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I, INTERIM REMEDIAL ACTION REPORT DOE/ID-11475 0
26-NOV-12 JENSEN, NOLAN R. TRANSMITTAL OF THE OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I, REMEDIAL ACTON REPORT (DRAFT) (WDP-RWMC-12-065) WDP-RWMC-12-065 0
31-JUL-12 NOT SPECIFIED FISCAL YEAR 2011 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11462 0
03-JUL-12 COOPER, JAMES R. DEPARTMENT OF ENERGY REVISED OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL (WDP-RWMC-12-027) WDP-RWMC-12-027 0
30-JUN-12 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 2
20-JUN-12 JOHANSEN, PETE DRAFT FINAL OU 3-14 REMEDIAL ACTIONS: PHASE II 90% DESIGN DOCUMENT (EDF-101116) 4008610 0
19-MAR-12 HAIN, KATHLEEN E. TRANSMITTAL OF THE OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT (EDF-10116), REVISION 0 (WDP-RWMC-12-012) WDP-RWMC-12-012 0
14-MAR-12 JOHANSEN, PETE COMMENTS ON THE OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN (DRAFT), DOE-ID-11337 IR-25322 0
06-MAR-12 SHANKLIN, DEAN E. OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT EDF-10116 0
15-FEB-12 FAULK, DENNIS EPA Concurrence on Operable Unit 3-14 Draft Final Phase II 90% Design and Phase III Acceleration Proposal IR-25317 0
14-FEB-12 KOCH, DARYL F. Department of Energy Operable Unit 3-14 Phase III Acceleration Proposal (WDP-RWMC-12-003) WDP-RWMC-12-003 0
31-JAN-12 NOT SPECIFIED PREFINAL INSPECTION REPORT FOR OPERABLE UNIT 3-14, PHASE I DOE/ID-11461 0
31-AUG-11 NOT SPECIFIED FISCAL YEAR 2010 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11442 1
24-JUN-08 NOT SPECIFIED OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 0
17-JUN-08 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/ID-11333 0
25-JUL-07 SHANKLIN, D. E. OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) SCOPE OF WORK DOE/ID-11318 00
21-AUG-06 MAXAND, J. SNAKE RIVER ALLIANCE REQUEST FOR EXTENSION TO COMMENT PERIOD ON THE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER 25015 00
28-FEB-94 WINCO BACKGROUND CONCENTRATIONS OF SELECTED METALS & RADIONUCLIDES IN BIG LOST RIVER ALLUVIUM AT ICPP, REVISION 1 (REV.01) 14143 00
05-MAY-93 WINCO TRACK 2 SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-11 - CPP-45 CPP-621 CHEMICAL STORAGE AREA SPILL AND CPP-58 PEW OVERHEAD PIPELINE SPILL, REV.01 5302 00
31-JUL-92 LYLE, J. L. TRANSMITTAL OF CLOSURE ADDENDUM FOR SAMPLING AND ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-07 AND 3-08 (TANK FARM II & III RESPECTIVELY) AND WASTE AREA GROUP 3 (WAG-3) QUALITY ASSURANCE PROJECT PLAN (QAPJP) AM/ERWM-RPO-173-92 00
03-JUN-92 LYLE, J. L. TRANSMITTAL OF THE ADDENDUM FOR RESPONSE TO COMMENTS FOR THE DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-08 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 RPO-129-92 00
27-MAY-92 WINCO WINCO ENVIRONMENTAL RESTORATION (ER) ADDENDUM TO DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-08 TANK FARM AREA II (DATED 03/31/92) 4697 00
07-APR-92 LYLE, J. L. TRANSMITTAL OF SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-08 AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) ERD1-098-92 00
31-MAR-92 CULP, B. SITE ASSESSMENT DOCUMENT PACKAGES FOR OPERABLE UNIT (OU) 3-08 - CPP-13, CPP-15, CPP-27, CCP-29, CPP-35, CPP-36, CPP-58E AND CPP-58W 6637 00