Select By Site Code

For Site Code CPP-58

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
27-FEB-18 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I AND PHASE II, PART A INTERIM REMEDIAL ACTION REPORT DOE/ID-11475 1
07-FEB-18 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 4
29-JAN-18 NOT SPECIFIED CORRECTED TABLE B-3 DOE/ID-11462 REV 0 6087213 0
01-JUN-17 SHANKLIN, DEAN E. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
01-JUN-17 LAWRENCE, SARAH D. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
01-JUN-17 FORBES, JEFFREY R. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JUN-16 FORBES, JEFFREY R. FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11545 0
01-JUN-16 JOLLEY, WENDELL L. FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11545 0
01-JUL-15 NOT SPECIFIED FISCAL YEAR 2014 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11526 0
01-JUN-15 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 3
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
01-JUN-14 NOT SPECIFIED FISCAL YEAR 2013 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11500 0
01-OCT-13 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/ID-11333 1
01-JUN-13 NOT SPECIFIED FISCAL YEAR 2012 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11476 0
01-MAR-13 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I, INTERIM REMEDIAL ACTION REPORT DOE/ID-11475 0
26-NOV-12 JENSEN, NOLAN R. TRANSMITTAL OF THE OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I, REMEDIAL ACTON REPORT (DRAFT) (WDP-RWMC-12-065) WDP-RWMC-12-065 0
31-AUG-12 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN DOE/ID-11334 2
31-JUL-12 NOT SPECIFIED FISCAL YEAR 2011 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11462 0
30-JUN-12 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 2
20-JUN-12 JOHANSEN, PETE DRAFT FINAL OU 3-14 REMEDIAL ACTIONS: PHASE II 90% DESIGN DOCUMENT (EDF-101116) 4008610 0
19-MAR-12 HAIN, KATHLEEN E. TRANSMITTAL OF THE OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT (EDF-10116), REVISION 0 (WDP-RWMC-12-012) WDP-RWMC-12-012 0
14-MAR-12 JOHANSEN, PETE COMMENTS ON THE OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN (DRAFT), DOE-ID-11337 IR-25322 0
06-MAR-12 SHANKLIN, DEAN E. OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT EDF-10116 0
15-FEB-12 FAULK, DENNIS EPA Concurrence on Operable Unit 3-14 Draft Final Phase II 90% Design and Phase III Acceleration Proposal IR-25317 0
14-FEB-12 KOCH, DARYL F. Department of Energy Operable Unit 3-14 Phase III Acceleration Proposal (WDP-RWMC-12-003) WDP-RWMC-12-003 0
31-JAN-12 NOT SPECIFIED PREFINAL INSPECTION REPORT FOR OPERABLE UNIT 3-14, PHASE I DOE/ID-11461 0
31-AUG-11 NOT SPECIFIED FISCAL YEAR 2010 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11442 1
20-APR-10 NOT SPECIFIED FISCAL YEAR 2009 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11419 0
31-AUG-09 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 10, AND REMOVAL ACTIONS DOE/ID-10587 10
30-JUN-09 NOT SPECIFIED 2008 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11395 0
05-MAY-09 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN DOE/ID-11334 1
09-JAN-09 RENO, SCOTT L. ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (ICP) DOE/ID-11293 1
27-JUN-08 NOT SPECIFIED OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN DOE/ID-11334 0
24-JUN-08 NOT SPECIFIED OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 0
17-JUN-08 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/ID-11333 0
10-MAR-08 SHANKLIN, D. E. 2007 ANNUAL OPERATIONS REPORT FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION DOE/ID-11358 00
25-JUL-07 SHANKLIN, D. E. OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) SCOPE OF WORK DOE/ID-11318 00
22-MAY-07 MCMANAMON, L. E. ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 03
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
15-NOV-06 SHANKLIN, D. E. OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) DOE/ID-10771 04
31-OCT-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 02
22-AUG-06 NOT SPECIFIED IDAHO CLEANUP PROJECT (ICP) PUBLIC NOTICE - PUBLIC MEETINGS SCHEDULED ON PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 25016 00
21-AUG-06 MAXAND, J. SNAKE RIVER ALLIANCE REQUEST FOR EXTENSION TO COMMENT PERIOD ON THE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER 25015 00
16-AUG-06 NOT SPECIFIED IDAHO CLEANUP PROJECT (ICP) PUBLIC NOTICE - AGENCIES RELEASE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER 25014 00
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
01-AUG-06 CAHN, L. S. PROPOSED PLAN FOR TANK FARM SOIL AND GROUNDWATER AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), OPERABLE UNIT (OU) 3-14 RPT-223 00
19-JUL-06 SHANKLIN, D. E. 2005 ANNUAL OPERATIONS REPORT FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) DOE/ID-11275 01
13-JUL-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 01
01-JUL-06 NOT SPECIFIED IDAHO CLEANUP PROJECT (ICP) FACT SHEET - TANK FARM SOIL AND IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER - AGENCIES TO RELEASE PROPOSED PLAN FOR CLEANUP 24977 00
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
31-MAY-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 00
23-FEB-06 SHANKLIN, D. E. 2005 ANNUAL OPERATIONS REPORT FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) DOE/ID-11275 00
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
08-SEP-05 HAIN, K. E. NEW SITE IDENTIFICATION (NSI) - CHEMICAL PROCESSING PLANT (CPP) PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR OVERHEAD PIPELINE SPILLS - ADDITIONAL INFORMATION 24921 00
23-JUN-05 SHANKLIN, D. E. REMEDIAL ACTION (RA) REPORT FOR THE TANK FARM INTERIM ACTION (TFIA), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM SOILS DOE/NE-ID-11209 00
08-JUN-05 CETO, N. COMMENT PERIOD EXTENSION FOR DRAFT OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) 24905 00
13-APR-05 SHANKLIN, D. E. OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) DOE/ID-10771 03
09-FEB-05 MCMANAMON, L. E. TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-2000-00529 03
17-DEC-04 SHANKLIN, D. E. FISCAL YEAR 2004 (FY-04) ANNUAL OPERATIONS REPORT FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) DOE/NE-ID-11206 00
03-NOV-04 VERWOLF, M. C. RESPONSE TO SEPTEMBER 23, 2004 (09/23/04) LETTER REGARDING OPERABLE UNIT (OU) 3-13 GROUP 4 TC-99 INVESTIGATION AND OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FMDP-FFA/CO-04-053 00
08-SEP-04 MCMANAMON, L. E. OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I AND II DOE/ID-10771 02
22-JUL-04 DOORNBOS, M. H. TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-2000-00529 02
09-JUN-04 HALL, R. C. TRANSMITTAL OF FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - REVISION 1 (REV.01) EM-ER-04-120 00
07-JUN-04 CAHN, L. S. OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN DOE/ID-10676 01
07-JUN-04 CAHN, L. S. TANK FARM SOIL AND GROUNDWATER FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX A TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 DOE/ID-10764 01
01-JUN-04 CAHN, L. S. EVALUATION OF FEASIBILITY OF AN EARLY DECISION AND PERMANENT REMEDY FOR TANK FARM SOIL - APPENDIX E TO OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN -DOE/ID-10676, REV.01 INEEL/EXT-03-01010 00
01-JUN-04 CAHN, L. S. TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX B TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 INEEL/EXT-2000-00529 01
01-JUN-04 CAHN, L. S. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX C TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 INEEL/EXT-99-00361 01
25-MAY-04 HALL, R. C. REQUEST FOR EXTENSION FOR SUBMITTAL OF THE FINAL OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-04-107 00
05-APR-04 HALL, R. C. REQUEST FOR EXTENSION FOR SUBMITTAL OF DRAFT FINAL OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-04-078 00
23-MAR-04 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10587 08
25-FEB-04 AR COORDINATOR OPERABLE UNIT (OU) 3-13 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-13 - INCLUDES EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) DOCUMENT ID #DOE/ID-11109 AR.INDEX.OU.3-13 01
18-DEC-03 HALL, R. C. DECEMBER 9, 2003 (12/09/03) AGENCY MEETING MINUTES - DECISIONS FROM ENVIRONMENTAL PROTECTION AGENCY (EPA), IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AND DEPARTMENT OF ENERGY (DOE) ON WASTE AREA GROUP 3 (WAG-3) ISSUES EM-ER-03-315 00
03-DEC-03 HALL, R. C. NOTIFICATION THAT THE DRAFT PHASE I SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 TANK FARM SOILS AND GROUNDWATER PROJECT WILL NOT BE SUBMITTED EM-ER-03-299 00
30-SEP-03 FORSYTHE, H. S. WASTE MANAGEMENT PLAN (WMP) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC)OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I & II - APPENDIX L TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, R DOE/ID-10770 03
30-SEP-03 FORSYTHE, H. S. OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I AND II - APPENDIX K TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 DOE/ID-10771 01
30-SEP-03 FORSYTHE, H. S. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR GROUP 1 TANK FARM INTERIM ACTION (TFIA) DOE/ID-10772 01
26-SEP-03 HALL, R. C. CERTIFICATION OF CONSTRUCTION COMPLETION OF OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) - PHASE I (PHASE 1) EM-ER-03-245 00
28-AUG-03 FITCH, D. R. THE 2003 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-11112 00
09-JUN-03 HALL, R. C. DOCUMENTATION OF AGREEMENT REACHED DURING WASTE AREA GROUP 3 (WAG-3) CONFERENCE CALL ON MARCH 20, 2003 (03/20/03) TO MODIFY PHASE 1 OF THE TANK FARM INTERIM ACTION (TFIA) EM-ER-03-140 00
20-MAY-03 MCMANAMON, L. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13, GROUP 1 SOILS TANK FARM INTERIM ACTION (TFIA) - APPENDIX M TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 INEEL/EXT-2000-00194 04
01-APR-03 RICE, R. S. WASTE MANAGEMENT PLAN (WMP) FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 TANK FARM INTERIM ACTION (TFIA), PHASE 1 DOE/ID-10770 02
05-MAR-03 HALL, R. C. NOTIFICATION THAT A SECONDARY DOCUMENT FOR THE OPERABLE UNIT (OU) 3-14 TANK FARM SOILS AND GROUNDWATER PROJECT WILL NOT BE SUBMITTED EM-ER-03-065 00
04-MAR-03 BOWHAN, B. R. RESOLUTION OF DISPUTE - FINAL FULLY EXECUTED ORIGINAL COPY OF AGREEMENT TO RESOLVE DISPUTE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 OCC-03-025 00
14-JAN-03 TUOTT, L. C. INSTITUTIONAL CONTROL PLAN FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13 DOE/ID-10729 03
14-JAN-03 TUOTT, L. C. THE 2002 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-11033 00
13-JAN-03 MACKEY, C. ENVIRONMENTAL PROTECTION AGENCY'S (EPA) STATEMENT OF POSITION REGARDING THE NOTICE OF VIOLATION (NOV) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 24769 00
20-DEC-02 DOE DEPARTMENT OF ENERGY (DOE) STATEMENT OF DISPUTE, NOTICE OF VIOLATION (NOV) REGARDING THE DRAFT REMEDIAL ACTION (RA) REPORT FOR THE TANK FARM SOILS 24767 00
20-DEC-02 BERGHOLZ, W. E. RESPONSE TO POTENTIAL ADMINISTRATIVE VIOLATIONS AND AREAS OF CONCERN, LETTER DATED DECEMBER 4, 2002 (12/04/02) EM-ER-02-211 00
04-DEC-02 KREIZENBECK, R. NOTICE OF VIOLATION (NOV) AND PENALTY ASSESSMENT 24768 00
01-OCT-02 TUOTT, L. C. INSTITUTIONAL CONTROL PLAN FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13 DOE/ID-10729 02
12-SEP-02 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 DOE/ID-10587 07
08-JAN-02 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-14, CHEMICAL PROCESSING PLANT 58 (CPP-58) - NITRIC ACID CONTAMINATION IN PROXIMITY TO GROUP 1 INTERIM ACTION (IA) TRENCH NEAR CPP-604 10958 00
19-JUL-01 COLLINS, R. L. TRANSMITTAL OF THE 2001 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13, REVISION 1 (REV.01) - DOE/ID-10883 EM-ER-01-124 00
01-JUL-01 TUOTT, L. C. THE 2001 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-10883 01
21-DEC-00 HAIN, K. E. TRANSMITTAL OF FINAL OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-243-00 00
20-DEC-00 FORSYTHE, H. S. OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER PHASE I REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN DOE/ID-10676 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
20-DEC-00 FORSYTHE, H. S. TANK FARM SOIL FIELD SAMPLING PLAN (FSP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10764 00
20-DEC-00 FORSYTHE, H. S. TANK FARM SOIL HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-2000-00529 00
20-DEC-00 FORSYTHE, H. S. WASTE MANAGEMENT PLAN (WMP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-99-00361 00
04-DEC-00 IVY, K. ADDITIONAL ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - DRAFT FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN; INJECTION WELL FIELD SAMPLING PLAN (FSP) 10945 00
22-NOV-00 IVY, K. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - DRAFT FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN 10944 00
22-NOV-00 ENGLISH, M. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS - DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 3-14, DOE/ID-10676 10948 00
06-NOV-00 JENKINS, T. W. TRANSMITTAL OF DRAFT FINAL OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - TANK FARM SOIL AND GROUNDWATER - DOE/ID-10676 EM-ER-212-00 00
01-NOV-00 IDEQ IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS & RESOLUTIONS FOR DRAFT FINAL OU 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - DOE/ID-10676, REV. D (REV.0D) 22899 00
19-SEP-00 HURST, C. J. ENGINEERING DESIGN FILE (EDF) - OU 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) - EVAPORATION POND SIZING DESIGN - FUNCTIONAL FILE #INEEL/EXT-2000-00920 - APPENDIX C TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 EDF-ER-206 00
18-SEP-00 FRITZ, K. D. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) PHASE 1 AND PHASE 2 - OLIVE STREET STORM WATER LIFT STATION AT INTEC - APPENDIX B TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772 EDF-1379 00
18-SEP-00 FRITZ, K. D. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) PHASE 1 AND PHASE 2 - DRAINAGE DITCH CAPACITY VERIFICATION AT INTEC - APPENDIX A TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, EDF-1387 00
31-AUG-00 ENGLISH, M. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS - DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN FOR OPERABLE UNIT (OU) 3-14, DOE/ID-10676 10947 00
28-AUG-00 IVY, K. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - OPERABLE UNIT (OU) 3-14 TANK FARM SOIL & GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) - DOE/ID-10676 10943 00
10-AUG-00 NYGARD, D. STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) EXTENDS COMMENT REVIEW PERIOD FOR DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN FOR OU 3-14 TANK FARM SOIL AND GROUNDWATER - DOE/ID-10676 21468 00
01-AUG-00 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - INVESTIGATION UNDER WAY FOR OPERABLE UNIT (OU) 3-14 AT WASTE AREA GROUP 3 (WAG-3) 21212 00
26-JUN-00 JENKINS, T. W. TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-120-00 00
17-MAY-00 HAIN, K. E. TRANSMITTAL OF FINAL INITIAL INSTITUTIONAL CONTROL MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 EM-ER-90-00 00
10-MAY-00 RASCH, D. N. IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AS ONE WASTE MANAGEMENT UNIT FOR CLOSURES AND DEMONSTRATING COMPLIANCE WITH DRINKING WATER STANDARDS TS-ESTD-00-085 00
01-MAY-00 FRENCH, P. S. INITIAL INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-10751 00
28-OCT-99 JENKINS, T. W. TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-175-99 00
18-OCT-99 ENGLISH, M. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON THE DRAFT FINAL SCOPE OF WORK (SOW) FOR WAG-3 OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/ 22695 00
14-OCT-99 AR COORDINATOR OPERABLE UNIT (OU) 3-13 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-13 AR.INDEX.OU.3-13 00
07-OCT-99 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) INVOLVEMENT IN DEVELOPMENT AND REVIEW OF THE RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13, INTEC - CONTINGENT UPON SPECIFIED REGULATORY STANDARDS IDEQ IS SIGNATORY TO THE ROD WITH DOE AND EPA 24797 00
07-OCT-99 DOE FINAL RECORD OF DECISION (ROD) IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 DOE/ID-10660 00
01-OCT-99 DOE FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10653 00
01-OCT-99 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14, TANK FARM SOILS AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-99-141 00
09-SEP-99 EPA ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON SUPPLEMENTAL FEASIBILITY STUDY (FS) FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 18077 00
09-SEP-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) 18078 00
30-AUG-99 HAIN, K. E. TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) INEEL OPE-ER-119-99 00
10-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 3-11 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-11 AR.INDEX.OU.3-11 00
05-AUG-99 PIERRE, W. REVIEW OF DRAFT FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT OU 3-13, IDAHO CHEMICAL PROCESSING PLANT (ICPP) - EPA COMMENTS ATTACHED 10683 00
04-AUG-99 KOCH, D. F. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - DOE/ID-10660 10682 00
29-JUL-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-14 - DOE/ID-10653 10942 00
20-JUL-99 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-99-99 00
30-JUN-99 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 TANK FARM SOILS & GROUNDWATER REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) OPE-ER-93-99 00
14-MAY-99 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT RECORD OF DECISION (ROD) OPERABLE UNIT (OU) 3-13 IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) - DOE/ID-10660 10681 00
11-MAY-99 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-14 TANK FARM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 17265 00
31-MAR-99 JENKINS, T. W. RESPONSE TO RECOMMENDATION ON PROPOSED PLAN FOR REMEDIAL ACTION (RA) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) OPE-ER-48-99 00
29-MAR-99 JENKINS, T. W. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-44-99 00
01-MAR-99 IDHW IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 10679 00
22-FEB-99 RICHARDSON, B. RESPONSE TO HELEN CHENOWETH'S DECEMBER 18, 1998 (12/18/98) LETTER - PUBLIC COMMENT PERIOD ON PROPOSED PLAN FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) EXTENDED 18081 00
17-FEB-99 JENKINS, T. W. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-28-99 00
11-FEB-99 ROBERTSON, B. B. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10694 00
09-FEB-99 CRAPO, M. PUBLIC COMMENTS ON RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10693 00
01-FEB-99 OWENDOFF, J. M. RESPONSE TO CONGRESSWOMAN HELEN CHENOWETH'S DECEMBER 18, 1998 (12/18/98) REQUEST FOR EXTENSION OF PUBLIC COMMENT PERIOD ON PROPOSED PLAN FOR CLEANUP OF INEEL WASTE AREA GROUP 3 (WAG-3) IDAHO NUCLEAR TECHNNOLOGY AND ENGINEERING CENTER (INTEC) 18080 00
11-JAN-99 INEEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY - COMMENT PERIOD EXTENDED ON PROPOSED CLEANUP PLAN FOR IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) 16878 00
08-JAN-99 JENKINS, T. W. ADDITION OF OPERABLE UNIT (OU) 3-14 TO FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) OPE-ER-05-99 00
22-DEC-98 STEWART, M. M. PUBLIC COMMENTS ON CLEANUP PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEEL 10701 00
22-DEC-98 HENSEL, D. PUBLIC COMMENTS ON CHEMICAL PLANT CLEANUP FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10702 00
22-DEC-98 BOBO, R. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10703 00
22-DEC-98 BRAILSFORD, B. PUBLIC COMMENTS - SNAKE RIVER ALLIANCE ON PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEEL 10704 00
22-DEC-98 MCCARTHY, J. M. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10705 00
21-DEC-98 COPERFIELD, C. PUBLIC COMMENTS ON PROPOSED PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10700 00
18-DEC-98 LEMLEY, J. K. PUBLIC COMMENTS ON PROPOSED CLEANUP PLAN FOR INEEL CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10691 00
18-DEC-98 CHENOWETH, H. CONCERN OVER DEPARTMENT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) ICPP & TO REQUEST PERSONAL ATTENTION IN REDIRECTING CRITICAL ASPECTS OF EFFORT - REQUEST PUBLIC COMMENT PERIOD BE EXTENDED FOR THIRTY (30) DAYS 18079 00
17-DEC-98 CHRISTINNA PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10684 00
15-DEC-98 VANHORN, R. L. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10686 00
03-DEC-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT 18064 00
01-DEC-98 COMMANDER, J. PUBLIC COMMENTS ON IDAHO CHEMICAL PROCESSING PLANT (ICPP) PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10690 00
19-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - MOSCOW, IDAHO - NOVEMBER 19, 1998 (11/19/98) 10678 00
19-NOV-98 BROSCIOUS, C. PUBLIC COMMENTS ON DEPARTMENT OF ENERGY (DOE) INEEL IDAHO CHEMICAL PROCESSING PLANT (ICPP) PROPOSED CLEANUP PLAN OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10699 00
18-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - BOISE, IDAHO - NOVEMBER 18, 1998 (11/18/98) 10677 00
18-NOV-98 CITIZENS ADVISORY BOARD PUBLIC COMMENTS - CITIZENS ADVISORY BOARD (CAB) FOR PROPOSED PLAN FOR REMEDIAL ACTION (RA) AT OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) ICPP 10706 00
16-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - IDAHO FALLS, IDAHO - NOVEMBER 16, 1998 (11/16/98) 10675 00
16-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - IDAHO FALLS, IDAHO - NOVEMBER 17, 1998 (11/17/98) 10676 00
10-NOV-98 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCOPE OF WORK (SOW) WASTE AREA GROUP (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 INEEL 18065 00
31-OCT-98 ANSLEY, S. L. PUBLIC COMMENTS ON REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10687 00
27-OCT-98 RANDOLPH, P. PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 10689 00
22-OCT-98 INEEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY - MEETINGS SCHEDULED ON CLEANUP OF IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 10545 00
14-OCT-98 JENKINS, T. W. TRANSMITTAL OF FINAL PROPOSED PLAN, REVISION 6 (REV.06) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-159-98 00
14-OCT-98 JENKINS, T. W. TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B, FEASIBILITY STUDY (FS) SUPPLEMENT REPORT REVISION 2 (REV.02) OPE-ER-160-98 00
14-OCT-98 JENKINS, T. W. TRANSMITTAL OF SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - DRAFT OPE-ER-161-98 00
14-OCT-98 JENKINS, T. W. DEPARTMENT OF ENERGY - IDAHO OPERATIONS OFFICE (DOE-ID) REQUEST FOR ADDITION OF OPERABLE UNIT (OU) 3-14 TO FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) OPE-ER-162-98 00
01-OCT-98 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL 10542 00
01-OCT-98 GREENWELL, R. D. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT, VOLUME 1 (VOL.01) OF 2 DOE/ID-10619,VOL.01 02
01-OCT-98 GREENWELL, R. D. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT, VOLUME 2 (VOL.02) OF 2 DOE/ID-10619,VOL.02 02
15-SEP-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 5 (REV.05) FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-148-98 00
01-SEP-98 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - WASTE AREA GROUP 3 (WAG-3) ENVIRONMENTAL INVESTIGATION NEARLY COMPLETE FOR INTEC (FORMERLY ICPP) OU 3-13 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - FINDINGS OF BASELINE RISK ASSESSMENT (BRA) 14840 00
17-AUG-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 4 (REV.04) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) OPE-ER-133-98 00
14-AUG-98 TAYLOR, A. E. PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10688 00
14-AUG-98 BROSCIOUS, C. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10698 00
06-AUG-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL- PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT - REVISION 1 (REV.01) OPE-ER-128-98 00
05-AUG-98 ROSE, K. A. RESPONSE TO RECOMMENDATIONS FROM THE NATIONAL REMEDY REVIEW BOARD (NRRB) ON THE PROPOSED REMEDY FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 14842 00
14-JUL-98 BROSCIOUS, C. PUBLIC COMMENTS ON DRAFT CLEANUP PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10697 00
22-JUN-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 3 (REV.03) FOR WASTE AREA GROUP 3 (WAG-3) - IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-104-98 00
27-MAY-98 NYGARD, D. IDHW CONCURRENCE WITH ENFORCEABLE SCHEDULE EXTENSION FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) 10446 00
27-MAY-98 PIERRE, W. EPA CONCURRENCE ON REQUEST FOR EXTENSION OF ENFORCEABLE MILESTONE FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) 10447 00
15-MAY-98 JENKINS, T. W. REQUEST FOR EXTENSION OF OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) & RELATED DOCUMENTS OPE-ER-67-98 00
14-MAY-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 2 (REV.02) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL; PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-78-98 00
17-APR-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN REVISION 1 (REV.01) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-68-98 00
26-MAR-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT 16293 00
12-MAR-98 JENKINS, T. W. TRANSMITTAL OF DOCUMENTS FOR REVIEW OF WASTE AREA GROUP 3 (WAG-3) COST ESTIMATES OPE-ER-40-98 00
06-MAR-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) 16292 00
13-FEB-98 HAIN, K. E. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-28-98 00
29-JAN-98 HAIN, K. E. TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 3-13 FEASIBILITY STUDY (FS) SUPPLEMENT TO FINAL OU 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OU 3-13 AT INEEL OPE-ER-18-98 00
26-JAN-98 RENO, S. L. COMPREHENSIVE FACILITY CLOSURE EVALUATION PROCESS 10799 00
09-JAN-98 RENO, S. L. IDHW-DEQ INFORMAL COMMENTS ON WORKING DRAFT OF PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) ICPP, JANUARY 5, 1998 (01/05/98) 15059 00
05-JAN-98 DEPPERSCHMIDT, J. D. TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL AND DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) - OPE-ER&SA-98-002 OPE-ER/SA-98-002 00
30-DEC-97 ROSE, K. A. REQUEST FOR 20 DAY EXTENSION OF COMMENT PERIOD ON DRAFT PROPOSED PLAN FOR ICPP AT INEEL 15057 00
04-DEC-97 JENKINS, T. W. TRANSMITTAL OF DRAFT PROPOSED PLAN FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL OPE-ER-261-97 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
25-NOV-97 JENKINS, T. W. TRANSMITTAL OF DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANR (ICPP) OPERABLE UNIT (OU) 3-13 AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-253-97 00
14-NOV-97 ROBISON, S. A. DOE-HQ APPROVAL AND COMMENTS ON DRAFT PROPOSED PLAN FOR REMEDIATION OF INEEL WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13, ICPP COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY( RI/FS) 15054 00
14-NOV-97 RENO, S. L. IDHW-DEQ COMMENTS ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL (DRAFT FINAL) 15055 00
01-NOV-97 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - COMPREHENSIVE INVESTIGATION IDENTIFIES EXTENT OF CONTAMINATION WITHIN WASTE AREA GROUP 3 (WAG-3) FOR INTEC (FORMERLY ICPP) OPERABLE UNIT (OU) 3-13 14841 00
01-NOV-97 RODRIGUEZ, R. R COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 RODRIGUEZ, R. R COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 RODRIGUEZ, R. R COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL DOE/ID-10534,BINDER-01 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 - APPENDIX A THROUGH APPENDIX F - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL DOE/ID-10534,BINDER-02 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 - APPENDIX G THROUGH APPENDIX N - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL DOE/ID-10534,BINDER-03 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART B ; FEASIBILITY STUDY (FS) REPORT - BINDER 1 OF 2 - (SEE DOE/ID-10534,BINDER-01 & DOE/ID-10534,BINDER-02 DOE/ID-10534,BINDER-03 FOR PART A) - FINAL DOE/ID-10572,BINDER-01 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART B FEASIBILITY STUDY (FS) REPORT BINDER 2 OF 2 APPENDIX C THROUGH I (SEE DOE/ID-10534,BINDER-01 & DOE/ID-10534,BINDER-02 DOE/ID-10534,BINDER-03 FOR PART A) - FINAL DOE/ID-10572,BINDER-02 00
01-NOV-97 KAPTEIN, M. S. HEALTH & SAFETY PLAN (HSP) FOR HIGH LEVEL LIQUID WASTE TANK FARM (HLLWTF) SOILS SAMPLING INEEL/EXT-97-00987 00
30-OCT-97 JENKINS, T. W. TRANSMITTAL OF DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL OPE-ER-174-97 00
07-OCT-97 HAIN, K. E. TWENTY (20) DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL OPE-ER-158-97 00
12-SEP-97 ORLEAN, H. ADDITIONAL ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 15053 00
03-SEP-97 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OU 3-13 AT INEEL (DRAFT) JUNE 1997 (06/97) 15051 00
14-AUG-97 HAIN, K. E. DOE-ID TRANSMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OPERABLE UNIT (OU) 3-13 AT INEEL - DRAFT ICPP COMPREHENSIVE FACILITY CLOSURE EVALUATION PHASE II (APPENDIX H) FOR REVIEW OPE-ER-127-97 00
13-AUG-97 ORLEAN, H. EPA COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL 10429 00
11-AUG-97 RENO, S. L. IDHW-DEQ EXTENSION OF REVIEW PERIOD ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL - DOE/ID-10572 JUNE 1997 (06/97) 10430 00
27-JUN-97 JINES, A. TRANSMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OPERABLE UNIT (OU) 3-13 AT INEEL OPE-ER-106-97 00
18-JUN-97 JENKINS, T. W. RESPONSE TO RECOMMENDATION ON TECHNOLOGY SCREENING & ALTERNATIVE DEVELOMENT FOR WAG-3 COMPREHENSIVE FEASIBILITY STUDY (FS) REPORT OPE-ER-101-97 00
05-MAR-97 JENSEN, N. R. TRANSMITTAL OF THE REVISED WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCHEDULE OPE-ER-33-97 00
17-DEC-96 JINES, A. RESPONSE TO COMMENTS FOR WASTE AREA GROUP 3 (WAG-3) DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT- PART A OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT OPE-ER-196-96 00
13-NOV-96 JENKINS, T. W. TWENTY (20) DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL - PART A - REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT FINAL) OPE-ER-173-96 00
08-OCT-96 RENO, S. L. IDHW COMMENTS ON COMPREHENSIVE RI/FS FOR ICPP OU 3-13 AT INEL - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) - DRAFT DOE/ID-10534 12996 00
04-OCT-96 ORLEAN, H. EPA COMMENTS ON DRAFT COMPREHENSIVE RI/FS FOR ICPP OU 3-13 - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) - REPORT 12995 00
29-AUG-96 RENO, S. L. IDHW REQUEST FOR EXTENSION OF REVIEW PERIOD ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT) - (OPE-ER-122-96) 10298 00
27-AUG-96 JENSEN, N. R. TRANSMITTAL OF REVISED WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCHEDULE OPE-ER-131-96 00
05-AUG-96 JENSEN, N. R. DOE TRANSMITTAL OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL PART A REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT) OPE-ER-122-96 00
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) INEL/95-0056, VOL 02 0
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, VOLUME I (VOL.01) INEL/95-0056, VOL. 01 0
05-JUL-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-127-95 00
21-JUN-95 RODRIGUEZ, R. R. MODIFICATION TO WASTE AREA GROUP 3 (WAG-3) BASELINE RISK ASSESSMENT (BRA) APPROACH KLF-210-95 00
05-JUN-95 GREEN, L. A. EXTENSION OF COMMENT RESOLUTION PERIOD ON WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-102-95 00
01-MAY-95 RENO, S. L. IDHW-DEQ COMMENTS ON WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) 18023 00
01-NOV-94 RENO, S. L. IDHW COMMENTS ON DRAFT TECHNICAL MEMORANDUM, WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) METHODOLOGY OPERABLE UNIT (OU) 3-13 SEPTEMBER 28, 1994 (09/28/94) 15034 00
21-OCT-94 GREEN, L. A. TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-283-94 00
14-OCT-94 WINCO FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5791 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW) WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY (RI/FS) 15035 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW), WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5785 00
10-AUG-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5782 00
08-AUG-94 MEYER, L. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5783 00
08-JUN-94 DOE, EPA, IDHW DECISION STATEMENTS FOR TRACK 2 SUMMARY REPORT FOR OU 3-11, CPP-621 AREA SPILLS, REV.02, NO FURTHER ACTION FOR CPP-45; CPP-58 SHOULD BE INCLUDED IN OU 3-13 RI/FS 5769 00
23-NOV-93 DOE DOE RESPONSE TO EPA & IDHW COMMENTS FOR DRAFT TRACK 2 SUMMARY REPORT FOR OU 3-11 AT ICPP, WAG-3 5771 00
01-NOV-93 WINCO TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-11, CPP-621 AREA SPILLS, REV.02 5753 00
20-SEP-93 LIVERMAN, E. EPA REVIEW COMMENTS FOR DRAFT TRACK 2 SUMMARY REPORT FOR OU 3-11 AT ICPP 5768 00
14-SEP-93 STOOPS, T. M. IDHW REVIEW COMMENTS FOR DRAFT TRACK 2 SUMMARY REPORT FOR OU 3-11 AT ICPP 5767 00
01-JUL-93 GOLDER ASSOCIATES, INC. SAMPLING AND ANALYSIS PLAN (SAP) FOR BOXED SOILS FROM SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-58 AND BASEMENT EXIT EXCAVATIONS AT CPP-604 AND CPP-605 AT ICPP, REVISION 1 (REV.01) 14084 00
05-MAY-93 WINCO TRACK 2 SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-11 - CPP-45 CPP-621 CHEMICAL STORAGE AREA SPILL AND CPP-58 PEW OVERHEAD PIPELINE SPILL, REV.01 5302 00
28-SEP-92 BATTAGLIA, P. J. FEASIBILITY STUDY (FS) FOR GAMMA PROFILING AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) FL-92-0234 00
21-JUL-92 WINCO QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR CHARACTERIZATION ACTIVITIES AT WASTE AREA GROUP 3 (WAG-3) QAPJP-E-035 00
16-OCT-86 WINCO INITIAL ASSESSMENT - CPP PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR OVERHEAD PIPELINE SPILLS 5422 00