CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
---|---|---|---|---|
27-FEB-18 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I AND PHASE II, PART A INTERIM REMEDIAL ACTION REPORT | DOE/ID-11475 | 1 |
07-FEB-18 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN | DOE/ID-11337 | 4 |
29-JAN-18 | NOT SPECIFIED | CORRECTED TABLE B-3 DOE/ID-11462 REV 0 | 6087213 | 0 |
01-JUN-17 | SHANKLIN, DEAN E. | FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11563 | 0 |
01-JUN-17 | LAWRENCE, SARAH D. | FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11563 | 0 |
01-JUN-17 | FORBES, JEFFREY R. | FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11563 | 0 |
08-AUG-16 | NOT SPECIFIED | EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE | DOE/ID-11548 | 0 |
01-JUN-16 | FORBES, JEFFREY R. | FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11545 | 0 |
01-JUN-16 | JOLLEY, WENDELL L. | FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11545 | 0 |
01-JUL-15 | NOT SPECIFIED | FISCAL YEAR 2014 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11526 | 0 |
01-JUN-15 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN | DOE/ID-11337 | 3 |
01-JAN-15 | NOT SPECIFIED | INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS | DOE/ID-11042 | 9 |
01-JUN-14 | NOT SPECIFIED | FISCAL YEAR 2013 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11500 | 0 |
01-OCT-13 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN | DOE/ID-11333 | 1 |
01-JUN-13 | NOT SPECIFIED | FISCAL YEAR 2012 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11476 | 0 |
01-MAR-13 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I, INTERIM REMEDIAL ACTION REPORT | DOE/ID-11475 | 0 |
31-AUG-12 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN | DOE/ID-11334 | 2 |
31-JUL-12 | NOT SPECIFIED | FISCAL YEAR 2011 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11462 | 0 |
03-JUL-12 | COOPER, JAMES R. | DEPARTMENT OF ENERGY REVISED OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL (WDP-RWMC-12-027) | WDP-RWMC-12-027 | 0 |
30-JUN-12 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN | DOE/ID-11337 | 2 |
20-JUN-12 | JOHANSEN, PETE | DRAFT FINAL OU 3-14 REMEDIAL ACTIONS: PHASE II 90% DESIGN DOCUMENT (EDF-101116) | 4008610 | 0 |
19-MAR-12 | HAIN, KATHLEEN E. | TRANSMITTAL OF THE OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT (EDF-10116), REVISION 0 (WDP-RWMC-12-012) | WDP-RWMC-12-012 | 0 |
14-MAR-12 | JOHANSEN, PETE | COMMENTS ON THE OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN (DRAFT), DOE-ID-11337 | IR-25322 | 0 |
06-MAR-12 | SHANKLIN, DEAN E. | OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT | EDF-10116 | 0 |
15-FEB-12 | FAULK, DENNIS | EPA Concurrence on Operable Unit 3-14 Draft Final Phase II 90% Design and Phase III Acceleration Proposal | IR-25317 | 0 |
14-FEB-12 | KOCH, DARYL F. | Department of Energy Operable Unit 3-14 Phase III Acceleration Proposal (WDP-RWMC-12-003) | WDP-RWMC-12-003 | 0 |
31-JAN-12 | NOT SPECIFIED | PREFINAL INSPECTION REPORT FOR OPERABLE UNIT 3-14, PHASE I | DOE/ID-11461 | 0 |
31-AUG-11 | NOT SPECIFIED | FISCAL YEAR 2010 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11442 | 1 |
20-APR-10 | NOT SPECIFIED | FISCAL YEAR 2009 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11419 | 0 |
31-AUG-09 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 10, AND REMOVAL ACTIONS | DOE/ID-10587 | 10 |
30-JUN-09 | NOT SPECIFIED | 2008 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11395 | 0 |
05-MAY-09 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN | DOE/ID-11334 | 1 |
09-JAN-09 | RENO, SCOTT L. | ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (ICP) | DOE/ID-11293 | 1 |
08-DEC-08 | AR COORDINATOR | OPERABLE UNIT (OU) 3-14 - IDAHO NATIONAL LABORATORY (INL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TANK FARM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-14 | AR.INDEX.OU.3-14 | 1 |
27-JUN-08 | NOT SPECIFIED | OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN | DOE/ID-11334 | 0 |
25-JUN-08 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER WASTE MANAGEMENT PLAN | DOE/ID-11335 | 0 |
25-JUN-08 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER CHARACTERIZATION PLAN FOR THE NORTH TANK FARM SOIL | DOE/ID-11336 | 0 |
24-JUN-08 | NOT SPECIFIED | OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN | DOE/ID-11337 | 0 |
17-JUN-08 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN | DOE/ID-11333 | 0 |
10-MAR-08 | SHANKLIN, D. E. | 2007 ANNUAL OPERATIONS REPORT FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION | DOE/ID-11358 | 00 |
25-JUL-07 | SHANKLIN, D. E. | OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) SCOPE OF WORK | DOE/ID-11318 | 00 |
22-MAY-07 | MCMANAMON, L. E. | ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 03 |
16-MAY-07 | AR COORDINATOR | OPERABLE UNIT (OU) 3-14 - IDAHO NATIONAL LABORATORY (INL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TANK FARM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-14 | AR.INDEX.OU.3-14 | 00 |
16-MAY-07 | DEQ | RECORD OF DECISION (ROD) FOR TANK FARM SOIL AND IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER, OPERABLE UNIT (OU) 3-14 | DOE/ID-11296 | 00 |
27-FEB-07 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 03 |
04-DEC-06 | OPALSKI, D. D. | ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 | 25063 | 00 |
15-NOV-06 | SHANKLIN, D. E. | OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) | DOE/ID-10771 | 04 |
31-OCT-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 02 |
22-AUG-06 | NOT SPECIFIED | IDAHO CLEANUP PROJECT (ICP) PUBLIC NOTICE - PUBLIC MEETINGS SCHEDULED ON PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | 25016 | 00 |
21-AUG-06 | MAXAND, J. | SNAKE RIVER ALLIANCE REQUEST FOR EXTENSION TO COMMENT PERIOD ON THE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER | 25015 | 00 |
16-AUG-06 | NOT SPECIFIED | IDAHO CLEANUP PROJECT (ICP) PUBLIC NOTICE - AGENCIES RELEASE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER | 25014 | 00 |
01-AUG-06 | CAHN, L. S. | PROPOSED PLAN FOR TANK FARM SOIL AND GROUNDWATER AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), OPERABLE UNIT (OU) 3-14 | RPT-223 | 00 |
19-JUL-06 | SHANKLIN, D. E. | 2005 ANNUAL OPERATIONS REPORT FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) | DOE/ID-11275 | 01 |
13-JUL-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 01 |
01-JUL-06 | NOT SPECIFIED | IDAHO CLEANUP PROJECT (ICP) FACT SHEET - TANK FARM SOIL AND IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER - AGENCIES TO RELEASE PROPOSED PLAN FOR CLEANUP | 24977 | 00 |
16-JUN-06 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 01 |
31-MAY-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 00 |
01-MAY-06 | CAHN, L. S. | OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER FEASIBILITY STUDY (FS) | DOE/ID-11247 | 00 |
27-APR-06 | CAHN, L. S. | OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) | DOE/NE-ID-11227 | 00 |
23-FEB-06 | SHANKLIN, D. E. | 2005 ANNUAL OPERATIONS REPORT FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) | DOE/ID-11275 | 00 |
04-OCT-05 | JOLLEY, W. L. | FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 00 |
23-JUN-05 | SHANKLIN, D. E. | REMEDIAL ACTION (RA) REPORT FOR THE TANK FARM INTERIM ACTION (TFIA), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM SOILS | DOE/NE-ID-11209 | 00 |
08-JUN-05 | CETO, N. | COMMENT PERIOD EXTENSION FOR DRAFT OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) | 24905 | 00 |
13-APR-05 | SHANKLIN, D. E. | OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) | DOE/ID-10771 | 03 |
09-FEB-05 | MCMANAMON, L. E. | TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEEL/EXT-2000-00529 | 03 |
17-DEC-04 | SHANKLIN, D. E. | FISCAL YEAR 2004 (FY-04) ANNUAL OPERATIONS REPORT FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) | DOE/NE-ID-11206 | 00 |
03-NOV-04 | VERWOLF, M. C. | RESPONSE TO SEPTEMBER 23, 2004 (09/23/04) LETTER REGARDING OPERABLE UNIT (OU) 3-13 GROUP 4 TC-99 INVESTIGATION AND OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | FMDP-FFA/CO-04-053 | 00 |
08-SEP-04 | MCMANAMON, L. E. | OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I AND II | DOE/ID-10771 | 02 |
22-JUL-04 | DOORNBOS, M. H. | TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEEL/EXT-2000-00529 | 02 |
09-JUN-04 | HALL, R. C. | TRANSMITTAL OF FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - REVISION 1 (REV.01) | EM-ER-04-120 | 00 |
07-JUN-04 | CAHN, L. S. | OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | DOE/ID-10676 | 01 |
07-JUN-04 | CAHN, L. S. | TANK FARM SOIL AND GROUNDWATER FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX A TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 | DOE/ID-10764 | 01 |
01-JUN-04 | CAHN, L. S. | EVALUATION OF FEASIBILITY OF AN EARLY DECISION AND PERMANENT REMEDY FOR TANK FARM SOIL - APPENDIX E TO OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN -DOE/ID-10676, REV.01 | INEEL/EXT-03-01010 | 00 |
01-JUN-04 | CAHN, L. S. | TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX B TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 | INEEL/EXT-2000-00529 | 01 |
01-JUN-04 | CAHN, L. S. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX C TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 | INEEL/EXT-99-00361 | 01 |
25-MAY-04 | HALL, R. C. | REQUEST FOR EXTENSION FOR SUBMITTAL OF THE FINAL OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | EM-ER-04-107 | 00 |
05-APR-04 | HALL, R. C. | REQUEST FOR EXTENSION FOR SUBMITTAL OF DRAFT FINAL OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | EM-ER-04-078 | 00 |
23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
25-FEB-04 | AR COORDINATOR | OPERABLE UNIT (OU) 3-13 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-13 - INCLUDES EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) DOCUMENT ID #DOE/ID-11109 | AR.INDEX.OU.3-13 | 01 |
18-DEC-03 | HALL, R. C. | DECEMBER 9, 2003 (12/09/03) AGENCY MEETING MINUTES - DECISIONS FROM ENVIRONMENTAL PROTECTION AGENCY (EPA), IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AND DEPARTMENT OF ENERGY (DOE) ON WASTE AREA GROUP 3 (WAG-3) ISSUES | EM-ER-03-315 | 00 |
03-DEC-03 | HALL, R. C. | NOTIFICATION THAT THE DRAFT PHASE I SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 TANK FARM SOILS AND GROUNDWATER PROJECT WILL NOT BE SUBMITTED | EM-ER-03-299 | 00 |
30-SEP-03 | FORSYTHE, H. S. | WASTE MANAGEMENT PLAN (WMP) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC)OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I & II - APPENDIX L TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, R | DOE/ID-10770 | 03 |
30-SEP-03 | FORSYTHE, H. S. | OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I AND II - APPENDIX K TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 | DOE/ID-10771 | 01 |
30-SEP-03 | FORSYTHE, H. S. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR GROUP 1 TANK FARM INTERIM ACTION (TFIA) | DOE/ID-10772 | 01 |
26-SEP-03 | HALL, R. C. | CERTIFICATION OF CONSTRUCTION COMPLETION OF OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) - PHASE I (PHASE 1) | EM-ER-03-245 | 00 |
09-JUN-03 | HALL, R. C. | DOCUMENTATION OF AGREEMENT REACHED DURING WASTE AREA GROUP 3 (WAG-3) CONFERENCE CALL ON MARCH 20, 2003 (03/20/03) TO MODIFY PHASE 1 OF THE TANK FARM INTERIM ACTION (TFIA) | EM-ER-03-140 | 00 |
20-MAY-03 | MCMANAMON, L. E. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13, GROUP 1 SOILS TANK FARM INTERIM ACTION (TFIA) - APPENDIX M TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 | INEEL/EXT-2000-00194 | 04 |
01-APR-03 | RICE, R. S. | WASTE MANAGEMENT PLAN (WMP) FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 TANK FARM INTERIM ACTION (TFIA), PHASE 1 | DOE/ID-10770 | 02 |
05-MAR-03 | HALL, R. C. | NOTIFICATION THAT A SECONDARY DOCUMENT FOR THE OPERABLE UNIT (OU) 3-14 TANK FARM SOILS AND GROUNDWATER PROJECT WILL NOT BE SUBMITTED | EM-ER-03-065 | 00 |
04-MAR-03 | BOWHAN, B. R. | RESOLUTION OF DISPUTE - FINAL FULLY EXECUTED ORIGINAL COPY OF AGREEMENT TO RESOLVE DISPUTE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | OCC-03-025 | 00 |
14-JAN-03 | TUOTT, L. C. | INSTITUTIONAL CONTROL PLAN FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13 | DOE/ID-10729 | 03 |
14-JAN-03 | TUOTT, L. C. | THE 2002 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 | DOE/ID-11033 | 00 |
13-JAN-03 | MACKEY, C. | ENVIRONMENTAL PROTECTION AGENCY'S (EPA) STATEMENT OF POSITION REGARDING THE NOTICE OF VIOLATION (NOV) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 24769 | 00 |
20-DEC-02 | DOE | DEPARTMENT OF ENERGY (DOE) STATEMENT OF DISPUTE, NOTICE OF VIOLATION (NOV) REGARDING THE DRAFT REMEDIAL ACTION (RA) REPORT FOR THE TANK FARM SOILS | 24767 | 00 |
20-DEC-02 | BERGHOLZ, W. E. | RESPONSE TO POTENTIAL ADMINISTRATIVE VIOLATIONS AND AREAS OF CONCERN, LETTER DATED DECEMBER 4, 2002 (12/04/02) | EM-ER-02-211 | 00 |
04-DEC-02 | KREIZENBECK, R. | NOTICE OF VIOLATION (NOV) AND PENALTY ASSESSMENT | 24768 | 00 |
01-OCT-02 | TUOTT, L. C. | INSTITUTIONAL CONTROL PLAN FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13 | DOE/ID-10729 | 02 |
12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
19-JUL-01 | COLLINS, R. L. | TRANSMITTAL OF THE 2001 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13, REVISION 1 (REV.01) - DOE/ID-10883 | EM-ER-01-124 | 00 |
01-JUL-01 | TUOTT, L. C. | THE 2001 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 | DOE/ID-10883 | 01 |
CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
---|---|---|---|---|
21-DEC-00 | HAIN, K. E. | TRANSMITTAL OF FINAL OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | EM-ER-243-00 | 00 |
20-DEC-00 | FORSYTHE, H. S. | OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER PHASE I REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | DOE/ID-10676 | 00 |
20-DEC-00 | FORSYTHE, H. S. | TANK FARM SOIL FIELD SAMPLING PLAN (FSP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10764 | 00 |
20-DEC-00 | FORSYTHE, H. S. | TANK FARM SOIL HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEEL/EXT-2000-00529 | 00 |
20-DEC-00 | FORSYTHE, H. S. | WASTE MANAGEMENT PLAN (WMP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEEL/EXT-99-00361 | 00 |
04-DEC-00 | IVY, K. | ADDITIONAL ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - DRAFT FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN; INJECTION WELL FIELD SAMPLING PLAN (FSP) | 10945 | 00 |
22-NOV-00 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - DRAFT FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | 10944 | 00 |
22-NOV-00 | ENGLISH, M. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS - DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 3-14, DOE/ID-10676 | 10948 | 00 |
06-NOV-00 | JENKINS, T. W. | TRANSMITTAL OF DRAFT FINAL OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - TANK FARM SOIL AND GROUNDWATER - DOE/ID-10676 | EM-ER-212-00 | 00 |
01-NOV-00 | IDEQ | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS & RESOLUTIONS FOR DRAFT FINAL OU 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - DOE/ID-10676, REV. D (REV.0D) | 22899 | 00 |
19-SEP-00 | HURST, C. J. | ENGINEERING DESIGN FILE (EDF) - OU 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) - EVAPORATION POND SIZING DESIGN - FUNCTIONAL FILE #INEEL/EXT-2000-00920 - APPENDIX C TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 | EDF-ER-206 | 00 |
18-SEP-00 | FRITZ, K. D. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) PHASE 1 AND PHASE 2 - OLIVE STREET STORM WATER LIFT STATION AT INTEC - APPENDIX B TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772 | EDF-1379 | 00 |
18-SEP-00 | FRITZ, K. D. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) PHASE 1 AND PHASE 2 - DRAINAGE DITCH CAPACITY VERIFICATION AT INTEC - APPENDIX A TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, | EDF-1387 | 00 |
31-AUG-00 | ENGLISH, M. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS - DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN FOR OPERABLE UNIT (OU) 3-14, DOE/ID-10676 | 10947 | 00 |
28-AUG-00 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - OPERABLE UNIT (OU) 3-14 TANK FARM SOIL & GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) - DOE/ID-10676 | 10943 | 00 |
10-AUG-00 | NYGARD, D. | STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) EXTENDS COMMENT REVIEW PERIOD FOR DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN FOR OU 3-14 TANK FARM SOIL AND GROUNDWATER - DOE/ID-10676 | 21468 | 00 |
01-AUG-00 | INEEL COMMUNITY RELATIONS | INEEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - INVESTIGATION UNDER WAY FOR OPERABLE UNIT (OU) 3-14 AT WASTE AREA GROUP 3 (WAG-3) | 21212 | 00 |
26-JUN-00 | JENKINS, T. W. | TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | EM-ER-120-00 | 00 |
17-MAY-00 | HAIN, K. E. | TRANSMITTAL OF FINAL INITIAL INSTITUTIONAL CONTROL MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 | EM-ER-90-00 | 00 |
10-MAY-00 | RASCH, D. N. | IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AS ONE WASTE MANAGEMENT UNIT FOR CLOSURES AND DEMONSTRATING COMPLIANCE WITH DRINKING WATER STANDARDS | TS-ESTD-00-085 | 00 |
01-MAY-00 | FRENCH, P. S. | INITIAL INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 | DOE/ID-10751 | 00 |
28-OCT-99 | JENKINS, T. W. | TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-175-99 | 00 |
18-OCT-99 | ENGLISH, M. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON THE DRAFT FINAL SCOPE OF WORK (SOW) FOR WAG-3 OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/ | 22695 | 00 |
14-OCT-99 | AR COORDINATOR | OPERABLE UNIT (OU) 3-13 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-13 | AR.INDEX.OU.3-13 | 00 |
07-OCT-99 | ALLRED, C. S. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) INVOLVEMENT IN DEVELOPMENT AND REVIEW OF THE RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13, INTEC - CONTINGENT UPON SPECIFIED REGULATORY STANDARDS IDEQ IS SIGNATORY TO THE ROD WITH DOE AND EPA | 24797 | 00 |
07-OCT-99 | DOE | FINAL RECORD OF DECISION (ROD) IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 | DOE/ID-10660 | 00 |
01-OCT-99 | DOE | FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10653 | 00 |
01-OCT-99 | HAIN, K. E. | TRANSMITTAL OF DRAFT FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14, TANK FARM SOILS AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-99-141 | 00 |
09-SEP-99 | EPA | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON SUPPLEMENTAL FEASIBILITY STUDY (FS) FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 18077 | 00 |
09-SEP-99 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 18078 | 00 |
30-AUG-99 | HAIN, K. E. | TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) INEEL | OPE-ER-119-99 | 00 |
10-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 3-07 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-07 | AR.INDEX.OU.3-07 | 00 |
05-AUG-99 | PIERRE, W. | REVIEW OF DRAFT FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT OU 3-13, IDAHO CHEMICAL PROCESSING PLANT (ICPP) - EPA COMMENTS ATTACHED | 10683 | 00 |
04-AUG-99 | KOCH, D. F. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - DOE/ID-10660 | 10682 | 00 |
29-JUL-99 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-14 - DOE/ID-10653 | 10942 | 00 |
20-JUL-99 | HAIN, K. E. | TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-99-99 | 00 |
30-JUN-99 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 TANK FARM SOILS & GROUNDWATER REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) | OPE-ER-93-99 | 00 |
14-MAY-99 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT RECORD OF DECISION (ROD) OPERABLE UNIT (OU) 3-13 IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) - DOE/ID-10660 | 10681 | 00 |
11-MAY-99 | DOE | NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-14 TANK FARM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 17265 | 00 |
31-MAR-99 | JENKINS, T. W. | RESPONSE TO RECOMMENDATION ON PROPOSED PLAN FOR REMEDIAL ACTION (RA) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) | OPE-ER-48-99 | 00 |
29-MAR-99 | JENKINS, T. W. | TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-44-99 | 00 |
01-MAR-99 | IDHW | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | 10679 | 00 |
22-FEB-99 | RICHARDSON, B. | RESPONSE TO HELEN CHENOWETH'S DECEMBER 18, 1998 (12/18/98) LETTER - PUBLIC COMMENT PERIOD ON PROPOSED PLAN FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) EXTENDED | 18081 | 00 |
17-FEB-99 | JENKINS, T. W. | TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-28-99 | 00 |
11-FEB-99 | ROBERTSON, B. B. | PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10694 | 00 |
09-FEB-99 | CRAPO, M. | PUBLIC COMMENTS ON RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10693 | 00 |
01-FEB-99 | OWENDOFF, J. M. | RESPONSE TO CONGRESSWOMAN HELEN CHENOWETH'S DECEMBER 18, 1998 (12/18/98) REQUEST FOR EXTENSION OF PUBLIC COMMENT PERIOD ON PROPOSED PLAN FOR CLEANUP OF INEEL WASTE AREA GROUP 3 (WAG-3) IDAHO NUCLEAR TECHNNOLOGY AND ENGINEERING CENTER (INTEC) | 18080 | 00 |
11-JAN-99 | INEEL COMMUNITY RELATIONS | NOTICE OF AVAILABILITY - COMMENT PERIOD EXTENDED ON PROPOSED CLEANUP PLAN FOR IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) | 16878 | 00 |
08-JAN-99 | JENKINS, T. W. | ADDITION OF OPERABLE UNIT (OU) 3-14 TO FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) | OPE-ER-05-99 | 00 |
22-DEC-98 | STEWART, M. M. | PUBLIC COMMENTS ON CLEANUP PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEEL | 10701 | 00 |
22-DEC-98 | HENSEL, D. | PUBLIC COMMENTS ON CHEMICAL PLANT CLEANUP FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10702 | 00 |
22-DEC-98 | BOBO, R. | PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10703 | 00 |
22-DEC-98 | BRAILSFORD, B. | PUBLIC COMMENTS - SNAKE RIVER ALLIANCE ON PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEEL | 10704 | 00 |
22-DEC-98 | MCCARTHY, J. M. | PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10705 | 00 |
21-DEC-98 | COPERFIELD, C. | PUBLIC COMMENTS ON PROPOSED PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10700 | 00 |
18-DEC-98 | LEMLEY, J. K. | PUBLIC COMMENTS ON PROPOSED CLEANUP PLAN FOR INEEL CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10691 | 00 |
18-DEC-98 | CHENOWETH, H. | CONCERN OVER DEPARTMENT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) ICPP & TO REQUEST PERSONAL ATTENTION IN REDIRECTING CRITICAL ASPECTS OF EFFORT - REQUEST PUBLIC COMMENT PERIOD BE EXTENDED FOR THIRTY (30) DAYS | 18079 | 00 |
17-DEC-98 | CHRISTINNA | PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10684 | 00 |
15-DEC-98 | VANHORN, R. L. | PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10686 | 00 |
03-DEC-98 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT | 18064 | 00 |
01-DEC-98 | COMMANDER, J. | PUBLIC COMMENTS ON IDAHO CHEMICAL PROCESSING PLANT (ICPP) PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10690 | 00 |
19-NOV-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - MOSCOW, IDAHO - NOVEMBER 19, 1998 (11/19/98) | 10678 | 00 |
19-NOV-98 | BROSCIOUS, C. | PUBLIC COMMENTS ON DEPARTMENT OF ENERGY (DOE) INEEL IDAHO CHEMICAL PROCESSING PLANT (ICPP) PROPOSED CLEANUP PLAN OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10699 | 00 |
18-NOV-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - BOISE, IDAHO - NOVEMBER 18, 1998 (11/18/98) | 10677 | 00 |
18-NOV-98 | CITIZENS ADVISORY BOARD | PUBLIC COMMENTS - CITIZENS ADVISORY BOARD (CAB) FOR PROPOSED PLAN FOR REMEDIAL ACTION (RA) AT OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) ICPP | 10706 | 00 |
16-NOV-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - IDAHO FALLS, IDAHO - NOVEMBER 16, 1998 (11/16/98) | 10675 | 00 |
16-NOV-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - IDAHO FALLS, IDAHO - NOVEMBER 17, 1998 (11/17/98) | 10676 | 00 |
10-NOV-98 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCOPE OF WORK (SOW) WASTE AREA GROUP (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 INEEL | 18065 | 00 |
31-OCT-98 | ANSLEY, S. L. | PUBLIC COMMENTS ON REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10687 | 00 |
27-OCT-98 | RANDOLPH, P. | PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 10689 | 00 |
22-OCT-98 | INEEL COMMUNITY RELATIONS | NOTICE OF AVAILABILITY - MEETINGS SCHEDULED ON CLEANUP OF IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | 10545 | 00 |
14-OCT-98 | JENKINS, T. W. | TRANSMITTAL OF FINAL PROPOSED PLAN, REVISION 6 (REV.06) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-159-98 | 00 |
14-OCT-98 | JENKINS, T. W. | TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B, FEASIBILITY STUDY (FS) SUPPLEMENT REPORT REVISION 2 (REV.02) | OPE-ER-160-98 | 00 |
14-OCT-98 | JENKINS, T. W. | TRANSMITTAL OF SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - DRAFT | OPE-ER-161-98 | 00 |
14-OCT-98 | JENKINS, T. W. | DEPARTMENT OF ENERGY - IDAHO OPERATIONS OFFICE (DOE-ID) REQUEST FOR ADDITION OF OPERABLE UNIT (OU) 3-14 TO FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) | OPE-ER-162-98 | 00 |
01-OCT-98 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL | 10542 | 00 |
01-OCT-98 | GREENWELL, R. D. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT, VOLUME 1 (VOL.01) OF 2 | DOE/ID-10619,VOL.01 | 02 |
01-OCT-98 | GREENWELL, R. D. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT, VOLUME 2 (VOL.02) OF 2 | DOE/ID-10619,VOL.02 | 02 |
15-SEP-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 5 (REV.05) FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-148-98 | 00 |
01-SEP-98 | INEEL COMMUNITY RELATIONS | INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - WASTE AREA GROUP 3 (WAG-3) ENVIRONMENTAL INVESTIGATION NEARLY COMPLETE FOR INTEC (FORMERLY ICPP) OU 3-13 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - FINDINGS OF BASELINE RISK ASSESSMENT (BRA) | 14840 | 00 |
17-AUG-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 4 (REV.04) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) | OPE-ER-133-98 | 00 |
14-AUG-98 | TAYLOR, A. E. | PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10688 | 00 |
14-AUG-98 | BROSCIOUS, C. | PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10698 | 00 |
06-AUG-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL- PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT - REVISION 1 (REV.01) | OPE-ER-128-98 | 00 |
05-AUG-98 | ROSE, K. A. | RESPONSE TO RECOMMENDATIONS FROM THE NATIONAL REMEDY REVIEW BOARD (NRRB) ON THE PROPOSED REMEDY FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 14842 | 00 |
14-JUL-98 | BROSCIOUS, C. | PUBLIC COMMENTS ON DRAFT CLEANUP PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10697 | 00 |
22-JUN-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 3 (REV.03) FOR WASTE AREA GROUP 3 (WAG-3) - IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-104-98 | 00 |
27-MAY-98 | NYGARD, D. | IDHW CONCURRENCE WITH ENFORCEABLE SCHEDULE EXTENSION FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) | 10446 | 00 |
27-MAY-98 | PIERRE, W. | EPA CONCURRENCE ON REQUEST FOR EXTENSION OF ENFORCEABLE MILESTONE FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) | 10447 | 00 |
15-MAY-98 | JENKINS, T. W. | REQUEST FOR EXTENSION OF OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) & RELATED DOCUMENTS | OPE-ER-67-98 | 00 |
14-MAY-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 2 (REV.02) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL; PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-78-98 | 00 |
17-APR-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN REVISION 1 (REV.01) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-68-98 | 00 |
26-MAR-98 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT | 16293 | 00 |
12-MAR-98 | JENKINS, T. W. | TRANSMITTAL OF DOCUMENTS FOR REVIEW OF WASTE AREA GROUP 3 (WAG-3) COST ESTIMATES | OPE-ER-40-98 | 00 |
06-MAR-98 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 16292 | 00 |
13-FEB-98 | HAIN, K. E. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-28-98 | 00 |
29-JAN-98 | HAIN, K. E. | TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 3-13 FEASIBILITY STUDY (FS) SUPPLEMENT TO FINAL OU 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OU 3-13 AT INEEL | OPE-ER-18-98 | 00 |
26-JAN-98 | RENO, S. L. | COMPREHENSIVE FACILITY CLOSURE EVALUATION PROCESS | 10799 | 00 |
09-JAN-98 | RENO, S. L. | IDHW-DEQ INFORMAL COMMENTS ON WORKING DRAFT OF PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) ICPP, JANUARY 5, 1998 (01/05/98) | 15059 | 00 |
05-JAN-98 | DEPPERSCHMIDT, J. D. | TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL AND DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) - OPE-ER&SA-98-002 | OPE-ER/SA-98-002 | 00 |
CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
---|---|---|---|---|
30-DEC-97 | ROSE, K. A. | REQUEST FOR 20 DAY EXTENSION OF COMMENT PERIOD ON DRAFT PROPOSED PLAN FOR ICPP AT INEEL | 15057 | 00 |
04-DEC-97 | JENKINS, T. W. | TRANSMITTAL OF DRAFT PROPOSED PLAN FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL | OPE-ER-261-97 | 00 |
25-NOV-97 | JENKINS, T. W. | TRANSMITTAL OF DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANR (ICPP) OPERABLE UNIT (OU) 3-13 AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-253-97 | 00 |
14-NOV-97 | ROBISON, S. A. | DOE-HQ APPROVAL AND COMMENTS ON DRAFT PROPOSED PLAN FOR REMEDIATION OF INEEL WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13, ICPP COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY( RI/FS) | 15054 | 00 |
14-NOV-97 | RENO, S. L. | IDHW-DEQ COMMENTS ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL (DRAFT FINAL) | 15055 | 00 |
01-NOV-97 | INEEL COMMUNITY RELATIONS | INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - COMPREHENSIVE INVESTIGATION IDENTIFIES EXTENT OF CONTAMINATION WITHIN WASTE AREA GROUP 3 (WAG-3) FOR INTEC (FORMERLY ICPP) OPERABLE UNIT (OU) 3-13 | 14841 | 00 |
01-NOV-97 | MCCARTHY, J. M. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
01-NOV-97 | SCHAFER-PERINI, A. L. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
01-NOV-97 | BURNS, D. E. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
01-NOV-97 | MARTIAN, P. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
01-NOV-97 | RAUNIG, D. E. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
01-NOV-97 | BURCH, N. A. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
01-NOV-97 | VANHORN, R. L. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
01-NOV-97 | RODRIGUEZ, R. R | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
01-NOV-97 | RODRIGUEZ, R. R. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART B ; FEASIBILITY STUDY (FS) REPORT - BINDER 1 OF 2 - (SEE DOE/ID-10534,BINDER-01 & DOE/ID-10534,BINDER-02 DOE/ID-10534,BINDER-03 FOR PART A) - FINAL | DOE/ID-10572,BINDER-01 | 00 |
01-NOV-97 | RODRIGUEZ, R. R. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART B FEASIBILITY STUDY (FS) REPORT BINDER 2 OF 2 APPENDIX C THROUGH I (SEE DOE/ID-10534,BINDER-01 & DOE/ID-10534,BINDER-02 DOE/ID-10534,BINDER-03 FOR PART A) - FINAL | DOE/ID-10572,BINDER-02 | 00 |
01-NOV-97 | KAPTEIN, M. S. | HEALTH & SAFETY PLAN (HSP) FOR HIGH LEVEL LIQUID WASTE TANK FARM (HLLWTF) SOILS SAMPLING | INEEL/EXT-97-00987 | 00 |
30-OCT-97 | JENKINS, T. W. | TRANSMITTAL OF DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL | OPE-ER-174-97 | 00 |
07-OCT-97 | HAIN, K. E. | TWENTY (20) DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL | OPE-ER-158-97 | 00 |
12-SEP-97 | ORLEAN, H. | ADDITIONAL ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 | 15053 | 00 |
03-SEP-97 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OU 3-13 AT INEEL (DRAFT) JUNE 1997 (06/97) | 15051 | 00 |
14-AUG-97 | HAIN, K. E. | DOE-ID TRANSMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OPERABLE UNIT (OU) 3-13 AT INEEL - DRAFT ICPP COMPREHENSIVE FACILITY CLOSURE EVALUATION PHASE II (APPENDIX H) FOR REVIEW | OPE-ER-127-97 | 00 |
13-AUG-97 | ORLEAN, H. | EPA COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL | 10429 | 00 |
11-AUG-97 | RENO, S. L. | IDHW-DEQ EXTENSION OF REVIEW PERIOD ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL - DOE/ID-10572 JUNE 1997 (06/97) | 10430 | 00 |
27-JUN-97 | JINES, A. | TRANSMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OPERABLE UNIT (OU) 3-13 AT INEEL | OPE-ER-106-97 | 00 |
18-JUN-97 | JENKINS, T. W. | RESPONSE TO RECOMMENDATION ON TECHNOLOGY SCREENING & ALTERNATIVE DEVELOMENT FOR WAG-3 COMPREHENSIVE FEASIBILITY STUDY (FS) REPORT | OPE-ER-101-97 | 00 |
05-MAR-97 | JENSEN, N. R. | TRANSMITTAL OF THE REVISED WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCHEDULE | OPE-ER-33-97 | 00 |
27-AUG-96 | JENSEN, N. R. | TRANSMITTAL OF REVISED WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCHEDULE | OPE-ER-131-96 | 00 |
01-AUG-95 | NOT SPECIFIED | WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) | INEL/95-0056, VOL 02 | 0 |
01-AUG-95 | NOT SPECIFIED | WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, VOLUME I (VOL.01) | INEL/95-0056, VOL. 01 | 0 |
21-JUN-95 | RODRIGUEZ, R. R. | MODIFICATION TO WASTE AREA GROUP 3 (WAG-3) BASELINE RISK ASSESSMENT (BRA) APPROACH | KLF-210-95 | 00 |
01-FEB-95 | LITCO | REPORT OF 1993 AND 1994 TANK FARM DRILLING AND SAMPLING INVESTIGATION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) | INEL-95/0064 | 00 |
12-APR-94 | WELLS, R. P. | LIMITATIONS & VALIDATION (L&V) REPORT, IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-07 RADIOCHEMICAL ANALYSIS, SDG #3PG10301BG | RPW-44-94 | 00 |
08-MAY-93 | WINCO | TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-07, TANK FARM AREA I, REVISION 2 (REV.02) | 5764 | 00 |
24-FEB-93 | MARTY, R. C. | VALIDATION OF ORGANOCHLORINE HERBICIDE DATA FOURTH (4TH) QUARTER 1992 GROUNDWATER SAMPLING EFFORT AT WESTINGHOUSE IDAHO CHEMICAL PROCESSING PLANT (ICPP): SAMPLE DELIVERY GROUP (SDG) #GW00801W4 4GW00101W4 4GW00201W4 4GW01001W4 | RM-06-93-A | 00 |
22-OCT-92 | DOORNBOS, M. H. | EVALUATION OF A UNIDIRECTIONAL GAMMA DETECTOR FOR OPERABLE UNIT (OU) 3-07 | 6614 | 00 |
28-SEP-92 | LYLE, J. L. | NOTICE OF DELAY IN SCHEDULE FOR SUBMITTAL OF TWO SECONDARY DOCUMENTS: THE SUMMARY REPORTS FOR OPERABLE UNITS OU 3-07 AND 3-08 | AM/ERWM-RPO-202-92 | 00 |
28-SEP-92 | BATTAGLIA, P. J. | FEASIBILITY STUDY (FS) FOR GAMMA PROFILING AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | FL-92-0234 | 00 |
06-AUG-92 | WINCO | FIELD IMPLEMENTATION DOCUMENT - OPERABLE UNITS (OU) 3-07, 3-08, AND BACKGROUND SOIL INVESTIGATIONS | 5516 | 00 |
08-JUN-92 | MALIK, L. E. | REPORT ON PRELIMINARY REVIEW OF IMPACT ON TANK FARM DUE TO CHARACTERIZATION ACTIVITIES | 6622 | 00 |
19-FEB-92 | URBANSKI, C. J. | SUBSURFACE IMAGING RESULTS FOR HIGH LEVEL WASTE TANK FARM REPLACEMENT (HLWTFR) PROJECT | CJU-05-92 | 00 |
01-JAN-92 | MOTAZED, B. | PORTABLE PIPE MAPPER (PPM) FIELD TEST AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 6623 | 00 |
18-DEC-91 | EARLE, O. K. | DISPOSITION OF RADIOACTIVELY CONTAMINATED SOIL | 6594 | 00 |
17-DEC-91 | EARLE, O. K. | SCOPE OF WORK FOR THE TRACK 2 STUDY OF OU 3-07: TANK FARM 1 | 5274 | 00 |
02-DEC-91 | JOSTEN, N. E. | FINAL REPORT ON ROBOTIC GEOPHYSICAL SURVEY | NEJ-28-91 | 00 |
29-OCT-91 | MASCARENAS, C. S. | SITES WITHIN OPERABLE UNIT (OU) 3-07 | 6596 | 00 |
18-OCT-91 | MEJIA, C. | REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07 TANK FARM | 6590 | 00 |
18-OCT-91 | MEJIA, C. | REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07, TANK FARM | 6591 | 00 |
18-OCT-91 | MEJIA, C. | REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07, TANK FARM | 6592 | 00 |
14-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA SW AND NW OF VALVE BOX B-4 | 5396 | 00 |
Previous Page | Administrative Record Home Page