Select By Site Code

For Site Code CPP-29

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
23-APR-96 AR COORDINATOR OPERABLE UNIT (OU) 3-08 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-08 AR.INDEX.OU.3-08 00
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) INEL/95-0056, VOL 02 0
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, VOLUME I (VOL.01) INEL/95-0056, VOL. 01 0
05-JUL-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-127-95 00
05-JUN-95 GREEN, L. A. EXTENSION OF COMMENT RESOLUTION PERIOD ON WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-102-95 00
01-MAY-95 RENO, S. L. IDHW-DEQ COMMENTS ON WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) 18023 00
26-OCT-94 DOE, EPA, IDHW DECISION STATEMENT FOR TRACK 2 SUMMARY REPORT, OU 3-08 TANK FARM AREA II, REV.03 - CPP-15 CPP-29 NO FURTHER ACTION DETERMINATION - CPP-13, CPP-27, CPP-35 AND CPP-36 TO BE INCLUDED IN OU 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/ 5810 00
21-OCT-94 GREEN, L. A. TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-283-94 00
14-OCT-94 WINCO FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5791 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW) WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY (RI/FS) 15035 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW), WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5785 00
10-AUG-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5782 00
08-AUG-94 MEYER, L. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5783 00
28-FEB-94 WINCO BACKGROUND CONCENTRATIONS OF SELECTED METALS & RADIONUCLIDES IN BIG LOST RIVER ALLUVIUM AT ICPP, REVISION 1 (REV.01) 14143 00
28-JUL-93 WINCO QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR CHARACTERIZATION ACTIVITIES AT WASTE AREA GROUP 3 (WAG-3) QAPJP-E-035 01
16-JUL-93 WINCO FINAL TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-08, TANK FARM AREA II, REVISION 3 (REV.03) 5786 00
09-JUN-93 STOOPS, T. M. IDHW REVIEW COMMENTS ON DRAFT TRACK 2 SUMMARY REPORT FOR OU 3-08 AT ICPP WAG-3 18069 00
26-OCT-92 STOOPS, T. M. RECEIPT OF YOUR NOTICE OF DELAY DATED 09/28/92 FOR SUBMISSION OF TRACK 2 SUMMARY REPORT FOR OU 3-07 & 3-08 6115 00
28-SEP-92 LYLE, J. L. NOTICE OF DELAY IN SCHEDULE FOR SUBMITTAL OF TWO SECONDARY DOCUMENTS: THE SUMMARY REPORTS FOR OPERABLE UNIT (OU) 3-07 AND 3-08 AM/ERWM-RPO-202-92-A 00
06-AUG-92 WINCO FIELD IMPLEMENTATION DOCUMENT - OPERABLE UNITS (OU) 3-07, 3-08, AND BACKGROUND SOIL INVESTIGATIONS 5516 00
31-JUL-92 LYLE, J. L. TRANSMITTAL OF CLOSURE ADDENDUM FOR SAMPLING AND ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-07 AND 3-08 (TANK FARM II & III RESPECTIVELY) AND WASTE AREA GROUP 3 (WAG-3) QUALITY ASSURANCE PROJECT PLAN (QAPJP) AM/ERWM-RPO-173-92 00
21-JUL-92 WINCO QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR CHARACTERIZATION ACTIVITIES AT WASTE AREA GROUP 3 (WAG-3) QAPJP-E-035 00
03-JUN-92 LYLE, J. L. TRANSMITTAL OF THE ADDENDUM FOR RESPONSE TO COMMENTS FOR THE DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-08 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 RPO-129-92 00
27-MAY-92 WINCO WINCO ENVIRONMENTAL RESTORATION (ER) ADDENDUM TO DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-08 TANK FARM AREA II (DATED 03/31/92) 4697 00
07-APR-92 LYLE, J. L. TRANSMITTAL OF SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-08 AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) ERD1-098-92 00
31-MAR-92 WINCO SAMPLING AND ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-08 TANK FARM AREA II IDAHO CHEMICAL PROCESSING PLANT (ICPP), REV.01 5276 00
31-MAR-92 CULP, B. SITE ASSESSMENT DOCUMENT PACKAGES FOR OPERABLE UNIT (OU) 3-08 - CPP-13, CPP-15, CPP-27, CCP-29, CPP-35, CPP-36, CPP-58E AND CPP-58W 6637 00
10-JAN-92 LYLE, J. L. TRANSMITTAL OF SCOPE OF WORK (SOW) FOR TRACK 2 PRELIMINARY SCOPING STUDY AT OPERABLE UNIT (OU) 3-08 RPO-001-92 00
19-DEC-91 GOLDER ASSOCIATES, INC. REPORT OF ICPP DRILLING & SAMPLING PROGRAM AT HIGH LEVEL LIQUID WASTE (HLLW) TANK FARM & LDU CPP-33 893-1195.530 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN NORTH & WEST OF THE MAIN STACK (CPP-708) 5393 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page