07-FEB-18 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 4
29-JAN-18 NOT SPECIFIED CORRECTED TABLE B-3 DOE/ID-11462 REV 0 6087213 0
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JUN-15 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 3
01-JUN-14 NOT SPECIFIED FISCAL YEAR 2013 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11500 0
01-OCT-13 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/ID-11333 1
01-JUN-13 NOT SPECIFIED FISCAL YEAR 2012 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11476 0
26-NOV-12 JENSEN, NOLAN R. TRANSMITTAL OF THE OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I, REMEDIAL ACTON REPORT (DRAFT) (WDP-RWMC-12-065) WDP-RWMC-12-065 0
31-AUG-12 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN DOE/ID-11334 2
31-JUL-12 NOT SPECIFIED FISCAL YEAR 2011 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11462 0
30-JUN-12 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 2
20-JUN-12 JOHANSEN, PETE DRAFT FINAL OU 3-14 REMEDIAL ACTIONS: PHASE II 90% DESIGN DOCUMENT (EDF-101116) 4008610 0
19-MAR-12 HAIN, KATHLEEN E. TRANSMITTAL OF THE OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT (EDF-10116), REVISION 0 (WDP-RWMC-12-012) WDP-RWMC-12-012 0
14-MAR-12 JOHANSEN, PETE COMMENTS ON THE OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN (DRAFT), DOE-ID-11337 IR-25322 0
06-MAR-12 SHANKLIN, DEAN E. OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT EDF-10116 0
15-FEB-12 FAULK, DENNIS EPA Concurrence on Operable Unit 3-14 Draft Final Phase II 90% Design and Phase III Acceleration Proposal IR-25317 0
14-FEB-12 KOCH, DARYL F. Department of Energy Operable Unit 3-14 Phase III Acceleration Proposal (WDP-RWMC-12-003) WDP-RWMC-12-003 0
31-JAN-12 NOT SPECIFIED PREFINAL INSPECTION REPORT FOR OPERABLE UNIT 3-14, PHASE I DOE/ID-11461 0
01-SEP-11 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES TO REVISE INSTITUTIONAL CONTROLS IN VARIOUS RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11439 0
31-AUG-11 NOT SPECIFIED FISCAL YEAR 2010 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11442 1
20-APR-10 NOT SPECIFIED FISCAL YEAR 2009 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11419 0
31-AUG-09 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 10, AND REMOVAL ACTIONS DOE/ID-10587 10
05-MAY-09 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN DOE/ID-11334 1
09-JAN-09 RENO, SCOTT L. ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (ICP) DOE/ID-11293 1
27-JUN-08 NOT SPECIFIED OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN DOE/ID-11334 0
24-JUN-08 NOT SPECIFIED OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 0
17-JUN-08 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/ID-11333 0
25-JUL-07 SHANKLIN, D. E. OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) SCOPE OF WORK DOE/ID-11318 00
22-MAY-07 MCMANAMON, L. E. ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 03
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
23-FEB-07 FORBES, J. R. ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER MONITORING REPORT (2006) DOE/ID-11301 00
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
31-OCT-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 02
16-AUG-06 NOT SPECIFIED IDAHO CLEANUP PROJECT (ICP) PUBLIC NOTICE - AGENCIES RELEASE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER 25014 00
01-AUG-06 CAHN, L. S. PROPOSED PLAN FOR TANK FARM SOIL AND GROUNDWATER AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), OPERABLE UNIT (OU) 3-14 RPT-223 00
13-JUL-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 01
01-JUL-06 NOT SPECIFIED IDAHO CLEANUP PROJECT (ICP) FACT SHEET - TANK FARM SOIL AND IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER - AGENCIES TO RELEASE PROPOSED PLAN FOR CLEANUP 24977 00
20-JUN-06 FORBES, J. R. ANNUAL INTEC GROUNDWATER MONITORING REPORT FOR GROUP 5 - SNAKE RIVER PLAIN AQUIFER (2005) DOE/ID-11278 0
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
31-MAY-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 00
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
24-MAY-05 FORBES, J. R. ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER MONITORING REPORT FOR GROUP 5 - SNAKE RIVER PLAIN AQUIFER (SRPA) 2004 DOE/NE-ID-11222 00
22-DEC-04 FORBES, J. R. MONITORING REPORT AND DECISION SUMMARY FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) DOE/ID-11098 01
30-AUG-04 FORSYTHE, H. S. LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - ATTACHMENT 1 TO MONITORING REPORT AND DECISION SUMMARY DOE/ID-11098 REVISION 1 (REV.01) DOE/ID-10783 03
07-JUN-04 CAHN, L. S. OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN DOE/ID-10676 01
23-MAR-04 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10587 08
27-FEB-04 DOE NOTICE OF AVAILABILITY - AGENCIES ANNOUNCE CHANGES TO CLEANUP REMEDY AT INEEL FACILITY - INTEC OPERABLE UNIT (OU) 3-13 24836 00
25-FEB-04 AR COORDINATOR OPERABLE UNIT (OU) 3-13 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-13 - INCLUDES EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) DOCUMENT ID #DOE/ID-11109 AR.INDEX.OU.3-13 01
20-FEB-04 DOE EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 DOE/ID-11109 00
02-FEB-04 HALL, R. C. SUBMITTAL OF FINAL EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), OPERABLE UNIT (OU) 3-13 EM-ER-04-022 00
22-JAN-04 HALL, R. C. TRANSMITTAL OF FINAL MONITORING REPORT AND DECISION SUMMARY FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) EM-ER-04-011 00
19-JAN-04 FORBES, J. R. MONITORING REPORT AND DECISION SUMMARY FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) DOE/ID-11098 00
22-DEC-03 HALL, R. C. TRANSMITTAL OF DRAFT FINAL EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 AND SUPPORTING DOCUMENTATION EM-ER-03-314 00
18-DEC-03 HALL, R. C. DECEMBER 9, 2003 (12/09/03) AGENCY MEETING MINUTES - DECISIONS FROM ENVIRONMENTAL PROTECTION AGENCY (EPA), IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AND DEPARTMENT OF ENERGY (DOE) ON WASTE AREA GROUP 3 (WAG-3) ISSUES EM-ER-03-315 00
16-DEC-03 FORBES, J. R. ENGINEERING DESIGN FILE (EDF) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) INJECTION WELL - SUMMARY OF HISTORICAL INFORMATION AND GROUNDWATER QUALITY TRENDS EDF-3943 00
04-DEC-03 RODDY, M. S. ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER MONITORING REPORT FOR GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) 2003 DOE/ID-11118 00
03-DEC-03 HALL, R. C. NOTIFICATION THAT THE DRAFT PHASE I SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 TANK FARM SOILS AND GROUNDWATER PROJECT WILL NOT BE SUBMITTED EM-ER-03-299 00
04-APR-03 HALL, R. C. NOTIFICATION THAT A 24 HOUR PUMP TEST FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) PROJECT WILL NOT BE PERFORMED EM-ER-03-093 00
18-MAR-03 HAIN, K. E. TRANSMITTAL OF LONG TERM MONITORING PLAN, REVISION 2 (REV.02), WASTE MANAGEMENT PLAN (WMP), REVISION 3 (REV.03) AND HEALTH AND SAFETY PLAN (HSP OR HASP), REVISION 2 (REV.02) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) EM-ER-03-079 00
05-MAR-03 HALL, R. C. NOTIFICATION THAT A SECONDARY DOCUMENT FOR THE OPERABLE UNIT (OU) 3-14 TANK FARM SOILS AND GROUNDWATER PROJECT WILL NOT BE SUBMITTED EM-ER-03-065 00
04-MAR-03 BOWHAN, B. R. RESOLUTION OF DISPUTE - FINAL FULLY EXECUTED ORIGINAL COPY OF AGREEMENT TO RESOLVE DISPUTE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 OCC-03-025 00
01-MAR-03 FORSYTHE, H. S. LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) DOE/ID-10783 02
01-MAR-03 FORSYTHE, H. S. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) PROJECT DOE/ID-10829 03
01-MAR-03 FORSYTHE, H. S. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) INEEL/EXT-2000-00817 02
14-JAN-03 TUOTT, L. C. INSTITUTIONAL CONTROL PLAN FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13 DOE/ID-10729 03
14-JAN-03 TUOTT, L. C. THE 2002 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-11033 00
01-OCT-02 TUOTT, L. C. INSTITUTIONAL CONTROL PLAN FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13 DOE/ID-10729 02
12-SEP-02 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 DOE/ID-10587 07
18-JUL-02 COLLINS, R. L. TRANSMITTAL OF MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA), REVISION 2 (REV.02) EM-ER-02-121 00
01-JUL-02 GIANOTTO, D. F. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - PER EM-ER-206-00 THIS MSIP IS THE RD/RA WORK PLAN FOR GROUP 5 DOE/ID-10782 02
01-JUL-02 NEHER, E. PLUME EVALUATION FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX A TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.02 DOE/ID-10784 02
01-JUL-02 GIANOTTO, D. F. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX H TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.02 DOE/ID-10829 02
01-FEB-02 RODDY, M. S. ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER MONITORING REPORT FOR GROUP 5 - SNAKE RIVER PLAIN AQUIFER (SRPA) - 2001 DOE/ID-10930 00
19-JUL-01 COLLINS, R. L. TRANSMITTAL OF THE 2001 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13, REVISION 1 (REV.01) - DOE/ID-10883 EM-ER-01-124 00
01-JUL-01 TUOTT, L. C. THE 2001 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-10883 01
20-DEC-00 FORSYTHE, H. S. OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER PHASE I REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN DOE/ID-10676 00
20-DEC-00 FORSYTHE, H. S. INJECTION WELL FIELD SAMPLING PLAN (FSP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10763 00
20-DEC-00 FORSYTHE, H. S. INJECTION WELL HEALTH AND SAFETY PLAN (HSP OR HASP) FOR PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-2000-00528 00
29-NOV-00 HAIN, K. E. TRANSMITTAL OF FINAL MONITORING SYSTEM INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - PER EM-ER-206-00 THIS DOCUMENT IS THE RD/RA WORK PLAN FOR THIS PROJECT EM-ER-223-00 00
22-NOV-00 IVY, K. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - DRAFT FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN 10944 00
22-NOV-00 ENGLISH, M. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS - DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 3-14, DOE/ID-10676 10948 00
01-NOV-00 IDEQ IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS & RESOLUTIONS FOR DRAFT FINAL OU 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - DOE/ID-10676, REV. D (REV.0D) 22899 00
01-NOV-00 ROBERTS, C. J. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) DOE/ID-10782 01
01-NOV-00 ROBERTS, C. J. LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX B TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) - DOE/ID-10782, REV.01 & DOE/ID-10782, REV.02 DOE/ID-10783 01
01-NOV-00 ROBERTS, C. J. PLUME EVALUATION FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX A TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.01 DOE/ID-10784 01
01-NOV-00 ROBERTS, C. J. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX H TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.01 DOE/ID-10829 01
01-OCT-00 FORSYTHE, H. S. HEALTH AND SAFETY PLAN (HSP) FOR OU 3-13 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX G TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SRPA, DOE/ID-10782, REV.01 INEEL/EXT-2000-00817 00
20-SEP-00 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV DOE/ID-10587 06
01-SEP-00 ROBERTS, C. J. DATA MANAGEMENT PLAN (DMP) FOR FIELD AND NONCHEMICAL DATA FROM OU 3-13 GROUP 4 AND GROUP 5, WELL INSTALLATION AND MONITORING PROJECTS - APPENDIX D TO MSIP FOR OU 3-13 GROUP 5 SRPA, DOE/ID-10782, REV.01 & REV.02 & APPENDIX J TO GROUP 4 MSIP, DOE/ID-10 DOE/ID-10768 00
31-AUG-00 ENGLISH, M. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS - DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN FOR OPERABLE UNIT (OU) 3-14, DOE/ID-10676 10947 00
28-AUG-00 IVY, K. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - OPERABLE UNIT (OU) 3-14 TANK FARM SOIL & GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) - DOE/ID-10676 10943 00
17-MAY-00 HAIN, K. E. TRANSMITTAL OF FINAL INITIAL INSTITUTIONAL CONTROL MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 EM-ER-90-00 00
01-MAY-00 FRENCH, P. S. INITIAL INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-10751 00
14-OCT-99 AR COORDINATOR OPERABLE UNIT (OU) 3-13 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-13 AR.INDEX.OU.3-13 00
07-OCT-99 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) INVOLVEMENT IN DEVELOPMENT AND REVIEW OF THE RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13, INTEC - CONTINGENT UPON SPECIFIED REGULATORY STANDARDS IDEQ IS SIGNATORY TO THE ROD WITH DOE AND EPA 24797 00
07-OCT-99 DOE FINAL RECORD OF DECISION (ROD) IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 DOE/ID-10660 00
09-SEP-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) 18078 00
30-AUG-99 HAIN, K. E. TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) INEEL OPE-ER-119-99 00
10-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 3-02 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR CHEMICAL PROCESSING PLANT (CPP) OU 3-02 AR.INDEX.OU.3-02 00
05-AUG-99 PIERRE, W. REVIEW OF DRAFT FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT OU 3-13, IDAHO CHEMICAL PROCESSING PLANT (ICPP) - EPA COMMENTS ATTACHED 10683 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
04-AUG-99 KOCH, D. F. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - DOE/ID-10660 10682 00
20-JUL-99 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-99-99 00
14-MAY-99 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT RECORD OF DECISION (ROD) OPERABLE UNIT (OU) 3-13 IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) - DOE/ID-10660 10681 00
31-MAR-99 JENKINS, T. W. RESPONSE TO RECOMMENDATION ON PROPOSED PLAN FOR REMEDIAL ACTION (RA) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) OPE-ER-48-99 00
29-MAR-99 JENKINS, T. W. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-44-99 00
01-MAR-99 IDHW IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 10679 00
22-FEB-99 RICHARDSON, B. RESPONSE TO HELEN CHENOWETH'S DECEMBER 18, 1998 (12/18/98) LETTER - PUBLIC COMMENT PERIOD ON PROPOSED PLAN FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) EXTENDED 18081 00
17-FEB-99 JENKINS, T. W. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-28-99 00
09-FEB-99 CRAPO, M. PUBLIC COMMENTS ON RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10693 00
01-FEB-99 OWENDOFF, J. M. RESPONSE TO CONGRESSWOMAN HELEN CHENOWETH'S DECEMBER 18, 1998 (12/18/98) REQUEST FOR EXTENSION OF PUBLIC COMMENT PERIOD ON PROPOSED PLAN FOR CLEANUP OF INEEL WASTE AREA GROUP 3 (WAG-3) IDAHO NUCLEAR TECHNNOLOGY AND ENGINEERING CENTER (INTEC) 18080 00
11-JAN-99 INEEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY - COMMENT PERIOD EXTENDED ON PROPOSED CLEANUP PLAN FOR IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) 16878 00
22-DEC-98 STEWART, M. M. PUBLIC COMMENTS ON CLEANUP PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEEL 10701 00
22-DEC-98 HENSEL, D. PUBLIC COMMENTS ON CHEMICAL PLANT CLEANUP FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10702 00
22-DEC-98 BOBO, R. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10703 00
22-DEC-98 BRAILSFORD, B. PUBLIC COMMENTS - SNAKE RIVER ALLIANCE ON PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEEL 10704 00
22-DEC-98 MCCARTHY, J. M. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10705 00
21-DEC-98 COPERFIELD, C. PUBLIC COMMENTS ON PROPOSED PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10700 00
18-DEC-98 LEMLEY, J. K. PUBLIC COMMENTS ON PROPOSED CLEANUP PLAN FOR INEEL CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10691 00
18-DEC-98 CHENOWETH, H. CONCERN OVER DEPARTMENT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) ICPP & TO REQUEST PERSONAL ATTENTION IN REDIRECTING CRITICAL ASPECTS OF EFFORT - REQUEST PUBLIC COMMENT PERIOD BE EXTENDED FOR THIRTY (30) DAYS 18079 00
17-DEC-98 CHRISTINNA PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10684 00
15-DEC-98 VANHORN, R. L. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10686 00
01-DEC-98 COMMANDER, J. PUBLIC COMMENTS ON IDAHO CHEMICAL PROCESSING PLANT (ICPP) PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10690 00
19-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - MOSCOW, IDAHO - NOVEMBER 19, 1998 (11/19/98) 10678 00
19-NOV-98 BROSCIOUS, C. PUBLIC COMMENTS ON DEPARTMENT OF ENERGY (DOE) INEEL IDAHO CHEMICAL PROCESSING PLANT (ICPP) PROPOSED CLEANUP PLAN OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10699 00
18-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - BOISE, IDAHO - NOVEMBER 18, 1998 (11/18/98) 10677 00
18-NOV-98 CITIZENS ADVISORY BOARD PUBLIC COMMENTS - CITIZENS ADVISORY BOARD (CAB) FOR PROPOSED PLAN FOR REMEDIAL ACTION (RA) AT OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) ICPP 10706 00
16-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - IDAHO FALLS, IDAHO - NOVEMBER 16, 1998 (11/16/98) 10675 00
16-NOV-98 SCHWARTZ, N. PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - IDAHO FALLS, IDAHO - NOVEMBER 17, 1998 (11/17/98) 10676 00
31-OCT-98 ANSLEY, S. L. PUBLIC COMMENTS ON REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10687 00
27-OCT-98 RANDOLPH, P. PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 10689 00
22-OCT-98 INEEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY - MEETINGS SCHEDULED ON CLEANUP OF IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 10545 00
14-OCT-98 JENKINS, T. W. TRANSMITTAL OF FINAL PROPOSED PLAN, REVISION 6 (REV.06) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-159-98 00
14-OCT-98 JENKINS, T. W. TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B, FEASIBILITY STUDY (FS) SUPPLEMENT REPORT REVISION 2 (REV.02) OPE-ER-160-98 00
01-OCT-98 INEEL COMMUNITY RELATIONS PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL 10542 00
01-OCT-98 GREENWELL, R. D. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT, VOLUME 1 (VOL.01) OF 2 DOE/ID-10619,VOL.01 02
01-OCT-98 GREENWELL, R. D. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT, VOLUME 2 (VOL.02) OF 2 DOE/ID-10619,VOL.02 02
15-SEP-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 5 (REV.05) FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-148-98 00
17-AUG-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 4 (REV.04) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) OPE-ER-133-98 00
14-AUG-98 TAYLOR, A. E. PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10688 00
14-AUG-98 BROSCIOUS, C. PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10698 00
05-AUG-98 ROSE, K. A. RESPONSE TO RECOMMENDATIONS FROM THE NATIONAL REMEDY REVIEW BOARD (NRRB) ON THE PROPOSED REMEDY FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 14842 00
14-JUL-98 BROSCIOUS, C. PUBLIC COMMENTS ON DRAFT CLEANUP PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10697 00
22-JUN-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 3 (REV.03) FOR WASTE AREA GROUP 3 (WAG-3) - IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-104-98 00
27-MAY-98 NYGARD, D. IDHW CONCURRENCE WITH ENFORCEABLE SCHEDULE EXTENSION FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) 10446 00
27-MAY-98 PIERRE, W. EPA CONCURRENCE ON REQUEST FOR EXTENSION OF ENFORCEABLE MILESTONE FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) 10447 00
15-MAY-98 JENKINS, T. W. REQUEST FOR EXTENSION OF OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) & RELATED DOCUMENTS OPE-ER-67-98 00
14-MAY-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 2 (REV.02) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL; PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-78-98 00
12-MAY-98 LMITCO INEEL STORM WATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITIES (SWPPP-CA) - GENERIC PLAN - THIS DOCUMENT IS APPENDIX M TO THE MONITORING SYSTEM & INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA), DOE/ID-10782, RE DOE/ID-10425(98) 02
17-APR-98 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN REVISION 1 (REV.01) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-68-98 00
26-MAR-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT 16293 00
06-MAR-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) 16292 00
13-FEB-98 HAIN, K. E. TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-28-98 00
09-JAN-98 RENO, S. L. IDHW-DEQ INFORMAL COMMENTS ON WORKING DRAFT OF PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) ICPP, JANUARY 5, 1998 (01/05/98) 15059 00
05-JAN-98 DEPPERSCHMIDT, J. D. TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL AND DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) - OPE-ER&SA-98-002 OPE-ER/SA-98-002 00
30-DEC-97 ROSE, K. A. REQUEST FOR 20 DAY EXTENSION OF COMMENT PERIOD ON DRAFT PROPOSED PLAN FOR ICPP AT INEEL 15057 00
04-DEC-97 JENKINS, T. W. TRANSMITTAL OF DRAFT PROPOSED PLAN FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL OPE-ER-261-97 00
14-NOV-97 ROBISON, S. A. DOE-HQ APPROVAL AND COMMENTS ON DRAFT PROPOSED PLAN FOR REMEDIATION OF INEEL WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13, ICPP COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY( RI/FS) 15054 00
01-NOV-97 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - COMPREHENSIVE INVESTIGATION IDENTIFIES EXTENT OF CONTAMINATION WITHIN WASTE AREA GROUP 3 (WAG-3) FOR INTEC (FORMERLY ICPP) OPERABLE UNIT (OU) 3-13 14841 00
01-NOV-97 RODRIGUEZ, R. R COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) DOE/ID-10534 BINDER 1 PART 1 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) DOE/ID-10534 BINDER 1 PART 2 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 RODRIGUEZ, R. R COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) DOE/ID-10534 BINDER 2 PART 1 0
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) DOE/ID-10534 BINDER 2 PART 2 0
01-NOV-97 RODRIGUEZ, R. R COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 MARTIAN, P. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 BURNS, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 MCCARTHY, J. M. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 SCHAFER-PERINI, A. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 RAUNIG, D. E. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 BURCH, N. A. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 VANHORN, R. L. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N DOE/ID-10534 BINDER 3 0
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL DOE/ID-10534,BINDER-01 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 - APPENDIX A THROUGH APPENDIX F - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL DOE/ID-10534,BINDER-02 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 - APPENDIX G THROUGH APPENDIX N - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL DOE/ID-10534,BINDER-03 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART B ; FEASIBILITY STUDY (FS) REPORT - BINDER 1 OF 2 - (SEE DOE/ID-10534,BINDER-01 & DOE/ID-10534,BINDER-02 DOE/ID-10534,BINDER-03 FOR PART A) - FINAL DOE/ID-10572,BINDER-01 00
01-NOV-97 RODRIGUEZ, R. R. COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART B FEASIBILITY STUDY (FS) REPORT BINDER 2 OF 2 APPENDIX C THROUGH I (SEE DOE/ID-10534,BINDER-01 & DOE/ID-10534,BINDER-02 DOE/ID-10534,BINDER-03 FOR PART A) - FINAL DOE/ID-10572,BINDER-02 00
12-SEP-97 ORLEAN, H. ADDITIONAL ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 15053 00
03-SEP-97 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OU 3-13 AT INEEL (DRAFT) JUNE 1997 (06/97) 15051 00
13-AUG-97 ORLEAN, H. EPA COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL 10429 00
11-AUG-97 RENO, S. L. IDHW-DEQ EXTENSION OF REVIEW PERIOD ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL - DOE/ID-10572 JUNE 1997 (06/97) 10430 00
17-DEC-96 JINES, A. RESPONSE TO COMMENTS FOR WASTE AREA GROUP 3 (WAG-3) DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT- PART A OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT OPE-ER-196-96 00
13-NOV-96 JENKINS, T. W. TWENTY (20) DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL - PART A - REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT FINAL) OPE-ER-173-96 00
08-OCT-96 RENO, S. L. IDHW COMMENTS ON COMPREHENSIVE RI/FS FOR ICPP OU 3-13 AT INEL - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) - DRAFT DOE/ID-10534 12996 00
04-OCT-96 ORLEAN, H. EPA COMMENTS ON DRAFT COMPREHENSIVE RI/FS FOR ICPP OU 3-13 - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) - REPORT 12995 00
29-AUG-96 RENO, S. L. IDHW REQUEST FOR EXTENSION OF REVIEW PERIOD ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT) - (OPE-ER-122-96) 10298 00
05-AUG-96 JENSEN, N. R. DOE TRANSMITTAL OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL PART A REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT) OPE-ER-122-96 00
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) INEL/95-0056, VOL 02 0
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, VOLUME I (VOL.01) INEL/95-0056, VOL. 01 0
05-JUL-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-127-95 00
05-JUN-95 GREEN, L. A. EXTENSION OF COMMENT RESOLUTION PERIOD ON WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-102-95 00
01-MAY-95 RENO, S. L. IDHW-DEQ COMMENTS ON WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) 18023 00
07-NOV-94 RENO, S. L. IDHW-DEQ COMMENTS ON DRAFT TEHCNICAL MEMORANDUM FOR WATER QUALITY TREND ANALYSIS IN SNAKE RIVER PLAIN AQUIFER (SRPA), IDAHO CHEMICAL PROCESSING PLANT (ICPP), OCTOBER 6, 1994 (10/06/94) 15039 00
01-NOV-94 RENO, S. L. IDHW COMMENTS ON DRAFT TECHNICAL MEMORANDUM, WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) METHODOLOGY OPERABLE UNIT (OU) 3-13 SEPTEMBER 28, 1994 (09/28/94) 15034 00
26-OCT-94 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT - ACTION DETERMINATION FOR OU 3-02 SITES - CPP-23 & CPP-37 SHOULD BE INCLUDED IN WAG-3 OPERABLE UNIT (OU) 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AND NO FURTHER ACTION DETERMINATION FOR CPP-59 5806 00
21-OCT-94 GREEN, L. A. TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-283-94 00
14-OCT-94 WINCO FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5791 00
12-OCT-94 MEYER, L. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 3-02 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 10033 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW) WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY (RI/FS) 15035 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW), WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5785 00
10-AUG-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5782 00
08-AUG-94 MEYER, L. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5783 00
05-AUG-94 WINCO TRACK 2 SUMMARY REPORT FOR CPP-23 CPP INJECTION WELL: CPP-37 GRAVEL PIT 1 & PIT 2 & CPP-59 KEROSENE TANK OVERFLOW WEST OF CPP-633, REV.02 5804 00
05-AUG-94 WINCO TRACK 2 SUMMARY REPORT REFERENCES FOR CPP-23 CPP INJECTION WELL; CPP-37 GRAVEL PIT 1 & PIT 2; & CPP-59 KEROSENE TANK OVERFLOW EAST OF CPP-633, REV.02 5805 00
05-JUL-94 MEYER, L. EPA COMMENTS ON THE DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT, OU 3-02 5807 00
01-JUL-94 RENO, S. L. IDHW-DEQ COMMENTS, DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT, OU 3-02 IDAHO CHEMICAL PROCESSING PLANT (ICPP) 5808 00
04-JAN-93 WINCO TRACK 1 DECISION DOCUMENTATION PACKAGE - INVESTIGATION OF CPP-23 - ACTION DETERMINATION, PROCEED TO TRACK 2 SCOPING 5343 00
14-MAR-91 BURNS, T. F. NOTIFICATION OF MODIFICATION OF PART A PERMIT FOR INEL - SUMMARY OF IDAHO CHEMICAL PROCESSING PLANT (ICPP) LAND DISPOSAL RESTRICTIONS (LDR) RECLASSIFICATIONS ERD-075-91 00
04-FEB-91 EARLE, O. K. REVISED LAND DISPOSAL UNITS (LDU) QUESTIONNAIRES OKE-13-91 00
22-AUG-90 SOLECKI, J. E. CALIPER LOGS FOR CPP-23 INJECTION WELL 2820 00
17-APR-90 KOSHUTA, C. R. REVIEW OF THE REVISED CLOSURE PLAN (CP) FOR CPP-23 6725 00
11-JAN-90 SOLECKI, J. E. DETAILED SCHEDULES FOR PREPARATION OF CLOSURE PLANS (CP) FOR COCA WASTE MANAGEMENT UNITS 8206 00
22-DEC-89 BLUMBERG, D. J. STATUS REPORT FOR DECEMBER 1989 (12/89) CLOSURE PLAN (CP) PREPARATION KHK-147-89 00
11-DEC-89 MOZES, R. F. IDAHO CHEMICAL PROCESSING PLANT (ICPP) INJECTION WELL ABANDONMENT REPORT RFM-41-89 00
15-NOV-89 SOLECKI, J. E. RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM EPA & STATE 10986 00
09-NOV-89 BLUMBERG, D. J. RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) AND STATE DJB-40-89 00
26-OCT-89 KOSHUTA, C. R. NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL - EPA AND IDHW REVIEWED DOE'S REVISED CLOSURE PLAN SCHEDULE AND FEEL THE SCHEDULE IS DEFICIENT 6709 00
01-OCT-89 FENIX SCISSON & MK-FIC REPORT ON PERFORATION & CEMENTING FOR ABANDONMENT OF THE INJECTION WELL MAH-FE-PL-304 6638 00
29-SEP-89 SOLECKI, J. E. REVISED CLOSURE PLAN (CP) SCHEDULE FOR EIGHT (8) LDU'S FOR EG&G AND THREE (3) LDU'S FOR WINCO 10110 00
01-SEP-89 SOLECKI, J. E. REVISED CLOSURE PLAN (CP) APPROACH FOR LAND DISPOSAL UNITS (LDU) 8472 00
27-MAY-87 MANN, L. J. USGS COMMENTS - GROUNDWATER MONITORING PLAN (GMP) ICPP INJECTION WELL 2558 00
27-MAY-87 MANN, L. J. USGS COMMENTS - CLOSURE PLAN (CP), ICPP INJECTION WELL 2559 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CPP INJECTION WELL (MAH-FE-304) 5387 00
08-MAY-86 VALENTINE, J. H. MEETING - INJECTION WELL - MAY 8, 1986 (05/08/86) 6626 00