Select By Site Code

For Site Code CPP-121

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
29-JAN-18 NOT SPECIFIED CORRECTED TABLE B-3 DOE/ID-11462 REV 0 6087213 0
01-JUN-17 FORBES, JEFFREY R. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
01-JUN-17 SHANKLIN, DEAN E. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
01-JUN-17 LAWRENCE, SARAH D. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JUN-16 JOLLEY, WENDELL L. FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11545 0
01-JUN-16 FORBES, JEFFREY R. FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11545 0
14-SEP-15 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - FORMER INTEC BUILDINGS CPP-601, CPP-602, CPP-627, AND CPP-640 AND EARTHEN CAP, CPP-139 (PART B) NSI-26008 00
01-JUL-15 NOT SPECIFIED FISCAL YEAR 2014 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11526 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
01-JUN-14 NOT SPECIFIED FISCAL YEAR 2013 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11500 0
01-JUN-13 NOT SPECIFIED FISCAL YEAR 2012 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11476 0
08-JAN-13 NOT SPECIFIED NEW SITE IDENTIFICATION (NSI) - INTEC BUILDINGS CPP-601, CPP-602, CPP-627, AND CPP-640 LANDFILL, CPP-139 (PART A) NSI-26008 0
31-JUL-12 NOT SPECIFIED FISCAL YEAR 2011 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11462 0
20-JUN-12 JOHANSEN, PETE DRAFT FINAL OU 3-14 REMEDIAL ACTIONS: PHASE II 90% DESIGN DOCUMENT (EDF-101116) 4008610 0
19-MAR-12 HAIN, KATHLEEN E. TRANSMITTAL OF THE OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT (EDF-10116), REVISION 0 (WDP-RWMC-12-012) WDP-RWMC-12-012 0
14-MAR-12 JOHANSEN, PETE COMMENTS ON THE OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN (DRAFT), DOE-ID-11337 IR-25322 0
06-MAR-12 SHANKLIN, DEAN E. OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT EDF-10116 0
17-FEB-12 FAULK, DENNIS WASTE AREA GROUP 3, OU 3-13 GROUP 2 SOILS BENEATH CPP-601, AND CPP-602 DEFERRED ACTION REMEDY IR-25318 0
17-FEB-12 JOHANSEN, PETE WASTE AREA GROUP 3, OU 3-13 GROUP 2 SOILS BENEATH CPP-601 AND CPP-602 DEFERRED ACTION REMEDY IR-25319 0
15-FEB-12 FAULK, DENNIS EPA Concurrence on Operable Unit 3-14 Draft Final Phase II 90% Design and Phase III Acceleration Proposal IR-25317 0
15-FEB-12 HAIN, KATHLEEN E. TRANSMITTAL OF THE FINAL REMOVAL ACTION REPORT FOR CPP-601, CPP-602, CPP-627, CPP-630, AND CPP-640 (DOE/ID-11453)(WDP-RWMC-12-005) WDP-RWMC-12-005 0
14-FEB-12 JOHANSEN, PETE WASTE AREA GROUP 3, FINAL REMOVAL ACTION REPORT FOR CPP-601, CPP-602, CPP-627, CPP-630, AND CPP-640, DOE/ID-11453, FEBRUARY 2012 IR-25320 0
14-FEB-12 KOCH, DARYL F. Department of Energy Operable Unit 3-14 Phase III Acceleration Proposal (WDP-RWMC-12-003) WDP-RWMC-12-003 0
08-FEB-12 NOT SPECIFIED GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-601, CPP-602, CPP-627, AND CPP-640 FUEL REPROCESSING COMPLEX NON-TIME-CRITICAL REMOVAL ACTION EDF-10195 1
08-FEB-12 NOT SPECIFIED RESIDUAL RADIOACTIVE INVENTORY FOR FUEL REPROCESSING COMPLEX NON-TIME CRITICAL REMOVAL ACTION REPORT EDF-10239 0
01-FEB-12 NOT SPECIFIED FINAL REMOVAL ACTION REPORT FOR CPP-601, CPP-602, CPP-627, CPP-630, AND CPP-640 DOE/ID-11453 0
31-JAN-12 NOT SPECIFIED PREFINAL INSPECTION REPORT FOR OPERABLE UNIT 3-14, PHASE I DOE/ID-11461 0
10-NOV-11 FAULK, DENNIS CONCURRENCE ON LEAVING PIPING WITH LEADED JOINTS BENEATH CPP-601 AND CPP-602 AS IMPRACTICAL TO REMOVE (WDP-RWMC-11-068) AR-25313 0
07-NOV-11 HAIN, KATHLEEN E. REQUEST FOR CONCURRENCE ON LEAVING PIPING WITH LEADED JOINTS BENEATH CPP-601 AND CPP-602 AS IMPRACTICAL TO REMOVE (WDP-RWMC-11-068) AR-25312 0
31-AUG-11 NOT SPECIFIED FISCAL YEAR 2010 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11442 1
09-JAN-09 RENO, SCOTT L. ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (ICP) DOE/ID-11293 1
22-MAY-07 MCMANAMON, L. E. ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 03
16-MAY-07 DEQ RECORD OF DECISION (ROD) FOR TANK FARM SOIL AND IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER, OPERABLE UNIT (OU) 3-14 DOE/ID-11296 00
31-OCT-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 02
13-JUL-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 01
31-MAY-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 00
20-JUN-05 HAIN, K. E. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-117, CPP-118, CPP-119, CPP-120, CPP-121, CPP-122 AND CPP-123 - FUEL PROCESSING POTENTIAL RELEASES 24915 00
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) INEL/95-0056, VOL 02 0
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, VOLUME I (VOL.01) INEL/95-0056, VOL. 01 0


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page