Select By Site Code

For Site Code CFA-17

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
09-AUG-05 JESSMORE, P. J. PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 4 (WAG-4), CENTRAL FACILITIES AREA (CFA) ICP/EXT-05-00955 00
17-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 4-05 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 4-05 AR.INDEX.OU.4-05 00
01-FEB-99 BURGESS, J. D. COMPREHENSIVE REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) FOR CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-13 AT INEEL - BOOK 1 & BOOK 2 DOE/ID-10680 00
04-NOV-98 MCCORMICK, S. H. HAZARDOUS WASTE DETERMINATION (HWD) - WASTE AREA GROUP 4 (WAG-4) OPERABLE UNIT (OU) 4-05 SITES CFA-17 & CFA-47 CENTRAL FACILITIES AREA (CFA) 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) 10557 00
12-JUN-98 HATHAWAY, C. TRANSMITTAL OF CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL REMOVAL ACTION SUMMARY REPORT FOR OPERABLE UNITS (OU) 4-02, 4-05 & 4-09 OPE-ER-94-98 00
01-JUN-98 LANDIS, J. A. CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL REMOVAL ACTION SUMMARY REPORT OPERABLE UNITS (OU) 4-02, 4-05 & 4-09 INEEL/EXT-97-01462 00
18-SEP-97 TANNER, D. M. CFA TANK FARM REMOVAL, CFA FIRE TRAINING REMOVAL & LAND TREATMENT LIFTS 10559 00
01-SEP-97 GURNEY, L. W. HEALTH & SAFETY PLAN (HSP) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 INEL/EXT-97-00474 01
01-AUG-97 KUHNS, D. J. ACTION MEMORANDUM FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 10428 00
25-JUL-97 JENSEN, N. R. DOE-ID TRANSMITTAL OF WAG-4 DOCUMENTS - ENGINEERING EVALUATION COST ANALYSIS (EE/CA) & ACTION MEMORANDUM FOR WAG-4 MISCELLANEOUS SITES NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-13, CFA-15, CFA-17, CFA-47 & CFA-42 OPE-ER-907-117 00
01-JUL-97 KUHNS, D. J. ACTION MEMORANDUM FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 10423 00
01-JUL-97 LATRAY, D. A. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 DOE/ID-10582 01
04-JUN-97 INEEL COMMUNITY RELATIONS PUBLIC NOTICE - PUBLIC COMMENT PERIOD BEGINS ON REMOVAL OF CONTAMINATED SOILS FROM CENTRAL FACILITIES AREA (CFA) OF INEEL 10556 00
16-MAY-97 RENO, S. L. IDHW-DEQ REVIEW OF DRAFT ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WASTE AREA GROUP 4 (WAG-4) MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-08, CFA-13, CFA-15, CFA-17, CFA-47 CFA-42 10558 00
06-MAY-97 ORLEAN, H. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR WASTE AREA GROUP (WAG-4) MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) 15170 00
01-MAY-97 LATRAY, D. A. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WASTE AREA GROUP 4 (WAG-4) MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 & CFA-42 DOE/ID-10582 00
01-MAY-97 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-13 CFA-15 CFA-17 CFA-47 & CFA-42 DOE/ID-10583 00
01-MAY-97 GURNEY, L. W. HEALTH & SAFETY PLAN (HSP) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-08, CFA-13, CFA-15, CFA-17, CFA-47, CFA-42 INEL/EXT-97-00474 00
30-APR-97 JENSEN, N. R. TRANSMITTAL OF DRAFT FIELD SAMPLING PLAN (FSP) FOR WAG-4 MISCELLANEOUS SITES 1997 REMOVAL ACTION, OU 4-02, 4-05, 4-08 & 4-09 OPE-ER-69-97 00
28-APR-97 JENSEN, N. R. TRANSMITTAL OF DRAFT ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR 1997 WAG-4 MISCELLANEOUS SITES REMOVAL ACTION, OU 4-02, 4-05, 4-08 & 4-09 OPE-ER-64-97 00
22-APR-97 JENSEN, N. R. FOURTEEN (14) DAY NOTIFICATION OF SAMPLING FOR WASTE AREA GROUP 4 (WAG-4) REMOVAL ACTION & COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-61-97 00
12-MAR-97 DOE ACTION DETERMINATION FOR CFA-04, CFA-17 & CFA-47 TO BE EVALUATED IN OU 4-13 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) BASELINE RISK ASSESSMENT (BRA) - NO FURTHER ACTION DETERMINATION FOR CFA-50 IN OPERABLE UNIT (OU) 4-05 - TRACK 2 INVESTIGATI 10401 00
01-MAR-97 MCCORMICK, S. H. WORK PLAN FOR WASTE AREA GROUP 4 (WAG-4) OU 4-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - COMMENT RESPONSES TO IDHW & EPA REVIEW OF DRAFT DOE/ID-10550 00
28-JUN-96 ROSENBERGER, M. S. IDHW RECOMMENDATION FROM TRACK 2 INVESTIGATION OF OPERABLE UNIT (OU) 4-05 AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) 10287 00
09-MAY-96 ORLEAN, H. ENVIRONMENTAL PROTECTION AGENCY (EPA) RECOMMENDATION LETTER & COMMENTS ON PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-05 10274 00
02-MAY-96 GREEN, L. A. TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 4-05 OPE-ER-79-96 00
01-APR-96 PEATROSS, R. G. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 4-05 INEL-95/0626 00
29-MAR-96 ORLEAN, H. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-05 (DRAFT) 10270 00
22-MAR-96 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW) COMMENTS ON PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 4-05 (DRAFT) 10271 00
23-FEB-96 GREEN, L. A. TRANSMITTAL OF DRAFT TRACK 2 SUMMARY REPORT FOR OU 4-05 OPE-ER-34-96 00
18-JUL-95 GREEN, L. A. TRANSMITTAL OF RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR OU 4-05 TRACK 2 OPE-ER-139-95 00
14-JUL-95 GREEN, L. A. TRANSMITTAL OF REVISED SAMPLING & ANALYSIS PLAN (SAP) & DOE RESPONSE TO IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON DRAFT SAP FOR OPERABLE UNIT (OU) 4-05 TRACK 2 OPE-ER-133-95 00
01-JUL-95 HONEYCUTT, T. K. FIELD SAMPLING PLAN (FSP) FOR WAG-4 OU 4-05, TRACK 2 INVESTIGATION INEL-95/0188 00
01-JUL-95 GURNEY, L. W. HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 4-05 TRACK 2 INVESTIGATION INEL-95/0237 00
25-MAY-95 DUDZIAK, A. J. DOE RESPONSE TO EPA & IDHW COMMENTS ON DRAFT OPERABLE UNIT (OU) 4-05 TRACK 2 SCOPE OF WORK (SOW) 10176 00
25-MAY-95 DUDZIAK, A. J. TRANSMITTAL OF DRAFT TRACK 2 SAMPLING & ANALYSIS PLAN (SAP) FOR OU 4-05 OPE-ER-092-95 00
15-FEB-95 BLOOD, H. R. EPA COMMENTS ON SCOPE OF WORK FOR OU 4-05 TRACK 2 INVESTIGATIONS AT CFA INEL 15165 00
13-JAN-95 DUDZIAK, A. J. TRANSMITTAL OF TRACK 2 SCOPE OF WORK FOR OPERABLE UNIT (OU) 4-05 FOR REVIEW & COMMENT OPE-ER-004-95 00
22-DEC-94 PIGOTT, W. R. SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 4-05 TRACK 2 INVESTIGATION 10671 00
29-NOV-94 DUDZIAK, A. J. TRANSMITTAL OF TRACK 2 PRELIMINARY SCOPING PACKAGES FOR OPERABLE UNIT (OU) 4-05 OPE-ER-311-94 00
20-JUL-94 SMITH, M. R. REMOVING MERCURY & ASBESTOS CONTAMINATED MATERIAL FROM THE CFA-674 POND (OU 4-05) 5754 00
08-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - CFA-17 FIRE DEPARTMENT TRAINING AREA; BERMED 2499 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page