CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
---|---|---|---|---|
08-AUG-16 | NOT SPECIFIED | EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE | DOE/ID-11548 | 0 |
01-JAN-15 | NOT SPECIFIED | INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS | DOE/ID-11042 | 9 |
28-AUG-14 | FAULK, DENNIS | EPA LETTER OF APPROVAL OF THE OU 10-04 REMEDIAL ACTION REPORT | 4713378 | 0 |
01-AUG-14 | KIMBRO, VALERIE M. | REMEDIAL ACTION REPORT FOR OPERABLE UNITS 6-05 AND 10-04, PHASE IV | DOE/ID-11498 | 0 |
24-JUL-14 | LIVIERATOS, TED | DEQ COMMENTS ON THE OU 10-04 PHASE IV REMEDIAL ACTION REPORT | 4682814 | 0 |
24-JUL-14 | FAULK, DENNIS | EPA COMMENTS ON THE OU 10-04 PHASE IV REMEDIAL ACTION REPORT | 4682815 | 0 |
01-APR-13 | HOLDREN, K. JEAN | PHASE I REMEDIAL ACTION REPORT FOR OPERABLE UNITS 6-05 AND 10-04 | DOE/ID-11480 | 0 |
27-FEB-07 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 03 |
04-DEC-06 | OPALSKI, D. D. | ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 | 25063 | 00 |
16-AUG-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) | DOE/ID-11289 | 00 |
16-JUN-06 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 01 |
24-MAR-06 | OPALSKI, D. D. | EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR RECORD OF DECISION (ROD) FOR EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES | DOE/ID-11264 | 00 |
04-OCT-05 | JOLLEY, W. L. | FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 00 |
23-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) | DOE/ID-11250 | 00 |
22-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2005 (FY-05) | DOE/ID-11249 | 00 |
30-AUG-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2004 (FY-04) | DOE/NE-ID-11200 | 00 |
19-JAN-05 | WELLS, R. P. | REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I | DOE/NE-ID-11186 | 00 |
09-FEB-04 | WELLS, R. P. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I | DOE/ID-11101 | 00 |
05-FEB-04 | WELLS, R. P. | OPERATIONS AND MAINTENANCE (O&M) PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I | DOE/ID-11102 | 01 |
18-DEC-03 | WELLS, R. P. | OPERATIONS AND MAINTENANCE (O&M) PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I | DOE/ID-11102 | 00 |
24-APR-03 | JOLLEY, W. L. | INSTITUTIONAL CONTROLS STATUS REPORT FOR WASTE AREA GROUPS 6 AND 10 (WAG-6 AND WAG-10) | INEEL/EXT-03-00199 | 00 |
20-MAR-03 | HOBSON, S. | CITIZENS ADVISORY BOARD (CAB) REVIEW AND COMMENTS - RECOMMENDATION #92 FOR THE PROPOSED PLAN FOR OPERABLE UNIT (OU) 10-04 - WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) | 02-CAB-031 | 00 |
04-MAR-03 | NELSON, G. E. | SUBMITTAL OF OPERABLE UNITS (OU) 6-05 AND 10-04 FINAL SCOPE OF WORK (SOW) FOR EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES | EM-ER-03-063 | 00 |
01-FEB-03 | BROOMFIELD, B. J. | OPERABLE UNITS (OU) 6-05 AND 10-04, EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES, REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) | DOE/ID-11035 | 00 |
30-JAN-03 | NELSON, G. E. | SUBMITTAL OF OPERABLE UNITS (OU) 6-05 AND 10-04 REVISED DRAFT SCOPE OF WORK (SOW) FOR EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES | EM-ER-03-031 | 00 |
18-DEC-02 | HATHAWAY, C. | TRANSMITTAL OF ENGINEERING DESIGN FILE (EDF) - RISK ASSESSMENT FOR THE RESIDUAL RADIOLOGICAL CONTAMINATION AT THE BORAX I REACTOR BURIAL SITE, CERCLA SITE BORAX-02, OPERABLE UNIT (OU) 6-01 | EM-ER-02-212 | 00 |
12-DEC-02 | GILES, J. R. | ENGINEERING DESIGN FILE (EDF) - RISK ASSESSMENT FOR THE RESIDUAL RADIOLOGICAL CONTAMINATION AT THE BORAX I REACTOR BURIAL SITE, CERCLA SITE BORAX-02, OPERABLE UNIT (OU) 6-01 | EDF-2208 | 01 |
20-NOV-02 | INEEL COMMUNITY RELATIONS | PRESS RELEASE - AGENCIES SIGN RECORD OF DECISION (ROD) TO CLEANUP EXPLODED ORDNANCE AND OTHER SITES AT THE INEEL | 24761 | 00 |
18-NOV-02 | NELSON, G. E. | TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 6-05 AND 10-04 EXPERIMENTAL BREEDER REACTOR I AND BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) | EM-ER-02-192 | 00 |
05-NOV-02 | BROOMFIELD, B. J. | RECORD OF DECISION (ROD) FOR EXPERIMENTAL BREEDER REACTOR I & BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES - OPERABLE UNITS (OU) 6-05 AND 10-04 | DOE/ID-10980 | 00 |
23-OCT-02 | NELSON, G. E. | IMPLEMENTATION AND MAINTENANCE OF SITE WIDE INSTITUTIONAL CONTROLS AS DISCUSSED IN THE RECORD OF DECISION (ROD) FOR EBR-I/BORAX AREA AND MISCELLANEOUS SITES - DOE/ID-10980, SEPTEMBER 2002 (09/02) | EM-ER-02-181 | 00 |
24-SEP-02 | NELSON, G. E. | SUBMITTAL OF FINAL RECORD OF DECISION (ROD) FOR EXPERIMENTAL BREEDER REACTOR I BOILING REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES - OPERABLE UNIT (OU) 6-05 AND 10-04 (DOE/ID-10980) | EM-ER-02-161 | 00 |
25-JUN-02 | EPA | EPA AND IDEQ COMMENT RESOLUTION FORMS - DRAFT RECORD OF DECISION (ROD) - EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I /BORAX) AND MISCELLANEOUS SITES - OPERABLE UNITS (OU) 6-05 & 10-04 - DOE/ID-10980 | 23839 | 00 |
11-JUN-02 | NELSON, G. E. | TWENTY (20) DAY EXTENSION OF COMMENT RESOLUTION PERIOD FOR OPERABLE UNIT (OU) 10-04 DRAFT RECORD OF DECISION (ROD) | EM-ER-02-101 | 00 |
26-APR-02 | HAIN, K. E. | DOE RESPONSE TO CAB COMMENTS - INEEL CITIZENS ADVISORY BOARD (CAB) SUBMITTAL OF RECOMMENDATION #92 | EM-ER-02-057 | 00 |
13-FEB-02 | HOBSON, S. | CITIZENS ADVISORY BOARD (CAB) REQUEST FOR A 30 DAY EXTENSION TO PUBLIC COMMENT PERIOD ON OPERABLE UNIT (OU) 10-04 PROPOSED PLAN | 02-CAB-008 | 00 |
12-FEB-02 | SCHWARTZ, N. | TRANSCRIPT FROM OPERABLE UNIT (OU) 10-04 PROPOSED PLAN PUBLIC MEETING HELD IN IDAHO FALLS, IDAHO FEBRUARY 12, 2002 (02/12/02) | 24759 | 00 |
07-FEB-02 | SCHWARTZ, N. | TRANSCRIPT FROM OPERABLE UNIT (OU) 10-04 PROPOSED PLAN PUBLIC MEETING HELD IN BOISE, IDAHO FEBRUARY 7, 2002 (02/07/02) | 24758 | 00 |
06-FEB-02 | NELSON, G. E. | OPERABLE UNIT (OU) 10-04 FFA/CO DEADLINE FOR SUBMITTAL OF DRAFT RECORD OF DECISION (ROD) - CONFIRMATION OF AGREEMENT REGARDING DEADLINE EXTENSION BY 30 CALENDAR DAYS | EM-ER-02-019 | 00 |
25-JAN-02 | NELSON, G. E. | INEEL WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 PROPOSED PLAN - EXTENSION OF PUBLIC REVIEW PERIOD BY 30 CALENDAR DAYS | EM-ER-02-014 | 00 |
01-JAN-02 | INEEL COMMUNITY RELATIONS | INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) ENVIRONMENTAL INVESTIGATION COMPLETE | 10955 | 00 |
01-JAN-02 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR OPERABLE UNIT (OU) 10-04 - WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) | 10956 | 00 |
13-SEP-01 | HAIN, K. E. | TRANSMITTAL OF INEEL WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 SUBMITTAL OF DRAFT PROPOSED PLAN FOR REVIEW AND COMMENT | EM-ER-01-151 | 00 |
17-AUG-01 | POETON, R. W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REMEDIAL ACTION (RA) REVIEW - INEEL STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR 1 (BORAX I) BURIAL GROUNDS | 23603 | 00 |
17-AUG-01 | POETON, R. W. | U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) REGION 10 OFFICE OF ENVIRONMENTAL CLEANUP REMEDIAL ACTION REVIEW - INEEL STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS | 24742 | 00 |
16-AUG-01 | NELSON, G. E. | SUBMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 - VOLUME 1 (VOL.01) AND VOLUME 2 (VOL.02) | EM-ER-01-131 | 00 |
15-AUG-01 | VANHORN, R. L. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 - VOLUME 1 (VOL.01) OF 2 | DOE/ID-10807,VOL.01 | 00 |
15-AUG-01 | VANHORN, R. L. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 - VOLUME 2 (VOL.02) OF 2 | DOE/ID-10807,VOL.02 | 00 |
02-AUG-01 | NELSON, G. E. | WAG-10 - REQUEST FOR AGREEMENT WITH FIFTEEN (15) DAY SCHEDULE EXTENSION FOR ISSUING THE FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) IN ACCORDANCE WITH FFA/CO SECTION 8.18 | EM-ER-01-126 | 00 |
05-JUL-01 | NELSON, G. E. | SUBMITTAL OF DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ASSESSMENT FOR WASTE AREA GROUPS 6 AND 10 (WAG-6 AND WAG-10) OPERABLE UNIT (OU) 10-04 FOR REVIEW AND COMMENT | EM-ER-01-119 | 00 |
08-MAY-01 | WINTER, G. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON THE DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 | 10934 | 00 |
08-MAY-01 | HATHAWAY, C. | 2001 ANNUAL INSPECTION SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-05 STATIONARY LOW POWER REACTOR 1 (SL-1) AND OU 6-01 BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS | EM-ER-01-077 | 00 |
07-MAY-01 | DOE | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS AND RESOLUTIONS TO COMMENTS ON THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WASTE AREA GROUP 6 AND 10 (WAG-6 & WAG-10) FOR OPERABLE UNIT (OU) 10-04 | 10940 | 00 |
04-MAY-01 | POETON, R. W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON THE DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 | 10933 | 00 |
04-MAY-01 | NOT SPECIFIED | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS AND RESOLUTIONS TO COMMENTS ON THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 10-04 | 10939 | 00 |
05-OCT-00 | HATHAWAY, C. | TRANSMITTAL OF OPERABLE UNIT (OU) 5-05 STATIONARY LOW POWER 1 (SL-1) BURIAL GROUNDS & OU 6-01 BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIED REACTOR ANNUAL INSPECTION REPORT, DE-AC07-99ID13727 | EM-ER-191-00 | 00 |
20-SEP-00 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV | DOE/ID-10587 | 06 |
01-MAY-00 | PERRY, S. W. | FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 10-04 FLY ASH PIT & BORAX | INEEL/EXT-99-01053 | 00 |
23-MAR-00 | GIANOTTO, D. F. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEEL/EXT-99-01253 | 00 |
11-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 5-05 AND OU 6-01 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 SCOPING OF THE AUXILIARY REACTOR AREA II (ARA II) STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND OU 5-05 AND OU 6-01 | AR.INDEX.OU.5-05 | 00 |
01-AUG-99 | INEEL COMMUNITY RELATIONS | INEEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - COMPREHENSIVE INVESTIGATION UNDER WAY FOR WASTE AREA GROUP 10 (WAG-10) | 18049 | 00 |
22-JUN-99 | PIERRE, W. | REQUEST FOR EXTENSION FOR OPERABLE UNIT (OU) 10-04 DEADLINE FOR DRAFT RECORD OF DECISION (ROD) | 10663 | 00 |
16-JUN-99 | NYGARD, D. | RESPONSE TO REQUEST FOR EXTENSION OF OPERABLE UNIT (OU) 10-04 REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) SCHEDULE & ADDITION OF NEW OPERABLE UNITS (OU) TITLED 10-08 & 10-09 | 10666 | 00 |
26-APR-99 | BURNS, D. E. | WORK PLAN FOR WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10554 | 00 |
05-FEB-99 | KROUPA, P. C. | WASTE AREA GROUP 10 (WAG-10) TIME EXTENSION ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | OPE-ER-21-99 | 00 |
29-JAN-99 | WINTER, G. | CORRECTED REVIEW COMMENTS ON WORK PLAN FOR WASTE AREA GROUPS 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - (DRAFT) DOE/ID-10554 NOVEMBER 1998 (11/98) | 10566 | 00 |
29-DEC-98 | POETON, R. W. | EXTENSION OF REVIEW FOR WASTE AREA GROUPS 6 & 10 (WAG-6 & WAG-10) OPERABLE UNIT (OU) 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT WORK PLAN | 10565 | 00 |
01-OCT-97 | ROTHERMEL, J. S. | REMEDIAL ACTION (RA) REPORT OPERABLE UNIT (OU) 5-05 STATIONARY LOW POWER REACTOR 1 (SL-1) & OU 6-01 BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS ENGINEERED BARRIERS | DOE/ID-10591 | 00 |
01-JUL-97 | CRAM, A. J. | STATIONARY LOW POWER REACTOR 1 (SL-1) & BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS ENGINEERED BARRIERS PROJECT OPERATION AND MAINTENANCE (O&M) PLAN OPERABLE UNIT (OU) 5-05 & OU 6-01 | INEL-95/0625 | 01 |
14-MAR-97 | BARNA, S. M. | SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10553 | 00 |
25-FEB-97 | WINTER, G. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT FINAL SCOPE OF WORK FOR OU 10-04 WASTE AREA GROUP 6 (WAG-6) & 10 (WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 10415 | 00 |
31-DEC-96 | POETON, R. W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT OU 10-04 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) STATEMENT OF WORK (SOW) - (OPE-ER-171-96) | 10306 | 00 |
30-DEC-96 | WINTER, G. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WAG-6 & WAG-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), DOE/ID-10553, NOVEMBER 1996 (11/96) | 10307 | 00 |
13-DEC-96 | DEPPERSCHMIDT, J. D. | TRANSMITTAL OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 10-04 WASTE AREA GROUP 6 & 10 (WAG-6 & WAG-10) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) TO INEL NATURAL RESOURCE TRUSTEE COUNCIL MEMBERS | OPE-EP-96-474 | 00 |
01-JUL-96 | FITCH, D. R. | FIELD SAMPLING PLAN (FSP) SL-1 & BORAX I BURIAL GROUNDS OPERABLE UNIT (OU) 5-05 & 6-01 (PARSONS ES-28.6.3) | DOE/ID-10540 | 00 |
04-APR-96 | GREEN, L. A. | TRANSMITTAL OF DRAFT FINAL WORK PLAN FOR SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) ACTIVITIES & DOE COMMENT RESOLUTIONS TO IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS | OPE/ER-96-061 | 00 |
01-APR-96 | COTTEN, G. B. | DESIGN DRAWINGS - CONSTRUCTION PLANS - APPENDIX C OF DOE/ID-10532, SL-1 & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS PROJECT RD/RA WORK PLAN | 11822 | 00 |
01-APR-96 | ROSENBERGER, M. S. | DOE RESOLUTIONS FOR IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY ( IDHW-DEQ) COMMENTS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 5-05 & 6-01 | 11823 | 00 |
01-APR-96 | COTTEN, G. B. | STATIONARY LOW POWER REACTOR-1 (SL-1) & BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS ENGINEERED BARRIERS PROJECT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN (PARSON'S #ES.28.06.23) | DOE/ID-10532 | 00 |
01-APR-96 | PARSONS ENGINEERING | STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS PROJECT OPERATION & MAINTENANCE (O&M) PLAN OU 5-05 & 6-01 - PARSONS #ES-28.6.9.12 | INEL-95/0625 | 00 |
01-APR-96 | PARSONS ENGINEERING | STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS HEALTH & SAFETY PLAN (HSP) OU 5-05 & 6-01 - PARSONS #ES.28.6.12 | INEL-95/0636 | 00 |
22-MAR-96 | GREEN, L. A. | WORKING SCHEDULE FOR SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL DESIGN AND REMEDIAL ACTION (RD/RA) ACTIVITIES | OPE-ER-52-96 | 00 |
21-MAR-96 | GREEN, L. A. | TRANSMITTAL OF REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK FOR SL-1 & BORAX I BURIAL GROUNDS - RESOLUTION TABLES FOR IDHW REVIEW COMMENTS ARE INCLUDED | OPE-ER-50-96 | 00 |
01-MAR-96 | ROTHERMEL, J. S. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS - OU 5-05 & 6-01 | INEL-95/0456 | 00 |
08-FEB-96 | GREEN, L. A. | TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS OU 5-05 & 6-01 AND TEN (10) NO ACTION SITES ROD | OPE-ER-27-96 | 00 |
08-FEB-96 | GREEN, L. A. | TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS OU 5-05 & 6-01 AND TEN (10) NO ACTION SITES ROD | OPE-ER-28-96 | 00 |
09-JAN-96 | DOE, EPA, IDHW | RECORD OF DECISION (ROD) FOR STATIONARY LOW POWER REACTOR 1 (SL-1) OU 5-05 & BORAX I BURIAL GROUNDS OU 6-01 & 10 (TEN) NO ACTION SITES (OU 5-01, 5-03, 5-04 AND 5-11) | INEL-95/0282 | 00 |
22-DEC-95 | GREEN, L. A. | STATIONARY LOW POWER REACTOR 1 (SL-1) & BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS (OU 5-05 & 6-01) & TEN (10) NO ACTION SITES RECORD OF DECISION (ROD), TRANSMITTAL OF | OPE-ER-234-95 | 00 |
07-DEC-95 | JINES, A. | AUXILIARY REACTOR AREA (ARA) WINDBLOWN SOILS EVALUATION | OPE-ER-225-95 | 00 |
13-NOV-95 | UNDERWOOD, E. J. | IDHW REVIEW COMMENTS ON OU 5-05 AND 6-01 DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK | 11486 | 00 |
08-NOV-95 | UNDERWOOD, E. J. | IDHW REVIEW COMMENTS ON OPERABLE UNIT (OU) 5-05 AND 6-01 DRAFT FINAL RECORD OF DECISION (ROD) | 10172 | 00 |
02-NOV-95 | JENSEN, N. R. | TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) BOILING WATER REACTOR EXPERIMENT BORAX I BURIAL GROUNDS OPERABLE UNIT (OU) 5-05 AND 6-01 & TEN (10) NO ACTION SITES RECORD OF DECISION (ROD), FOR REVIEW AND SIGNATURE | OPE-ER-204-95 | 00 |
13-OCT-95 | UNDERWOOD, E. J. | IDHW COMMENTS ON VARIOUS DOCUMENTS FOR OPERABLE UNIT (OU) 5-05 AND 6-01 | 10171 | 00 |
10-OCT-95 | ORLEAN, H. | EPA COMMENTS ON SEPTEMBER 1995 (09/95) DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) | 10163 | 00 |
06-OCT-95 | GREEN, L. A. | SAMPLING EVENT NOTIFICATION | OPE-ER-193-95 | 00 |
22-SEP-95 | UNDERWOOD, E. J. | IDHW ASSESSMENT OF RISK FROM EXTERNAL EXPOSURE TO RADIATION FROM CONTAMINATION BROUGHT TO THE SURFACE BY BIOLOGICAL ACTIVITY AT SL-1 AND BORAX I SITES | 10169 | 00 |
22-SEP-95 | UNDERWOOD, E. J. | IDHW TRANSMITTAL OF VARIOUS DOCUMENTS FOR OPERABLE UNIT (OU) 5-05 AND 6-01 | 10170 | 00 |
20-SEP-95 | GREEN, L. A. | COMMENT RESOLUTION TABLES FOR 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS), PROPOSED PLAN | OPE-ER-176-95 | 00 |
20-SEP-95 | JINES, A. | ASSESSMENT OF RISK FROM EXTERNAL EXPOSURE TO RADIATION FROM CONTAMINATION BROUGHT TO SURFACE BY BIOLOGICAL ACTIVITY AT SL-1 AND BORAX I SITES | OPE-ER-177-95 | 00 |
13-SEP-95 | GREEN, L. A. | TRANSMITTAL OF VARIOUS DOCUMENTS FOR OU 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS) | OPE-ER-187-95 | 00 |
CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
---|---|---|---|---|
12-SEP-95 | GREEN, L. A. | TRANSMITTAL OF VARIOUS DOCUMENTS FOR OPERABLE UNITS (OU) 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS) | OPE-ER0-172-95 | 00 |
07-SEP-95 | JORGENSEN, D. K. | ENGINEERING DESIGN FILE (EDF) - ARA WINDBLOWN AREA RISK EVALUATION - (EDF SERIAL NUMBER IS INEL-95/103) | ER-WAG5-54 | 02 |
01-SEP-95 | HOLDREN, K. J. | ASSESSMENT OF SURFACE SOILS SURROUNDING SL-1 BURIAL GROUNDS | 10137 | 00 |
30-AUG-95 | FILEMYR, R. G. | SUPPORT DOCUMENTATION: ESTIMATION OF URANIUM-235 SURFACE SOIL CONCENTRATIONS BASED ON MASS UNRECOVERED AT BORAX I BURIAL GROUNDS | 10133 | 00 |
30-AUG-95 | FILEMYR, R. G. | ERRATA FOR REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OPERABLE UNITS (OU) 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS | 10134 | 00 |
30-AUG-95 | FILEMYR, R. G. | SUPPORT DOCUMENTATION; ANNUAL DOSE CALCULATIONS FOR SELECTED SCENARIOS AT SL-1 AND BORAX I BURIAL GROUNDS | 10135 | 00 |
30-AUG-95 | FILEMYR, R. G. | SL-1 & BORAX I CLASS C WASTE EQUIVALENCY DETERMINATION | 10136 | 00 |
22-AUG-95 | ORLEAN, H. | EPA COMMENTS ON FINAL DRAFT RECORD OF DECISION (ROD) FOR OU 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) | 10162 | 00 |
18-AUG-95 | UNDERWOOD, E. J. | IDHW REVIEW COMMENTS ON OPERABLE UNIT (OU) 5-05 AND 6-01 DRAFT RECORD OF DECISION (ROD) | 10168 | 00 |
03-AUG-95 | GREEN, L. A. | TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS (OU 5-05 & 6-01) & TEN (10) NO ACTION SITES RECORD OF DECISION (ROD) - DRAFT FOR REVIEW | OPE-ER-146-95 | 00 |
25-JUL-95 | BLOOD, H. R. | EPA COMMENTS ON DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT, VOLUME 1 OF 2 (VOL.01 OF VOL.02) FOR OPERABLE UNIT (OU) 5-05 & 6-01 SL-1 & BORAX I BURIAL GROUNDS | 10158 | 00 |
07-JUL-95 | ORLEAN, H. | EPA COMMENTS ON ASSESSMENT OF SURFACE SOILS SURROUNDING SL-1 BURIAL GROUND | 10161 | 00 |
20-JUN-95 | UNDERWOOD, E. J. | IDAHO DEPARTMENT OF HEALTH AND WELFARE, DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON ASSESSMENT OF SURFACE SOILS SURROUNDING THE SL-1 BURIAL GROUND AND ARA WINDBLOWN AREA RISK EVALUATION | 10167 | 00 |
18-MAY-95 | DANE, R. | INEL PROPOSED PLANS PUBLIC MEETING & COMMENT SESSION TRANSCRIPT - PRESENTATION 1: SL-1 & BORAX I BURIAL SITE INVESTIGATIONS & TRACK 1'S - PRESENTATION 2: CFA LANDFILLS & TRACK 1'S - HELD IN MOSCOW, IDAHO MAY 18, 1995 (05/18/96) | 10157 | 00 |
17-MAY-95 | SCHWARTZ, N. | INEL PROPOSED PLANS PUBLIC MEETING & COMMENT SESSION TRANSCRIPT - PRESENTATION 1: SL-1 & BORAX I BURIAL SITE INVESTIGATIONS & TRACK 1'S - PRESENTATION 2: CFA LANDFILLS TRACK 1'S - HELD IN BOISE, IDAHO MAY 17, 1995 (05/17/95) | 10156 | 00 |
16-MAY-95 | DANE, R. | INEL PROPOSED PLANS PUBLIC MEETING & COMMENT SESSION TRANSCRIPT - PRESENTATION 1: SL-1 & BORAX I BURIAL SITE INVESTIGATIONS & TRACK 1'S - PRESENTATION 2: CFA LANDFILLS & TRACK 1'S - HELD IN IDAHO FALLS MAY 16, 1995 (05/16/95) | 10155 | 00 |
02-MAY-95 | GREEN, L. A. | TRANSMITTAL OF PROPOSED PLAN FOR OU 5-05, SL-1 BURIAL BURIAL GROUND AND 6-01, BORAX I BURIAL GROUND AND VARIOUS NO ACTION TRACK 1 SITES | OPE-ER-086-95 | 00 |
01-MAY-95 | DOE, EPA, IDHW | PROPOSED PLAN FOR OPERABLE UNITS (OU) 5-05 AND 6-01 STATIONARY LOW POWER REACTOR 1 (SL-1) AND THE BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS | 10011 | 00 |
01-APR-95 | DOE, EPA, IDHW | NOTICE OF AVAILABILITY FOR CFA LANDFILL I, II, & III OU 4-12, STATIONARY LOW POWER REACTOR 1 (SL-1) & BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS OU 5-05 & 6-01 | 10013 | 00 |
01-APR-95 | INEL COMMUNITY RELATIONS | UPDATE FACT SHEET - INEL INVESTIGATES REACTOR DEBRIS | 9649 | 00 |
20-MAR-95 | UNDERWOOD, E. J. | IDHW REVIEW COMMENTS ON OPERABLE UNIT (OU) 5-05 AND 6-01 DRAFT PROPOSED PLAN | 10166 | 00 |
17-MAR-95 | BLOOD, H. R. | EPA COMMENTS ON DRAFT PROPOSED PLAN FOR SL-1 & BORAX I BURIAL GROUNDS (OU 5-05 & 6-01) | 10160 | 00 |
01-MAR-95 | VETTER, D. W. | REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS | INEL-95/0027 | 00 |
01-MAR-95 | FILEMYR, R. G. | REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS | INEL-95/0027 | 00 |
01-MAR-95 | HOLDREN, K. J. | REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS | INEL-95/0027 | 00 |
17-FEB-95 | BLOOD, H. R. | EPA COMMENTS ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS | 10159 | 00 |
17-FEB-95 | RENO, S. L. | IDHW COMMENTS ON REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) - DRAFT FINAL | 10165 | 00 |
02-DEC-94 | VETTER, D. W. | RECORD OF MEETING WITH CRAIG KVAMME, LITCO, REGARDING BASIS FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) DISPOSAL COSTS | 10027 | 00 |
09-SEP-94 | GREEN, L. A. | REVISION OF SCHEDULE FOR OPERABLE UNIT (OU) 5-05 SL-1 BURIAL GROUND SITE ARA-06 AND 6-01 BORAX I BURIAL GROUND SITE BORAX-02 | OPE-ER-237-94 | 00 |
01-SEP-94 | INEL COMMUNITY RELATIONS | INEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - DOE STUDIES TWO (2) RADIONUCLIDE BURIAL GROUNDS | 7865 | 00 |
01-AUG-94 | RENO, S. L. | COMMENTS IN REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) VOLUME 1 OF 2 (DRAFT) - VOL.01 OF VOL.02 | 10164 | 00 |
06-JUL-94 | HOLDREN, K. J. | INTERVIEWS WITH DARRELL HANNI REGARDING THE STATIONARY LOW POWER REACTOR SL-1 BURIAL GROUND | KJH-09-94 | 00 |
15-JUN-94 | LYLE, J. L. | TRANSMITTAL OF THE DRAFT REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS, VOLUME 1 (VOL.01) OF 2 | OPE-ER-157-94 | 00 |
15-APR-94 | MEADOWS, D. | RECORD OF MEETING WITH ROGER WILHELMSON, EG&G IDAHO REGARDING PIPES IN STATIONARY LOW POWER REACTOR 1 (SL-1) | 10024 | 00 |
14-APR-94 | MEADOWS, D. | RECORD OF MEETING WITH EDDY CHEW, DEPARTMENT OF ENERGY (DOE) IDAHO, REGARDING STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND - PIPES | 10025 | 00 |
14-APR-94 | HOLDREN, K. J. | MEMO OF CONVERSATION WITH RICHARD GREEN REGARDING PIPES IN STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND | 10028 | 00 |
01-MAR-94 | HALFORD, V. E. | RI/FS SCOPE OF WORK FOR OPERABLE UNITS (OU) 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | EGG-ER-10998 | 01 |
17-FEB-94 | TUCKER, J. | RECORD OF MEETING WITH DICK MESERVEY, EG&G IDAHO REGARDING BOILING WATER REACTOR EXPERIMENT (BORAX) I | 10023 | 00 |
16-FEB-94 | VANDERPOEL, G. | RECORD OF MEETING WITH ROGER G. JENSEN, USGS REGARDING DEPTH TO AQUIFER NEAR BOILING WATER REACTOR EXPERIMENT (BORAX) I & STATIONARY LOW POWER REACTOR 1 (SL-1) | 10022 | 00 |
25-JAN-94 | MEADOWS, D. | RECORD OF MEETING WITH GLENN BRISCOE REGARDING STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND | 10026 | 00 |
02-NOV-93 | BLOOD, H. R. | EPA COMMENTS: THE DRAFT RI/FS SCOPE OF WORK FOR OPERABLE UNITS (OU) 5-05 AND 6-01, SL-1 AND BORAX I BURIAL GROUNDS | 5623 | 00 |
01-NOV-93 | NOT SPECIFIED | TECHNICAL MEMORANDUM - PRELIMINARY BASELINE RISK ASSESSMENT (BRA) FOR OU 5-05 & 6-01, SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | MISC-94001 | 00 |
26-OCT-93 | STOOPS, T. M. | IDHW-DEQ COMMENTS TO THE DRAFT SCOPE OF WORK (SOW) FOR THE RI/FS FOR OU 5-05 (SL-1 BURIAL GROUND) AND OU 6-01 (BORAX I BURIAL GROUND) | 5773 | 00 |
01-OCT-93 | NOT SPECIFIED | TECHNICAL MEMORANDUM - OVERVIEW OF EXPOSURE SCENARIOS FOR BASELINE RISK ASSESSMENT (BRA) OU 5-05, 6-01 STATIONARY LOW POWER REACTOR, BORAX I BURIAL GROUNDS REMEDIAL INVESTIGATION (RI) | 5662 | 00 |
03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - BORAX-02 BORAX I BURIAL SITE | 2629 | 00 |
Previous Page | Administrative Record Home Page