Select By Site Code

For Site Code ARA-13

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
26-SEP-05 WELLS, R. P. PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 5 (WAG-5) ICP/EXT-05-00973 00
13-JUL-05 WELLS, R. P. REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 5-12 REMEDIAL ACTION DOE/NE-ID-11205 00
24-SEP-03 WELLS, R. P. FINAL DOCUMENTATION FOR OPERABLE UNIT (OU) 5-12 NO ACTION SITES DOE/ID-11058 00
01-APR-03 ROBERTS, J. D. HEALTH & SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 5-12 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) PROJECTS INEEL/EXT-2000-00515 02
09-JAN-02 LIVIERATOS, T. IDEQ REVIEW COMMENTS AND RESOLUTIONS ON REMEDIAL ACTION (RA) REPORT FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 PHASE I REMEDIAL ACTION (RA); SITES ARA-02, ARA-16, ARA-25, AND INACTIVE SITES ARA-07, ARA-08, ARA-13 AND ARA-21 (DRAFT FINAL) 10953 00
01-JAN-02 WELLS, R. P. REMEDIAL ACTION (RA) REPORT FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 PHASE I REMEDIAL ACTION (RA) SITES ARA-02, ARA-16, ARA-25, AND INACTIVE WASTE SYSTEM SITES ARA-07, ARA-08, ARA-13, AND ARA-21 DOE/ID-10954 00
03-DEC-01 LIVIERATOS, T. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) GENERAL AND SPECIFIC COMMENTS ON REMEDIAL ACTION (RA) REPORT FOR WAG-5 OU 5-12 PHASE I REMEDIAL ACTION (RA); SITES ARA-02, ARA-16, ARA-25, AND INACTIVE SITES ARA-07, ARA-08, ARA-13 AND ARA-21 (DRAFT) 21566 00
26-JUN-01 HATHAWAY, C. TRANSMITTAL OF REVISION 1 (REV.01) OF WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 POWER BURST FACILITY & AUXILIARY REACTOR AREA (PBF/ARA) PHASE I REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EM-ER-01-111 00
19-JUN-01 WELLS, R. P. WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE I - OPERABLE UNIT (OU) 5-12 DOE/ID-10761 01
14-JUN-01 HATHAWAY, C. DISPOSAL OF WASTE AREA GROUP 5 (WAG-5) AUXILIARY REACTOR AREA 13 (ARA-13) SEPTIC WASTE AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPE-EM-ER-01-103 00
12-APR-01 WOOLEY, K. A. HEALTH & SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 5-12 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) PROJECTS INEEL/EXT-2000-00515 01
01-JAN-99 HOLDREN, K. J. WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10607 00
01-MAY-97 WEBBER, F. L. FINAL WORK PLAN FOR WAG-5 OU 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10555 00
01-JAN-97 HIARING, C. M. FINAL SCOPE OF WORK FOR OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10547 00
08-FEB-96 GREEN, L. A. TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS OU 5-05 & 6-01 AND TEN (10) NO ACTION SITES ROD OPE-ER-27-96 00
08-FEB-96 GREEN, L. A. TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS OU 5-05 & 6-01 AND TEN (10) NO ACTION SITES ROD OPE-ER-28-96 00
09-JAN-96 DOE, EPA, IDHW RECORD OF DECISION (ROD) FOR STATIONARY LOW POWER REACTOR 1 (SL-1) OU 5-05 & BORAX I BURIAL GROUNDS OU 6-01 & 10 (TEN) NO ACTION SITES (OU 5-01, 5-03, 5-04 AND 5-11) INEL-95/0282 00
01-MAY-95 DOE, EPA, IDHW PROPOSED PLAN FOR OPERABLE UNITS (OU) 5-05 AND 6-01 STATIONARY LOW POWER REACTOR 1 (SL-1) AND THE BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS 10011 00
04-NOV-94 AR COORDINATOR OPERABLE UNIT (OU) 5-11 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OU 5-11 AR.INDEX.OU.5-11 00
21-JUN-93 NOT SPECIFIED TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - ARA-III SANITARY SEWER LEACH FIELD AND SEPTIC TANK (ARA-740) 5325 00
15-SEP-86 ALEXANDER, T. G. INITIAL ASSESSMENT - ARA-13 SANITARY SEWER LEACH FIELD AND SEPTIC TANK ARA-740 2991 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page