Select By Operable Unit (OU)

For Operable Unit 7/GEN

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
06-AUG-18 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY2017 RPT-1635 0
18-DEC-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 10
01-MAY-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY2016 RPT-1543 0
26-JAN-17 KOCH, DARYL F. DEQ CONCURRENCE TO ADDENDUM TO TABLES 1 AND 3 OF THE GENERAL ACTION MEMO FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 3) (EM-FMDP-17-001) 5661786 0
26-JAN-17 FAULK, DENNIS EPA CONCURRENCE TO ADDENDUM TO TABLES 1 AND 3 OF THE GENERAL ACTION MEMO FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 3) (EM-FMDP-17-001) 5661787 0
18-JAN-17 WHITHAM, KENNETH ADDENDUM TO TABLES 1 AND 3 OF THE GENERAL ACTION MEMO FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 3) (EM-FMDP-17-001) EM-FMDP-17-001 0
01-JAN-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2015 RPT-1503 0
01-JUN-16 NOT SPECIFIED QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 9, 10, AND REMOVAL ACTIONS DOE/ID-10587 11
08-FEB-16 FAULK, DENNIS EPA CONCURRENCE ON THE IDAHO NATIONAL LAB 5 YEAR REVIEW 5282268 0
31-DEC-15 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2010-2014 DOE/ID-11513 0
01-AUG-15 NOT SPECIFIED INL SITE COMMUNITY INVOLVEMENT PLAN DOE/ID-11518 0
01-JUN-15 NOT SPECIFIED ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT DOE/ID-11293 3
01-MAY-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2014 RPT-1361 0
01-APR-15 NOT SPECIFIED ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT DOE/ID-11293 2
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
06-OCT-14 FAULK, DENNIS EPA CONCURRENCE FOR ADDENDUM TO TABLE 1 OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 1) 4747805 0
01-OCT-14 KOCH, DARYL F. DEQ CONCURRENCE FOR ADDENDUM TO TABLE 1 OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 1) 4747806 0
30-SEP-14 JENSEN, NOLAN R. REQUEST FOR CONCURRENCE FOR ADDENDUM TO TABLE 1 OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 1) (WDP-RWMC-14-021) WDP-RWMC-14-021 0
01-MAY-14 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2013 RPT-1268 0
01-SEP-13 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 8
01-JUN-13 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2012 RPT-1196 0
01-JUL-12 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2011 RPT-1001 0
30-APR-12 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 7
07-FEB-11 OPALSKI, DANIEL D. U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE ON THE FIVE-YEAR REVIEW FOR IDAHO NATIONAL LABORATORY FISCAL YEARS 2005-2009 4544925 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 1) DOE/ID-11429 (PART 1) 0
19-JAN-11 NOT SPECIFIED FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 2) DOE/ID-11429 (PART 2) 0
13-JAN-11 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2010 RPT-759 0
31-AUG-09 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 10, AND REMOVAL ACTIONS DOE/ID-10587 10
20-APR-09 BECHTOLD, THOMAS E.. FISCAL YEAR 2008 ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX RPT-620 0
09-JAN-09 RENO, SCOTT L. ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (ICP) DOE/ID-11293 1
05-FEB-08 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS DOE/ID-11042 04
25-JUN-07 MEAGHER, B. G. FISCAL YEAR 2006 (FY-06) ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) RPT-339 00
27-JUL-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN DOE/ID-11042 03
01-MAY-06 HANEY, T. J. LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2006 ICP/EXT-06-01130 00
23-MAR-04 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10587 08
12-SEP-02 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 DOE/ID-10587 07
27-OCT-00 HATHAWAY, C. DISPOSAL OF WASTE AREA GROUP 5 (WAG-5) AUXILIARY REACTOR AREA 16 (ARA-16) AND ARA-25 SOILS AND PIPING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPE-EM-ER-205 00
01-OCT-00 INEEL COMMUNITY RELATIONS INEEL REPORTER - ON-GOING PROBING CAMPAIGN YIELDING VALUABLE INFORMATION ABOUT BURIED WASTE - OCTOBER 2000 - NOVEMBER 2000 (10/2000 - 11/2000) 21900 00
20-SEP-00 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV DOE/ID-10587 06
01-OCT-99 INEEL COMMUNITY RELATIONS UPDATE FACT SHEET - TREATABILITY STUDIES (TS) BEING CONDUCTED AT WASTE AREA GROUP 7 (WAG-7) 10962 00
01-SEP-98 INEEL COMMUNITY RELATIONS INEEL REPORTER - TRANSURANIC WASTE PROGRAM UNDERGOES INSPECTION 16781 00
01-DEC-97 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) DOE/ID-10587 05
01-NOV-95 INEL COMMUNITY RELATIONS INEL REPORTER - 11/95 - 12/95 - MILESTONE ACHIEVED AHEAD OF SCHEDULE 11381 00
01-OCT-95 INEL COMMUNITY RELATIONS INEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - LAST INVESTIGATION BEGINS AT RWMC WAG-7 10879 00
01-MAR-95 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 INEL-95/0086 04
02-AUG-93 BARRY, G. A. TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) 93MSE/ID-225 00
01-AUG-93 BARRY, G. A. SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 6744 00
08-JAN-93 RHODES, D. W. EVALUATION OF RECORDS FOR WASTE GENERATED AT ICPP & DISPOSED AT RWMC DURING THE PERIOD OF 1960 - 1983 DWR-01-93 00
01-DEC-91 PAARMANN, M. L. RWMC INVESTIGATIONS REPORT, VOLUME 1 (VOL.01) EGG-WM-9707,VOL.01 00
01-DEC-91 PAARMANN, M. L. RWMC INVESTIGATIONS REPORT, VOLUME 2 (VOL.02) EGG-WM-9707,VOL.02 00
01-DEC-91 PAARMANN, M. L. RWMC INVESTIGATIONS REPORT, VOLUME 3 (VOL.03) EGG-WM-9707,VOL.03 00
01-DEC-91 PAARMANN, M. L. RWMC INVESTIGATIONS REPORT, VOLUME 4 (VOL.04) EGG-WM-9707,VOL.04 00
01-JUL-91 DONEHEY, A. J. IN SITU TECHNOLOGY EVALUATION & FUNCTIONAL & OPERATIONAL GUIDELINES FOR TREATABILITY STUDIES AT RWMC AT THE INEL EGG-WTD-9799 00
01-MAY-89 LEWIS, B. D. REF - STRATIGRAPHY OF UNSATURATED ZONE AT RWMC, INEL, IDAHO DOE/ID-22080 00
01-DEC-87 MANN, L. J. REF - PURGEABLE ORGANIC COMPOUNDS IN GROUNDWATER AT INEL, IDAHO - USGS OPEN FILE REPORT 87-766 DOE/ID-22074 00
01-NOV-87 LEWIS, B. D. HYDROGEOLOGY & GEOCHEMISTRY OF UNSATURATED ZONE RWMC, INEL DOE/ID-22073 00
01-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - RWMC SUBSURFACE DISPOSAL AREA (SDA) 2837 00
29-SEP-86 MILLER, C. L. EDF - ENGINEERING DESIGN FILE - RWMC SMALL SCALE SOIL GROUT TEST REPORT EDF-263 00
01-AUG-85 REYES, B. D. ENVIRONMENTAL SURVEILLANCE FOR THE INEL RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AND OTHER AREAS - ANNUAL REPORT 1984 EGG-2386 00
01-MAR-82 SCHUMAN, R. P. IMMOBILIZATION OF TRANSURANIC (TRU) SLUDGE IN GLASS CERAMIC MATERIALS (REPORT) EGG-FM-5709 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page