01-MAY-18 NOT SPECIFIED LONG-TERM MONITORING STUDY FOR OPERABLE UNIT 7-13/14 DOE/ID-11568 0
18-APR-18 NOT SPECIFIED REGULATORY AGENCY MEETING TO DISCUSS COMMENTS ON THE 30% DESIGN REPORT FOR THE WAG 7 PHASE 3 REMEDIAL DESIGN OF AN EVAPOTRANSPIRATION COVER ON THE SDA AT THE RWMC, INL CCN 322153 0
13-MAR-18 JEWETT, MARC A. TRANSMITTAL OF THE LIMITATIONS AND VALIDATION REPORTS FOR ANNUAL AQUIFER SAMPLING CONDUCTED IN NOVEMBER 2017 FOR WASTE AREA GROUP 7 CCN 321833 0
01-MAR-18 JEWETT, MARC A. TRANSMITTAL OF THE LIMITATIONS AND VALIDATIONS REPORTS FOR ANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN NOVEMBER 2017 FOR WASTE AREA GROUP 7 CCN 321832 0
01-NOV-17 CRESAP, DALE FISCAL YEAR 2017 ANNUAL LETTER REPORT FOR OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE RPT-1609 0
01-SEP-17 SHANKLIN, DEAN E. OPERABLE UNIT 7-13/14 PHASE 3 SOIL BORROW SOURCE REPORT RPT-1524 0
01-SEP-17 MAHNAMI, DANIEL D. OPERABLE UNIT 7-13/14 PHASE 3 SOIL BORROW SOURCE REPORT RPT-1524 0
01-SEP-17 FORBES, JEFFREY R. OPERABLE UNIT 7-13/14 PHASE 3 SOIL BORROW SOURCE REPORT RPT-1524 0
31-JUL-17 WITKOWSKI, ELIZABETH C. BORROW EXPANSION IN SPREADING AREAS A AND B (OS-ESD-17-083) / SHPO REVIEW NO.: 2017-1130 OS-ESD-17-083 0
13-JUN-17 BROCHU, ROBERT A. DEPARTMENT OF THE ARMY APPROVED JURISDICTIONAL DETERMINATION REGARDING INL SPREADING AREAS CCN 320963 0
30-MAR-17 NOT SPECIFIED OPERABLE UNIT 7-13/14 PHASE 3 PAD A FOCUSED FEASIBILITY STUDY DOE/ID-11541 0
28-MAR-17 NOT SPECIFIED REGULATORY AGENCY MEETING TO DISCUSS WORK SCOPE FOR THE WAG 7 PHASE 3 REMEDIAL DESIGN OF AN EVAPOTRANSPIRATION COVER ON THE SUBSURFACE DISPOSAL AREA AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX, IDAHO NATIONAL LABORATORY SITE 5776749 0
22-MAR-17 CRESAP, DALE A. OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 2
02-MAR-17 JEWETT, MARC A. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORT FOR ANNUAL AQUIFER SAMPLING CONDUCTED IN NOVEMBER 2016 FOR WASTE AREA GROUP 7 CCN 320439 0
15-FEB-17 JEWETT, MARC A. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORT FOR ANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN OCTOBER 2016 FOR WASTE AREA GROUP 7 CCN 320361 0
01-NOV-16 CRESAP, DALE FISCAL YEAR 2016 ANNUAL LETTER REPORT FOR OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE RPT-1528 0
25-OCT-16 JENSEN, NOLAN R. CONSIDERATION OF ACCELERATING THE DATE FOR SUBMITTAL OF THE INTERIM REMEDIAL ACTION REPORT FOR PHASE 1 OF THE REMEDIAL ACTION FOR OPERABLE UNIT 7-13/14 (WDP-RWMC-16-029) WDP-RWMC-16-029 0
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-MAY-16 NOT SPECIFIED OPERABLE UNIT 7-13/14 PHASE 3 BORROW SOURCE FIELD SAMPLING PLAN DOE/ID-11542 0
03-MAR-16 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORT FOR ANNUAL AQUIFER SAMPLING CONDUCTED IN NOVEMBER 2015 FOR WASTE AREA GROUP 7 CCN 318880 0
18-FEB-16 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORT FOR ANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN OCTOBER 2015 FOR WASTE AREA GROUP 7 CCN 318822 0
31-MAR-15 BROWN, M. E. TRANSMITTAL OF THE REVISED LETTER REPORT FOR ANNUAL AQUIFER SAMPLING CONDUCTED IN NOVEMBER 2014 FOR WASTE AREA GROUP 7 CCN 317608 0
31-MAR-15 BROWN, M. E. TRANSMITTAL OF THE REVISED LETTER REPORT FOR ANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN NOVEMBER 2014 FOR WASTE AREA GROUP 7 CCN 317609 0
11-MAR-15 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORT FOR ANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN NOVEMBER 2014 FOR WASTE AREA GROUP 7 CCN 317528 0
05-MAR-15 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORT FOR ANNUAL AQUIFER SAMPLING CONDUCTED IN NOVEMBER 2014 FOR WASTE AREA GROUP 7 CCN 317508 0
01-MAR-15 FORBES, JEFFREY R. OPERABLE UNIT 7-13/14 FIVE-YEAR OPERATIONS AND MAINTENANCE REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11516 0
01-MAR-15 KIMBRO, VALERIE M. OPERABLE UNIT 7-13/14 FIVE-YEAR OPERATIONS AND MAINTENANCE REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11516 0
01-MAR-15 CRESAP, DALE A. OPERABLE UNIT 7-13/14 FIVE-YEAR OPERATIONS AND MAINTENANCE REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11516 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
30-OCT-14 BROWN, M. E. TRANSMITTAL OF FINAL PHASE 1 INTERIM REMEDIAL ACTION REPORT FOR OPERABLE UNIT 7-13/14 TARGETED WASTE RETRIEVALS, DOE/ID-11396, REV.3 CCN 317051 0
01-OCT-14 NOT SPECIFIED PHASE 1 INTERIM REMEDIAL ACTION REPORT FOR OPERABLE UNIT 7-13/14 TARGETED WASTE RETRIEVALS DOE/ID-11396 3
01-AUG-14 FORBES, JEFFREY R. FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 AQUIFER MONITORING DOE/ID-11492 1
01-AUG-14 HOLDREN, K. JEAN FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 AQUIFER MONITORING DOE/ID-11492 1
01-AUG-14 ALBERICO, KRISTINA M. OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 1) 0
01-AUG-14 FORBES, JEFFREY R. OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 1) 0
01-AUG-14 HOLDREN, K. JEAN OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 1) 0
01-AUG-14 ALBERICO, KRISTINA M. OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 2) 0
01-AUG-14 FORBES, JEFFREY R. OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 2) 0
01-AUG-14 HOLDREN, K. JEAN OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 2) 0
01-AUG-14 HOLDREN, K. JEAN OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 3) 0
01-AUG-14 FORBES, JEFFREY R. OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 3) 0
01-AUG-14 ALBERICO, KRISTINA M. OPERABLE UNIT 7-13/14 FIVE-YEAR MONITORING REPORT FOR FISCAL YEARS 2010-2014 DOE/ID-11507 (PART 3) 0
01-APR-14 HOLDREN, K. JEAN OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 1
01-APR-14 LOPEZ, STEVE L. OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 1
01-APR-14 CRESAP, DALE A. OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 1
01-APR-14 HOLDREN, K. JEAN FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 VADOSE ZONE MONITORING DOE/ID-11503 0
05-MAR-14 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR ANNUAL AQUIFER SAMPLING CONDUCTED IN NOVEMBER 2013 FOR WASTE AREA GROUP 7 CCN 316170 0
05-MAR-14 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR ANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN NOVEMBER 2013 FOR WASTE AREA GROUP 7 CCN 316173 0
04-FEB-14 LIVIERATOS, TED REQUEST FOR CONCURRENCE TO REDUCE VADOSE ZONE MONITORING FREQUENCY AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX BEGINNING IN FISCAL YEAR 2014 (WDP-RWMC-14-002) AND TRANSMITTAL OF THE DRAFT NEW SITE IDENTIFICATION FORM FOR SITE CFA-11 4489367 0
04-FEB-14 FAULK, DENNIS EPA CONCURRENCE REGARDING REDUCING THE FREQUENCY OF VADOSE ZONE MONITORING AT THE RWMC FROM SEMI-ANNUAL TO ANNUAL SAMPLING 4489368 0
28-JAN-14 JENSEN, NOLAN R. REQUEST FOR CONCURRENCE TO REDUCE VADOSE ZONE MONITORING FREQUENCY AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX BEGINNING IN FISCAL YEAR 2014 WDP-RWMC-14-002 0
20-NOV-13 BROWN, M. E. TRANSMITTAL OF THE FISCAL YEAR 2013 ANNUAL LETTER REPORT FOR OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE CCN 315816 0
01-NOV-13 HOLDREN, K. JEAN OPERABLE UNIT 7-13/14 PHASE 3 REMEDIAL DESIGN WORK PLAN DOE/ID-11482 0
01-NOV-13 MEAGHER, BRANDT G. OPERABLE UNIT 7-13/14 PHASE 3 REMEDIAL DESIGN WORK PLAN DOE/ID-11482 0
01-SEP-13 HOLDREN, K. JEAN FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 AQUIFER MONITORING DOE/ID-11492 0
01-SEP-13 FORBES, JEFFREY R. FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 AQUIFER MONITORING DOE/ID-11492 0
26-AUG-13 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN APRIL AND MAY 2013 FOR WASTE AREA GROUP 7 CCN 315392 0
01-JUN-13 NOT SPECIFIED PHASE 1 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 DOE/ID-11389 2
23-MAY-13 BUELOW, LAURA C. REQUEST FOR CONCURRENCE TO REDUCE AQUIFER MONITORING FREQUENCY AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX BEGINNING IN FISCAL YEAR 2013 CCN 315061 0
10-APR-13 KOCH, DARYL REQUEST FOR CONCURRENCE TO REDUCE AQUIFER MONITORING FREQUENCY AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX BEGINNING IN FISCAL YEAR 2013 (WDP-RWMC-12-025) 4242177 0
02-APR-13 JENSEN, NOLAN R. REQUEST FOR CONCURRENCE TO REDUCE AQUIFER MONITORING FREQUENCY AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX BEGINNING IN FISCAL YEAR 2013 WDP-RWMC-13-025 0
13-MAR-13 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN NOVEMBER 2012 AND WASTE AREA GROUP 7 CCN 314773 0
04-MAR-13 KOCH, DARYL F. REVIEW AND COMMENT PERIOD FOR PHASE 1 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 (DRAFT) DECEMBER 2012 DOE/ID-11389 REV 2, DRAFT C 4210681 0
06-DEC-12 BROWN, M. E. TRANSMITTAL OF THE FISCAL YEAR 2012 ANNUAL LETTER REPORT FOR OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE CCN 314439 0
09-AUG-12 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN APRIL AND MAY 2012 FOR WASTE AREA GROUP 7 CCN 313924 0
30-APR-12 KOCH, DARYL R. DEQ CONCURRENCE TO DEPARTMENT OF ENERGY OPERABLE UNIT 7-13/14 ACCELERATED RETRIEVAL PROJECT V ENCLOSURE TERMINATION OF COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION AND LIABILITY ACT STATUS (WDP-RWMC-12-018) 4102460 0
30-APR-12 FAULK, DENNIS EPA CONCURRENCE - REQUEST TO REMOVE ARP V ENCLOSURE FROM CERCLA 4102461 0
24-APR-12 COOPER, JAMES R. DEPARTMENT OF ENERGY OPERABLE UNIT 7-13/14 ACCELERATED RETRIEVAL PROJECT V ENCLOSURE TERMINATION OF COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION AND LIABILITY ACT STATUS (WDP-RWMC-12-018) WDP-RWMC-12-018 0
01-APR-12 NOT SPECIFIED PHASE 1 INTERIM REMEDIAL ACTION REPORT FOR OPERABLE UNIT 7-13/14 TARGETED WASTE RETRIEVALS DOE/ID-11396 2
06-FEB-12 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN OCTOBER 2011 FOR WASTE AREA GROUP 7 CCN 313098 0
09-NOV-11 PHAM, HA ARP IV: STRUCTURAL STEEL DISPOSAL ANALYSIS AR-25311 0
09-NOV-11 REIMBOLD, MIKE ARP IV: STRUCTURAL STEEL DISPOSAL ANALYSIS AR-25311 0
07-NOV-11 FAULK, DENNIS ADDENDUM TO TABLE 1 OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 1) (EM-FMDP-11-097) AR-25310 0
03-NOV-11 SHAW, R. MARK ADDENDUM TO TABLE 1 OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 1) (EM-FMDP-11-097) AR-25308 0
03-NOV-11 KOCH, DARYL ADDENDUM TO TABLE 1 OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 1) (EM-FMDP-11-097) AR-25309 0
17-AUG-11 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN APRIL 2011 FOR WASTE AREA GROUP 7 CCN 312303 0
10-FEB-11 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN OCTOBER 2010 FOR WASTE AREA GROUP 7 CCN 311435 0
19-JAN-11 NOT SPECIFIED INTERIM COMPLETION REPORT FOR PHASE 2 OPERABLE UNIT 7-13/14 IN SITU GROUTING (PART 1) DOE/ID-11436 (PART 1) 0
19-JAN-11 NOT SPECIFIED INTERIM COMPLETION REPORT FOR PHASE 2 OPERABLE UNIT 7-13/14 IN SITU GROUTING (PART 2) DOE/ID-11436 (PART 2) 0
16-DEC-10 BROWN, M. E. TRANSMITTAL OF THE FIRST FISCAL YEAR 2010 ANNUAL LETTER REPORT FOR OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE CCN 311202 0
13-DEC-10 BROWN, M. E. TRANSMITTAL OF THE FIRST FISCAL YEAR 2011 ANNUAL LETTER REPORT FOR OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE CCN 312845 0
21-SEP-10 SALOMON, HOPI FIELD SAMPLING PLAN FOR THE ACCELERATED RETRIEVAL PROJECT V PLN-3500 0
08-SEP-10 NOT SPECIFIED PHASE 1 INTERIM REMEDIAL ACTION REPORT FOR OPERABLE UNIT 7-13/14 TARGETED WASTE RETRIEVALS DOE/ID-11396 1
17-AUG-10 BROWN, M. E. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN APRIL 2010 FOR WASTE AREA GROUP 7 CCN 310623 0
09-AUG-10 NOT SPECIFIED PHASE 1 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 DOE/ID-11389 1
27-JUL-10 NOT SPECIFIED HEALTH AND SAFETY PLAN FOR THE ACCELERATED RETRIEVAL PROJECT ICP/EXT-04-00209 15
22-MAR-10 NOT SPECIFIED PHASE 1 INTERIM REMEDIAL ACTION REPORT FOR OPERABLE UNIT 7-13/14 TARGETED WASTE RETRIEVALS DOE/ID-11396 0
24-FEB-10 FULTON, JOHN C. TRANSMITTAL OF LIMITATIONS AND VALIDATION REPORTS FOR SEMIANNUAL SOIL MOISTURE AND PERCHED WATER SAMPLING OF THE VADOSE ZONE CONDUCTED IN OCTOBER 2009 FOR WASTE AREA GROUP 7 CCN 309898 0
23-FEB-10 NOT SPECIFIED TRANSITIONAL REMEDIAL ACTION STATUS REPORT FOR THE OPERABLE UNIT 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE RPT-686 0
27-JAN-10 NOT SPECIFIED PHASE 2 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 DOE/ID-11405 PART 1 0
27-JAN-10 NOT SPECIFIED PHASE 2 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 DOE/ID-11405 PART 2 0
08-DEC-09 ARENAZ, MARK R. DOCUMENTATION OF A NON-SIGNIFICANT CHANGE TO THE RECORD OF DECISION FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-13/14, IDAHO NATIONAL LABORATORY SITE, IDAHO AR-25271 0
03-DEC-09 KOEPPEN, L. DON FISCAL YEAR 2009 ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) RPT-683 0
17-NOV-09 NOT SPECIFIED OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 0
17-NOV-09 LOPEZ, STEVE L. OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 0
17-NOV-09 JORGENSEN, MICHAEL D. OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 0
17-NOV-09 HOLDREN, K. JEAN OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 0
17-NOV-09 CRESAP, DALE A. OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN DOE/ID-11393 0
09-NOV-09 NOT SPECIFIED HEALTH AND SAFETY PLAN FOR THE ACCELERATED RETRIEVAL PROJECT ICP/EXT-04-00209 14
22-OCT-09 NOT SPECIFIED HEALTH AND SAFETY PLAN FOR THE ACCELERATED RETRIEVAL PROJECT ICP/EXT-04-00209 13
21-SEP-09 NOT SPECIFIED FIELD SAMPLING PLAN FOR THE ACCELERATED RETRIEVAL PROJECT IV PLN-3144 0
16-SEP-09 HOLDREN, K. JEAN VADOSE ZONE FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 PLN-3224 0
16-SEP-09 KOEPPEN, L. DON VADOSE ZONE FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 PLN-3224 0
31-AUG-09 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 10, AND REMOVAL ACTIONS DOE/ID-10587 10
19-AUG-09 NOT SPECIFIED PHASE 1 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 DOE/ID-11389 0
11-MAR-09 NOT SPECIFIED FIELD SAMPLING PLAN FOR LYSIMETER, VAPOR PORT, AIR, AND TENSIOMETER MONITORING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX ACTIVE LOW-LEVEL WASTE DISPOSAL FACILITY ICP/EXT-05-01060 1
17-DEC-08 MEAGHER, BRANDT G. REMEDIAL DESIGN/REMEDIAL ACTION SCOPE OF WORK FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX OPERABLE UNIT 7-13/14 DOE/ID-11377 0
30-OCT-08 NOT SPECIFIED REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT I, II AND III DOE/NE-ID-11178 4
06-OCT-08 SOLOMON, HOPI FIELD SAMPLING PLAN FOR THE ACCELERATED RETRIEVAL PROJECT III PLN-2815 0
02-OCT-08 NOT SPECIFIED HEALTH AND SAFETY PLAN FOR THE ACCELERATED RETRIEVAL PROJECT ICP/EXT-04-00209 12
01-OCT-08 NOT SPECIFIED OPERABLE UNIT (OU) 7-13/14 - IDAHO NATIONAL LABORATORY (INL) ADMINISTRATIVE RECORD (AR) INDEX FOR WASTE AREA GROUP (WAG) 7 COMPREHENSIVE RI/FS AR.INDEX.OU.7-13/14 0
01-OCT-08 NOT SPECIFIED RECORD OF DECISION FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX OPERABLE UNIT 7-13/14 DOE/ID-11359 0
23-SEP-08 PROVENCHER, RICHARD B. ACTION MEMORANDUM FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) III WITHIN PIT 6 OF THE SUBSURFACE DISPOSAL AREA (SDA) DOE/ID-11363 0
23-SEP-08 KOCH, DARYL F. ACTION MEMORANDUM FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) III WITHIN PIT 6 OF THE SUBSURFACE DISPOSAL AREA (SDA) DOE/ID-11363 0
23-SEP-08 CETO, NICHOLAS ACTION MEMORANDUM FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) III WITHIN PIT 6 OF THE SUBSURFACE DISPOSAL AREA (SDA) DOE/ID-11363 0
03-JUL-08 NOT SPECIFIED AGREEMENT TO IMPLEMENT, U.S. DISTRICT COURT ORDER DATED MAY 25, 2006 91-0035-S-EJL 0
08-APR-08 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-2000-00029 04
21-MAR-08 GREEN, O. D. AGREEMENT TO EXTEND DEADLINES 25199 00
03-DEC-07 NOT SPECIFIED AGREEMENT-IN-PRINCIPLE BETWEEN THE SHOSHONE-BANNOCK TRIBES AND THE UNITED STATES DEPARTMENT OF ENERGY AR-25223 0
06-NOV-07 CITIZENS ADVISORY BOARD CAB RECOMMENDATION #135 -- IDAHO NATIONAL LABORATORY (INL) SITE ENVIRONMENTAL MANAGEMENT CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION TO THE WASTE AREA GROUP (WAG) 7 PROPOSED PLAN 25172 00
02-NOV-07 ARENAZ, M. R. RESPONSE TO SNAKE RIVER ALLIANCE REQUEST TO EXTEND THE COMMENT PERIOD ON THE PROPOSED PLAN FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-13/14 WDP-RWMC-07-049 00
17-OCT-07 HOLDREN, K. J. PROPOSED PLAN FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-13/14 DOE/ID-11288 00
04-OCT-07 DOORNBOS, M. H. REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT FOR A DESCRIBED AREA WITHIN PIT 4 DOE/NE-ID-11178 03
26-SEP-07 BECHTOLD, T. E. FIELD SAMPLING PLAN (FSP) FOR LYSIMETER AND PERCHED WATER MONITORING OF OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-2000-00714 04
15-AUG-07 PROVENCHER, R. B. APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION/ COST ANALYSIS (EE/CA) FOR THE IDAHO NATIONAL LABORATORY (INL), ACCELERATED RETRIEVAL PROJECT (ARP) III IN THE SUBSURFACE DISPOSAL AREA (SDA) WPD-RWMC-07-030 00
30-JUL-07 GREEN, O. D. AGREEMENT TO EXTEND DEADLINE FOR SUBMISSION OF THE OPERABLE UNIT (OU) 7-13/14 PROPOSED PLAN TO AUGUST 7, 2007 25123 00
17-JUL-07 MEAGHER, B. G. PUBLIC PARTICIPATION PLAN FOR WASTE AREA GROUP (WAG) 7 OPERABLE UNIT (OU) 7-13/14 AT THE IDAHO NATIONAL LABORATORY (INL) SITE DOE/ID-11308 00
30-JUN-07 GURNEY, L. W. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00209 10
27-JUN-07 GREEN, O. D. AGREEMENT TO EXTEND DEADLINE FOR SUBMISSION OF THE OPERABLE UNIT (OU) 7-13/14 PROPOSED PLAN TO JULY 31, 2007 25114 00
25-JUN-07 MEAGHER, B. G. FISCAL YEAR 2006 (FY-06) ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) RPT-339 00
29-MAY-07 HOLDREN, K. J. FEASIBILITY STUDY (FS) FOR OPERABLE UNIT (OU) 7-13/14 DOE/ID-11268 00
09-APR-07 GURNEY, L. W. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00209 09
28-MAR-07 HARDESTY, T. AGENCIES AGREE TO EXTEND DEADLINES FOR SUBMISSION OF THE OPERABLE UNIT (OU) 7-13/14 PROPOSED PLAN 25088 00
26-MAR-07 BUTLER, J. LANE ELIMINATION OF SELECTED SUBSURFACE DISPOSAL AREA MONITOROING EVENTS CCN 304602 0
20-MAR-07 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II RPT-204 01
16-MAR-07 HARDESTY, T. AGREEMENT TO EXTEND DEADLINES FOR THREE OPERABLE UNITS (OU) 7-13, 7-14 AND OU 7-10 DELIVERABLES 2474048 00
22-JAN-07 MARTIAN, P. VERIFICATION AND BENCHMARK TESTING OF THE TETRAD SIMULATOR, - VERSION 12.7MS RPT-335 00
19-DEC-06 GURNEY, L. W. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00209 08
18-DEC-06 GEOTRANS, INC. BENCHMARKING VERIFICATION OF TETRAD SIMULATOR VERSION 12.7MS 2313772 00
22-NOV-06 MAGNUSON, S. O. SUBSURFACE FLOW AND TRANSPORT MODEL DEVELOPMENT FOR THE OPERALBE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION AND FEASIBILITY STUDY (RI/FS) ICP/EXT-05-01016 01
22-NOV-06 ANDERSON, D. L. SOURCE RELEASE MODELING REPORT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 ICP/EXT-05-01039 01
09-NOV-06 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) I ICP/EXT-04-00516 07
22-AUG-06 BURTON, B. N. REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 DOE/NE-ID-11178 02
16-AUG-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) DOE/ID-11289 00
09-AUG-06 DICK, J. R. ENGINEERING DESIGN FILE (EDF) - CHEMICAL COMPATIBILITY AND INVENTORY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) AND THE ACCELERATED RETRIEVAL PROJECT II EDF-5307 01
20-JUN-06 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II RPT-204 00
13-JUN-06 KOEPPEN, L. D. FISCAL YEAR 2005 (FY-05) ENVIRONMENTAL MONITORING REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) RPT-171 00
31-MAY-06 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) I ICP/EXT-04-00516 06
19-MAY-06 HOLDREN, K. J. REMEDIAL INVESTIGATION AND BASELINE RISK ASSESSMENT (RI/BRA) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 DOE/ID-11241 00
25-APR-06 GURNEY, L. W. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00209 07
17-APR-06 PROVENCHER, R. B. ACTION MEMORANDUM FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II WITHIN PITS 4 AND 6 OF THE SUBSURFACE DISPOSAL AREA (SDA) DOE/NE-ID-11238 00
07-APR-06 WHELDON, N. M. SHORT TERM RISK ASSESSMENT FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 FEASIBILITY STUDY (FS) RPT-188 00
24-MAR-06 ANDERSON, D. L. SOURCE RELEASE MODELING REPORT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 ICP/EXT-05-01039 00
22-MAR-06 MAGNUSON, S. O. SUBSURFACE FLOW AND TRANSPORT MODEL DEVELOPMENT FOR THE OPERALBE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION AND FEASIBILITY STUDY (RI/FS) ICP/EXT-05-01016 00
22-MAR-06 DANIELS, K. W. INDEPENDENT INVESTIGATION REPORT OF THE NOVEMBER 2005 (11/05) DRUM FIRE AT THE IDAHO NATIONAL LABORATORY (INL) SITE RPT-190 00
13-MAR-06 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) I ICP/EXT-04-00516 05
21-FEB-06 KOEPPEN, L. D. FIELD SAMPLING PLAN (FSP) FOR LYSIMETER AND PERCHED WATER MONITORING OF OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-2000-00714 03
15-FEB-06 VARVEL, M. D. ENGINEERING DESIGN FILE (EDF) - MASS ESTIMATES OF ORGANIC COMPOUNDS IN 743 SERIES WASTE BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-08 AND 7-13 & 7-14 INEEL/EXT-01-00277 02
24-JAN-06 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) EXTENDING REVIEW AND COMMENT OF OPERABLE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) TWENTY (20) DAYS 24927 00
24-JAN-06 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00209 06
18-JAN-06 HAMPTON, N. L. BIOLOGICAL DATA TO SUPPORT OPERABLE UNIT (OU) 7-13 AND 7-14 MODELING OF PLANT AND ANIMAL INTRUSION AT BURIED WASTE SITES INEEL/EXT-01-00273 01
22-DEC-05 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-2000-00029 03
16-DEC-05 VAIL, J. A. ESTIMATED RADIOLOGICAL INVENTORY SENT FROM IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 (1952 - 1993) INEEL/EXT-03-00967 01
29-NOV-05 POLLITT, D. B. FIELD SAMPLING PLAN (FSP) FOR LYSIMETER, TENSIOMETER, AND VAPOR PORT MONITORING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ACTIVE LOW LEVEL WASTE (LLW) PIT ICP/EXT-05-01060 00
23-NOV-05 PERRY, J. N. RESPONSE TO OCTOBER 19, 2005 (10/19/05) COMMENTS ON REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) - DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) CLARIFICATION OF POSITION ON THE PRESENTATION OF RISK FOR ALL PATHWAYS WDP-RWMC-05-075 00
18-NOV-05 LOPEZ, S. L. ESTIMATED RADIOLOGICAL INVENTORY SENT FROM TEST AREA NORTH (TAN) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1960 THROUGH 1993 (1960 - 1993) INEEL/EXT-03-00997 02
10-NOV-05 CARBONEAU, M. L. ESTIMATED RADIOLOGICAL INVENTORY SENT FROM ARGONNE NATIONAL LABORATORY WEST (ANL-W) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 INEEL/EXT-02-01385 01
04-NOV-05 MCKENZIE, M. D. WASTE INFORMATION AND LOCATION DATABASE UPDATE FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 PROJECT ICP/EXT-04-00271 00
01-NOV-05 CISE, C. A. ENGINEERING DESIGN FILE (EDF) - CRITICALITY SAFETY EVALUATION FOR THE ACCELERATED RETRIEVAL AND TARGETED WASTE REMOVAL AND DISPOSITION PROJECTS (ARP/T-RAD) WITHIN THE SUBSURFACE DISPOSAL AREA (SDA) AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) EDF-4494 03
26-OCT-05 HUBBELL, J. M. MOISTURE MONITORING PROGRAM AT THE SUBSURFACE DISPOSAL AREA (SDA) FOR FISCAL YEAR 2004 (FY-04) ICP/EXT-05-00829 00
19-OCT-05 KOCH, D. F. OPERABLE UNIT (OU) 7-13 AND 7-14 DRAFT BASELINE RISK ASSESSMENT (BRA) 24928 00
05-OCT-05 SEBO, D. E. COLLOCATED FACILITIES ANALYSIS FOR WASTE AREA GROUP 7 (WAG-7) , OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-01-00027 01
29-SEP-05 MATTHERN, G. E. PREREMEDIAL DESIGN REPORT OF REMEDIATION OPTIONS FOR OPERABLE UNIT (OU) 7-13 AND 7-14 ICP/EXT-04-00330 00
28-SEP-05 HANSON, D. J. EVALUATION OF THE DURABILITY OF PORTLAND CEMENT BASED GROUT FOR SUBSURFACE APPLICATIONS AT OPERABLE UNIT (OU) 7-13 AND 7-14 ICP/EXT-05-00798 00
28-SEP-05 KOEPPEN, L. D. FIELD SAMPLING PLAN (FSP) FOR LYSIMETER AND PERCHED WATER MONITORING OF OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-2000-00714 02
23-SEP-05 FITCH, D. R. IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) DOE/ID-11250 00
07-SEP-05 WENDT, D. S. ENGINEERING DESIGN FILE (EDF) - RADIOLYTIC HYDROGEN GAS GENERATION IN IDC 003 AND IDC 004 WASTE FORMS FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 EDF-5223 00
30-AUG-05 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT I (ARP I) ICP/EXT-04-00516 04
24-AUG-05 SEBO, D. E. BERYLLIUM WASTE TRANSURANIC (TRU) INVENTORY IN THE SUBSURFACE DISPOSAL AREA (SDA), OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-01-01678 03
10-AUG-05 BURTON, B. N. REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 DOE/NE-ID-11178 01
13-JUL-05 PERRY, J. N. RESPONSE TO CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #121 ON THE OVERALL APPROACH TO CLEANUP AND CLOSURE OF THE SUBSURFACE DISPOSAL AREA (SDA) WDP-RWMC-05-037 00
09-JUN-05 PERRY, J. N. TRANSMITTAL OF WASTE AREA GROUP 7 (WAG-7) DOCUMENTS - ICP/EXT-05-00784 FINAL REPORT FOR WAG-7 PROBING PROJECT WDP-RWMC-05-035 00
31-MAY-05 BRYAN, J. D. ENGINEERING DESIGN FILE (EDF) - WASTE INVENTORY ESTIMATE FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II EDF-5447 01
09-MAY-05 PERRY, J. N. TRANSMITTAL OF WAG-7 DOCUMENTS - QUARTERLY MONITORING REPORTS FOR AQUIFER SAMPLES AND LYSIMETER AND PERCHED WATER SAMPLES AT RWMC AND SURFACE GEOPHYSICS AND DOWNHOLE GEOPHYSICAL LOGGING RESULTS FOR 2003 AND 2004 WMD-RWMC-05-026 00
09-MAY-05 PERRY, J. N. TRANSMITTAL OF WAG-7 DOCUMENTS - OU 7-13 AND OU 7-14 QUARTERLY MONITORING REPORTS FOR AQUIFER SAMPLES AND LYSIMETER AND PERCHED WATER SAMPLES AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) WMD-RWMC-05-027 00
05-MAY-05 KOEPPEN, L. D. FISCAL YEAR 2004 (FY-04) OPERABLE UNIT (OU) 7-13 AND 7-14 ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-05-00795 00
03-MAY-05 ST. MICHEL, W. D. ENGINEERING DESING FILE (EDF) - AREA BASED APPROACH TO IDENTIFY TYPE IV (TYPE 4) WASTE FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) I EDF-5601 00
01-MAY-05 MEYER, T. J. FINAL REPORT FOR THE WASTE AREA GROUP 7 (WAG-7) PROBING PROJECT ICP/EXT-05-00784 00
28-APR-05 PROVENCHER, R. B. ACCELERATED RETRIEVAL PROJECT (ARP) DEPARTMENT OF ENERGY (DOE) MEMORANDUM - MULTI-SOURCE LEACHATE AT PIT 4 AND THE SUBSURFACE DISPOSAL AREA (SDA) AND PAPER DISCUSSING APPLICABILITY TO THE F039 HAZARDOUS WASTE NUMBER TO CERCLA REMEDIATION ACTIVITIES 1808137 00
28-APR-05 BRYAN, J. D. ENGINEERING DESIGN FILE (EDF) - WASTE INVENTORY ESTIMATE FOR THE DESCRIBED AREA WITHIN PIT 4 FOR THE ACCELERATED RETRIVAL PROJECT (ARP) WITHIN THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) EDF-4478 03
28-APR-05 GROENEWOLD, G. S. ACTINIDE ANALYSIS AND LEACHING OF SAMPLES COLLECTED FROM THE GLOVEBOX EXCAVATOR METHOD PROJECT FOR OU 7-13 AND 7-14 ICP/EXT-04-00439 00
28-APR-05 VEJVODA, E. SUMMARY OF ROCKY FLATS PLANT WASTE BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) ICP/EXT-04-00717 00
28-APR-05 GILES, J. R. SUPPLEMENT TO EVALUATION OF NAVAL REACTORS FACILITY (NRF) RADIOACTIVE WASTE DISPOSED OF AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) FROM 1953 TO 1999 ICP/EXT-05-00833 00
27-APR-05 JOSTEN, N. E. TYPE A NUCLEAR LOGGING DATA ACQUISITION AND PROCESSING FOR OPERABLE UNIT (OU) 7-13, 7-14 AND 7-10 INEEL/EXT-02-00558 02
12-APR-05 OLSON, G. L. FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-2000-00029 02
07-APR-05 PERRY, J. N. TRANSMITTAL OF DRAFT SUPPLEMENT TO EVALUATION OF NAVAL REACTORS FACILITY (NRF) RADIOACTIVE WASTE DISPOSED OF AT RADIOACTIVE WASTE MANAGMENT COMPLEX (RWMC) FROM 1953 TO 1999 - ENCLOSURES NOT AVAILABLE WDP-RWMC-05-018 00
06-APR-05 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT I (ARP I) ICP/EXT-04-00516 03
04-APR-05 VARVEL, M. D. ENGINEERING DESIGN FILE (EDF) - MASS ESTIMATES OF ORGANIC COMPOUNDS BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-08 AND 7-13 & 7-14 INEEL/EXT-01-00277 01
29-MAR-05 NORTH WIND ENVIRONMENTAL HISTORICAL BACKGROUND REPORT FOR ROCKY FLATS PLANT WASTE SHIPPED TO THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) AND BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1954 THROUGH 1971 ICP/EXT-04-00248 01
21-MAR-05 LIVIERATOS, T. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REQUEST TO KEEP PIT 9 SAMPLES 1784126 00
17-MAR-05 RITTER, P. D. NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) RADIOLOGICAL MONITORING PLAN FOR PHASES I AND II OF THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00389 01
10-MAR-05 PROVENCHER, R. B. RESPONSES TO CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #119 ON CLEANUP AND CLOSURE OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) EM-WM-05-015 00
09-MAR-05 JOSTEN, N. E. SURFACE GEOPHYSICS AND DOWNHOLE GEOPHYSICAL LOGGING RESULTS FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), 2003-2004 ICP/EXT-04-00702 00
01-MAR-05 ICP COMMUNITY RELATIONS PUBLIC ENCOURAGED TO ATTEND MEETINGS ON BURIED WASTE PROJECT 24894 00
01-MAR-05 BURTON, B. N. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II DOE/NE-ID-11223 00
03-FEB-05 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00209 05
01-FEB-05 USGS U.S. GEOLOGICAL SURVEY (USGS) REVIEW OF TRANSPORT OF SELECTED RADIONUCLIDES IN INTERIM RISK ASSESSMENT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), WASTE AREA GROUP 7 (WAG-7), OPERABLE UNIT (OU) 7-13 & 7-14, INEEL - VOLUMES I & II (VOL.01 & VOL.0 DOE/ID-22192 00
01-FEB-05 PROVENCHER, R. B. APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE INEEL ACCELERATED RETRIEVAL PROJECT (ARP) PROJECT PHASE II IN THE SUBSURFACE DISPOSAL AREA (SDA) EM-WM-04-083 00
25-JAN-05 KNIGHT, L. INEEL CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #119 ON CLEANUP AND CLOSURE OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 05-CAB-016 00
20-JAN-05 BRYAN, J. D. ENGINEERING DESIGN FILE (EDF) - WASTE INVENTORY FOR PHASE II OF THE ACCELERATED RETRIEVAL PROJECT (ARP) EDF-5447 00
18-JAN-05 LOPEZ, S. L. SUMMARY REPORT FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT ICP/EXT-04-00646 01
17-DEC-04 PROVENCHER, R. B. AUTHORIZATION TO PERFORM PHASE I (PHASE 1) OPERATIONS AT THE ACCELERATED RETRIEVAL PROJECT (ARP) EM-WM-04-085 00
13-DEC-04 MCILWAIN, B. A. DATA QUALITY OBJECTIVES (DQO) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00515 01
08-DEC-04 SHAW, P. G. ENGINEERING DESIGN FILE (EDF) - GROUT SELECTION CRITERIA AND RECOMMENDATION FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT EDF-5333 00
06-DEC-04 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00516 02
03-NOV-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) ICP/EXT-04-00209 04
27-OCT-04 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00516 01
26-OCT-04 DICK, J. R. ENGINEERING DESIGN FILE (EDF) - CHEMICAL COMPATIBILITY AND INVENTORY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 EDF-5307 00
08-OCT-04 BURTON, B. N. REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 DOE/NE-ID-11178 00
04-OCT-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00209 03
30-SEP-04 ANKENY, M. PRELIMINARY DESIGN FOR AN ENGINEERED SURFACE BARRIER AT THE SUBSURFACE DISPOSAL AREA (SDA) ICP/EXT-04-00216 00
30-SEP-04 JOHNESEE, J. A. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (CUSTOMER, PROJECT, AND SYSTEM) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 1 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 TFR-267 00
30-SEP-04 HOLDER, R. B. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (SUBSYSTEM) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 2 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 TFR-269 00
30-SEP-04 JOHNESEE, J. A. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (ASSUMPTIONS) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 3 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 TFR-280 00
29-SEP-04 SENTIERI, P. J. ENGINEERING DESIGN FILE (EDF) - CRITICALITY SAFETY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 EDF-4494 02
29-SEP-04 BUNNELL, P. J. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT MEASUREMENT AND CONTROLS - ATTACHMENT 12 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-4933 00
29-SEP-04 STEPHENS, D. L. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT FOUNDATION GROUTING STUDY - ATTACHMENT 5 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5028 00
29-SEP-04 CLARK, D. W. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT FIRE PROTECTION - ATTACHMENT 15 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5054 00
29-SEP-04 CRAM, A. J. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT DELIVERY SYSTEM - ATTACHMENT 10 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5102 00
29-SEP-04 GRAFF, K. E. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ELECTRICAL UTILITIES - ATTACHMENT 13 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5122 00
29-SEP-04 CRAM, A. J. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT STORAGE AND MIXING - ATTACHMENT 9 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5135 00
29-SEP-04 BLAKELY, B. L. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT FACILITIES - ATTACHMENT 11 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5144 00
29-SEP-04 JENSEN, S. A. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT SELECTION BASIS - ATTACHMENT 4 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5146 00
29-SEP-04 JENSEN, S. A. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUBSURFACE DISPOSAL AREA (SDA) SITE CONDITIONS - ATTACHMENT 6 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5147 00
29-SEP-04 EASTMAN, R. L. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT SYSTEMS - ATTACHMENT 14 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5150 00
29-SEP-04 THOMPSON, E. B. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ENVIRONMENTAL, SAFETY, AND HEALTH (ES&H) - ATTACHMENT 17 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5152 00
29-SEP-04 RAIVO, B. D. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT HYDRAULIC EXCAVATOR AND DRILL INJECTION RIG - ATTACHMENT 7 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5153 00
29-SEP-04 THOMPSON, E. B. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT OPERATIONS, MAINTENANCE, AND LOGISTICS - ATTACHMENT 8 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5155 00
29-SEP-04 RAIVO, B. D. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT VEHICLES - ATTACHMENT 16 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 EDF-5162 00
29-SEP-04 SHROPSHIRE, K. L. ENGINEERING STUDIES REPORT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ICP/EXT-04-00525 00
28-SEP-04 MCILWAIN, B. A. FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00516 00
16-SEP-04 LEECASTER, M. K. FISCAL YEAR 2004 (FY-04) GEOSTATISTICAL MODELING OF LITHOLOGIC CHARACTERISTICS IN THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 ICP/EXT-04-00494 00
10-SEP-04 PERRY, J. N. SUPPLEMENTAL RESPONSIVENESS SUMMARY FOR THE ACTION MEMORANDUM FOR ACCELERATED RETRIEVAL OF A DESCRIBED AREA WITHIN PIT 4 FMDP-FFA/CO-04-011 00
19-AUG-04 PROVENCHER, R. B. ACTION MEMORANDUM FOR ACCELERATED RETRIEVAL OF A DESCRIBED AREA WITHIN PIT 4 DOE/NE-ID-11179 00
18-AUG-04 HOLDREN, K. J. METHODOLOGY FOR DEVELOPING PRELIMINARY REMEDIATION GOALS FOR OPERABLE UNIT (OU) 7-13 & 7-14 SUBSURFACE DISPOSAL AREA (SDA) ICP/EXT-03-00047 00
18-AUG-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT ICP/EXT-04-00210 03
17-AUG-04 HOLDREN, K. J. SECOND ADDENDUM TO THE WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-11039 00
17-AUG-04 NALLA, G. NEAR FIELD SIMULATION OF CARBON-14 AND TRITIUM MIGRATION FROM BURIED BERYLLIUM BLOCKS IN THE SUBSURFACE DISPOSAL AREA (SDA) ICP/EXT-04-00321 00
11-AUG-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00209 02
09-AUG-04 BLACKWOOD, L. G. VALIDATION OF THE ROCKY FLATS PLANT RADIONUCLIDE INVENTORY IN THE HISTORIC DATA TASK USING STORED WASTE EXPERIMENTAL PILOT PLANT (SWEPP) ASSAY DATA, VOLUME 1 (VOL.01) AND VOLUME 2 (VOL.02) ICP/EXT-04-00211 01
22-JUL-04 WRIGHT, K. E. AN EVALUATION OF TRACERS FOR USE IN VADOSE ZONE INVESTIGATIONS AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ICP/EXT-04-00334 00
19-JUL-04 SONDRUP, A. J. ESTIMATING CARBON TETRACHLORIDE AND TOTAL VOLATILE ORGANIC COMPOUND (VOC) MASS REMAINING IN SUBSURFACE DISPOSAL AREA (SDA) PITS ICP/EXT-04-00396 00
15-JUL-04 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) PROPOSAL FOR SEMIANNUAL AQUIFER MONITORING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 24871 00
08-JUL-04 SNOOK, J. G. PROPOSAL FOR SEMIANNUAL AQUIFER MONITORING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) EM-ER-04-144 00
08-JUL-04 LOPEZ, S. L. ESTIMATED RADIOLOGICAL INVENTORY SENT FROM TEST AREA NORTH (TAN) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1960 THROUGH 1993 (1960 - 1993) INEEL/EXT-03-00997 01
01-JUL-04 LOPEZ, S. L. ACTION MEMORANDUM FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT DOE/NE-ID-11162 00
25-JUN-04 ALLRED, C. S. AGREEMENT TO EXTEND DEADLINES RELATED TO OPERABLE UNIT (OU) 7-13 AND 7-14 24868 00
18-JUN-04 SENTIERI, P. J. ENGINEERING DESIGN FILE (EDF) - CRITICALITY SAFETY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 EDF-4494 01
15-JUN-04 ANSLEY, S. L. UPDATED STRATIGRAPHIC SELECTIONS FOR WELLS IN THE VICINITY OF THE SUBSURFACE DISPOSAL AREA (SDA) ICP/EXT-04-00207 00
15-JUN-04 WHITAKER, C. A. STRATIGRAPHIC AND GEOPHYSICAL DATA FOR WELLS IN THE VICINITY OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-04-00208 00
03-JUN-04 HANSON, D. J. EVALUATION OF THE DURABILITY OF WAXFIX FOR SUBSURFACE APPLICATIONS ICP/EXT-04-00300 00
02-JUN-04 STALEY, C. S. ENGINEERING DESIGN FILE (EDF) - AIR EMISSIONS EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 EDF-4692 00
01-JUN-04 RILEY, R. G. RECOMMENDED PARAMETER VALUES FOR IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) SUBSURFACE DISPOSAL AREA (SDA) SOURCE RELEASE MODELING PNNL-14742 00
24-MAY-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT ICP/EXT-04-00210 02
24-MAY-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT ICP/EXT-04-00210 01
14-MAY-04 LUKE, D. E. PRELIMINARY DETERMINATION OF HAZARDOUS WASTE FROM OTHER GENERATORS COLLOCATED WITH ROCKY FLATS PLANT TRANSURANIC (TRU) WASTE IN THE OPERABLE UNIT (OU) 7-13 AND 7-14 SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-03-01139 00
12-MAY-04 ICP COMMUNITY RELATIONS COMMUNITY RELATIONS NOTICE - COMMENT PERIOD ON THE REMOVAL ACTION AT PIT 4 - KETCHUM MEETING ADDED 24854 00
12-MAY-04 MCELROY, D. L. FISCAL YEAR 2003 (FY-03), OPERABLE UNIT (OU) 7-13 AND 7-14 ADVANCED TENSIOMETER MONITORING RESULTS FROM THE DEEP VADOSE ZONE AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-04-00241 00
12-MAY-04 ABBOTT, C. HISTORICAL BACKGROUND REPORT FOR ROCKY FLATS PLANT WASTE SHIPPED TO THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) AND BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1954 THROUGH 1971 ICP/EXT-04-00248 00
12-MAY-04 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR MONITORING TYPE B PROBES FOR OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) INEEL/EXT-2000-01435 02
11-MAY-04 BATCHELLER, T. A. COLLOIDAL PLUTONIUM AT THE OPERABLE UNIT (OU) 7-13 AND 7-14 SUBSURFACE DISPOSAL AREA (SDA) - ESTIMATE OF INVENTORY AND TRANSPORT PROPERTIES ICP/EXT-04-00253 00
10-MAY-04 DOE PUBLIC NOTICE - DEPARTMENT OF ENERGY (DOE) ANNOUNCES PLANS TO RETRIEVE BURIED WASTE AN THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) 24849 00
10-MAY-04 ICP COMMUNITY RELATIONS COMMUNITY RELATIONS NOTICE - COMMENT PERIOD ON THE REMOVAL ACTION AT PIT 4 24852 00
29-APR-04 ICP COMMUNITY RELATIONS IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) INFORMATION FAIR ON COMPLETING CLEANUP AND STRENGTHENING OUR NUCLEAR LEGACY 24846 00
29-APR-04 ICP COMMUNITY RELATIONS ATTEND AN INFORMATION FAIR ON COMPLETING CLEANUP AND STRENGTHENING OUR NUCLEAR LEGACY 24847 00
29-APR-04 BURTON, B. N. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE ACCELERATED RETRIEVAL OF A DESIGNATED PORTION OF PIT 4 DOE/NE-ID-11146 00
21-APR-04 KOEPPEN, L. D. FISCAL YEAR 2003 (FY-03) ENVIRONMENTAL MONITORING (EM) REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-04-00259 01
19-APR-04 MYERS, D. R. FISCAL YEAR 2003 (FY-03) SUMMARY REPORT FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 PROBING PROJECT ICP/EXT-04-00189 00
12-APR-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE CLEAN CLOSE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) PROJECT ROUTINE MONITORING INEEL/EXT-01-01538 01
12-APR-04 CARBONEAU, M. L. ESTIMATED RADIOLOGICAL INVENTORY SENT FROM ARGONNE NATIONAL LABORATORY WEST (ANL-W) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 INEEL/EXT-02-01385 00
09-APR-04 ABBOTT, D. G. FEASIBILITY STUDY (FS) PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU GROUTING (ISG) IN SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-03-00316 01
08-APR-04 KOEPPEN, L. D. FISCAL YEAR 2003 (FY-03) ENVIRONMENTAL MONITORING (EM) REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-04-00259 00
06-APR-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00209 01
01-APR-04 DRESEL, P. E. EVALUATION OF XENON GAS DETECTION AS A MEANS FOR IDENTIFYING BURIED TRANSURANIC (TRU) WASTE AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) PNNL-14617 00
29-MAR-04 VAIL, J. A. ESTIMATED RADIOLOGICAL INVENTORY SENT FROM IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 (1952 - 1993) INEEL/EXT-03-00967 00
26-MAR-04 NICHOLS, T. T. ENGINEERING DESIGN FILE (EDF) - REVISED RADIOLOGICAL DOSE AND NONRADIOLOGICAL EXPOSURE FACTORS FOR IN SITU VITRIFICATION (ISV) LOSS OF CONFINEMENT AND MELT EXPULSION ACCIDENT SCENARIOS AT OPERABLE UNIT (OU) 7-13 AND 7-14 EDF-4527 00
23-MAR-04 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10587 08
18-MAR-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 EARLY ACTIONS BERYLLIUM PROJECT ICP/EXT-04-00210 00
14-MAR-04 DOE NOTICE OF AVAILABILITY - DEPARTMENT OF ENERGY (DOE) ANNOUNCES PLANS TO REDUCE RISK AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) 24830 00
12-MAR-04 SHROPSHIRE, K. L. MISSION NEED STATEMENT FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ICP/EXT-03-00084 00
11-MAR-04 WOOLEY, K. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 ICP/EXT-04-00209 00
10-MAR-04 INEEL COMMUNITY RELATIONS AGENCIES SEEKING PUBLIC COMMENT ON A PROPOSAL TO COAT BERYLLIUM BLOCKS AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 24833 00
03-MAR-04 LOPEZ, S. L. ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 EARLY ACTIONS BERYLLIUM PROJECT DOE/NE-ID-11144 00
25-FEB-04 GREEN, L. A. APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ACCELERATED RETRIEVAL PROJECT (ARP) IN PIT 4 OF SUBSURFACE DISPOSAL AREA (SDA) EM-ER-04-032 00
23-FEB-04 WHITAKER, C. A. SAMPLING AND ANALYSIS PLAN (SAP) FOR ANALYSES OF HYDROLOGIC PROPERTIES, GEOCHEMISTRY, AND RADIONUCLIDES FROM INTERBED CORES DRILLED AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ICP/EXT-04-00143 00
12-FEB-04 SHAW, P. G. ENGINEERING DESIGN FILE (EDF) - GROUT SELECTION CRITERIA AND RECOMMENDATION FOR OPERABLE UNIT (OU) 7-13 & 7-14 IN SITU GROUTING (ISG) EARLY ACTION PROJECT EDF-4397 00
11-FEB-04 GREEN, L. A. NON TIME CRITICAL REMOVAL ACTION (NTCRA) - APPROVAL TO PROCEED WITH PREPARATION OF ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR INEEL, IN SITU GROUTING (ISG) EARLY ACTION PROJECT IN SUBSURFACE DISPOSAL AREA (SDA) EM-ER-04-018 00
03-FEB-04 HULL, L. C. SPATIAL DISTRIBUTION OF NEPTUNIUM AND URANIUM PARTITION COEFFICIENTS (KD) FOR INTERBED SEDIMENTS AT A RADIOACTIVE WASTE SUBSURFACE DISPOSAL AREA (SDA) ICP/EXT-03-00088 00
02-FEB-04 HAIN, K. E. ADDITIONAL IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REVIEW COMMENTS AND DOE RESPONSES ON OPERABLE UNIT (OU) 7-13 AND 7-14 DRAFT FINAL SECOND ADDENDUM TO THE WORK PLAN FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EM-ER-04-023 00
28-JAN-04 ROGERS, N. K. CONCEPTUAL DESIGN PLAN FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - PHASE TWO (PHASE II OR PHASE 2) ICP/EXT-03-00039 00
20-JAN-04 OLSON, G. L. OPERABLE UNIT (OU) 7-13 AND 7-14 FIELD REPRESENTATIVE GLOVEBOX EXCAVATOR METHOD LOGBOOK - JANUARY 20, 2004 - FEBRUARY 20, 2004 (01/20/04 - 02/20/04) - GLOVEBOX BOOK ER-038-2004 00
05-DEC-03 ABBOTT, D. G. FEASIBILITY STUDY (FS) PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU THERMAL DESORPTION (ISTD) IN THE SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-03-00962 00
02-DEC-03 LOPEZ, S. L. ESTIMATED RADIOLOGICAL INVENTORY SENT FROM TEST AREA NORTH (TAN) TO THE SUBSURFACE DISPOSAL AREA (SDA) 1960 - 1993 INEEL/EXT-03-00997 00
25-NOV-03 KOZAK, M. INDEPENDENT PEER REVIEW OF SOURCE TERM MODELING FOR THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) SUBSURFACE DISPOSAL AREA (SDA) ICP/EXT-03-00081 00
19-NOV-03 OLSON, G. L. FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-2000-00029 01
17-NOV-03 ARROWROCK GROUP, INC. THE IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) A HISTORICAL CONTEXT AND ASSESSMENT NARRATIVE AND INVENTORY INEEL/EXT-97-01021 01
14-NOV-03 HAIN, K. E. INFORMAL DISPUTE CONCERNING OPERABLE UNIT (OU) 7-13 AND 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-03-285 00
11-NOV-03 SLOAN, P. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) COLD TEST PITS FOR OPERABLE UNITS (OU) 7-13 & 7-14 INEEL/EXT-99-00364 04
10-NOV-03 NYGARD, D. RESPONSE TO DEPARTMENT OF ENERGY (DOE) RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON DRAFT FINAL SECOND ADDENDUM WORK PLAN FOR OPERABLE UNIT (OU) 7-13 AND 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY 24814 00
29-OCT-03 YANCEY, N. A. TEST PLAN FOR EVALUATION OF IN SITU THERMAL DESORPTION (ISTD) AND GROUTING TECHNOLOGIES FOR OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-03-00059 00
27-OCT-03 PIERRE, W. CONTINUING CONCERNS WITH THE DRAFT FINAL SECOND ADDENDUM TO THE WORK PLAN FOR OPERABLE UNIT (OU) 7-13 AND 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 24813 00
30-SEP-03 GROENEWOLD, G. S. TEST PLAN FOR STUDY OF OPERABLE UNIT (OU) 7-13 & 7-14 SOIL AND WASTE MATERIAL SAMPLES OBTAINED FROM OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-03-00759 01
29-SEP-03 NEELEY, M. N. CRITICALITY SAFETY EVALUATION FOR IN SITU THERMAL DESORPTION (ISTD) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) INEEL/EXT-03-00825 00
20-SEP-03 ABBOTT, D. G. PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU GROUTING (ISG) IN SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-03-00316 00
04-SEP-03 WEBBER, F. L. TRANSMITTAL OF WHITE PAPER - THE NUMERICAL VALUE OF THE SOIL-TO-WATER PARTITION COEFFICIENT (KD) FOR PLUTONIUM AT THE INEEL - REPRESENTS AN INDEPENDENT REVIEW BY OUTSIDE INEEL SUBJECT MATTER EXPERTS JMS-105-03 00
02-SEP-03 BURTON, B. N. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 PREREMEDIAL DESIGN, RETRIEVED WASTE AND SOIL CHARACTERIZATION, AND ENVIRONMENTAL MANAGEMENT SCIENCE PROGRAM TESTS INEEL/EXT-03-00554 00
31-AUG-03 SENTIERI, P. J. CRITICALITY SAFETY EVALUATION FOR IN SITU GROUTING (ISG) IN THE SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-03-00638 00
28-AUG-03 BERKEY, E. WHITE PAPER - NUMERICAL VALUE OF THE SOIL-TO-WATER PARTITION COEFFICIENT (KD) FOR PLUTONIUM AT THE INEEL - REPRESENTS AN INDEPENDENT REVIEW BY OUTSIDE INEEL SUBJECT MATTER EXPERTS 24827 00
27-AUG-03 GROENEWOLD, G. S. TEST PLAN FOR STUDY OF OPERABLE UNIT (OU) 7-13 & 7-14 SOIL AND WASTE MATERIAL SAMPLES OBTAINED FROM OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-03-00759 00
16-JUL-03 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR MONITORING TYPE B PROBES FOR OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) INEEL/EXT-2000-01435 01
08-JUL-03 MEAGHER, B. G. FEASIBILITY STUDY (FS) PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU VITRIFICATION (ISV) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-03-00317 00
30-JUN-03 HULL, L. C. FATE OF MAGNESIUM CHLORIDE BRINE APPLIED TO SUPPRESS DUST FROM UNPAVED ROADS AT INEEL SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-01-01173 00
30-JUN-03 GILES, J. R. EVALUATION OF GAMMA RAY PASSIVE LOGGING TOOL CALIBRATIONS FOR TYPE A PROBES AT INEEL SUBSURFACE DISPOSAL AREA (SDA) OPERABLE UNITS (OU) 7-13 AND 7-14 INEEL/EXT-03-00118 00
18-JUN-03 MILLER, C. M. FINAL RESULTS REPORT, IN SITU GROUTING (ISG) TECHNOLOGY FOR APPLICATION IN BURIED TRANSURANIC (TRU) WASTE SITES - OPERABLE UNIT (OU) 7-13 AND 7-14 - VOLUME 1 (VOL.01) AND VOLUME 2 (VOL.02) INEEL/EXT-02-00233 01
09-JUN-03 ROBACK, R. C. INITIAL REPORT AQUIFER BACKGROUND STUDY: SUMMARY OF URANIUM AND PLUTONIUM DATA FROM INEEL GROUNDWATER SAMPLES INEEL/EXT-03-00655 00
06-JUN-03 HULL, L. C. FATE AND TRANSPORT OF PLUTONIUM AND AMERICIUM IN THE SUBSURFACE OF OU 7-13 AND 7-14 INEEL/EXT-03-00558 00
02-JUN-03 LEECASTER, M. K. DETERMINATION OF BACKGROUND URANIUM CONCENTRATION IN THE SNAKE RIVER PLAIN AQUIFER (SRPA) UNDER THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY'S (INEEL) RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) INEEL/EXT-03-00367 00
13-MAY-03 CASPER, J. L. FIELD SAMPLING PLAN (FSP) FOR THE LYSIMETER AND PERCHED WATER MONITORING OF OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-2000-00714 01
30-APR-03 SENTIERI, P. J. CRITICALITY SAFETY EVALUATION FOR IN SITU VITRIFICATION (ISV) PROCESSING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEEL INEEL/EXT-03-00207 00
30-APR-03 ROBACK, R. C. INTERIM REPORT FOR PLUTONIUM AQUIFER BACKGROUND STUDY INEEL/EXT-03-00358 00
21-APR-03 MYERS, D. R. FISCAL YEAR 2002 (FY-02) SUMMARY REPORT FOR OPERABLE UNIT (OU) 7-13 & 7-14 PROBING PROJECT INEEL/EXT-03-00001 00
31-MAR-03 OLSON, G. L. FISCAL YEAR 2002 (FY-02) ENVIRONMENTAL MONITORING REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) INEEL/EXT-03-00055 00
26-MAR-03 HAIN, K. E. OPERABLE UNIT (OU) 7-13 & 7-14 SECOND ADDENDUM TO REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN AND SCOPE OF WORK (SOW) EM-ER-03-086 00
17-MAR-03 PIERRE, W. OPERABLE UNIT (OU) 7-13 & 7-14 SECOND ADDENDUM TO REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN AND SCOPE OF WORK (SOW) 26453 00
01-MAR-03 MULLEN, C. K. BERYLLIUM WASTE TRANSURANIC (TRU) INVENTORY IN THE SUBSURFACE DISPOSAL AREA (SDA), OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-01-01678 02
25-FEB-03 HOLDREN, K. J. SECOND REVISION TO THE SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-95/0253 02
12-FEB-03 SENTIERI, P. J. CRITICALITY SAFETY STUDY OF SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-01-01294 01
06-FEB-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) INEEL/EXT-98-00857 05
09-JAN-03 MCELROY, D. L. ADVANCED TENSIOMETER MONITORING RESULTS FROM THE DEEP VADOSE ZONE AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) INEEL/EXT-02-01276 00
23-DEC-02 ARMSTRONG, A. T. EVALUATION OF IN SITU GROUTING (ISG) FOR OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-01-00278 00
23-DEC-02 ZITNIK, J. F. PRELIMINARY EVALUATION OF REMEDIAL ALTERNATIVES FOR THE SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-02-01258 00
20-DEC-02 THOMAS, T. N. EVALUATION OF IN SITU VITRIFICATION (ISV) FOR OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-01-00279 00
20-DEC-02 HOLDREN, K. J. EVALUATION OF SOIL AND BURIED TRANSURANIC (TRU) WASTE RETRIEVAL TECHNOLOGIES FOR OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-01-00281 00
20-DEC-02 HOLDREN, K. J. EVALUATION OF SHORT TERM RISKS FOR OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-02-00038 00
19-DEC-02 JOSTEN, N. E. COMPILATION OF ANALYTICAL NOTES AND DATA ANALYSES FOR THE INTEGRATED PROBING PROJECT (IPP) 1999 - 2002 INEEL/EXT-02-01306 00
23-OCT-02 LITTLE, M. A COMPREHENSIVE INVENTORY OF RADIOLOGICAL AND NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED OR PROJECTED TO BE BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) INEEL RWMC DURING THE YEARS OF 1984 TO 2003 - SUPPLEMENTAL VOLUME 1 AND 2 (VOL.01 & VOL.02) INEL-95/0135-SUPPL 00
11-OCT-02 SLOAN, P. A. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) COLD TEST PITS FOR OPERABLE UNITS (OU) 7-13 & 7-14 INEEL/EXT-99-00364 03
27-SEP-02 HOLDREN, K. J. ANCILLARY BASIS FOR RISK ANALYSIS OF SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-02-01125 00
12-SEP-02 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 DOE/ID-10587 07
15-JUL-02 JESSMORE, J. J. OPERABLE UNIT (OU) 7-13 & 7-14 IN SITU GROUTING (ISG) TREATABILITY STUDIES (TS) BENCH SCALE TESTING INEEL/EXT-02-00851 00
03-JUL-02 WATSON, L. R. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) COLD TEST PITS FOR OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-99-00364 02
26-JUN-02 NYGARD, D. IDAHO DEPARTEMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON PRE-DRAFT WASTE AREA GROUP 7 (WAG-7), OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION AND BASELINE RISK ASSESSMENT (RI/BRA) 28047 00
21-APR-02 LIVIERATOS, T. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REVIEW COMMENTS FOR DRAFT METHODOLOGY FOR DEVELOPING PRELIMINARY REMEDIATION GOALS FOR OPERABLE UNIT (OU) 7-13 AND 7-14 SUBSURFACE DISPOSAL AREA (SDA) 1842977 00
18-APR-02 ABRAHAM, S. AGREEMENT TO RESOLVE DISPUTES IN THE MATTER OF: MARCH 16, 2001 (03/16/2001) STATEMENT OF DISPUTE - STATE OF IDAHO (IDEQ), UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (EPA) AND UNITED STATES DEPARTMENT OF ENERGY (DOE-HQ) 10970 00
17-APR-02 THOMPSON, E. R. HISTORICAL DESCRIPTION OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SURROGATE BURIED WASTE TEST PITS FOR ENVIRONMENTAL RESTORATION (ER) WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-2000-00785 01
15-APR-02 LEECASTER, M. K. GEOSTATISTIC MODELING OF SUBSURFACE CHARACTERISTICS IN RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) REGION, OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-02-00029 00
04-APR-02 ENGLISH, B. L. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON CLOSURE PLAN (CP) FOR TRANSURANIC STORAGE AREA (TSA) INTERIM STATUS UNITS (PADS 1, 2, AND R) LOCATED AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ON THE INEEL (EPA ID NOS. ID489000895 24734 00
02-APR-02 MONSON, B. R. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DOE'S MARCH 15, 2002 (03/15/02) LETTER CONCERNING EXISTING INVENTORY PERMIT DEFINITION AS APPLIED TO CERCLA WASTES LOCATED AT INEEL 24733 00
29-MAR-02 O'NEILL, K. C. AGENCY EXTENSION OF DEADLINE FOR SUBMITTAL OF THE DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 7-13 AND OU 7-14 1842786 00
15-MAR-02 SENTIERI, P. J. CRITICALITY SAFETY STUDY OF THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-13 & 7-14 INEEL/EXT-01-01294 00
15-MAR-02 RASCH, D. N. DOE RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REQUEST FOR INFORMATION CONCERNING LETTER FROM DOE DESCRIBING POSITION ON DEFINITION OF EXISTING INVENTORIES AS STIPULATED IN THREE HWMA RCRA PERMITS ADDRESSING UNITS AT RWMC TS-ETSD-02-039 00
06-MAR-02 BRADLEY, T. M. FOLLOW-ON COMMENTS REGARDING NAVAL REACTORS PROGRAM RADIONUCLIDE INVENTORIES AT THE SUBSURFACE DISPOSAL AREA (SDA) NR:IBO-02/032 00
14-FEB-02 BRADLEY, T. M. NAVAL REACTORS FACILITY (NRF) SUMMARY COMMENTS REGARDING PROJECTED INVENTORY OF NAVAL REACTORS WASTE DISPOSAL AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) NR:IBO-02/029 00
29-NOV-01 O'NEILL, K. C. TRANSMITTAL OF FINAL CLEMSON SORPTION STUDY REPORT AND LONG TERM CORROSION DEGRADATION TEST THIRD (3RD) YEAR RESULTS EM-ER-01-197 00
21-NOV-01 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE WASTE AREA GROUP 7 (WAG-7) ROUTINE MONITORING INEEL/EXT-01-01538 00
11-OCT-01 BUKOWSKI, T. A. FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-2000-00029 00
05-OCT-01 WATSON, L. R. HEALTH & SAFETY PLAN (HSP OR HASP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) COLD TEST PITS FOR OPERABLE UNIT (OU) 7-13 7-14 INEEL/EXT-99-00364 01
28-SEP-01 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 7-14 IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) INEEL/EXT-01-00766 00
21-SEP-01 ADLER-FLITTON, M. K. LONG TERM CORROSION & DEGRADATION TEST THIRD (3RD) YEAR RESULTS INEEL/EXT-01-00036 00
05-SEP-01 PIERRE, W. EPA RESPONSE TO DOE LETTERS: PATH FORWARD FOR IN SITU VITRIFICATION (ISV) EVALUATION IN OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EM-ER-01-141 AND IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) EM-ER-01-142 10952 00
05-SEP-01 PIERRE, W. PATH FORWARD FOR IN SITU VITRIFICATION (ISV) EVALUATION IN OU 7-13 AND 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AND IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) - EPA DOES NOT CONCUR WITH EXPANDED SCOPE OF WORK 24706 00
27-AUG-01 HAIN, K. E. PATH FORWARD FOR IN SITU VITRIFICATION (ISV) EVALUATION IN OPERABLE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EM-ER-01-141 00
27-AUG-01 HAIN, K. E. PATH FORWARD FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) EM-ER-01-142 00
22-AUG-01 ANDERSON, D. L. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) SOIL MOISTURE INSTRUMENTED PROBE - PROBING, LOGGING AND INSTRUMENTATION PROJECT EDF-ER-234 01
22-AUG-01 ANDERSON, D. L. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) VAPOR PORT INSTRUMENTED PROBE EDF-ER-235 00
22-AUG-01 DICK, J. R. NITRATE EXPLOSIVES TESTS TO SUPPORT THE OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU VITRIFICATION (ISV) PROJECT INEEL/EXT-01-00265 00
28-JUN-01 PIERRE, W. POTENTIAL APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS FOR THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPERABLE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 24900 00
11-JUN-01 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR MONITORING TYPE B PROBES FOR OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) INEEL/EXT-2000-01435 00
01-JUN-01 GROSSMAN, C. J. THE SORPTION OF SELECTED RADIONUCLIDES IN SEDIMENTARY INTERBED SOILS FROM THE SNAKE RIVER PLAIN INEEL/EXT-01-01106 00
31-MAY-01 VARVEL, M. D. ENGINEERING DESIGN FILE (EDF) - MASS ESTIMATES OF ORGANIC COMPOUNDS BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-08 AND 7-13 & 7-14 INEEL/EXT-01-00277 00
30-APR-01 JACKSON, T. FEASIBILITY STUDY (FS) ASSESSMENT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 21311 00
04-APR-01 HULL, L. C. APPROACH TO SIMULATION OF ACTINIDES FOR OPERABLE UNIT (OU) 7-13 7-14 BASELINE RISK ASSESSMENT (BRA) LCH-04-01 00
01-APR-01 WHITMIRE, D. L. SUMMARY REPORT - SIMULATION OF GROUNDWATER FLOW NEAR SUBSURFACE DISPOSAL AREA (SDA) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) INEEL/EXT-01-01643 00
16-MAR-01 HAIN, K. E. SUBMITTAL OF STATEMENT OF DISPUTE TO DISPUTE RESOLUTION COMMITTEE REGARDING REQUEST FOR EXTENSION OF MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 EM-ER-01-048 00
15-MAR-01 BRADLEY, T. M. NAVAL NUCLEAR PROPULSION PROGRAM - RADIOLOGICAL INVENTORY OF WASTE DISPOSED AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) - RESPONSE TO QUESTIONS CONCERNING POTENTIAL DATA GAPS FOR NAVAL REACTORS FACILITY (NRF) WASTE DISPOSED AT THE RWMC NR:IBO-01/039 00
14-MAR-01 INEEL COMMUNITY RELATIONS DOE NEWS - STATE AND INEEL SCIENTISTS FOCUS ON UNDERSTANDING RESULTS OF RADIONUCLIDE DETECTION 24675 00
13-MAR-01 WELLS, R. P. ENGINEERING DESIGN FILE (EDF) - REVIEW OF THE ROCKY FLATS PLANT (RFP) DATA CONTAINED IN THE HISTORICAL DATA TASK (HDT) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 - FUNCTIONAL FILE #INEEL/EXT-01-00030 INEEL/EXT-01-00030 00
02-MAR-01 NYGARD, D. RESPONSE TO DECEMBER 2000 (12/2000) SECOND ADDENDUM TO WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT AND SECOND REVISION TO THE SCOPE OF WORK (SOW) 10926 00
20-FEB-01 MILLER, B. P. HEALTH & SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 INTEGRATED PROBING PROJECT (IPP) - PREVIOUSLY KNOWN AS SUBSURFACE INVESTIGATION INEEL/EXT-98-00857 04
13-FEB-01 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 TRACER TEST AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-2000-01428 00
29-JAN-01 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TABLE DESCRIBING MINIMUM INFORMATION NEEDED TO REACH A SUPPORTABLE DECISION FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 24669 00
01-JAN-01 BECKER, WILLIAM J. APPLICATION FOR THE RISK-BASED STORAGE OF PCB REMEDIATION WASTE AT THE INEEL RWMC TSA-RE INEEL/EXT-99-00637 2
01-JAN-01 NITSCHKE, ROBERT L. APPLICATION FOR THE RISK-BASED STORAGE OF PCB REMEDIATION WASTE AT THE INEEL RWMC TSA-RE INEEL/EXT-99-00637 2
21-DEC-00 FJELD, R. A. FINAL REPORT - COLUMN TESTS TO STUDY TRANSPORT OF PLUTONIUM AND OTHER RADIONUCLIDES IN SEDIMENTARY INTERBED AT INEEL INEEL/EXT-01-00763 00
20-DEC-00 HAMPTON, N. L. REVIEW OF WASTE AREA GROUP 7 (WAG-7) ECOLOGICAL CONTAMINANTS OF POTENTIAL CONCERN INEEL/EXT-2000-01405 00
12-DEC-00 BERGHOLZ, W. E. WAG-7 NOVEMBER 15, 2000 (11/15/2000) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) MEETING - INCLUDES PROPOSED PRIORITIES MEETING AGENDA DECEMBER 19, 2000 (12/19/2000) AND RESPONSE TO DIVISION OF ENVIRONMENTAL QUALITY (DEQ) DIFFERENCE OF OPINION EM-ER-232-00 00
01-DEC-00 MCNEIL TECHNOLOGIES, INC. ANALYSIS OF THE ENVIRONMENTAL PROTECTION AGENCY'S (EPA) RECORDS OF DECISION (ROD) RELATED TO LANDFILLS 21310 00
30-NOV-00 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR FLUORESCENT TRACER DYE STUDY FOR OPERABLE UNIT (OU) 7-13 & 7-14 SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-2000-01118 00
10-NOV-00 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 SUBSURFACE INVESTIGATION INEEL/EXT-98-00857 03
01-NOV-00 CHOPPIN, G. R. ACTINIDE SOLUBILITY EXPERIMENTS IN INEEL PERCHED SIMULANT SOLUTION FINAL REPORT INEEL/EXT-01-00762 00
01-NOV-00 ROBACK, R. C. ASSESSMENT OF URANIUM AND PLUTONIUM IN SATURATED AND UNSATURATED ZONES BENEATH THE SUBSURFACE DISPOSAL AREA (SDA), INEEL INEEL/EXT-01-00771 00
26-OCT-00 HULL, L. C. TEST PLAN TO MEASURE ADSORPTION OF ACTINIDES ON INTERBED MATERIALS FROM RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) DOE/ID-10796 00
28-SEP-00 BEITEL, G. A. EVALUATION OF OPERABLE UNIT (OU) 7-10 STAGE I SOIL MOISTURE READINGS - OU 7-10 STAGED INTERIM ACTION (SIA) PROJECT STAGE I INEEL/EXT-2000-00651 00
21-SEP-00 ADLER-FLITTON, M. K. LONG TERM CORROSION DEGRADATION (LTCD) TEST FIRST (1ST) YEAR RESULTS INEEL/EXT-99-00678 00
20-SEP-00 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON THE SCOPE OF WORK (SOW) FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR RWMC SUBSURFACE DISPOSAL AREA (SDA) - REJECTED BY REGULATORS 24341 00
01-SEP-00 CASE, M. J. TECHNICAL REVISION OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) LOW LEVEL WASTE (LLW) RADIOLOGICAL PERFORMANCE ASSESSMENT FOR CALENDAR YEAR 2000 (CY-2000) INEEL/EXT-2000-01089 00
15-AUG-00 HAIN, K. E. DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) LETTER DATED JULY 7, 2000 (07/07/2000) & IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER DATED JULY 19, 2000 (07/19/2000) - PIT 9 RECORD OF DECISION (ROD) REQUEST FOR EXTENSION EM-ER-153-00 00
07-AUG-00 MEYER, T. J. RESOLUTIONS TO IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON INTERIM RISK ASSESSMENT (IRA) & CONTAMINANT SCREENING FOR WASTE AREA GROUP 7 (WAG-7) REMEDIAL INVESTIGATION (RI) DOE/ID-10569 DRAFT REVISION 2 (REV.02) MARCH 02, 1998 (03/02/98) 10841 00
07-AUG-00 MEYER, T. J. RESOLUTIONS TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON INTERIM RISK ASSESSMENT (IRA) & CONTAMINANT SCREENING FOR WASTE AREA GROUP 7 (WAG-7) REMEDIAL INVESTIGATION (RI) DOE/ID-10569 DRAFT REVISION 2 (REV.02) MARCH 02, 1998 (03/02/98) 10842 00
01-AUG-00 SLATE, L. J. PRELIMINARY CRITICALITY SAFETY EVALUATION FOR IN SITU GROUTING (ISG) IN SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-2000-00794 00
19-JUL-00 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED JUNE 30, 2000 (06/30/2000) - OU 7-10 STAGED INTERIM ACTION PROJECT (SIAP) - TRANSMITTAL OF STAGE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN 24667 00
18-JUL-00 BAUMER, A. R. OPERABLE UNIT (OU) 7-13 & 7-14 PLAN FOR INSTALLATION, LOGGING & MONITORING OF PROBEHOLES IN THE SUBSURFACE DISPOSAL AREA (SDA) INEEL/EXT-98-00856 01
07-JUL-00 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED JUNE, 30 2000 (06/30/2000) CONCERNING REQUEST FOR MODIFICATION MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) 24666 00
30-JUN-00 HAIN, K. E. OPERABLE UNIT (OU) 7-10 STAGED INTERIM ACTION (SIA) PROJECT - TRANSMITTAL OF STAGE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - (EXTENSION OF OPERABLE UNIT (OU) 7-10, 7-13 & 7-14 ENFORCEABLE DEADLINES) EM-ER-118-00 00
20-APR-00 EPA AGREEMENT IN PRINCIPLE BY WASTE AREA GROUP 7 (WAG-7) PROJECT MANAGEMENT TEAM - APRIL 20, 2000 (04/20/2000) 24668 00
13-APR-00 HAIN, K. E. WASTE AREA GROUP 7 (WAG-7) REQUEST FOR MODIFICATION OF MILESTONES - OPERABLE UNIT (OU) 7-10 STAGED INTERIM ACTION (SIA) PROJECT, OU 7-13 & 7-14 PITS AND TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-63-00 00
01-APR-00 HULL, L. C. SOLUBILITY CALCULATIONS FOR CONTAMINANTS OF POTENTIAL CONCERN, OPERABLE UNIT (OU) 7-13 AND 7-14 INEEL/EXT-2000-00465 00
21-MAR-00 WEIDNER, J. R. ENGINEERING DESIGN FILE (EDF) - DURABILITY OF JET GROUT MATERIALS AND APPLICATION TECHNOLOGY FOR SUBSURFACE DISPOSAL AREA (SDA) - CONTAMINATED WASTE PITS AND TRENCHES TREATABILITY STUDIES (TS) - GROUT PERFORMANCE - IN SITU GROUTING (ISG) TREATABILITY ER-EDF-128 00
16-MAR-00 ARMSTRONG, A. TRANSMITTAL OF DRAFT UNITED STATES GEOLOGICAL SOCIETY (USGS) ADMINISTRATIVE REPORT OPE-ER-51-00 00
01-MAR-00 MILLER, B. P. HEALTH & SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 SUBSURFACE INVESTIGATION INEEL/EXT-98-00857 02
29-FEB-00 GREEN, T. S. ENVIRONMENTAL RESTORATION (ER) PLAN - DOWNHOLE LOGGING PLN-493 04
23-DEC-99 BAUMER, A. R. ENVIRONMENTAL RESTORATION (ER) DEPARTMENT DRILLING LOGBOOK - RWMC SDA - TSA DRILLING - DECEMBER 23, 1999 - JANUARY 12, 2000 (12/23/99 - 1/12/2000) ER-122-99 00
17-DEC-99 BAUMER, A. R. ENVIRONMENTAL RESTORATION (ER) DEPARTMENT DRILLING LOGBOOK - WELL #SOUTH MON-A-010 - RWMC SDA - TSA DRILLING - DECEMBER 17, 1999 - JANUARY 13, 2000 (12/17/99 - 01/13/2000) ER-123-99 00
15-DEC-99 HAIN, KATHLEEN E. OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - COMBINATION OF OPERABLE UNITS (OUS) 13 AND 14 OPE-ER-198-99 00
01-NOV-99 BONNEMA, B. E. ENGINEERING DESIGN FILE (EDF) - ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) DESIGN BASIS SELF ASSESSMENT - IDENTIFY KEY SYSTEM FEATURES FOR OCVZ THERMAL SOIL VAPOR EXTRACTION UNITS & EVALUATE DESIGN BASIS EDF-ER-097 00
01-NOV-99 NITSCHKE, ROBERT L APPLICATION FOR THE RISK-BASED STORAGE OF PCB REMEDIATION WASTE AT THE INEEL RWMC TSA-RE INEEL/EXT-99-00637 0
01-NOV-99 BECKER, WILLIAM J. APPLICATION FOR THE RISK-BASED STORAGE OF PCB REMEDIATION WASTE AT THE INEEL RWMC TSA-RE INEEL/EXT-99-00637 0
27-OCT-99 JORGENSEN, D. K. ENVIRONMENTAL RESTORATION (ER) DEPARTMENT DRILLING LOGBOOK - RWMC SDA - TSA DRILLING - OCTOBER 27, 1999 - DECEMBER 23, 1999 (10/27/99 - 12/23/99) ER-100-99 00
15-OCT-99 JINES, A. TRANSMITTAL OF DOCUMENTS - FIELD SAMPLING PLAN (FSP) FOR RWMC DRILLING & CORING SAMPLING PROJECT - INEEL/EXT-99-00598 & EXTRACTION OF PLUTONIUM FROM SPIKED INEEL SOIL SAMPLES USING LIGAND-ASSISTED SUPERCRITICAL FLUID TECHNIQUE - INEEL/EXT-99-00870 OPE-ER-155-99 00
27-SEP-99 JESSMORE, J. J. OPERABLE UNIT (OU) 7-13 & 7-14 - IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) WORK PLAN DOE/ID-10690 00
26-AUG-99 FOX, R. V. EXTRACTION OF PLUTONIUM FROM SPIKED INEEL SOIL SAMPLES USING LIGAND-ASSISTED SUPERCRITICAL FLUID EXTRACTION (LA-SFE) TECHNIQUE INEEL/EXT-99-00870 00
09-AUG-99 JINES, A. TRANSMITTAL OF EX SITU TREATABILITY STUDY (TS) WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 & RESPONSES TO AGENCY REVIEW COMMENTS ON DRAFT DOCUMENT OPE-ER-107-99 00
01-AUG-99 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) DRILLING AND CORE SAMPLING PROJECT INEEL/EXT-99-00598 00
01-JUL-99 BONNEMA, B. E. EX SITU TREATABILITY STUDY (TS) WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 DOE/ID-10678 00
14-MAY-99 JINES, A. TRANSMITTAL OF OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT EX SITU TREATABILITY STUDY (TS) WORK PLAN OPE-ER-70-99 00
01-MAY-99 LMITCO OPERABLE UNIT (OU) 7-13 & 7-14 IN SITU THERMAL DESORPTION (ISTD) TREATABILITY STUDY (TS) WORK PLAN DOE/ID-13467 00
01-MAY-99 HOLDREN, K. J. OPERABLE UNIT (OU) 7-13 & 7-14 PLAN FOR INSTALLATION & LOGGING OF PROBEHOLES IN PITS 4 & 10 OF SDA INEEL/EXT-98-00856 00
01-MAY-99 MILLER, B. P. HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 SUBSURFACE INVESTIGATION INEEL/EXT-98-00857 01
27-APR-99 ARMSTRONG, A. OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (R/FS) - TRANSMITTAL OF IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) WORK PLAN DRAFT FOR REVIEW OPE-ER-63-99 00
08-APR-99 JINES, A. DISCUSSION OF & RESPONSE TO U. S. GEOLOGICAL SURVEY (USGS) PEER REVIEW: PROPOSED WELLS AT SUBSURFACE DISPOSAL AREA (SDA) 17181 00
08-APR-99 BARRIE, S. L. ENGINEERING DESIGN FILE (EDF) - GROUNDWATER MONITORING RESULTS FOR WASTE AREA GROUP 7 (WAG-7) - OCTOBER 1997 TO JULY 1998 (10/97 - 07/98) EDF-ER-063 00
08-APR-99 JINES, A. REPORT TITLED SIGNIFICANT ISSUES TO BE RESOLVED TO SUPPORT & DEFEND INTERIM RISK ASSESSMENT & ADDITIONAL WORK REQUIRED TO RESOLVE THOSE ISSUES DATED OCTOBER 15, 1998 (10/15/98) OPE-ER-53-99 00
01-APR-99 DOE REMEDIATION PLANS FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEEL - REVISION 1 (REV.01) - REVISION 8 (REV.08) WERE DRAFTS - REVISION 9 (REV.09) WAS ISSUED AS THE FIRST FINAL DOCUMENT DOE/ID-10670 09
31-MAR-99 JINES, A. OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - TRANSMITTAL OF IN SITU VITRIFICATION (ISV) TREATABILITY STUDY (TS) WORK PLAN OPE-ER-46-99 00
31-MAR-99 JINES, A. OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - TRANSMITTAL OF DRAFT IN SITU THERMAL DESORPTION (ISTD) TREATABILITY STUDY (TS) WORK PLAN OPE-ER-47-99 00
01-MAR-99 FARNSWORTH, R. K. OPERABLE UNIT (OU) 7-13 & 7-14 IN SITU VITRIFICATION (ISV) TREATABILITY STUDY (TS) WORK PLAN DOE/ID-10667 00
11-AUG-98 JINES, A. TRANSMITTAL OF ADDENDUM A TO WORK PLAN FOR OU 7-13 & 7-14 OPE-ER-98-130 00
01-AUG-98 JORGENSEN, D. K. INTERIM RISK ASSESSMENT (IRA) & CONTAMINANT SCREENING FOR WASTE AREA GROUP 7 (WAG-7) REMEDIAL INVESTIGATION (RI) DOE/ID-10569 00
01-AUG-98 JORGENSEN, D. K. ADDENDUM TO WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10622 00
01-AUG-98 BRUCE, J. E. FIELD SAMPLING PLAN (FSP) FOR D&D OF RWMC CERTIFIED & SEGREGATED (C&S) BUILDING (WMF-612) INEEL/EXT-98-00565 00
22-JUL-98 HAIN, K. E. TRANSMITTAL OF ADDENDUM A TO WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 OPE-ER-119-98 00
01-JUL-98 MAGNUSON, S. O. DEVELOPMENT CALIBRATION & PREDICTIVE RESULTS OF A SIMULATOR FOR SUBSURFACE PATHWAY FATE & TRANSPORT OF AQUEOUS & GASEOUS PHASE CONTAMINANTS IN SUBSURFACE DISPOSAL AREA (SDA) AT INEEL INEEL/EXT-97-00609 00
01-MAY-98 DOOLEY, K. J. WASTE AREA GROUP 7 (WAG-7) HEALTH & SAFETY PLAN (HSP) FOR ROUTINE MONITORING OF OPERABLE UNITS (OU) 7-13 & 7-14 - EFFECTIVE 05/06/98 THIS DOCUMENT REPLACED EGG-ER-10748 - SEE ER-DAR-1259 INEEL/EXT-98-00454 00
01-APR-98 BURGESS, J. D. HEALTH & SAFETY PLAN (HSP) FOR INSTALLATION OF GROUNDWATER & SOIL VAPOR MONITORING WELLS BETWEEN RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AND CENTRAL FACILITIES AREA (CFA) INEEL/EXT-98-00150 00
01-SEP-97 NOT SPECIFIED HOT SPOT REMOVAL SYSTEM - SYSTEM DESCRIPTION INEEL/EXT-97-00666 00
01-SEP-97 JORGENSEN, D. K. REVISED SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-95/0253 01
06-MAY-97 DICKE, C. A. REVIEW OF THE TRACK 2 SUMMARY REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ACID PIT AND INTERPRETATION OF THE ACID PIT SECONDARY ION MASS SPECTROMETRY ANALYSIS CAD-01-97 00
01-MAY-97 BECKER, B. H. SELECTION AND DEVELOPMENT OF MODELS USED IN THE WASTE AREA GROUP 7 (WAG-7) BASELINE RISK ASSESSMENT (BRA) INEEL/EXT-97-00391 00
01-MAY-97 DICKE, C. A. DISTRIBUTION COEFFICIENTS & CONTAMINANT SOLUBILITIES FOR WAG-7 BASELINE RISK ASSESSMENT (BRA) INEL/EXT-97-00201 00
01-MAY-97 GALLOWAY, K. J. WORK PLAN FOR THE IN SITU STABILIZATION TREATABILITY STUDY (TS) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ACID PIT INEL/EXT-97/00068 00
21-MAR-97 GROENEWOLD, G. S. SCOPING STUDIES TO IDENTIFY FORMS OF MERCURY IN ACID PIT SOIL SAMPLES GSG-10-97 00
18-MAR-97 DOE, EPA, IDHW AGREEMENT TO RESOLVE DISPUTES 1088-06-29-120-A 00
01-MAR-97 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - COMPREHENSIVE INVESTIGATION CONTINUING FOR RWMC WAG-7 OU 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 13945 00
01-MAR-97 EVANS, S. K. TEST PLAN FOR MATERIAL TESTING PHASE OF IN SITU STABILIZATION TREATABILITY STUDY (TS) INEL/EXT-97-00096 00
06-SEP-96 BARNES, C. M. EDF - ENGINEERING DESIGN FILE - ENGINEERING SUPPORT FILLING DATA GAPS FOR PROCESSES & TECHNOLOGIES - COLLECTION OF TECHNOLOGY & PROCESS INFORMATION FOR USE IN OU 7-13 & 7-14 FEASIBILITY STUDY (FS) ER-WAG7-92 00
01-AUG-96 BARNES, C. M. EDF - ENGINEERING DESIGN FILE - INDEX & DISCUSSION OF DATA GATHERED FOR PLASMA ARC CENTRIFUGAL FURNACE ER-WAG7-87 00
15-MAY-96 LABUY, S. A. ENGINEERING DESIGN FILE (EDF) - ADVANCED REACTIVITY MEASUREMENT FACILITY (ARMF) RADIOACTIVE SOURCE SHIPPING DRUM - DESIGN INPUTS, ANALYSES, DESIGN DESCRIPTION EDF-ER-023 00
08-MAY-96 JENSEN, N. R. TRANSMITTAL OF FINAL WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-96-83 00
02-MAY-96 HAMPTON, N. L. ENGINEERING DESIGN FILE (EDF) - WAG-7 DATA COMPILATION TASKS - SUBSURFACE DISPOSAL AREA (SDA) BIOTIC DATA COMPILATION ER-WAG7-76 01
01-MAY-96 BENSEN, T. A. WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-95/0343 00
17-APR-96 NEARMAN, M. J. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10276 00
14-FEB-96 DOE FEDERAL FACILITY AGREEMENT CONSENT ORDER (FFA/CO) FEBRUARY 14, 1996 (02/14/96) PROJECT MANAGER MEETING MINUTES - TELECONFERENCE 17866 00
07-FEB-96 PRENDERGAST, W. J. EDF - ENGINEERING DESIGN FILE - DIGEST OF REPORTS & INFORMATION ON STATUS OF ISV TECHNOLOGY ER-WAG7-85 00
18-JAN-96 DOE FEDERAL FACILITY AGREEMENT CONSENT ORDER (FFA/CO) JANUARY 18, 1996 (01/18/96) PROJECT MANAGER MEETING MINUTES - TELECONFERENCE 17862 00
09-JAN-96 PIERRE, W. EPA EXTENSION OF COMMENT PERIOD ON DRAFT WORK PLAN FOR OU 7-13 & 7-14 WAG-7 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10174 00
21-DEC-95 NEARMAN, M. J. EPA EXTENSION OF COMMENT PERIOD ON DRAFT WORK PLAN OU 7-13 & 7-14 WAG-7 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10173 00
20-DEC-95 KOCH, D. F. IDHW COMMENTS ON DRAFT WORK PLAN FOR OPERABLE UNIT (OU) 7-13 AND 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 10151 00
01-DEC-95 RAVIO, B. D. WASTE DESCRIPTION INFORMATION FOR TRANSURANICALLY CONTAMINATED WASTES STORED AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) INEL-95/0412 00
25-OCT-95 GARCIA, K. M. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 & 7-14 FEASIBILITY STUDY (FS) - DIGEST #2 (TWO) OF REPORTS ON SURFACE BARRIERS FOR ARID REGIONS ER-WAG-83 00
17-OCT-95 NOT SPECIFIED SETTLEMENT AGREEMENT SA1095 0
02-OCT-95 BARNES, C. M. ENGINEERING DESIGN FILE (EDF) - ENGINEERING SUPPORT OF OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - PIT 9 INTERFACE INFORMATION FROM LESAT IN MEETING ON SEPTEMBER 14, 1995 (09/14/95) ER-WAG7-79 00
01-SEP-95 BARNES, C. M. ENGINEERING DESIGN FILE (EDF) - PRELIMINARY DEVELOPMENT OF ALTERNATIVE REMEDIATION TECHNOLOGIES & IDENTIFICATION OF DATA NEEDS FOR OPERABLE UNIT (OU) 7-13 & 7-14 FEASIBILITY STUDY (FS) ER-WAG7-78 01
01-AUG-95 HUNTLEY, R. M. SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEL-95/0253 00
18-JUL-95 KOCH, D. F. IDAHO DEPARTMENT OF HEALTH AND WELFARE - DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT SCOPE OF WORK FOR OU 7-13 AND 7-14 WAG-7 COMPREHENSIVE RI/FS 10039 00
12-JUL-95 HARKER, Y. D. ENGINEERING DESIGN FILE (EDF) - ENVIRONMENTAL RESTORATION (ER) HISTORICAL DATA TASK (HDT) RECENT & PROJECTED DATA TASK (RPDT) - TEST REACTOR AREA (TRA) EVALUATION - SCALING FACTORS FOR WASTE ACTIVITIES MEASURED BY G-M METHOD ER-WAG7-57 00
09-JUN-95 HAMPTON, N. L. ENGINEERING DESIGN FILE (EDF) - WAG-7 DATA COMPILATION TASKS - SUBSURFACE DISPOSAL AREA (SDA) BIOTIC DATA COMPILATION ER-WAG7-76 00
07-JUN-95 HULA, G. A. TRANSMITTAL OF DRAFT SCOPE OF WORK (SOW) FOR OU 7-13 TRU PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT WAG-7 OPE-ER-106-95 00
31-MAY-95 KECK, K. N. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - SUBSURFACE DISPOSAL AREA (SDA) SURFACE WATER DESCRIPTION & DATA ER-WAG7-66 00
31-MAY-95 MARTIAN, P. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) - SUBSURFACE DISPOSAL AREA (SDA) BURIED DRUM FAILURE RATE DATA COMPILATION ER-WAG7-68 00
31-MAY-95 NEUPAUER, R. M. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) - SDA LITHOLOGY & PERCHED WATER DATA COMPILATION ER-WAG7-69 00
31-MAY-95 MCCARTHY, J. M. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - SUBSURFACE DISPOSAL AREA (SDA) HYDRAULIC CHARACTERIZATION DATA COMPILATION: BASALTS ER-WAG7-70 00
31-MAY-95 MCCARTHY, J. M. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - SUBSURFACE DISPOSAL AREA (SDA) HYDRAULIC CHARACTERIZATION DATA COMPILATION: SURFICIAL SEDIMENTS & INTERBEDS ER-WAG7-71 00
31-MAY-95 MAGNUSON, S. O. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) WATER & SOILS SAMPLING DATA - SUBSURFACE DISPOSAL AREA (SDA) SOIL BASALT & WATER CONCENTRATION DATA COMPILATION: RADIONUCLIDES & INORGANICS ER-WAG7-72 00
31-MAY-95 SONDRUP, A. J. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) SUBSURFACE DISPOSAL AREA (SDA) VOLATILE ORGANIC DATA COMPILATION SOIL VAPOR EMISSION & WATER SAMPLES ER-WAG7-73 00
31-MAY-95 NEUPAUER, R. M. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) DATA COMPILATION SUBSURFACE DISPOSAL AREA (SDA) COVER OVERBURDEN THICKNESS ER-WAG7-74 00
31-MAY-95 STALEY, C. S. ENGINEERING DESIGN FILE (EDF) - AIR MONITORING DATA SUPPORTING WASTE AREA GROUP 7 (WAG-7) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ER-WAG7-75 00
01-JUL-93 MEACHUM, T. R. ENGINEERING DESIGN FILE (EDF) - AREAS AND VOLUMES FOR SELECTED RWMC PITS AND TRENCHES ER&WM-EDF-0007-93 00
28-MAY-93 MEACHUM, T. R. EDF - ENGINEERING DESIGN FILE - AREAS AND VOLUMES FOR SELECTED RWMC PITS AND TRENCHES ER/WM-EDF-0007-93 00
01-JUN-92 HORTON, R. B. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 1) 0
01-JUN-92 SCHLAFMAN, M. J. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 1) 0
01-JUN-92 HIARING, C. M. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 1) 0
01-JUN-92 HORTON, R. B. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 2) 0
01-JUN-92 HIARING, C. M. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 2) 0
01-JUN-92 SCHLAFMAN, M. J. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 2) 0
01-JUN-92 HIARING, C. M. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 3) 0
01-JUN-92 HORTON, R. B. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 3) 0
01-JUN-92 SCHLAFMAN, M. J. A PHOTOGRAPHIC REPORT OF DISPOSAL AND STORAGE ACTIVITIES AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX WM-ERP-92-014 (PART 3) 0
01-DEC-91 PAARMANN, M. L. RWMC INVESTIGATIONS REPORT, VOLUME 1 (VOL.01) EGG-WM-9707,VOL.01 00
01-DEC-91 PAARMANN, M. L. RWMC INVESTIGATIONS REPORT, VOLUME 2 (VOL.02) EGG-WM-9707,VOL.02 00
01-DEC-91 PAARMANN, M. L. RWMC INVESTIGATIONS REPORT, VOLUME 3 (VOL.03) EGG-WM-9707,VOL.03 00
01-DEC-91 PAARMANN, M. L. RWMC INVESTIGATIONS REPORT, VOLUME 4 (VOL.04) EGG-WM-9707,VOL.04 00
27-SEP-91 SCHWALLER, R. G. FINAL REPORT - SOIL OVERBURDEN SAMPLING AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) TRANSURANIC STORAGE AREA (TSA) EGG-WM-8986-B 00
26-AUG-91 SLOAN, P. A. ENGINEERING DESIGN FILE (EDF) - IN SITU VITRIFICATION (ISV) LARGE FIELD TEST SITING REQUIREMENTS & SELECTION ERP-ISV-032 00
01-JAN-91 ARRENHOLZ, D. A. HISTORICAL REPORT OF TRANSURANIC (TRU) WASTE PITS AND TRENCHES AT SUBSURFACE DISPOSAL AREA (SDA) OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) WTD-91-027 00
08-MAY-90 MIYASAKI, D. H. ENGINEERING DESIGN FILE (EDF) - CALCULATION OF OFF GAS CONCENTRATIONS DURING IN SITU VITRIFICATION (ISV) PROCESS - INTERMEDIATE FIELD TEST ERP-ISV-034 00
12-OCT-89 MACKINNON, R. J. ENGINEERING DESIGN FILE (EDF) - IN SITU VITRIFICATION (ISV) CODE IMPLEMENTATION - OUTLINE MODELING REQUIREMENTS FOR ISV ERP-ISV-021 00
02-JUN-89 BELLER, J. M. ENGINEERING DESIGN FILE (EDF) - BURIED WASTE PROGRAM (BWP) IN SITU VITRIFICATION (ISV) - PRODUCTION SCALE COST ESTIMATE BWP-ISV-006 00
31-MAY-89 CALLOW, R. A. ENGINEERING DESIGN FILE (EDF) - INTERMEDIATE SCALE IN SITU VITRIFICATION (ISV) TEST REQUIREMENTS & PIT DESIGN BWP-ISV-010 00
21-FEB-89 MELVILLE, J. B. ENGINEERING DESIGN FILE (EDF) - ISV TREATABILITY STUDY (TS) - LARGE SCALE DEMONSTRATION TEST TIME REQUIRED TO VITRIFY TRU CONTAMINATED PITS & TRENCHES AT SDA BWP-ISV-007 00
24-JAN-89 GARCIA, E. C. ENGINEERING DESIGN FILE (EDF) - IN SITU VITRIFICATION (ISV) SUMMARY CHARACTERIZATION OF SUBSURFACE DISPOSAL AREA (SDA) - ESTIMATE METAL CONTENT OF WASTE BURIED IN SDA BWP-ISV-005 00
29-APR-88 VIGIL, M. J. ENGINEERING DESIGN FILE (EDF) - MODEL OF MIGRATION OF HAZARDOUS CONSTITUENT - ESTIMATE OF WATER IN PITS DURING FLOODING EVENTS BWP-12 00
01-JUL-85 RODGERS, A. D. A HISTORY OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEL WM-F1-81-003 03
01-AUG-79 HUDSON, R. J. EARLY WASTE RETRIEVAL FINAL REPORT TREE-1321 00
01-AUG-78 MCKINNEY, J. D. INITIAL DRUM RETRIEVAL FINAL REPORT TREE-1286 00
01-MAY-72 THOMPSON, R. J. SOLID RADIOACTIVE WASTE RETRIEVAL TEST ACI-120 00
10-JUN-71 LEE, W. H. ROCKY FLATS SOLID WASTE SENT TO THE NATIONAL REACTOR TESTING STATION (NRTS) 1954 THROUGH 1970 1792319 00