28-MAR-07 HARDESTY, T. AGENCIES AGREE TO EXTEND DEADLINES FOR SUBMISSION OF THE OPERABLE UNIT (OU) 7-13/14 PROPOSED PLAN 25088 00
16-MAR-07 HARDESTY, T. AGREEMENT TO EXTEND DEADLINES FOR THREE OPERABLE UNITS (OU) 7-13, 7-14 AND OU 7-10 DELIVERABLES 2474048 00
27-FEB-07 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 03
04-DEC-06 OPALSKI, D. D. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 25063 00
16-JUN-06 JOLLEY, W. L. FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 01
04-OCT-05 JOLLEY, W. L. FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) DOE/NE-ID-11201 00
27-APR-05 JOSTEN, N. E. TYPE A NUCLEAR LOGGING DATA ACQUISITION AND PROCESSING FOR OPERABLE UNIT (OU) 7-13, 7-14 AND 7-10 INEEL/EXT-02-00558 02
08-NOV-04 BRYAN, J. D. REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - TO VIEW ATTACHMENT 1 SEE ICP/EXT-04-00126 - TO VIEW ATTACHMENT 2 SEE 1564435 DOE/NE-ID-11155 00
30-JUN-04 KOCH, D. F. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO THE EXTENSION REQUEST FOR THE OPERABLE UNIT (OU) 7-10 REMEDIAL ACTION (RA) REPORT 24875 00
29-JUN-04 SNOOK, J. G. EXTENSION REQUEST FOR THE OPERABLE UNIT (OU) 7-10 REMEDIAL ACTION (RA) REPORT EM-ER-04-137 00
26-MAY-04 CLOUGH, M. K. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) GLOVEBOX EXCAVATOR METHOD FACILITY FINAL INSPECTION 24859 00
31-MAR-04 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS INEEL/EXT-02-01117 07
16-MAR-04 EBERLINE FINAL VALIDATION REPORT - MOBILE NONDESTRUCTIVE ASSAY (NDA) TRAILER FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - ATTACHMENT 2 TO REMEDIAL ACTION (RA) REPORT - DOE/NE-ID-11155 1564435 00
10-MAR-04 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS - DOCUMENT ID NUMBER ERRONEOUSLY APPEARS ON COVER PAGE AS ICP/EXT-02-01117 INEEL/EXT-02-01117 06
24-FEB-04 KOCH, D. F. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO LETTER REGARDING COMPLETION OF EXCAVATION OPERATIONS AT THE GLOVEBOX EXCAVATOR METHOD PROJECT 24831 00
24-FEB-04 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO LETTER REGARDING COMPLETION OF EXCAVATION OPERATIONS AT THE GLOVEBOX EXCAVATOR METHOD PROJECT 24832 00
24-FEB-04 SNOOK, J. G. COMPLETION OF EXCAVATION OPERATIONS AT THE GLOVEBOX EXCAVATOR METHOD PROJECT EM-ER-04-042 00
27-JAN-04 KOCH, D. F. AUTHORIZATION FOR RELEASE OF $2 MILLION DOLLARS IN DEPARTMENT OF ENERGY (DOE) FUNDS 24825 00
26-JAN-04 CETO, N. COMMENCEMENT OF WASTE RETRIEVAL AT GLOVEBOX EXCAVATOR METHOD PROJECT 24824 00
26-JAN-04 SNOOK, J. G. COMMENCEMENT OF WASTE RETRIEVAL AT GLOVEBOX EXCAVATOR METHOD PROJECT EM-ER-04-004 00
21-JAN-04 BRYAN, J. D. PRE-FINAL INSPECTION REPORT FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - ATTACHMENT 1 TO REMEDIAL ACTION (RA) REPORT - DOE/NE-ID-11155 ICP/EXT-04-00126 00
11-DEC-03 SNOOK, J. G. APPROVAL OF CRITICAL DECISION 4 (CD-4) FOR THE GLOVEBOX EXCAVATOR METHOD PROJECT EM-ER-03-300 00
11-DEC-03 SNOOK, J. G. TRANSMITTAL OF APPROVAL OF CRITICAL DECISION 4 (CD-4) FOR THE GLOVEBOX EXCAVATOR METHOD PROJECT EM-ER-03-307 00
11-DEC-03 SELLERS, E. D. AUTHORIZATION TO COMMENCE RETRIEVAL OPERATIONS AT THE GLOVEBOX EXCAVATOR METHOD PROJECT EM-WM-03-129 00
05-DEC-03 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) DENIAL OF EXTENSION OF STAGE III MILESTONE FROM APRIL 2002 (04/02) AGREEMENT TO RESOLVE DISPUTES 24840 00
05-DEC-03 WERNTZ, J. H. ENVIRONMENTAL PROTECTION AGENCY (EPA) DENIAL OF EXTENSION OF STAGE III MILESTONE FROM APRIL 2002 (04/02) AGREEMENT TO RESOLVE DISPUTES 24841 00
01-DEC-03 ICP COMMUNITY RELATIONS UPDATE FACT SHEET - EXCAVATION BEGINS AT PIT 9 DEMONSTRATION FACILITY 24817 00
13-NOV-03 SENTIERI, P. J. CRITICALITY SAFETY EVALUATION FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-01-01617 05
28-OCT-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS INEEL/EXT-02-01117 05
10-OCT-03 HELM, B. R. PRECONCEPTUAL DESIGN RETRIEVAL ALTERNATIVES FOR THE PIT 9 REMEDIATION PROJECT INEEL/EXT-03-00908 00
09-OCT-03 LANDMAN, W. H. TREATMENT ALTERNATIVES FEASIBILITY STUDY (FS) FOR THE PIT 9 REMEDIATION PROJECT INEEL/EXT-03-00907 00
08-OCT-03 AUSTAD, S. L. ANALYSIS OF ALTERNATIVES SUMMARY FOR THE PIT 9 REMEDIATION PROJECT INEEL/EXT-03-00909 00
06-OCT-03 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-02-00542 02
01-OCT-03 NISHIOKA, D. E. TECHNOLOGY EVALUATION OF RETRIEVAL OPTIONS FOR THE PIT 9 REMEDIATION PROJECT INEEL/EXT-03-00526 00
12-SEP-03 BURTON, B. N. WASTE MANAGEMENT PLAN (WMP) FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-02-00767 01
10-SEP-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS INEEL/EXT-02-01117 04
02-SEP-03 NISHIOKA, D. E. ENGINEERING DESIGN FILE (EDF) - WASTE RETRIEVAL PROCESS TECHNOLOGY SEARCH FOR THE OPERABLE UNIT (OU) 7-10 STAGE III PROJECT EDF-4025 00
28-AUG-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS INEEL/EXT-02-01117 03
27-AUG-03 PRATT, M. B. PROJECT TURNOVER DOCUMENTATION PACKAGE FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-03-00622 00
04-AUG-03 JACKSON, T. TREATMENT TECHNOLOGIES FOR THE OPERABLE UNIT (OU 7-10) STAGE III PROJECT INEEL/EXT-03-00022 00
30-JUL-03 PEATROSS, R. G. HAZARD IDENTIFICATION DOCUMENT FOR THE OPERABLE UNIT (OU) 7-10 STAGE III PROJECT INEEL/EXT-03-00790 00
30-JUL-03 THOMPSON, D. F. PLAN (PLN) - RISK MANAGEMENT PLAN FOR OPERABLE UNIT (OU) 7-10 STAGE III PROJECT PLN-1358 01
10-JUL-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS INEEL/EXT-02-01117 02
20-JUN-03 THOMPSON, D. F. PLAN (PLN) - RISK MANAGEMENT PLAN FOR OPERABLE UNIT (OU) 7-10 STAGE III PROJECT PLN-1358 00
05-JUN-03 JAMISON, R. K. PRE-FINAL INSPECTION CHECKLIST FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-02-01184 00
01-MAY-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS INEEL/EXT-02-01117 01
14-MAR-03 SENTIERI, P. J. CRITICALITY SAFETY EVALUATION FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-01-01617 03
13-MAR-03 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-02-00542 01
12-FEB-03 SNOOK, J. G. TRANSMITTAL OF FINALIZED GLOVEBOX EXCAVATOR METHOD PROJECT DOCUMENTS EM-ER-03-044 00
05-FEB-03 RITTER, P. D. NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MONITORING PLAN FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-03-00079 00
29-JAN-03 SALOMON, H. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-02-00542 00
27-JAN-03 BURTON, B. N. WASTE MANAGEMENT PLAN (WMP) FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-02-00767 00
22-JAN-03 MILLER, B. P. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS INEEL/EXT-02-01117 00
21-JAN-03 BURTON, B. N. ENGINEERING DESIGN FILE (EDF) - APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARAR) IMPLEMENTATION MATRIX FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT EDF-2324 00
03-DEC-02 IANI, L. J. INEEL PIT 9 DISPUTE RESOLUTION -CONFIRMATION OF ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) UNDERSTANDING OF MAJOR POINTS DISCUSSED DURING FRIDAY'S TELECONFERENCE 24722 00
21-NOV-02 SENTIERI, P. J. CRITICALITY SAFETY EVALUATION FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-01-01617 02
01-NOV-02 KEMPTHORNE, D. DIRK KEMPTHORNE'S LETTER TO SPENCER ABRAHAM, SECRETARY OF U. S. DEPARTMENT OF ENERGY (DOE-HQ), REGARDING RESCHEDULED VISIT TO IDAHO 24719 00
21-OCT-02 SENTIERI, P. J. CRITICALITY SAFETY EVALUATION FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-01-01617 01
15-OCT-02 DAVIES, S. A. SUPPLEMENT TO REMEDIAL DESIGN (RD) PACKAGE FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT DOE/ID-11032-SUPPL 00
03-OCT-02 JEWELL, J. K. ESTIMATING THE MASS OF PU-239 WASTE NEAR P9-20 PROBE HOLE FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT INEEL/EXT-02-01189 00
19-SEP-02 DAVIES, S. A. REMEDIAL DESIGN (RD) PACKAGE FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - VOLUME 1 (VOL.01) AND VOLUME 2 (VOL.02) DOE/ID-11032 00
05-SEP-02 PACE, B. STATUS OF CULTURAL RESOURCES REVIEW OF PIT 9 GLOVEBOX EXCAVATOR METHOD PROJECT 24755 00
01-SEP-02 INEEL COMMUNITY RELATIONS A COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) - PIT 9 CLEANUP CONSTRUCTION BEGINS 24749 00
02-AUG-02 NEITZEL, S. LETTER FROM THE IDAHO STATE HISTORICAL SOCIETY - REVIEW COMMENTS ON THE GLOVEBOX EXCAVATOR METHOD PROJECT AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 24754 00
01-AUG-02 PREUSSNER, B. D. SPECIFICATION (SPC) - BACKHOE SAFETY RELATED MODIFICATIONS FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SPC-351 00
01-AUG-02 PREUSSNER, B. D. SPECIFICATION (SPC) - BACKHOE MODIFICATIONS FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SPC-401 00
31-JUL-02 PRATT, M. B. OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT, CRITICAL DECISION 2/3 (CD-2/3) SUBMITTAL DOCUMENTS DKJ-157-02 00
30-JUL-02 SNOOK, J. G. START OF CONSTRUCTION FOR GLOVEBOX EXCAVATOR METHOD PROJECT EM-ER-02-125 00
24-JUL-02 JOHNSON, B. E. PERFORMANCE SPECIFICATION (SPC) - EMISSIONS MONITORING SYSTEM FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SPC-392 00
23-JUL-02 POPE, M. I. PERFORMANCE SPECIFICATION (SPC) - HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTER SYSTEMS FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SPC-391 00
19-JUL-02 CARPENEDO, R. J. DESIGN SPECIFICATION (SPC) - PACKAGING GLOVEBOX SYSTEM (PGS) FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SPC-387 01
16-JUL-02 STARCK, R. A. LETTER TO THE IDAHO STATE HISTORICAL SOCIETY TO REVIEW THE GLOVEBOX EXCAVATOR METHOD PROJECT AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) - INEEL/EXT-01-01512 ENCLOSED TO FACILITATE REVIEW TS-ESTD-02-109 00
16-JUL-02 STARCK, R. A. LETTER TO THE SHOSHONE BANNOCK TRIBES TO REVIEW THE GLOVEBOX EXCAVATOR METHOD PROJECT AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) - INEEL/EXT-01-01512 ENCLOSED TO FACILITATE REVIEW TS-ESTD-02-110 00
14-JUL-02 GUILLEN, L. E. A-E CONSTRUCTION SPECIFICATION (SPC) - FACILITY PACKAGE FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SPC-389 00
10-JUL-02 CARPENEDO, R. J. PERFORMANCE SPECIFICATION (SPC) - PACKAGING GLOVEBOX SYSTEM (PGS) LIFT TABLE FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SPC-388 00
26-JUN-02 SNOOK, J. G. CRITICAL DECISION 2/3 (CD-2/3) FOR GLOVEBOX EXCAVATOR METHOD PROJECT APPROVED EM-ER-02-107 00
15-MAY-02 PRATT, M. B. OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT PARTIAL CRITICAL DECISION 3B (CD-3B) SUBMITTAL DKJ-111-02 00
10-MAY-02 PALMER, S. L. A-E PERFORMANCE SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - WEATHER ENCLOSURE STRUCTURE (WES) WMF-671 SPC-364 00
10-MAY-02 JENSEN, S. A. A-E CONSTRUCTION SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - FACILITY FLOOR STRUCTURE (FFS) FABRICATION SPC-366 00
10-MAY-02 JENSEN, S. A. A-E CONSTRUCTION SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - FACILITY STRUCTURES SPC-367 00
18-APR-02 ABRAHAM, S. AGREEMENT TO RESOLVE DISPUTES IN THE MATTER OF: MARCH 16, 2001 (03/16/2001) STATEMENT OF DISPUTE - STATE OF IDAHO (IDEQ), UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (EPA) AND UNITED STATES DEPARTMENT OF ENERGY (DOE-HQ) 10970 00
18-APR-02 PRATT, M. B. OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT, CRITICAL DECISION 3A (CD-3A) SUBMITTAL DOCUMENTS DKJ-73-02 00
18-APR-02 DIRKMAAT, P. J. APPROVAL OF CRITICAL DECISION 3A (CD-3A) - EARLY PROCUREMENT AND SITE UTILITIES WORK FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT LOCATED AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT THE INEEL EM-INTEC-02-021 00
17-APR-02 HAIN, K. E. PARTIAL ACHIEVEMENT OF CRITICAL DECISION 2/3 (CD-2/3) FOR GLOVEBOX EXCAVATOR METHOD PROJECT RETRIEVAL DEMONSTRATION EM-ER-02-061 00
16-APR-02 KINGSFORD, C. O. CONSTRUCTION SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SITE DEVELOPMENT SPC-352 01
08-APR-02 BURTON, B. N. APPROVED ENVIRONMENTAL CHECKLIST (EC) - RWMC OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT RWMC-99-002EC 01
04-APR-02 ENGLISH, B. L. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON CLOSURE PLAN (CP) FOR TRANSURANIC STORAGE AREA (TSA) INTERIM STATUS UNITS (PADS 1, 2, AND R) LOCATED AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ON THE INEEL (EPA ID NOS. ID489000895 24734 00
04-APR-02 HARKER, W. S. INDEPENDENT PROJECT REVIEW (IPR) PLAN OF OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT, CD-A3 SCOPE EM-IDM-02-027 00
04-APR-02 STEPHENS, D. L. A-E PERFORMANCE SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - RETRIEVAL CONFINEMENT STRUCTURE (RCS) SPC-358 00
02-APR-02 MONSON, B. R. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DOE'S MARCH 15, 2002 (03/15/02) LETTER CONCERNING EXISTING INVENTORY PERMIT DEFINITION AS APPLIED TO CERCLA WASTES LOCATED AT INEEL 24733 00
28-MAR-02 IDEQ IDEQ, EPA, AND DOE AGREEMENT FOR EXTENSION OF DEADLINE FOR SUBMITTAL OF DRAFT REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) AND FEASIBILITY STUDY (FS) FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-13 & 7-14 24731 00
25-MAR-02 HAIN, K. E. COMMENTS SUBMITTED BY DOE-ID PROGRAMMATIC SAFETY REVIEW GROUP ON PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT AND RESPONSES TO EPA AND IDEQ COMMENTS ON CONCEPTUAL DESIGN REPORT (CDR) EM-ER-02-043 00
25-MAR-02 AKERS, D. W. SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT DESIGN INPUT FOR FISSILE MATERIAL MONITORING SYSTEM (FMMS) SPC-360 00
15-MAR-02 CRESAP, D. A. PERFORMANCE SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR FISSILE MATERIAL MONITOR (FMM) - GLOVEBOX EXCAVATOR METHOD PROJECT SPC-355 00
15-MAR-02 RASCH, D. N. DOE RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REQUEST FOR INFORMATION CONCERNING LETTER FROM DOE DESCRIBING POSITION ON DEFINITION OF EXISTING INVENTORIES AS STIPULATED IN THREE HWMA RCRA PERMITS ADDRESSING UNITS AT RWMC TS-ETSD-02-039 00
06-MAR-02 ABRAHAM, S. LETTER FROM THE SECRETARY OF ENERGY TO THE GOVERNOR OF IDAHO - PROPOSAL TO RESOLVE DISPUTE IS BEING ACTIVELY PURSUED 24730 00
06-MAR-02 BRADLEY, T. M. FOLLOW-ON COMMENTS REGARDING NAVAL REACTORS PROGRAM RADIONUCLIDE INVENTORIES AT THE SUBSURFACE DISPOSAL AREA (SDA) NR:IBO-02/032 00
14-FEB-02 BRADLEY, T. M. NAVAL REACTORS FACILITY (NRF) SUMMARY COMMENTS REGARDING PROJECTED INVENTORY OF NAVAL REACTORS WASTE DISPOSAL AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) NR:IBO-02/029 00
29-JAN-02 ROBERSON, J. H. THANK YOU FOR INSTITUTE FOR ENERGY AND ENVIRONMENTAL RESEARCH (IEER) REPORT - POISON IN THE VADOSE ZONE: AN EXAMINATION OF THE THREATS TO THE SNAKE RIVER PLAIN AQUIFER (SRPA) FROM INEEL - DOE POSITION ON CONCLUSIONS LISTED IN EXECUTIVE SUMMARY 24727 00
24-JAN-02 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON PIT 9 10% CONCEPTUAL DESIGN FOR GLOVEBOX EXCAVATOR METHOD 24724 00
23-JAN-02 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT 10% REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR STAGE II PIT 9 GLOVEBOX EXCAVATOR METHOD OPERABLE UNIT (OU) 7-10 24723 00
23-JAN-02 GEARHEARD, M. F. ENVIRONMENTAL PROTECTION AGENCY (EPA) NOTICE OF INSPECTION & REQUEST FOR INFORMATION TO EVALUATE COMPLIANCE WITH TERMS OF DECEMBER 1991 (12/91) FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) AND RELEVANT SECTIONS OF NATIONAL PRIORITIES LIST (NPL 24725 00
22-JAN-02 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) NOTICE OF FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (FFA/CO) INSPECTION OF THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) AT IDAHO FALLS, IDAHO 24726 00
09-JAN-02 KEMPTHORNE, D. LETTER FROM GOVERNOR OF IDAHO TO THE SECRETARY OF ENERGY - CONTROVERSY REGARDING CLEANUP OF PIT 9 - RESOLUTION OF OUTSTANDING ISSUES 24732 00
01-JAN-02 DAVIES, S. A. OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - CONCEPTUAL DESIGN REPORT (CDR) FOR CRITICAL DECISION 1 (CD-1) INEEL/EXT-01-01512 00
01-JAN-02 DAVIES, S. A. OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT PRELIMINARY PROJECT EXECUTION PLAN (PEP) INEEL/EXT-01-01513 00
14-DEC-01 FREI, M. W. EVALUATION OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) MEMORANDUM DECISION AND ORDER DATED JULY 23, 2001 (07/23/01) TO THE GOVERNOR OF IDAHO FOR RESOLUTION - INCLUDED DEPARTMENT OF ENERGY (DOE) POSITION PAPER EM-ER-01-200 00
03-DEC-01 ROUSSEAU, J. P. USGS COMMENTARY ON INSTITUTE FOR ENERGY AND ENVIRONMENTAL RESEARCH (IEER) REPORT - POISON IN THE VADOSE ZONE: AN EXAMINATION OF THE THREATS TO THE SNAKE RIVER PLAIN AQUIFER (SRPA) FROM THE INEEL 24728 00
30-NOV-01 CASTANON, L. A. INEEL PIT 9 DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) AGREEMENT WITH AN ADDITIONAL EXTENSION TO CURRENT DEADLINE - NEW DEADLINE OF DECEMBER 15, 2001 (12/15/2001) 24721 00
28-NOV-01 ALLRED, C. S. INEEL PIT 9 DISPUTE RESOLUTION - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) PROPOSAL FOR SETTLEMENT 24720 00
30-OCT-01 FREI, M. W. EXTENSION OF DISPUTE RESOLUTION FOR PIT 9 RETRIEVAL DEMONSTRATION UNTIL NOVEMBER 30, 2001 (11/30/2001) - CONTAINS LIST OF ENFORCEABLE DEADLINES & MILESTONES EM-ER-01-180 00
25-OCT-01 CASTANON, L. A. INEEL PIT 9 DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) AGREEMENT TO THE NOVEMBER 30, 2001 (11/30/2001) EXTENSION DATE 24718 00
25-OCT-01 HAIN, K. E. RESPONSE TO AUGUST 22, 2001 (08/22/2001) ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR INFORMATION PURSUANT TO SECTION 104 0F CERCLA FOR WAG-7 OF THE INEEL EM-ER-01-173 00
18-OCT-01 CASTANON, L. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR INFORMATION WITH RESPONSES TO BBWI'S REQUEST FOR CLARIFICATION ENCLOSED 24716 00
15-OCT-01 ALLRED, C. S. PIT 9 DISPUTE RESOLUTION - AGREEMENT TO EXTEND DEADLINE FOR AN ADDITIONAL PERIOD OF TIME CONCLUDING ON NOVEMBER 30, 2001 (11/30/2001) - ENFORCEABLE DEADLINES LISTED 24715 00
12-OCT-01 ALLRED, C. S. PHONE CALL CONFIRMED FIRM DATES FOR FINAL TWO MILESTONES FOR STAGE II OF PIT 9 PROJECT - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AGREEABLE TO EXTENSION OF DISPUTE RESOLUTION DATE TO NOVEMBER 30, 2001 (11/30/01) 24714 00
11-OCT-01 BERGHOLZ, W. E. CONFIRMS TELEPHONE DISCUSSIONS HELD OCTOBER 11, 2001 (10/11/01) BETWEEN STEVE ALLRED AND ASSISTANT SECRETARY ROBERSON CONCERNING EXTENSION OF OCTOBER 12, 2001 (10/12/01) PIT 9 DISPUTE RESOLUTION DEADLINE, DOE REQUESTS EXTENSION TO NOVEMBER 30, 2001 24713 00
10-OCT-01 ROBERSON, J. H. THREE ENFORCEABLE MILESTONES SUCCESSFULLY DEVELOPED BY IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ), ENVIRONMENTAL PROTECTION AGENCY (EPA) AND DOE NEGOTIATING TEAM FOR PIT 9 DISPUTE DURING OCTOBER 3, 2001 (10/03/01) TELECONFERENCE MEETING 24711 00
10-OCT-01 BERGHOLZ, W. E. OCTOBER 3, 2001 (10/03/2001) PIT 9 TELECONFERENCE MEETING RESULTED IN AGREEMENT ON SEVERAL MILESTONES FOR STAGE II WITH DRAFT PROPOSED REVISIONS ATTACHED EM-ER-01-168 00
05-OCT-01 KREIZENBECK, R. DISPUTE RESOLUTION, INEEL OPERABLE UNIT (OU) 7-10, PIT 9 - ENVIRONMENTAL PROTECTION AGENCY (EPA) OBSERVATIONS AND ASSIGNMENT OF STAFF TO NEGOTIATE A RESOLUTION 24708 00
04-OCT-01 GEARHEARD, M. F. INEEL, CERCLA SECTION 104(E) REQUEST FOR INFORMATION - ENVIRONMENTAL PROTECTION AGENCY (EPA) WILL RESPOND DIRECTLY TO BECHTEL BWXT IDAHO, LLC (BBWI) REGARDING EXTENSION TO INFORMATION REQUEST 24707 00
04-OCT-01 GEARHEARD, M. F. INEEL CERCLA SECTION 104(E) REQUEST FOR INFORMATION - ENVIRONMENTAL PROTECTION AGENCY (EPA) - BBWI TO PROVIDE DOCUMENTS BY OCTOBER 25, 2001 (10/25/2001) 24709 00
01-OCT-01 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER TO ASSISTANT SECRETARY FOR ENVIRONMENTAL MANAGEMENT - BELIEVE THAT CONCEPTUAL PLAN CAN PROVIDE A BASIS TO MOVE FORWARD TO A RESOLUTION 24710 00
01-OCT-01 BERGHOLZ, W. E. TRANSMITTAL OF WASTE AREA GROUP 7 (WAG-7) ANALYSIS OF OPERABLE UNIT (OU) 7-10 STAGE II MODIFICATIONS EM-ER-01-159 00
01-OCT-01 MCCONNEL, B. C. WASTE AREA GROUP 7 (WAG-7) ANALYSIS OF OPERABLE UNIT (OU) 7-10 STAGE II MODIFICATIONS INEEL/EXT-01-01105 00
25-SEP-01 ROBERSON, J. H. LETTER TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) DIRECTOR FROM DEPARTMENT OF ENERGY (DOE) ASSISTANT SECRETARY FOR ENVIRONMENTAL MANAGEMENT (EM) - AGREEMENT REACHED ON A CONCEPTUAL PATH FORWARD - FUNDAMENTAL TOPICS OF AGREEMENT FOR PIT 9 24705 00
25-SEP-01 OLSEN, M. D. REQUEST FOR INFORMATION PURSUANT TO SECTION 104 OF CERCLA FOR INEEL - EPA LETTER RECEIVED AUGUST 21, 2001 (08/21/2001) - BBWI LEGAL - BBWI WILL ADDRESS DOE'S REQUEST FOR RECORDS WITH CLARIFICATION REQUEST ENCLOSED MDO-62-01 00
25-SEP-01 BERGHOLZ, W. E. ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR INFORMATION PURSUANT TO SECTION 104 OF CERCLA FOR INEEL - BBWI WILL PREPARE DOE'S REQUEST FOR RECORDS OCC-01-129 00
05-SEP-01 PIERRE, W. PATH FORWARD FOR IN SITU VITRIFICATION (ISV) EVALUATION IN OU 7-13 AND 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AND IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) - EPA DOES NOT CONCUR WITH EXPANDED SCOPE OF WORK 24706 00
30-AUG-01 LOCKHART, F. R. LETTER FROM DOE ROCKY FLATS FIELD OFFICE TO REGIONAL DIRECTOR OF ENVIRONMENTAL PROTECTION AGENCY (EPA) - OPTIMISTIC MEETING NEXT WEEK FOCUSED ON RESOLUTION OF PIT 9 DISPUTE WILL BE SUCCESSFUL 01-DOE-01667 00
29-AUG-01 FINDLEY, C. E. INEEL DISPUTE RESOLUTION OU 7-10 - PIT 9 DISPUTE NEGOTATIONS - ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) PROPOSAL - GOALS AND PATH FORWARD 24703 00
22-AUG-01 GEARHEARD, M. F. ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR INFORMATION PURSUANT TO SECTION 104 OF CERCLA FOR INEEL 24701 00
22-AUG-01 DEBOLT, P. A. TRANSMITTAL OF WRITTEN DISPOSITION QUESTIONS FOR DEPARTMENT OF ENERGY (DOE) RECORD CUSTODIANS 24704 00
15-AUG-01 FINDLEY, C. E. DISPUTE RESOLUTION OU 7-10 - NEED FOR STAGE I CORING - EXTENT OF ADDITIONAL SAMPLING NEEDED 24700 00
13-AUG-01 FINDLEY, C. E. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO UNDER SECRETARY OF ENERGY LETTER ON OU 7-10 DISPUTE RESOLUTION NEGOTIATION SCHEDULE EXTENSION TO OCTOBER 12, 2001 (10/12/2001) 24699 00
10-AUG-01 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO EXTENSION REQUEST FOR PIT 9 DISPUTE RESOLUTION 24698 00
07-AUG-01 CARD, R. G. LETTER FROM UNDER SECRETARY OF ENERGY TO ACTING ADMINISTRATOR OF ENVIRONMENTAL PROTECTION AGENCY (EPA) REGION 10 (X) - DISPUTE OVER REQUEST BY DOE TO EXTEND SCHEDULE FOR IMPLEMENTATION OF WASTE RETRIEVAL IN PIT 9 - NEW NEGOTIATIONS BEING IMPLEMENTED 24697 00
06-AUG-01 CARD, R. G. LETTER FROM UNDER SECRETARY OF ENERGY TO DIRECTOR OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) - DISPUTE OVER REQUEST BY DOE TO EXTEND SCHEDULE FOR IMPLEMENTATION OF WASTE RETRIEVAL IN PIT 9 - NEW NEGOTIATIONS BEING IMPLEMENTED 23573 00
01-AUG-01 GREEN, O. D. REPORT OF JOSEPH L. ALVAREZ AND JOHN A. AUXIER REGARDING WASTE RETRIEVAL FROM PIT 9, THE 90% DESIGN DATED JULY 25, 2001 (07/25/01) - TO DETERMINE TO WHAT EXTENT THERE WAS FLEXIBILITY TO REDUCE PIT 9 PROJECT TIME AND COST AND TRANSMITTAL LETTER 24694 00
25-JUL-01 FINDLEY, C. E. OPERABLE UNIT (OU) 7-10 PIT 9 MODIFICATIONS ANALYSIS - INEEL DISPUTE - ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURS WITH IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TO DENY DEPARTMENT OF ENERGY'S (DOE'S) REQUEST FOR AN EXTENSION 21473 00
23-JUL-01 ALLRED, C. S. DETERMINATION OF DISPUTE - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) MEMORANDUM DECISION AND ORDER ON DISPUTE RESOLUTION IN THE MATTER OF DEPARTMENT OF ENERGY'S (DOE'S) MARCH 16, 2001 (03/16/01) STATEMENT OF DISPUTE 24692 00
18-JUL-01 FINDLEY, C. E. DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY (EPA) OPTIONS ON HOW TO PROCEED WITH PROJECT AND REACH AGREEMENT ON ACCEPTABLE SCHEDULE AND REMEDIAL APPROACH 24690 00
18-JUL-01 ALLRED, C. S. PIT 9 DISPUTE RESOLUTION - IDAHO DEPARTMENT OF EMVIRONMENTAL QUALITY (IDEQ) DENIAL OF DEPARTMENT OF ENERGY'S (DOE'S) FEBRUARY 26, 2001 (02/26/01) REQUEST FOR EXTENSION OF PIT 9 DEADLINES AND MARCH 16, 2001(03/16/01) STATEMENT OF DISPUTE 24691 00
17-JUL-01 HAIN, K. E. DISPUTE RESOLUTION - DELIVERY OF PIT 9 SCHEDULE DETAILED INFORMATION ON ASSUMPTIONS USED TO DEVELOP THE SCHEDULE SUBMITTED WITH THE FEBRUARY 26, 2001 (02/26/2001) REQUEST FOR EXTENSION OF DEADLINES (EM-ER-01-028) EM-ER-01-123 00
11-JUL-01 HAIN, K. E. JULY 10 AND JULY 11, 2001 (07/11/2001 - 07/12/2001) MEETING ON PIT 9 SCHEDULE EXTENSION DISPUTE- STATEMENT FROM EACH AGENCY LEAD CONCERNING RESULTS OF THE MEETING - SUMMATION TO THE SENIOR EXECUTIVE COMMITTEE (SEC) 24740 00
05-JUL-01 BERGHOLZ, W. E. DISPUTE RESOLUTION - REVISED AGENDA FOR PIT 9 SCHEDULE DISPUTE MEETING TO BE HELD JULY 10 AND JULY 11, 2001 (07/10/01 - 07/11/01) - ALSO ENCLOSED IS A CONCEPTUAL DESCRIPTION OF AN ALTERNATIVE TO SCHEDULE AND SCOPE OF SCHEDULE PROVIDED BY IDEQ AND EPA OM-01-002 00
03-JUL-01 GREEN, O. D. DISPUTE RESOLUTION - STAGE II VALUE ENGINEERING REVIEW MEETING SCHEDULED JULY 10 AND JULY 11, 2001 (07/10/01 - 07/11/01) - ENVIRONMENTAL PROTECTION AGENCY (EPA) AND IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RECEIVED AND REVIEWED PROPOSED SCHED 24689 00
26-JUN-01 FINDLEY, C. E. DISPUTE RESOLUTION - OPERABLE UNIT (OU) 7-10 ENVIRONMENTAL PROTECTION AGENCY (EPA) SCHEDULE ASSUMPTIONS 24688 00
25-JUN-01 COOK, B. A. AGENDA FOR OU 7-10 STAGE II VALUE ENGINEERING REVIEW EM-ER-01-110 00
18-JUN-01 COOK, B. A. CONFIRMATION OF JUNE 15, 2001 (06/15/2001) SENIOR EXECUTIVE COMMITTEE CONFERENCE CALL DECISIONS EM-ER-01-107 00
15-JUN-01 FINDLEY, C. E. DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY (EPA) AGREES TO OPERABLE UNIT (OU) 7-10 EXTENSION OF DEADLINE TO JULY 18, 2001 (07/18/2001) 24686 00
15-JUN-01 ALLRED, C. S. DISPUTE RESOLUTION - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AGREES TO OPERABLE UNIT (OU) 7-10 EXTENSION OF DEADLINE TO JULY 18, 2001 (07/18/2001) 24687 00
14-JUN-01 FINDLEY, C. E. DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY (EPA) AGREEMENT TO OPERABLE UNIT (OU) 7-10 EXTENSION OF DEADLINE JULY 6, 2001 (07/06/2001) 24684 00
08-JUN-01 FINDLEY, C. E. ENVIRONMENTAL PROTECTION AGENCY (EPA) STATEMENT OF DISPUTE - DEPARTMENT OF ENERGY (DOE) REQUEST FOR EXTENSION OF MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 24683 00
08-JUN-01 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) WILL EXTEND DEADLINE FOR RESOLVING DISPUTE OVER EXTENSION OF MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 24685 00
07-JUN-01 DIRKMAAT, P. J. DEPARTMENT OF ENERGY (DOE) PLANNED SPENT NUCLEAR FUEL (SNF) SHIPMENTS EM-ER-01-097 00
07-JUN-01 COOK, B. A. CONFIRMATION OF JUNE 7, 2001 (06/07/2001) SENIOR EXECUTIVE COMMITTEE (SEC) CONFERENCE CALL DECISIONS EM-ER-01-098 00
23-MAY-01 ALLRED, C. S. DISPUTE RESOLUTION - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AND ENVIRONMENTAL PROTECTION AGENCY (EPA) JOINT COUNTER PROPOSAL 24682 00
20-APR-01 ALLRED, C. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) AND IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AGREEMENT TO EXTEND TIME FRAME FOR DELIBERATIONS OF THE SENIOR EXECUTIVE COMMITTEE (SEC) 24681 00
19-APR-01 LYLE, J. L. COMMITMENT TO PROVIDE A PROPOSED PATH FORWARD AND PROPOSAL TO EXTEND THE SENIOR EXECUTIVE COMMITTEE (SEC) TIME PERIOD FOR RESOLUTION OF DISPUTE EM-ER-01-073 00
02-APR-01 LYLE, J. L. ELEVATION OF OPERABLE UNIT (OU) 7-10 DISPUTE RESOLUTION TO THE SENIOR EXECUTIVE COMMITTEE (SEC) EM-ER-01-057 00
27-MAR-01 GREEN, O. D. PIT 9 - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DEPARTMENT OF ENERGY'S (DOE'S) INVOCATION OF DISPUTE 24677 00
21-MAR-01 GEARHEARD, M. F. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY'S (DOE'S) INVOCATION OF DISPUTE 24738 00
16-MAR-01 HAIN, K. E. SUBMITTAL OF STATEMENT OF DISPUTE TO DISPUTE RESOLUTION COMMITTEE REGARDING REQUEST FOR EXTENSION OF MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 EM-ER-01-048 00
14-MAR-01 INEEL COMMUNITY RELATIONS DOE NEWS - STATE AND INEEL SCIENTISTS FOCUS ON UNDERSTANDING RESULTS OF RADIONUCLIDE DETECTION 24675 00
12-MAR-01 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) NON-CONCURRENCE OF REQUEST TO EXTEND DEADLINES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 24671 00
09-MAR-01 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) DENIAL OF FEBRUARY 26, 2001 (02/26/2001) REQUEST FOR EXTENSION DEADLINES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 24670 00
26-FEB-01 EDGERTON, B. G. DEPARTMENT OF ENERGY (DOE) REQUEST FOR EXTENSION OF DEADLINES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 EM-ER-01-028 00
29-JAN-01 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TABLE DESCRIBING MINIMUM INFORMATION NEEDED TO REACH A SUPPORTABLE DECISION FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 24669 00
12-DEC-00 BERGHOLZ, W. E. WAG-7 NOVEMBER 15, 2000 (11/15/2000) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) MEETING - INCLUDES PROPOSED PRIORITIES MEETING AGENDA DECEMBER 19, 2000 (12/19/2000) AND RESPONSE TO DIVISION OF ENVIRONMENTAL QUALITY (DEQ) DIFFERENCE OF OPINION EM-ER-232-00 00
22-NOV-00 EDGERTON, B. G. WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 REVISED WORKING SCHEDULE EM-ER-222-00 00
31-OCT-00 HAIN, K. E. DOE RESPONSES TO AGENCY COMMENTS ON STAGE II DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 PIT 9 INTERIM RECORD OF DECISION (ROD) EM-ER-00-206 00
28-SEP-00 BEITEL, G. A. EVALUATION OF OPERABLE UNIT (OU) 7-10 STAGE I SOIL MOISTURE READINGS - OU 7-10 STAGED INTERIM ACTION (SIA) PROJECT STAGE I INEEL/EXT-2000-00651 00
27-SEP-00 HAIN, K. E. WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 PIT 9 RECORD OF DECISION (ROD) - REQUEST FOR EXTENSION EM-ER-188-00 00
25-AUG-00 HAIN, K. E. WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 PIT 9 RECORD OF DECISION (ROD) - REQUEST FOR EXTENSION EM-ER-162-00 00
15-AUG-00 HAIN, K. E. DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) LETTER DATED JULY 7, 2000 (07/07/2000) & IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER DATED JULY 19, 2000 (07/19/2000) - PIT 9 RECORD OF DECISION (ROD) REQUEST FOR EXTENSION EM-ER-153-00 00
19-JUL-00 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED JUNE 30, 2000 (06/30/2000) - OU 7-10 STAGED INTERIM ACTION PROJECT (SIAP) - TRANSMITTAL OF STAGE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN 24667 00
07-JUL-00 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED JUNE, 30 2000 (06/30/2000) CONCERNING REQUEST FOR MODIFICATION MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) 24666 00
30-JUN-00 HAIN, K. E. OPERABLE UNIT (OU) 7-10 STAGED INTERIM ACTION (SIA) PROJECT - TRANSMITTAL OF STAGE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - (EXTENSION OF OPERABLE UNIT (OU) 7-10, 7-13 & 7-14 ENFORCEABLE DEADLINES) EM-ER-118-00 00
20-APR-00 EPA AGREEMENT IN PRINCIPLE BY WASTE AREA GROUP 7 (WAG-7) PROJECT MANAGEMENT TEAM - APRIL 20, 2000 (04/20/2000) 24668 00
13-APR-00 HAIN, K. E. WASTE AREA GROUP 7 (WAG-7) REQUEST FOR MODIFICATION OF MILESTONES - OPERABLE UNIT (OU) 7-10 STAGED INTERIM ACTION (SIA) PROJECT, OU 7-13 & 7-14 PITS AND TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-63-00 00
08-MAR-00 BEITEL, G. A. ENGINEERING DESIGN FILE (EDF) - OU 7-10 STAGED INTERIM ACTION (SIA) PROJECT - STAGE I INDEPENDENT TECHNICAL PANEL SAFETY REVIEW OF PROPOSED STAGE I DRILLING ACTIVITIES EDF-ER-143 00
29-FEB-00 GREEN, T. S. ENVIRONMENTAL RESTORATION (ER) PLAN - DOWNHOLE LOGGING PLN-493 04
01-DEC-99 INEEL COMMUNITY RELATIONS INEEL REPORTER - NOVEMBER 1999 AND DECEMBER 1999 (11/99 & 12/99) - INEEL INSERTS PROBE TUBE INTO BURIED WASTE PIT 10964 00
19-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 7-10 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) PIT 9 COMPREHENSIVE DEMONSTRATION INTERIM ACTION (IA) OU 7-10 AR.INDEX.OU.7-10 00
01-NOV-98 INEEL COMMUNITY RELATIONS INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) 17370 00
29-SEP-98 INEEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY - AGENCIES RELEASE EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) DOCUMENT FOR PIT 9 10541 00
01-SEP-98 DOE, EPA, IDHW EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR PIT 9 INTERIM ACTION (IA) RECORD OF DECISION (ROD) AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEEL IDAHO FALLS, IDAHO 10537 00
01-AUG-98 MILLER, B. P. HEALTH & SAFETY PLAN (HSP) FOR OU 7-10 CONTINGENCY PROJECT STAGE I COLD TEST INEEL/EXT-98-00570 00
29-JUN-98 DUSTIN, J. D. WORK PLAN FOR STAGE I OU 7-10 CONTINGENCY PROJECT DOE/ID-10623 00
01-JUN-98 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - AGENCIES OUTLINE CONTINGENCY PLAN FOR PIT 9 CLEANUP 16785 00
01-JUN-98 DUSTIN, J. D. FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 7-10 CONTINGENCY REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) - STAGE I DOE/ID-10620 00
01-JUN-98 MILLER, B. P. HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 7-10 CONTINGENCY PROJECT STAGE I SUBSURFACE INVESTIGATION INEEL/EXT-98-00138 00
01-MAY-98 INEEL COMMUNITY RELATIONS INEEL REPORTER - PIT 9 SUBCONTRACT TERMINATED 16783 00
01-OCT-97 LMITCO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) & REMEDIAL DESIGN WORK PLAN (RDWP) OU 7-10 - PIT 9 PROJECT INTERIM ACTION (IA) INEL-94/0110 02
01-SEP-97 INEEL COMMUNITY RELATIONS INEEL REPORTER - SEPTEMBER & OCTOBER 1997 (09/97 & 10/97) - DOE TO SUBMIT PROPOSAL OF PIT 9 CLEANUP, AGENCIES SIGN TRA ROD, WROC INCREASES VOLUME OF WASTE TREATED & CITIZENS ADVISORY BOARD (CAB) REVIEWS, PROVIDES COMMENTS ON DRAFT ERP FACT SHEET 14283 00
01-JUN-97 INEEL COMMUNITY RELATIONS INEEL REPORTER - JUNE & JULY 1995 (06/97 & 07/97) - AGENCIES RESOLVE DISPUTES ON PIT 9 & TEST AREA NORTH (TAN) PROJECTS 14315 00
18-MAR-97 DOE, EPA, IDHW AGREEMENT TO RESOLVE DISPUTES 1088-06-29-120-A 00
01-JUN-96 INEL COMMUNITY RELATIONS INEL REPORTER - WEEKLY NEWSETTER DISCUSSING HOW WASTES ARE MANAGED AT THE INEL - CONSTRUCTION UNDERWAY ON PIT 9 RETRIEVAL FACILITY 24175 00
01-NOV-95 INEL COMMUNITY RELATIONS INEL REPORTER - 11/95 - 12/95 - MILESTONE ACHIEVED AHEAD OF SCHEDULE 11381 00
10-FEB-95 SCHWARTZ, F. G. PIT 9 ADMINISTRATIVE RECORD (AR) - FIXED PRICE CONTRACT WITH LESAT, SUBCONTRACT #C91-133136 & COST DIFFERENCE SUMMARIZED IN SUPPORT OF PIT 9 ESD DEVELOPMENT OPE-ER-024-95 00
06-FEB-95 DOE, EPA, IDHW NOTICE OF AVALIABILITY FOR THE EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR PIT 9 RECORD OF DECISION (ROD) 5863 00
01-FEB-95 INEL COMMUNITY RELATIONS UPDATE FACT SHEET - CONSTRUCTION BEGINS AT PIT 9 8896 00
26-JAN-95 DOE, EPA, IDHW EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE PIT 9 INTERIM ACTION (IA) RECORD OF DECISION (ROD) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 5862 00
26-JAN-95 GREEN, L. A. TRANSMITTAL OF EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR PIT 9 OPE-ER-008-95 00
01-JAN-95 NOT SPECIFIED REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) AND REMEDIAL DESIGN WORK PLAN (RDWP) OU 7-10 - PIT 9 PROJECT INTERIM ACTION (IA) INEL-94/0110 01
01-DEC-94 INEL COMMUNITY RELATIONS INEL REPORTER - (12/94) - ENERGY SECRETARY ANNOUNCES PIT 9 CONTRACT WINNER 8897 00
24-OCT-94 LYLE, J. L. PIT 9 PRIMARY DOCUMENT EXTENSION NOTIFICATION OPE-ER-288-94 00
01-MAR-94 DAMES & MOORE COMPILATION AND SUMMARIZATION OF THE SUBSURFACE DISPOSAL AREA (SDA) RADIONUCLIDE TRANSPORT DATA AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) EGG-ER-10546 03
23-FEB-94 FORSBERG, D. L. EDF - ENGINEERING DESIGN FILE - REVISED PLUTONIUM, AMERICIUM-241, AND URANIUM-235 INVENTORY ESTIMATES FOR PIT 9 BASED ON THE 1993 HISTORICAL DATA TASK ER-BWP-82 02
01-DEC-93 BURTON, B. N. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) & REMEDIAL DESIGN WORK PLAN (RDWP) - OU 7-10 PIT 9 PROJECT INTERIM ACTION (IA) EGG-ER-11055 00
01-NOV-93 INEL COMMUNITY RELATIONS INEL REPORTER - 11/93 - AGENCIES SIGN RECORD OF DECISION (ROD) FOR PIT 9 6994 00
01-OCT-93 INEL COMMUNITY RELATIONS RECORD OF DECISION (ROD) - DECLARATION FOR PIT 9 AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SUBSURFACE DISPOSAL AREA (SDA) 5569 00
20-SEP-93 NEARMAN, M. J. EPA COMMENTS ON THE RESPONSIVENESS SUMMARY FOR PIT 9 5530 00
20-SEP-93 NEARMAN, M. J. INEL WAG-7 RWMC PIT 9 INTERIM ACTION (IA) - DEVELOPMENT OF DELISTING LEVELS 5554 00
17-SEP-93 LYLE, J. L. TRANSMITTAL OF THE RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 7-10, PIT 9, AT THE RWMC AT INEL ERD-091-93 00
16-SEP-93 NEARMAN, M. J. EPA COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF DECISION (ROD) 5524 00
04-SEP-93 NOT SPECIFIED EPA COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF DECISION (ROD) 5523 00
04-SEP-93 NYGARD, D. STATE OF IDAHO COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF DECISION (ROD) 5525 00
04-SEP-93 NEARMAN, M. J. ADDITIONAL EPA COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF DECISION (ROD) 5537 00
03-SEP-93 NEARMAN, M. J. EPA COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF THE DECISION (ROD) 5542 00
01-SEP-93 NOT SPECIFIED EVALUATION OF THE CORRECTIVE ACTION MANAGEMENT UNIT (CAMU) RULE'S APPLICATION TO THE PIT 9 INTERIM ACTION (IA) 5534 00
01-SEP-93 NOT SPECIFIED FINAL RESPONSIVENESS SUMMARY OVERVIEW 5551 00
30-AUG-93 NYGARD, D. ADDITIONAL ARARS INDENTIFIED BY THE STATE OF IDAHO 5527 00
11-AUG-93 STALEY, C. S. EDF - ENGINEERING DESIGN FILE - RADIOLOGICAL AND NONRADIOLOGICAL EFFECTS OF INCINERATING RETRIEVED WASTES FROM PIT 9 RWMC-91-004.3 02
10-AUG-93 DOE RESPONSE FROM DOE-ID TO EPA COMMENTS ON THE DRAFT PIT 9 RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 5543 00
10-AUG-93 DOE RESPONSE FROM DOE-ID TO IDHW COMMENTS ON THE DRAFT PIT 9 RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 5544 00
05-AUG-93 STALEY, C. S. EDF - ENGINEERING DESIGN FILE - RADIOLOGICAL IMPACTS FROM ROUTINE OPERATIONS OF PIT 9 WASTE RETRIEVAL RWMC-91-004 02
01-AUG-93 NOT SPECIFIED PIT 9 LAND DISPOSAL RESTRICTION (LDR) AS APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARAR) ANALYSIS 5545 00
29-JUL-93 NOT SPECIFIED FINDING OF NO SIGNIFICANT IMPACT (FONSI) FOR INTERIM ACTION (IA) FOR CLEANUP OF PIT 9 AT RWMC, INEL 6821 00
21-JUL-93 NEARMAN, M. J. EPA COMMENTS ON THE 06/02/93 REVISION OF THE RECORD OF DECISION (R0D) 5526 00
01-JUL-93 BROWN, R. M. INEL TRANSURANIC WASTE ACCEPTANCE CRITERIA (WAC) DOE/ID-10074 05
23-JUN-93 LYLE, J. L. PIT 9 DRAFT FINAL RECORD OF DECISION (ROD) EXTENSION NOTIFICATION (ERWM-ERD-046-93) 5546 00
04-JUN-93 EPA EPA COMMENTS ON THE 06/02/93 REVISION OF THE RECORD OF DECISION (ROD) 5522 00
03-JUN-93 NOT SPECIFIED SUPPLEMENT TO THE REVISED PROPOSED PLAN FOR A CLEANUP OF PIT 9 AT RWMC, INEL 6820 00
17-MAY-93 NOT SPECIFIED DRAFT RESPONSIVENESS SUMMARY OVERVIEW 5539 00
14-MAY-93 LYLE, J. L. TRANSMITTAL OF THE DRAFT FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 7-10, PIT 9, AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), INEL (ERWM-ERD-054-93) 5548 00
23-APR-93 LYLE, J. L. PIT 9 DRAFT FINAL RECORD OF DECISION (ROD) EXTENSION NOTIFICATION (ERWM-ERD-046-93) 5547 00
02-APR-93 NEARMAN, M. J. INEL WAG-7 PIT 9 INTERIM ACTION (IA) DRAFT RESPONSIVENESS SUMMARY 5361 00
18-MAR-93 DOE RESPONSE TO IDHW ON THE DRAFT PIT 9 RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 5528 00
18-MAR-93 DOE RESPONSE TO EPA COMMENTS ON THE DRAFT PIT 9 RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 5529 00
10-MAR-93 NYGARD, D. COMMENTS ON THE DRAFT RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 5359 00
17-FEB-93 NYGARD, D. RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) DRAFT RECORD OF DECISION (ROD) - (COMMENT PERIOD EXTENSION) 5360 00
09-FEB-93 DOE RESPONSE TO EPA COMMENTS ON THE DRAFT RECORD OF DECISION (ROD) FOR PIT 9 AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) 5532 00
02-FEB-93 NOT SPECIFIED IDHW COMMENTS ON THE 06/02/93 REVISION OF THE RECORD OF DECISION (ROD) 5536 00
31-DEC-92 LYLE, J. L. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 7-10 PIT 9 AT THE RWMC AT THE INEL AM/ERWM-ERD-120 00
24-DEC-92 NOT SPECIFIED DRAFT RESPONSIVENESS SUMMARY OVERVIEW 5552 00
22-DEC-92 STALEY, C. S. EDF - ENGINEERING DESIGN FILE - HAZARDOUS CHEMICAL RELEASES RESULTING FROM PIT 9 WASTE RETRIEVAL AT RWMC RWMC-91-004.2 01
21-DEC-92 PIERRE, W. TREATABILITY VARIANCE FOR PIT 9 RECORD OF DECISION (ROD) 5533 00
04-NOV-92 INEL COMMUNITY RELATIONS PUBLIC MEETING TRANSCRIPTS - REVISED PROPOSED PLAN FOR PIT 9 - MOSCOW, BOISE, TWIN FALLS, POCATELLO AND IDAHO FALLS, IDAHO 5233 00
01-NOV-92 INEL COMMUNITY RELATIONS INEL REPORTER - 11/92 - REVISED PIT 9 PROPOSED PLAN ISSUED, MEETINGS SCHEDULED 6041 00
29-OCT-92 BURTON, B. N. EDF - ENGINEERING DESIGN FILE - SUMMARY PROCESS DESCRIPTION OF PROPOSED REMEDIAL ALTERNATIVES FOR A CLEANUP OF PIT 9 AT THE INEL RWMC ERD-BWP-077 00
22-OCT-92 NOT SPECIFIED RECORD OF WRITTEN COMMENTS RECEIVED DURING THE PUBLIC COMMENT PERIOD ON THE REVISED PIT 9 PROPOSED PLAN 5231 00
20-OCT-92 FORSBERG, D. L. EDF - ENGINEERING DESIGN FILE - PIT 9 COMPREHENSIVE DEMONSTRATION PROJECT COST ESTIMATE BASIS OF ALTERNATIVES LISTED IN THE REVISED PROPOSED PLAN ERD-BWP-076 00
19-OCT-92 DOE PUBLIC AFFAIRS DOE NEWS - AGENCIES REVISE PIT 9 PROPOSED PLAN, SCHEDULE MEETINGS 5213 00
01-OCT-92 INEL COMMUNITY RELATIONS REVISED PROPOSED PLAN FOR A CLEANUP OF PIT 9 AT THE RWMC, INEL 5203 00
01-OCT-92 NOT SPECIFIED CODED VERBAL AND WRITTEN COMMENTS RECEIVED ON THE REVISED PROPOSED PLAN FOR PIT 9 5535 00
01-OCT-92 MCCARTHY, J. M. EDF - ENGINEERING DESIGN FILE - GWSCREEN MODELING FOR THE PIT 9 PROJECT - SENSITIVITY TO KD IN THE SOURCE AND ATTENUATION LAYER RWMC-92-005.1 00
01-JUL-92 SAIC DOCKET REPORT ON HEALTH BASED LEVELS & SOLUBILITIES USED IN THE EVALUATION OF DELISTING PETITIONS, SUBMITTED UNDER 40 CFR 260.20 & 260.22 5550 00
01-JUN-92 RENY, D. A. TENTATIVE HAZARD CLASSIFICATION FOR PIT 9 COMPREHENSIVE DEMONSTRATION EGG-WM-9966 00
01-MAY-92 EPA VITRIFICATION TECHNOLOGIES FOR TREATMENT OF HAZARDOUS AND RADIOACTIVE WASTE EPA/625/R-92/002 00
08-APR-92 AWC, INC. JOHNSTON ATOLL TRU SOIL CLEANUP PROJECT (DRAFT REPORT) 5101 00
01-APR-92 MCKENZIE, M. D. SUMMARY OF CONCEPTUAL COST FOR PIT 9 EGG-WM-10153 00
23-MAR-92 FORSBERG, D. L. EDF - ENGINEERING DESIGN FILE - EVALUATION OF REMEDIAL ALTERNATIVES FOR PIT 9 INTERIM ACTION (IA) ERP-BWP-68 00
17-MAR-92 FIGUEROA, I. C. EDF - ENGINEERING DESIGN FILE - PIT 9 RESIDUAL RISK ASSESSMENT ERP-BWP-69 00
23-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, IDAHO PRESS TRIBUNE, NAMPA, IDAHO 01/23/92 4427 00
23-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, THE TIMES NEWS, TWIN FALLS, IDAHO, 01/23/92 4428 00
23-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, IDAHO STATESMAN, BOISE, IDAHO, 01/23/92 4429 00
23-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED FOR PROPOSED PLAN FOR PIT 9, IDAHO STATE JOURNAL, POCATELLO, IDAHO, 01/23/92 4430 00
23-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, LEWISTON, IDAHO 01/23/92 4433 00
22-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, IDAHOAN, MOSCOW, IDAHO 01/22/91 4431 00
22-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, SOUTH IDAHO PRESS, BURLEY, IDAHO 01/22/92 4432 00
22-JAN-92 INEL COMMUNITY RELATIONS COMMENT PERIOD EXTENDED ON THE PROPOSED PLAN FOR PIT 9, BURLEY, IDAHO 01/22/92 7762 00
21-JAN-92 NOT SPECIFIED COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9 - THE POST REGISTER IDAHO FALLS, IDAHO 01/21/92 3550 00
07-JAN-92 NOT SPECIFIED PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN FOR AN INTERIM ACTION (IA) AT PIT 9 AT RWMC, IDAHO FALLS, IDAHO 01/07/92 3544 00
01-JAN-92 LIEKHUS, K. J. NONRADIONUCLIDE INVENTORY IN PIT 9 AT RWMC EGG-WM-10079 00
01-JAN-92 LUGAR, R. M. EDF - ENGINEERING DESIGN FILE - RESULTS OF CHEMICAL & RADIOLOGICAL ANALYSIS OF RWMC PIT 9 & ACID PIT PERIMETER SUBSURFACE SOIL ERP-BWP-67 00
13-DEC-91 DOE PUBLIC AFFAIRS RECORD OF WRITTEN COMMENTS RECEIVED DURING THE PUBLIC COMMENT PERIOD 12/13/91 - 02/11/92 ON THE PROPOSED PLAN OF PIT 9 5098 00
06-DEC-91 COE, M. DOE NEWS - AGENCIES RESCHEDULE COMMENT PERIOD ON PROPOSED CLEANUP 3392 00
05-DEC-91 NOT SPECIFIED PROPOSED PLAN FOR A CLEANUP OF PIT 9 AT RWMC, INEL 3543 00
05-DEC-91 NOT SPECIFIED CODED VERBAL AND WRITTEN COMMENTS RECEIVED ON THE ORIGINAL PROPOSED PLAN FOR PIT 9 5521 00
01-NOV-91 DOE PUBLIC PARTICIPATION IN ENVIRONMENTAL RESTORATION (ER) ACTIVITIES DOE/EH-0221 00
01-NOV-91 MCCLELLAN, Y. PRELIMINARY RISK EVALUATION FOR PIT 9 EGG-WM-9938 00
11-SEP-91 LIIKALA, S. C. ENGINEERING SCALE TESTS OF ISV TO PCB AND RADIOACTIVE CONTAMINATED SOILS 5099 00
01-AUG-91 KNIGHT, J. L. BRIEF ANALYSIS & DESCRIPTION OF TRANSURANIC (TRU) WASTES IN SUBSURFACE DISPOSAL AREA (SDA) OF RWMC AT INEL EGG-WTD-9438 01
01-AUG-91 CALLOW, R. A. IN SITU VITRIFICATION (ISV) APPLICATION TO BURIED WASTE (BW): FINAL REPORT OF INTERMEDIATE FIELD TESTS AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) EGG-WTD-9807 00
10-JUL-91 KING, J. J. ENGINEERING DESIGN FILE (EDF) - METHODOLOGY FOR DETERMINATION OF A RADIOLOGICAL INVENTORY FOR PIT 9 & CORRESPONDING RESULTS ERP-BWP-64 00
01-JUN-91 DOE NATURAL RESOURCE TRUSTEESHIP & ECOLOGICAL EVALUATION FOR ENVIRONMENTAL RESTORATION (ER) AT DOE FACILITIES PUBLIC PARTICIPATION ENVIRONMENTAL RESTORATION (ER) ACTIVITIES DOE/EH-0192 00
01-FEB-91 ARRENHOLZ, D. A. IN SITU VITRIFICATION (ISV) PROGRAM TREATABILITY INVESTIGATION PROGRESS REPORT EGG-WTD-9383 01
01-FEB-90 SALEEM, Z. BACKGROUND DOCUMENT FOR EPA'S COMPOSITE MODEL FOR LANDFILLS (EPACML) 5549 00
01-APR-88 LANEY, P. T. ANNUAL PROGRESS REPORT FY-87 SUBSURFACE INVESTIGATIONS (SI) PROGRAM AT RWMC OF INEL DOE/ID-10183 00
01-JUN-87 MARKHAM, O. D. SUMMARIES OF INEL RADIOECOLOGY AND ECOLOGY PROGRAM RESEARCH PROJECTS DOE/ID-12111 00
01-MAR-87 BUELT, J. L. IN SITU VITRIFICATION (ISV) OF TRANSURANIC WASTE: AN UPDATED SYSTEMS EVALUATION AND APPLICATIONS ASSESSMENT PNL-4800-SUPPL.1 00
01-JUL-84 ARTHUR, W. J. VERTEBRATES OF INEL DOE/ID-12099 00
16-JUL-79 REICH, E. E. BERYLLIUM REGULATIONS LETTER 5538 00
01-AUG-76 BARRACLOUGH, J. T. HYDROLOGY OF SOLID WASTE BURIAL GROUND AS RELATED TO POTENTIAL MIGRATION OF RADIONUCLIDES, INEL - USGS OPEN FILE REPORT 76-471 IDO-22056 0