CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
---|---|---|---|---|
26-SEP-05 | WELLS, R. P. | PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 5 (WAG-5) | ICP/EXT-05-00973 | 00 |
24-SEP-03 | WELLS, R. P. | FINAL DOCUMENTATION FOR OPERABLE UNIT (OU) 5-12 NO ACTION SITES | DOE/ID-11058 | 00 |
11-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 5-03 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OU 5-03 | AR.INDEX.OU.5-03 | 00 |
01-JAN-99 | HOLDREN, K. J. | WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10607 | 00 |
01-MAY-97 | WEBBER, F. L. | FINAL WORK PLAN FOR WAG-5 OU 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10555 | 00 |
01-JAN-97 | HIARING, C. M. | FINAL SCOPE OF WORK FOR OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10547 | 00 |
08-FEB-96 | GREEN, L. A. | TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS OU 5-05 & 6-01 AND TEN (10) NO ACTION SITES ROD | OPE-ER-27-96 | 00 |
08-FEB-96 | GREEN, L. A. | TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS OU 5-05 & 6-01 AND TEN (10) NO ACTION SITES ROD | OPE-ER-28-96 | 00 |
09-JAN-96 | DOE, EPA, IDHW | RECORD OF DECISION (ROD) FOR STATIONARY LOW POWER REACTOR 1 (SL-1) OU 5-05 & BORAX I BURIAL GROUNDS OU 6-01 & 10 (TEN) NO ACTION SITES (OU 5-01, 5-03, 5-04 AND 5-11) | INEL-95/0282 | 00 |
01-MAY-95 | DOE, EPA, IDHW | PROPOSED PLAN FOR OPERABLE UNITS (OU) 5-05 AND 6-01 STATIONARY LOW POWER REACTOR 1 (SL-1) AND THE BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS | 10011 | 00 |
28-JUL-94 | NOT SPECIFIED | TRACK 1 INVESTIGATION FOR THE RUBBLE PILE AND CONSTRUCTION DEBRIS NORTHWEST OF PBF-720 - NO FURTHER ACTION DETERMINATION | 5740 | 00 |
24-JUN-93 | NOT SPECIFIED | TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - PBF SPERT IV BLOWDOWN PIT (ADJACENT TO PBF-716) PBF-24 OU 5-03 | 5323 | 00 |
22-JUN-93 | NOT SPECIFIED | TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - PBF COOLING TOWER AREA AND DRAINAGE DITCH AT PBF REACTOR AREA PBF-28 OU 5-03 | 5324 | 00 |
08-APR-93 | DIETZ, C. G. | TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - NO FURTHER ACTION DETERMINATION - PBF REACTOR AREA BOILER BLOWDOWN PIT PBF-06 | 5257 | 00 |
08-APR-93 | DIETZ, C. G. | NO FURTHER ACTION DETERMINATION - PBF REACTOR AREA OIL DRUM STORAGE - PBF-07 TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE | 5258 | 00 |
12-JAN-88 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-13 REACTOR AREA RUBBLE PIT | 2232 | 00 |
06-JUL-87 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-07 REACTOR AREA OIL DRUM STORAGE PER-T-13 | 2717 | 00 |
22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-24 SPERT IV BLOWDOWN PIT ADJACENT TO PBF-716 | 2739 | 00 |
19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-06 REACTOR AREA BLOWDOWN PIT FOR BOILER BY PBF-621 | 2716 | 00 |
Previous Page | Administrative Record Home Page