CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
---|---|---|---|---|
26-SEP-05 | WELLS, R. P. | PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 5 (WAG-5) | ICP/EXT-05-00973 | 00 |
24-SEP-03 | WELLS, R. P. | FINAL DOCUMENTATION FOR OPERABLE UNIT (OU) 5-12 NO ACTION SITES | DOE/ID-11058 | 00 |
11-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 5-01 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OU 5-01 | AR.INDEX.OU.5-01 | 00 |
01-JAN-99 | HOLDREN, K. J. | WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10607 | 00 |
01-MAY-97 | WEBBER, F. L. | FINAL WORK PLAN FOR WAG-5 OU 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10555 | 00 |
01-JAN-97 | HIARING, C. M. | FINAL SCOPE OF WORK FOR OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10547 | 00 |
23-MAY-96 | DOE | TRACK 1 INVESTIGATION NO FURTHER ACTION DETERMINATION FOR AUXILIARY REACTOR AREA 19 (ARA-19) ARA-II DETENTION TANK FOR FUEL OIL & RADIONUCLIDES (ARA-719) - DECISION DOCUMENTATION PACKAGE | 10309 | 00 |
08-FEB-96 | GREEN, L. A. | TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS OU 5-05 & 6-01 AND TEN (10) NO ACTION SITES ROD | OPE-ER-27-96 | 00 |
08-FEB-96 | GREEN, L. A. | TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS OU 5-05 & 6-01 AND TEN (10) NO ACTION SITES ROD | OPE-ER-28-96 | 00 |
09-JAN-96 | DOE, EPA, IDHW | RECORD OF DECISION (ROD) FOR STATIONARY LOW POWER REACTOR 1 (SL-1) OU 5-05 & BORAX I BURIAL GROUNDS OU 6-01 & 10 (TEN) NO ACTION SITES (OU 5-01, 5-03, 5-04 AND 5-11) | INEL-95/0282 | 00 |
01-MAY-95 | DOE, EPA, IDHW | PROPOSED PLAN FOR OPERABLE UNITS (OU) 5-05 AND 6-01 STATIONARY LOW POWER REACTOR 1 (SL-1) AND THE BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS | 10011 | 00 |
20-APR-95 | DOE, EPA, IDHW | TRACK 1 INVESTIGATION NO FURTHER ACTION DETERMINATION FOR ARA-15 ARA-III RADIONUCLIDE TANK (ARA-735) - DECISION DOCUMENTATION PACKAGE | 10014 | 00 |
20-APR-95 | DOE, EPA, IDHW | TRACK 1 INVESTIGATION NO FURTHER ACTION DETERMINATION FOR ARA-18 ARA-III RADIONUCLIDE TANK (ARA-736) | 10015 | 00 |
01-APR-94 | NOT SPECIFIED | TRACK 1 INVESTIGATION FOR THE ARA-744 EVAPORATION POND LOCATED NE OF ARA-I - NO FURTHER ACTION DETERMINATION | 5654 | 00 |
24-JUN-93 | NOT SPECIFIED | TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - ARA-I DRAIN (ARA-626) ARA-17 OU 5-01 | 5322 | 00 |
01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-05 EVAPORATION POND TO NORTH EAST ARA-744 | 2983 | 00 |
01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-16 RADIONUCLIDE TANKS ARA-729 | 2994 | 00 |
15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-15 RADIONUCLIDE TANK ARA-735 | 2993 | 00 |
15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-17 DRAIN FROM ARA-626 | 2995 | 00 |
15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-18 RADIONUCLIDE TANK ARA-736 | 2996 | 00 |
15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-19 DETENTION TANK FOR FUEL OIL - RADIONUCLIDES ARA-719 | 2997 | 00 |
Previous Page | Administrative Record Home Page