Select By Operable Unit (OU)

For Operable Unit 4-05

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
09-AUG-05 JESSMORE, P. J. PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 4 (WAG-4), CENTRAL FACILITIES AREA (CFA) ICP/EXT-05-00955 00
28-MAR-00 HUNTLEY, R. M. ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 4 (WAG-4) RECORD OF DECISION (ROD) COST ESTIMATE EDF-ER-152 00
17-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 4-05 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 4-05 AR.INDEX.OU.4-05 00
04-NOV-98 MCCORMICK, S. H. HAZARDOUS WASTE DETERMINATION (HWD) - WASTE AREA GROUP 4 (WAG-4) OPERABLE UNIT (OU) 4-05 SITES CFA-17 & CFA-47 CENTRAL FACILITIES AREA (CFA) 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) 10557 00
02-OCT-98 HATHAWAY, C. CORRECTION TO LETTER, SUBJECT - TRANSMITTAL OF REMOVAL ACTION SUMMARY OF CFA-04 POND & TSF-08 TIME CRITICAL REMOVAL ACTIONS (TCRA) FOR OPERABLE (OU) 4-05 OPE-ER-150-98 00
03-SEP-98 NICKLAUS, D. REMOVAL ACTION SUMMARY OF CFA-04 POND & TSF-08 TIME CRITICAL REMOVAL ACTIONS (TCRA) INEL-95/0382 02
12-JUN-98 HATHAWAY, C. TRANSMITTAL OF CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL REMOVAL ACTION SUMMARY REPORT FOR OPERABLE UNITS (OU) 4-02, 4-05 & 4-09 OPE-ER-94-98 00
01-JUN-98 LANDIS, J. A. CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL REMOVAL ACTION SUMMARY REPORT OPERABLE UNITS (OU) 4-02, 4-05 & 4-09 INEEL/EXT-97-01462 00
18-SEP-97 TANNER, D. M. CFA TANK FARM REMOVAL, CFA FIRE TRAINING REMOVAL & LAND TREATMENT LIFTS 10559 00
01-SEP-97 GURNEY, L. W. HEALTH & SAFETY PLAN (HSP) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 INEL/EXT-97-00474 01
01-AUG-97 KUHNS, D. J. ACTION MEMORANDUM FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 10428 00
25-JUL-97 JENSEN, N. R. DOE-ID TRANSMITTAL OF WAG-4 DOCUMENTS - ENGINEERING EVALUATION COST ANALYSIS (EE/CA) & ACTION MEMORANDUM FOR WAG-4 MISCELLANEOUS SITES NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-13, CFA-15, CFA-17, CFA-47 & CFA-42 OPE-ER-907-117 00
01-JUL-97 KUHNS, D. J. ACTION MEMORANDUM FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 10423 00
01-JUL-97 LATRAY, D. A. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 DOE/ID-10582 01
01-JUL-97 REESE, C. L. DECONTAMINATION PLAN FOR CONTAMINATED EQUIPMENT AT CERCLA OU 1-08 AND 4-05 MERCURY RETORTING INEL/EXT-97-00503 01
04-JUN-97 INEEL COMMUNITY RELATIONS PUBLIC NOTICE - PUBLIC COMMENT PERIOD BEGINS ON REMOVAL OF CONTAMINATED SOILS FROM CENTRAL FACILITIES AREA (CFA) OF INEEL 10556 00
23-MAY-97 JENSEN, N. R. RESPONSE TO APRIL 1, 1997 (04/01/97) SHAWN ROSENBERGER TO NOLAN JENSEN LETTER REGARDING SUMMARY OF CFA-674 POND TIME CRITICAL REMOVAL ACTION (TCRA) REPORT, OU 4-05 OPE-ER-81-97 00
16-MAY-97 RENO, S. L. IDHW-DEQ REVIEW OF DRAFT ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WASTE AREA GROUP 4 (WAG-4) MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-08, CFA-13, CFA-15, CFA-17, CFA-47 CFA-42 10558 00
06-MAY-97 ORLEAN, H. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR WASTE AREA GROUP (WAG-4) MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) 15170 00
01-MAY-97 LATRAY, D. A. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WASTE AREA GROUP 4 (WAG-4) MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 & CFA-42 DOE/ID-10582 00
01-MAY-97 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-13 CFA-15 CFA-17 CFA-47 & CFA-42 DOE/ID-10583 00
01-MAY-97 GURNEY, L. W. HEALTH & SAFETY PLAN (HSP) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-08, CFA-13, CFA-15, CFA-17, CFA-47, CFA-42 INEL/EXT-97-00474 00
30-APR-97 JENSEN, N. R. TRANSMITTAL OF DRAFT FIELD SAMPLING PLAN (FSP) FOR WAG-4 MISCELLANEOUS SITES 1997 REMOVAL ACTION, OU 4-02, 4-05, 4-08 & 4-09 OPE-ER-69-97 00
28-APR-97 JENSEN, N. R. TRANSMITTAL OF DRAFT ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR 1997 WAG-4 MISCELLANEOUS SITES REMOVAL ACTION, OU 4-02, 4-05, 4-08 & 4-09 OPE-ER-64-97 00
22-APR-97 JENSEN, N. R. FOURTEEN (14) DAY NOTIFICATION OF SAMPLING FOR WASTE AREA GROUP 4 (WAG-4) REMOVAL ACTION & COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-61-97 00
01-APR-97 ROSENBERGER, M. S. IDHW-DEQ REVIEW OF SUMMARY OF CFA-674 POND TIME CRITICAL REMOVAL ACTION (TCRA) REPORT 10422 00
18-MAR-97 ROSENBERGER, M. S. IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON THE OPERABLE UNIT (OU) 4-05 & 1-08 REMOVAL ACTION MERCURY RETORT PROJECT WASTE STREAM APPLICABLE OR RELEVANT & APPROPRIATE REQUIREMENTS (ARAR) TABLE 10410 00
12-MAR-97 DOE ACTION DETERMINATION FOR CFA-04, CFA-17 & CFA-47 TO BE EVALUATED IN OU 4-13 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) BASELINE RISK ASSESSMENT (BRA) - NO FURTHER ACTION DETERMINATION FOR CFA-50 IN OPERABLE UNIT (OU) 4-05 - TRACK 2 INVESTIGATI 10401 00
12-FEB-97 JENSEN, N. R. DOE-ID TRANSMITTAL OF OPERABLE UNIT (OU) 4-05 & 1-08 REMOVAL ACTION MERCURY RETORT PROJECT WASTE STREAM APPLICABLE OR RELEVANT & APPROPRIATE REQUIREMENTS (ARAR) TABLE OPE-ER-12-97 00
01-FEB-97 JONES, R. W. HEALTH & SAFETY PLAN (HSP) FOR MERCURY RETORT PROJECT INEL-95/0424 03
28-JUN-96 ROSENBERGER, M. S. IDHW RECOMMENDATION FROM TRACK 2 INVESTIGATION OF OPERABLE UNIT (OU) 4-05 AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) 10287 00
09-MAY-96 ORLEAN, H. ENVIRONMENTAL PROTECTION AGENCY (EPA) RECOMMENDATION LETTER & COMMENTS ON PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-05 10274 00
02-MAY-96 GREEN, L. A. TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 4-05 OPE-ER-79-96 00
01-APR-96 PEATROSS, R. G. PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 4-05 INEL-95/0626 00
29-MAR-96 ORLEAN, H. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-05 (DRAFT) 10270 00
22-MAR-96 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW) COMMENTS ON PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 4-05 (DRAFT) 10271 00
23-FEB-96 GREEN, L. A. TRANSMITTAL OF DRAFT TRACK 2 SUMMARY REPORT FOR OU 4-05 OPE-ER-34-96 00
01-OCT-95 SHERWOOD, J. A. SAMPLING & ANALYSIS PLAN (SAP) FOR RETORTED MERCURY CONTAMINATED WASTE FROM CFA-674 & TAN MERCURY SPILL SITE AT INEL INEL-95/0222 01
18-JUL-95 GREEN, L. A. TRANSMITTAL OF RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR OU 4-05 TRACK 2 OPE-ER-139-95 00
14-JUL-95 GREEN, L. A. TRANSMITTAL OF REVISED SAMPLING & ANALYSIS PLAN (SAP) & DOE RESPONSE TO IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON DRAFT SAP FOR OPERABLE UNIT (OU) 4-05 TRACK 2 OPE-ER-133-95 00
01-JUL-95 HONEYCUTT, T. K. FIELD SAMPLING PLAN (FSP) FOR WAG-4 OU 4-05, TRACK 2 INVESTIGATION INEL-95/0188 00
01-JUL-95 GURNEY, L. W. HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 4-05 TRACK 2 INVESTIGATION INEL-95/0237 00
25-MAY-95 DUDZIAK, A. J. DOE RESPONSE TO EPA & IDHW COMMENTS ON DRAFT OPERABLE UNIT (OU) 4-05 TRACK 2 SCOPE OF WORK (SOW) 10176 00
25-MAY-95 DUDZIAK, A. J. TRANSMITTAL OF DRAFT TRACK 2 SAMPLING & ANALYSIS PLAN (SAP) FOR OU 4-05 OPE-ER-092-95 00
15-FEB-95 BLOOD, H. R. EPA COMMENTS ON SCOPE OF WORK FOR OU 4-05 TRACK 2 INVESTIGATIONS AT CFA INEL 15165 00
13-JAN-95 DUDZIAK, A. J. TRANSMITTAL OF TRACK 2 SCOPE OF WORK FOR OPERABLE UNIT (OU) 4-05 FOR REVIEW & COMMENT OPE-ER-004-95 00
01-JAN-95 INEL COMMUNITY RELATIONS INEL REPORTER - 01/95 & 02/95 - TREATING MERCURY CONTAMINATED MATERIAL LAST STEP REMOVAL ACTION 8898 00
22-DEC-94 PIGOTT, W. R. SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 4-05 TRACK 2 INVESTIGATION 10671 00
29-NOV-94 DUDZIAK, A. J. TRANSMITTAL OF TRACK 2 PRELIMINARY SCOPING PACKAGES FOR OPERABLE UNIT (OU) 4-05 OPE-ER-311-94 00
23-SEP-94 DUDZIAK, A. J. TRANSMITTAL OF REMOVAL ACTION PLAN FOR CFA-674 POND OPERABLE UNIT (OU) 4-05 OPE-ER-248-94 00
20-JUL-94 SMITH, M. R. REMOVING MERCURY & ASBESTOS CONTAMINATED MATERIAL FROM THE CFA-674 POND (OU 4-05) 5754 00
08-JUL-94 INEL COMMUNITY RELATIONS NOTICE OF AVAILABILITY - INEL TO REMOVE MERCURY, ASBESTOS CONTAMINATED MATERIAL 5714 00
05-JUL-94 GREEN, L. A. TRANSMITTAL OF REVISED ACTION MEMORANDUM FOR OU 4-05, CFA-674 POND CALCINE & ASBESTOS REMOVAL ACTION OPE-ER-180-94 00
05-APR-94 STAIGER, M. D. CALCINE DISPOSAL AT CFA MDS-2-94 00
18-MAR-94 DUDZIAK, A. J. TRANSMITTAL OF ACTION MEMORANDUM FOR; AND REQUEST FOR CONCURRENCE ON: TIME CRITICAL REMOVAL ACTION (TCRA) ON OU 4-05, CFA-674 WASTE CALCINE AREA OPE-ER-65-94 00
08-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - CFA-17 FIRE DEPARTMENT TRAINING AREA; BERMED 2499 00
08-OCT-86 ALEXANDER, T. G. INITIAL ASSESSMENT - CFA-04 POND CFA-674 2509 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page