Select By Operable Unit (OU)

For Operable Unit 3-14

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
27-FEB-18 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I AND PHASE II, PART A INTERIM REMEDIAL ACTION REPORT DOE/ID-11475 1
07-FEB-18 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 4
29-JAN-18 NOT SPECIFIED CORRECTED TABLE B-3 DOE/ID-11462 REV 0 6087213 0
18-DEC-17 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 10
01-JUN-17 FORBES, JEFFREY R. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
01-JUN-17 SHANKLIN, DEAN E. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
01-JUN-17 LAWRENCE, SARAH D. FISCAL YEAR 2016 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11563 0
08-AUG-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES, RESULTING FROM THE 2010 TO 2014 FIVE-YEAR REVIEW, TO IMPLEMENT CHANGES IN RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE DOE/ID-11548 0
01-JUN-16 FORBES, JEFFREY R. FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11545 0
01-JUN-16 JOLLEY, WENDELL L. FISCAL YEAR 2015 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11545 0
19-MAY-16 NOT SPECIFIED EXPLANATION OF SIGNIFICANT DIFFERENCES FOR OPERABLE UNIT 10-08 RECORD OF DECISION FOR SITE-WIDE GROUNDWATER, MISCELLANEOUS SITES, AND FUTURE SITES DOE/ID-11547 0
01-JUL-15 NOT SPECIFIED FISCAL YEAR 2014 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11526 0
01-JUN-15 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 3
31-MAR-15 FAULK, DENNIS EPA CONCURRENCE FOR DISCHARGE OF IWTU WATER TO STORM WATER EVAPORATION CCN 317610 0
17-MAR-15 JOHANSEN, P.E. DEQ CONCURRENCE FOR DISCHARGE OF WATER FROM IWTU TO CPP-1793 STORM WATER EVAPORATION POND CCN 317584 0
09-MAR-15 BROWN, M.E. REQUEST FOR CONCURRENCE FOR DISCHARGE OF WATER FROM INTEGRATED WASTE TREATMENT UNIT(IWTU) TO CPP-1793 STORM WATER EVAPORATION POND CCN 317526 0
01-JAN-15 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 9
01-JUN-14 NOT SPECIFIED FISCAL YEAR 2013 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11500 0
01-MAY-14 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2013 RPT-1268 0
01-OCT-13 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/ID-11333 1
01-SEP-13 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 8
01-JUN-13 NOT SPECIFIED FISCAL YEAR 2012 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11476 0
01-JUN-13 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2012 RPT-1196 0
15-MAR-13 FAULK, DENNIS OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL (WDP-RWMC-13-018) 4212308 0
08-MAR-13 KOCH, DARYL F. DEPARTMENT OF ENERGY REVISED OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL (WDP-RWMC-13-018) MARCH 4, 2013 4210680 0
04-MAR-13 JENSEN, NOLAN R. DEPARTMENT OF ENERGY REVISED OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL (WDP-RWMC-13-018) WDP-RWMC-13-018 0
01-MAR-13 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I, INTERIM REMEDIAL ACTION REPORT DOE/ID-11475 0
26-NOV-12 JENSEN, NOLAN R. TRANSMITTAL OF THE OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER, PHASE I, REMEDIAL ACTON REPORT (DRAFT) (WDP-RWMC-12-065) WDP-RWMC-12-065 0
31-AUG-12 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN DOE/ID-11334 2
31-JUL-12 NOT SPECIFIED FISCAL YEAR 2011 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11462 0
11-JUL-12 KOCH, DARYL F. DEPARTMENT OF ENERGY REVISED OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL (WDP-RWMC-12-027) LETTER DATED JULY 3, 2012 4025891 0
09-JUL-12 FAULK, DENNIS REVISED OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL 4022644 0
03-JUL-12 COOPER, JAMES R. DEPARTMENT OF ENERGY REVISED OPERABLE UNIT 3-14 PHASE III ACCELERATION PROPOSAL (WDP-RWMC-12-027) WDP-RWMC-12-027 0
01-JUL-12 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2011 RPT-1001 0
30-JUN-12 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 2
20-JUN-12 JOHANSEN, PETE DRAFT FINAL OU 3-14 REMEDIAL ACTIONS: PHASE II 90% DESIGN DOCUMENT (EDF-101116) 4008610 0
30-APR-12 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS DOE/ID-11042 7
19-MAR-12 HAIN, KATHLEEN E. TRANSMITTAL OF THE OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT (EDF-10116), REVISION 0 (WDP-RWMC-12-012) WDP-RWMC-12-012 0
14-MAR-12 JOHANSEN, PETE COMMENTS ON THE OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN (DRAFT), DOE-ID-11337 IR-25322 0
06-MAR-12 SHANKLIN, DEAN E. OPERABLE UNIT 3-14 REMEDIAL ACTIONS: FINAL PHASE II 90% DESIGN DOCUMENT EDF-10116 0
15-FEB-12 FAULK, DENNIS EPA Concurrence on Operable Unit 3-14 Draft Final Phase II 90% Design and Phase III Acceleration Proposal IR-25317 0
15-FEB-12 HAIN, KATHLEEN E. TRANSMITTAL OF THE FINAL REMOVAL ACTION REPORT FOR CPP-601, CPP-602, CPP-627, CPP-630, AND CPP-640 (DOE/ID-11453)(WDP-RWMC-12-005) WDP-RWMC-12-005 0
14-FEB-12 KOCH, DARYL F. Department of Energy Operable Unit 3-14 Phase III Acceleration Proposal (WDP-RWMC-12-003) WDP-RWMC-12-003 0
31-JAN-12 NOT SPECIFIED PREFINAL INSPECTION REPORT FOR OPERABLE UNIT 3-14, PHASE I DOE/ID-11461 0
10-NOV-11 FAULK, DENNIS CONCURRENCE ON LEAVING PIPING WITH LEADED JOINTS BENEATH CPP-601 AND CPP-602 AS IMPRACTICAL TO REMOVE (WDP-RWMC-11-068) AR-25313 0
07-NOV-11 HAIN, KATHLEEN E. REQUEST FOR CONCURRENCE ON LEAVING PIPING WITH LEADED JOINTS BENEATH CPP-601 AND CPP-602 AS IMPRACTICAL TO REMOVE (WDP-RWMC-11-068) AR-25312 0
31-AUG-11 NOT SPECIFIED FISCAL YEAR 2010 ANNUAL OPERATIONS AND MAINTENANCE REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11442 1
07-FEB-11 OPALSKI, DANIEL D. U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE ON THE FIVE-YEAR REVIEW FOR IDAHO NATIONAL LABORATORY FISCAL YEARS 2005-2009 4544925 0
13-JAN-11 NOT SPECIFIED INL SITE-WIDE INSTITUTIONAL CONTROLS AND OPERATIONS AND MAINTENANCE ANNUAL REPORT - FY 2010 RPT-759 0
20-APR-10 NOT SPECIFIED FISCAL YEAR 2009 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11419 0
14-DEC-09 DOE, DEQ, EPA NEW SITE IDENTIFICATION FORM - CONTAMINATION ADJACENT TO THE CPP-633 WASTE CONTAINER ENGINEERED CAP, EAST FOUNDATION NSI-25259 0
30-SEP-09 JESSMORE, JAMES J, ASSESSMENT OF SHALLOW INJECTION WELLS 21-CPP, 22 CPP, AND 23-CPP RPT-530 1
14-SEP-09 HUTCHISON, DAVID P. SUBMITTAL OF NOTICE OF COMPLETION OF ABANDONMENT FOR CLASS V SHALLOW INJECTION WELLS 15-CPP (34-X-0001-078), 41-CPP (34-X-0001-079), AND 44-CPP (34-X-0001-080) LOCATED AT INTEC, INL SITE CCN 309108 0
31-AUG-09 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 10, AND REMOVAL ACTIONS DOE/ID-10587 10
30-JUN-09 NOT SPECIFIED 2008 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER DOE/ID-11395 0
05-MAY-09 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN DOE/ID-11334 1
09-JAN-09 RENO, SCOTT L. ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (ICP) DOE/ID-11293 1
08-DEC-08 AR COORDINATOR OPERABLE UNIT (OU) 3-14 - IDAHO NATIONAL LABORATORY (INL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TANK FARM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-14 AR.INDEX.OU.3-14 1
17-OCT-08 DOE, EPA, DEQ SHALLOW INJECTION WELL 41-CPP WEST OF BUILDING CPP-710 NSI-25119 0
23-SEP-08 NOT SPECIFIED SHALLOW INJECTION WELLS CPP-133 AND CPP-134 NSI-25205 0
25-JUN-08 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER WASTE MANAGEMENT PLAN DOE/ID-11335 0
25-JUN-08 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER CHARACTERIZATION PLAN FOR THE NORTH TANK FARM SOIL DOE/ID-11336 0
24-JUN-08 NOT SPECIFIED OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN DOE/ID-11337 0
17-JUN-08 NOT SPECIFIED OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/ID-11333 0
23-APR-08 NOT SPECIFIED TITLE TEST-1 04
10-MAR-08 SHANKLIN, D. E. 2007 ANNUAL OPERATIONS REPORT FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION DOE/ID-11358 00
25-JUL-07 SHANKLIN, D. E. OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) SCOPE OF WORK DOE/ID-11318 00
22-MAY-07 MCMANAMON, L. E. ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 03
16-MAY-07 AR COORDINATOR OPERABLE UNIT (OU) 3-14 - IDAHO NATIONAL LABORATORY (INL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TANK FARM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-14 AR.INDEX.OU.3-14 00
16-MAY-07 DEQ RECORD OF DECISION (ROD) FOR TANK FARM SOIL AND IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER, OPERABLE UNIT (OU) 3-14 DOE/ID-11296 00
31-OCT-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 02
22-AUG-06 NOT SPECIFIED IDAHO CLEANUP PROJECT (ICP) PUBLIC NOTICE - PUBLIC MEETINGS SCHEDULED ON PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 25016 00
21-AUG-06 MAXAND, J. SNAKE RIVER ALLIANCE REQUEST FOR EXTENSION TO COMMENT PERIOD ON THE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER 25015 00
16-AUG-06 NOT SPECIFIED IDAHO CLEANUP PROJECT (ICP) PUBLIC NOTICE - AGENCIES RELEASE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER 25014 00
01-AUG-06 CAHN, L. S. PROPOSED PLAN FOR TANK FARM SOIL AND GROUNDWATER AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), OPERABLE UNIT (OU) 3-14 RPT-223 00
13-JUL-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 01
01-JUL-06 NOT SPECIFIED IDAHO CLEANUP PROJECT (ICP) FACT SHEET - TANK FARM SOIL AND IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER - AGENCIES TO RELEASE PROPOSED PLAN FOR CLEANUP 24977 00
31-MAY-06 MCMANAMON, L. E. MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) PLN-2128 00
01-MAY-06 CAHN, L. S. OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER FEASIBILITY STUDY (FS) DOE/ID-11247 00
27-APR-06 CAHN, L. S. OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) DOE/NE-ID-11227 00
27-APR-06 BAILEY, A. L. END OF WELL REPORTS FOR THE OPERABLE UNIT (OU) 3-14 2004 TANK FARM SOIL INVESTIGATION AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) ICP/EXT-04-00706 00
07-APR-06 KECK, K. N. IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) TANK FARM INADVERTENT INTRUDER ASSESSMENT EDF-6803 00
10-NOV-05 HULL, L. C. OPERABLE UNIT (OU) 3-14 TANK FARM ALLUVIUM GEOCHEMICAL PROPERTIES REPORT DOE/ID-11271 00
01-NOV-05 JENSEN, N. R. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-128, 4" SWA-100532 LEAK NEAR THE INTERSECTION WITH 8" SWN-3001 24920 00
25-OCT-05 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-126 - 20 INCH SW-NS-110477 FLANGE LEAK EAST OF CPP-601 24918 00
25-OCT-05 BUTLER, J. L. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-125 - 2 INCH SWA-106450 FLANGE LEAK NORTH OF CPP-1618 24919 00
08-SEP-05 HAIN, K. E. NEW SITE IDENTIFICATION (NSI) - CHEMICAL PROCESSING PLANT (CPP) PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR OVERHEAD PIPELINE SPILLS - ADDITIONAL INFORMATION 24921 00
09-JUN-05 KUHNS, D. J. NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-112 - WM-184 CHEMICAL PROCESSING PLANT (CPP) TANK FARM CONTAINMENT VAULT POTENTIAL RELEASE 24908 00
08-JUN-05 CETO, N. COMMENT PERIOD EXTENSION FOR DRAFT OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) 24905 00
09-FEB-05 MCMANAMON, L. E. TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-2000-00529 03
03-NOV-04 VERWOLF, M. C. RESPONSE TO SEPTEMBER 23, 2004 (09/23/04) LETTER REGARDING OPERABLE UNIT (OU) 3-13 GROUP 4 TC-99 INVESTIGATION AND OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FMDP-FFA/CO-04-053 00
22-JUL-04 DOORNBOS, M. H. TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-2000-00529 02
09-JUN-04 HALL, R. C. TRANSMITTAL OF FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - REVISION 1 (REV.01) EM-ER-04-120 00
07-JUN-04 CAHN, L. S. OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN DOE/ID-10676 01
07-JUN-04 CAHN, L. S. TANK FARM SOIL AND GROUNDWATER FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX A TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 DOE/ID-10764 01
01-JUN-04 CAHN, L. S. EVALUATION OF FEASIBILITY OF AN EARLY DECISION AND PERMANENT REMEDY FOR TANK FARM SOIL - APPENDIX E TO OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN -DOE/ID-10676, REV.01 INEEL/EXT-03-01010 00
01-JUN-04 CAHN, L. S. TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX B TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 INEEL/EXT-2000-00529 01
01-JUN-04 CAHN, L. S. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX C TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 INEEL/EXT-99-00361 01
25-MAY-04 HALL, R. C. REQUEST FOR EXTENSION FOR SUBMITTAL OF THE FINAL OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-04-107 00
11-MAY-04 HALL, R. C. DEPARTMENT OF ENERGY (DOE) APPROVAL TO PLACE NEW WASTE AREA GROUP 3 (WAG-3) SITES IN OPERABLE UNIT (OU) 3-14 24851 00
27-APR-04 HAIN, K. E. TRACK 1 DECISION DOCUMENTATION PACKAGE - NO ACTION REQUIRED - INVESTIGATION FOR SHALLOW INJECTION WELLS CPP-104, CPP-105, CPP-106, CPP-107 AND CPP-108 ASSOCIATED WITH FUEL OIL STORAGE TANKS (CPP-701) - APPROVED FOR OU 3-14 PER DOCUMENT ID #24851 CPP-104, CPP-105, CPP-106, CPP-107 00
24-APR-04 BRAGASSA, J. L. DECISION DOCUMENTATION PACKAGE - TRACK 1 SITES CPP-102, CPP-103, CPP-109 AND CPP-110 - SHALLOW INJECTION WELLS LOCATED AT INTEC - APPROVED AS OPERABLE UNIT (OU) 3-14 SITES PER DOE MEMO (DOCUMENT ID #24851) DATED MAY 11, 2004 (05/11/04) 24884 00
05-APR-04 HALL, R. C. REQUEST FOR EXTENSION FOR SUBMITTAL OF DRAFT FINAL OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-04-078 00
23-MAR-04 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10587 08
20-FEB-04 DOE EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 DOE/ID-11109 00
02-FEB-04 HALL, R. C. SUBMITTAL OF FINAL EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), OPERABLE UNIT (OU) 3-13 EM-ER-04-022 00
18-DEC-03 HALL, R. C. DECEMBER 9, 2003 (12/09/03) AGENCY MEETING MINUTES - DECISIONS FROM ENVIRONMENTAL PROTECTION AGENCY (EPA), IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AND DEPARTMENT OF ENERGY (DOE) ON WASTE AREA GROUP 3 (WAG-3) ISSUES EM-ER-03-315 00
03-DEC-03 HALL, R. C. NOTIFICATION THAT THE DRAFT PHASE I SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 TANK FARM SOILS AND GROUNDWATER PROJECT WILL NOT BE SUBMITTED EM-ER-03-299 00
04-AUG-03 HAIN, K. E. NEW SITE IDENTIFICATION (NSI) - CPP-102, CPP-103, CPP-104, CPP-105, CPP-106, CPP-107, CPP-108, CPP-109, CPP-110 - ABANDONED SHALLOW INJECTION WELLS AT INTEC 28120 00
05-MAR-03 HALL, R. C. NOTIFICATION THAT A SECONDARY DOCUMENT FOR THE OPERABLE UNIT (OU) 3-14 TANK FARM SOILS AND GROUNDWATER PROJECT WILL NOT BE SUBMITTED EM-ER-03-065 00
04-MAR-03 BOWHAN, B. R. RESOLUTION OF DISPUTE - FINAL FULLY EXECUTED ORIGINAL COPY OF AGREEMENT TO RESOLVE DISPUTE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 OCC-03-025 00
12-SEP-02 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 DOE/ID-10587 07
08-JAN-02 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-14, CHEMICAL PROCESSING PLANT 58 (CPP-58) - NITRIC ACID CONTAMINATION IN PROXIMITY TO GROUP 1 INTERIM ACTION (IA) TRENCH NEAR CPP-604 10958 00
31-AUG-01 JENKINS, T. W. TRANSMITTAL OF FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 EM-ER-01-137 00
01-AUG-01 FORSYTHE, H. S. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 DOE/ID-10880 00
16-JUL-01 IVY, K. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT FOR OU 3-14, DOE/ID-10880 10946 00
16-JUL-01 CODY, C. A. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS - DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT FOR OU 3-14, DOE/ID-10880 10949 00
16-JUL-01 DOE DEPARTMENT OF ENERGY (DOE) RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT 10950 00
16-JUL-01 DOE DEPARTMENT OF ENERGY (DOE) RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON DRAFT OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT 10951 00
12-JUN-01 JENKINS, T. W. TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT EM-ER-01-099 00
21-DEC-00 HAIN, K. E. TRANSMITTAL OF FINAL OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-243-00 00
20-DEC-00 FORSYTHE, H. S. OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER PHASE I REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN DOE/ID-10676 00
20-DEC-00 FORSYTHE, H. S. INJECTION WELL FIELD SAMPLING PLAN (FSP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10763 00
20-DEC-00 FORSYTHE, H. S. TANK FARM SOIL FIELD SAMPLING PLAN (FSP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10764 00
20-DEC-00 FORSYTHE, H. S. INJECTION WELL HEALTH AND SAFETY PLAN (HSP OR HASP) FOR PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-2000-00528 00
20-DEC-00 FORSYTHE, H. S. TANK FARM SOIL HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-2000-00529 00
20-DEC-00 FORSYTHE, H. S. WASTE MANAGEMENT PLAN (WMP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) INEEL/EXT-99-00361 00
04-DEC-00 IVY, K. ADDITIONAL ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - DRAFT FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN; INJECTION WELL FIELD SAMPLING PLAN (FSP) 10945 00
22-NOV-00 IVY, K. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - DRAFT FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN 10944 00
22-NOV-00 ENGLISH, M. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS - DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 3-14, DOE/ID-10676 10948 00
06-NOV-00 JENKINS, T. W. TRANSMITTAL OF DRAFT FINAL OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - TANK FARM SOIL AND GROUNDWATER - DOE/ID-10676 EM-ER-212-00 00
01-NOV-00 IDEQ IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS & RESOLUTIONS FOR DRAFT FINAL OU 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - DOE/ID-10676, REV. D (REV.0D) 22899 00
31-AUG-00 ENGLISH, M. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS - DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN FOR OPERABLE UNIT (OU) 3-14, DOE/ID-10676 10947 00
28-AUG-00 IVY, K. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - OPERABLE UNIT (OU) 3-14 TANK FARM SOIL & GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) - DOE/ID-10676 10943 00
10-AUG-00 NYGARD, D. STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) EXTENDS COMMENT REVIEW PERIOD FOR DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN FOR OU 3-14 TANK FARM SOIL AND GROUNDWATER - DOE/ID-10676 21468 00
01-AUG-00 INEEL COMMUNITY RELATIONS INEEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - INVESTIGATION UNDER WAY FOR OPERABLE UNIT (OU) 3-14 AT WASTE AREA GROUP 3 (WAG-3) 21212 00
26-JUN-00 JENKINS, T. W. TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN EM-ER-120-00 00
10-MAY-00 RASCH, D. N. IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AS ONE WASTE MANAGEMENT UNIT FOR CLOSURES AND DEMONSTRATING COMPLIANCE WITH DRINKING WATER STANDARDS TS-ESTD-00-085 00
28-OCT-99 JENKINS, T. W. TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-175-99 00
18-OCT-99 ENGLISH, M. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON THE DRAFT FINAL SCOPE OF WORK (SOW) FOR WAG-3 OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/ 22695 00
07-OCT-99 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) INVOLVEMENT IN DEVELOPMENT AND REVIEW OF THE RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13, INTEC - CONTINGENT UPON SPECIFIED REGULATORY STANDARDS IDEQ IS SIGNATORY TO THE ROD WITH DOE AND EPA 24797 00
07-OCT-99 DOE FINAL RECORD OF DECISION (ROD) IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 DOE/ID-10660 00
01-OCT-99 DOE FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10653 00
01-OCT-99 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14, TANK FARM SOILS AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-99-141 00
30-AUG-99 HAIN, K. E. TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) INEEL OPE-ER-119-99 00
05-AUG-99 PIERRE, W. REVIEW OF DRAFT FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT OU 3-13, IDAHO CHEMICAL PROCESSING PLANT (ICPP) - EPA COMMENTS ATTACHED 10683 00
04-AUG-99 KOCH, D. F. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - DOE/ID-10660 10682 00
29-JUL-99 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-14 - DOE/ID-10653 10942 00
20-JUL-99 HAIN, K. E. TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-99-99 00
30-JUN-99 JENKINS, T. W. TRANSMITTAL OF REVISED DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 TANK FARM SOILS & GROUNDWATER REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) OPE-ER-93-99 00
14-MAY-99 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT RECORD OF DECISION (ROD) OPERABLE UNIT (OU) 3-13 IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) - DOE/ID-10660 10681 00
11-MAY-99 DOE NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-14 TANK FARM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 17265 00
29-MAR-99 JENKINS, T. W. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-44-99 00
01-MAR-99 IDHW IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 10679 00
17-FEB-99 JENKINS, T. W. TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPE-ER-28-99 00
09-FEB-99 CRAPO, M. PUBLIC COMMENTS ON RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10693 00
08-JAN-99 JENKINS, T. W. ADDITION OF OPERABLE UNIT (OU) 3-14 TO FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) OPE-ER-05-99 00
03-DEC-98 RENO, S. L. IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT 18064 00
10-NOV-98 ROSE, K. A. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCOPE OF WORK (SOW) WASTE AREA GROUP (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 INEEL 18065 00
27-OCT-98 RANDOLPH, P. PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 10689 00
16-OCT-98 DOE NEW SITE IDENTIFICATION (NSI) - TANK FARM INTERSTITIAL SOILS - CPP-96 16750 00
14-OCT-98 JENKINS, T. W. TRANSMITTAL OF SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - DRAFT OPE-ER-161-98 00
14-OCT-98 JENKINS, T. W. DEPARTMENT OF ENERGY - IDAHO OPERATIONS OFFICE (DOE-ID) REQUEST FOR ADDITION OF OPERABLE UNIT (OU) 3-14 TO FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) OPE-ER-162-98 00
14-AUG-98 TAYLOR, A. E. PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) 10688 00
27-MAY-98 NYGARD, D. IDHW CONCURRENCE WITH ENFORCEABLE SCHEDULE EXTENSION FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) 10446 00
27-MAY-98 PIERRE, W. EPA CONCURRENCE ON REQUEST FOR EXTENSION OF ENFORCEABLE MILESTONE FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) 10447 00
15-MAY-98 JENKINS, T. W. REQUEST FOR EXTENSION OF OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) & RELATED DOCUMENTS OPE-ER-67-98 00
26-JAN-98 RENO, S. L. COMPREHENSIVE FACILITY CLOSURE EVALUATION PROCESS 10799 00
01-NOV-97 KAPTEIN, M. S. HEALTH & SAFETY PLAN (HSP) FOR HIGH LEVEL LIQUID WASTE TANK FARM (HLLWTF) SOILS SAMPLING INEEL/EXT-97-00987 00
17-APR-62 LATCHUM, J. W. REPORT OF THE INVESTIGATING COMMITTEE CHEMICAL PROCESSING PLANT (CPP) WASTE TANK LEAKAGE OF MARCH 17, 1962 (03/17/62) LA-53-62A 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page