Select By Operable Unit (OU)

For Operable Unit 3-09

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
28-AUG-03 FITCH, D. R. THE 2003 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 DOE/ID-11112 00
10-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 3-09 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-09 AR.INDEX.OU.3-09 00
24-JUN-97 JENSEN, N. R. TRANSMITTAL OF ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP OPE-ER-102-97 00
01-JUN-97 FRANCIS, C. S. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHENMICAL PROCESSING PLANT (ICPP) DOE/ID-10568 01
01-MAY-97 ARROWOOD, J. R. HEALTH & SAFETY PLAN (HSP OR HASP) FOR ICPP RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION INEL/EXT-97-00132 01
27-MAR-97 RENO, S. L. IDHW-DEQ COMMENTS ON ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP - DOE/ID-10568 FEBRUARY 1997 (02/97) 14351 00
28-FEB-97 JENSEN, N. R. TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPE-ER-29-97 00
01-FEB-97 NOT SPECIFIED APPROVAL MEMORANDUM FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION 10315 00
01-FEB-97 FRANCIS, C. S. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) DOE/ID-10568 00
30-JAN-97 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION ENGINEERING EVALUATION COST ANALYSIS (EE/CA) 18071 00
19-OCT-95 GREEN, L. A. DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 10445 00
19-OCT-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) & DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY ( EPA) COMMENTS OPE-ER-201-95 00
01-OCT-95 GREENWELL, R. D. DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) INEL-94/0171 00
01-AUG-95 LITCO SAMPLING AND ANALYSIS PLAN (SAP) FOR WAG-3 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (FINAL) INEL-95/0137 00
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) INEL/95-0056, VOL 02 0
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, VOLUME I (VOL.01) INEL/95-0056, VOL. 01 0
05-JUL-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-127-95 00
05-JUN-95 GREEN, L. A. EXTENSION OF COMMENT RESOLUTION PERIOD ON WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-102-95 00
01-MAY-95 RENO, S. L. IDHW-DEQ COMMENTS ON WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) 18023 00
20-APR-95 DOE ACTION DETERMINATION FOR OPERABLE UNIT (OU) 3-09 - TO BE FURTHER EVALUATED IN WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 3-13 10404 00
17-FEB-95 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW AND COMMENT PERIOD FOR DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INEL-95/0137 15045 00
01-FEB-95 LITCO FINAL PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-09 INEL-95/0094 04
23-JAN-95 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE (IDHW) COMMENTS ON INEL TRACK 2 SUMMARY REPORT FOR OU 3-09 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 10032 00
19-DEC-94 JONES, E. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON INEL TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-09 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 10031 00
22-NOV-94 GREEN, L. A. TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-09 OPE-ER-308-94 00
21-OCT-94 GREEN, L. A. TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-283-94 00
14-OCT-94 WINCO FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5791 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW) WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY (RI/FS) 15035 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW), WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5785 00
10-AUG-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5782 00
08-AUG-94 MEYER, L. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5783 00
26-APR-94 LYLE, J. L. TRANSMITTAL OF DRAFT FINAL TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) OPE-ER-099-94 00
22-MAR-94 LANEY, P. T. COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP-10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) PTL-02-94 00
18-MAR-94 LIVERMAN, E. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WAG-3 & WAG-10 RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 5777 00
01-MAR-94 NOT SPECIFIED ADDENDUM FOR THE SAMPLING & ANALYSIS PLAN (SAP) FOR THE TRACK 2 CHARACTERIZATION OF ICPP OPERABLE UNIT (OU) 3-09 5795 00
01-DEC-93 WINCO SAMPLING & ANALYSIS PLAN (SAP) FOR THE TRACK 2 CHARACTERIZATION OF ICPP OPERABLE UNIT (OU) 3-09, REV.01 5746 00
01-DEC-93 HONEYCUTT, T. K. TECHNICAL MEMORANDUM FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) SOILS TREATABILITY STUDY (TS): PHYSICAL SEPARATION OF RADIONUCLIDES IN SOILS EGG-ER-11101 00
30-NOV-93 LIVERMAN, E. EPA REVIEW COMMENTS FOR DRAFT TRACK 2 SAMPLING & ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-09, ICPP 5774 00
28-OCT-93 WINCO DRAFT TRACK 2 SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-09 (CPP-603 AREA), REV.01 5747 00
24-SEP-93 INEL COMMUNITY RELATIONS PUBLIC NOTICE - THE DEPARTMENT OF ENERGY (DOE) ANNOUNCES A 30 DAY PUBLIC COMMENT PERIOD ON THE REMOVAL ACTIONS AT OU 3-08, 3-09, AND OU 3-12 AT THE ICPP 5567 00
24-SEP-93 BUGGER, B. DOE NEWS - REMOVAL ACTIONS TO TAKE PLACE AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 6805 00
30-AUG-93 WINCO ACTION MEMORANDUM FOR A REMOVAL ACTION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) OU 3-09 CPP-740 SETTLING BASIN, INEL, BUTTE COUNTY, IDAHO, REVISION 1 (REV.01) 5519 00
02-AUG-93 BARRY, G. A. TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) 93MSE/ID-225 00
01-AUG-93 BARRY, G. A. SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 6744 00
01-AUG-93 NUTHAK, S. A. HEALTH & SAFETY PLAN (HSP) FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) EGG-ER-10922 00
28-MAY-93 EARLE, O. K. TRANSMITTAL OF ACTION MEMORANDUM FOR TIME CRITICAL REMOVAL ACTIONS (TCRA) PLANNED FOR FY-93 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) FOR INCLUSION INTO THE ADMINISTRATIVE RECORD (AR) FILE OKE-64-93 00
07-DEC-89 SOLECKI, J. E. IDHW REQUEST FOR INFORMATION CONCERNING STATUS OF "A SHALLOW SEEPAGE PIT ON WEST SIDE OF CPP-603" - CONCLUDED THAT THE SHALLOW PIT IS SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-2 (CPP-02), FRENCH DRAIN WEST OF CPP-603 906 00
06-NOV-89 NYGARD, D. COCA UNIT DISCOVERY AT THE ICPP - SHALLOW SEEPAGE PIT ON WEST SIDE OF CPP-603 - CONCLUDED THAT THE SHALLOW PIT IS SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-2 (CPP-02), FRENCH DRAIN WEST OF CPP-603 6630 00
16-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL WEST OF CPP-693 EAST OF DRY FUEL STORAGE AREA 5442 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-01, CONCRETE SETTLING BASIN, VAULT, AND DRY WELLS E. OF CPP-603 5365 00
07-OCT-86 WINCO INITIAL ASSESSMENT - FRENCH DRAIN W. OF CPP-603 5366 00
07-OCT-86 WINCO INITIAL ASSESSMENT - TEMPORARY STORAGE AREA SE OF CPP-603 5367 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL AROUND CPP-603 SETTLING TANK 5368 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL AROUND CPP-603 SETTLING BASIN 5369 00
07-OCT-86 WINCO INITIAL ASSESSMENT - TRENCH E. OF CPP-603 FUEL STORAGE BASIN 5370 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-08, CPP-603 BASIN FILTER SYSTEM LINE FAILURE 5372 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SOIL CONTAMINATION NEAR THE NE CORNER OF CPP-603 S. BASIN 5373 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-603 PLASTIC PIPELINE BREAK 5374 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-603 SLUDGE AND WATER RELEASE 5375 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SOIL STORAGE AREA SOUTH OF CPP PEACH BOTTOM FUEL STORAGE AREA 5381 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-603 TO CPP-604 LINE LEAK 5383 00
07-OCT-86 WINCO INITIAL ASSESSMENT - PARTICULATE AIR RELEASE SOUTH OF CPP-603 5386 00
07-OCT-86 WINCO INITIAL ASSESSMENT - ABANDONED LIQUID RADIOACTIVE WASTE STORAGE TANK CPP VES-SFE-20 5433 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP-603 BASIN FILTER SYSTEM LINE FAILURE 6674 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - SOIL CONTAINMENT NEAR NORTHEAST CORNER OF CPP-603 SOUTH BASIN 6675 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP-603 PLASTIC PIPELINE BREAK 6676 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP-603 SLUDGE & WATER RELEASE 6677 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP SOIL STORAGE AREA NEAR PEACH BOTTOM FUEL STORAGE AREA 6682 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP-19, CPP-603 TO CPP-604 LINE LEAK 6684 00
01-SEP-84 SCHMIDT, D. A. RADIOLOGICAL CHARACTERIZATION & DECISION ANALYSIS FOR VES-SFE-20 WASTE TANK & VAULT WINCO-1021 00
01-MAY-82 LOW, J. O. INTERNAL TECHNICAL REPORT - RADIOACTIVE WASTE CHARACTERIZATION OF CHEMICAL PROCESSING PLANT 603 (CPP-603) CLEANUP BASIN SYSTEM CPP-740 WM-F1-81-023 01


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page