Select By Operable Unit (OU)

For Operable Unit 3-07

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
10-AUG-99 AR COORDINATOR OPERABLE UNIT (OU) 3-07 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-07 AR.INDEX.OU.3-07 00
24-JUN-97 JENSEN, N. R. TRANSMITTAL OF ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP OPE-ER-102-97 00
01-JUN-97 FRANCIS, C. S. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHENMICAL PROCESSING PLANT (ICPP) DOE/ID-10568 01
27-MAR-97 RENO, S. L. IDHW-DEQ COMMENTS ON ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP - DOE/ID-10568 FEBRUARY 1997 (02/97) 14351 00
28-FEB-97 JENSEN, N. R. TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPE-ER-29-97 00
01-FEB-97 NOT SPECIFIED APPROVAL MEMORANDUM FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION 10315 00
01-FEB-97 FRANCIS, C. S. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) DOE/ID-10568 00
30-JAN-97 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION ENGINEERING EVALUATION COST ANALYSIS (EE/CA) 18071 00
01-AUG-95 LITCO SAMPLING AND ANALYSIS PLAN (SAP) FOR WAG-3 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (FINAL) INEL-95/0137 00
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) INEL/95-0056, VOL 02 0
01-AUG-95 NOT SPECIFIED WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, VOLUME I (VOL.01) INEL/95-0056, VOL. 01 0
05-JUL-95 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-127-95 00
05-JUN-95 GREEN, L. A. EXTENSION OF COMMENT RESOLUTION PERIOD ON WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN OPE-ER-102-95 00
01-MAY-95 RENO, S. L. IDHW-DEQ COMMENTS ON WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) 18023 00
17-FEB-95 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW AND COMMENT PERIOD FOR DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INEL-95/0137 15045 00
01-FEB-95 LITCO REPORT OF 1993 AND 1994 TANK FARM DRILLING AND SAMPLING INVESTIGATION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL-95/0064 00
26-OCT-94 DOE, EPA, IDHW TRACK 2 DECISION STATEMENT - ACTION DETERMINATION FOR OU 3-07 TANK FARM AREA, CPP-16, CPP-20, CPP-24, CPP-25, CPP-30 CPP-32E NO FURTHER ACTION DETERMINATION - CPP-26, CPP-28, CPP-31, CPP-32W, CPP-79 AND CPP-83 SHOULD BE INCLUDED IN WAG-3 COMPREHENSIV 5809 00
21-OCT-94 GREEN, L. A. TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-283-94 00
19-OCT-94 JONES, E. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL WASTE AREA GROUP 3 (WAG-3) TECHNICAL WORK PLAN FOR PERCHED WATER PUMPING AND TRACER TESTS 15038 00
18-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) PERCHED GROUNDWATER PUMPING AND TRACER TEST, SEPTEMBER 16, 1994 (09/16/94) 15037 00
14-OCT-94 WINCO FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5791 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW) WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY (RI/FS) 15035 00
06-OCT-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW), WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5785 00
10-AUG-94 RENO, S. L. IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5782 00
08-AUG-94 MEYER, L. ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5783 00
12-APR-94 WELLS, R. P. LIMITATIONS & VALIDATION (L&V) REPORT, IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-07 RADIOCHEMICAL ANALYSIS, SDG #3PG10301BG RPW-44-94 00
08-MAY-93 WINCO TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-07, TANK FARM AREA I, REVISION 2 (REV.02) 5764 00
24-FEB-93 MARTY, R. C. VALIDATION OF ORGANOCHLORINE HERBICIDE DATA FOURTH (4TH) QUARTER 1992 GROUNDWATER SAMPLING EFFORT AT WESTINGHOUSE IDAHO CHEMICAL PROCESSING PLANT (ICPP): SAMPLE DELIVERY GROUP (SDG) #GW00801W4 4GW00101W4 4GW00201W4 4GW01001W4 RM-06-93-A 00
26-OCT-92 STOOPS, T. M. RECEIPT OF YOUR NOTICE OF DELAY DATED 09/28/92 FOR SUBMISSION OF TRACK 2 SUMMARY REPORT FOR OU 3-07 & 3-08 6115 00
22-OCT-92 DOORNBOS, M. H. EVALUATION OF A UNIDIRECTIONAL GAMMA DETECTOR FOR OPERABLE UNIT (OU) 3-07 6614 00
28-SEP-92 LYLE, J. L. NOTICE OF DELAY IN SCHEDULE FOR SUBMITTAL OF TWO SECONDARY DOCUMENTS: THE SUMMARY REPORTS FOR OPERABLE UNITS OU 3-07 AND 3-08 AM/ERWM-RPO-202-92 00
17-AUG-92 MASCARENAS, C. S. SITE SPECIFIC HEALTH & SAFETY PLAN (HSP), REV.01 FY-92 DRILLING & SAMPLING PROGRAM TRACK 2 INVESTIGATION OF OU 3-07 TANK FARM & OU 3-08 TANK FARM II 6621 00
17-AUG-92 RETZLAFF, R. IDAHO CHEMICAL PROCESSING PLANT (ICPP) GEOPHYSICAL SURVEY 903-1188 00
06-AUG-92 WINCO FIELD IMPLEMENTATION DOCUMENT - OPERABLE UNITS (OU) 3-07, 3-08, AND BACKGROUND SOIL INVESTIGATIONS 5516 00
31-JUL-92 LYLE, J. L. TRANSMITTAL OF CLOSURE ADDENDUM FOR SAMPLING AND ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-07 AND 3-08 (TANK FARM II & III RESPECTIVELY) AND WASTE AREA GROUP 3 (WAG-3) QUALITY ASSURANCE PROJECT PLAN (QAPJP) AM/ERWM-RPO-173-92 00
21-JUL-92 WINCO QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR CHARACTERIZATION ACTIVITIES AT WASTE AREA GROUP 3 (WAG-3) QAPJP-E-035 00
10-JUL-92 LYLE, J. L. MODIFICATIONS TO OPERABLE UNIT (OU) 3-07 TANK FARM SAMPLING & ANALYSIS PLAN (SAP) AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 AM/ERWM-RPO-154-92 00
08-JUN-92 MALIK, L. E. REPORT ON PRELIMINARY REVIEW OF IMPACT ON TANK FARM DUE TO CHARACTERIZATION ACTIVITIES 6622 00
24-APR-92 LYLE, J. L. TRANSMITTAL OF THE ADDENDUM FOR THE RESPONSE TO EPA AND IDHW COMMENTS FOR THE DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-07 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 RPO-091-92 00
02-MAR-92 LYLE, J. L. TRANSMITTAL OF THE SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-07 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 RPO-047-92 00
28-FEB-92 WINCO SEE OKE-75-92 FOR MODIFICATIONS - DRAFT IDAHO CHEMICAL PROCESSING PLANT (ICPP) SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-07 TANK FARM AREA 4413 00
19-FEB-92 URBANSKI, C. J. SUBSURFACE IMAGING RESULTS FOR HIGH LEVEL WASTE TANK FARM REPLACEMENT (HLWTFR) PROJECT CJU-05-92 00
01-JAN-92 MOTAZED, B. PORTABLE PIPE MAPPER (PPM) FIELD TEST AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) 6623 00
18-DEC-91 EARLE, O. K. DISPOSITION OF RADIOACTIVELY CONTAMINATED SOIL 6594 00
17-DEC-91 EARLE, O. K. SCOPE OF WORK FOR THE TRACK 2 STUDY OF OU 3-07: TANK FARM 1 5274 00
02-DEC-91 JOSTEN, N. E. FINAL REPORT ON ROBOTIC GEOPHYSICAL SURVEY NEJ-28-91 00
29-OCT-91 MASCARENAS, C. S. SITES WITHIN OPERABLE UNIT (OU) 3-07 6596 00
18-OCT-91 MEJIA, C. REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07 TANK FARM 6590 00
18-OCT-91 MEJIA, C. REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07, TANK FARM 6591 00
18-OCT-91 MEJIA, C. REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07, TANK FARM 6592 00
09-MAY-91 LYLE, J. L. RESPONSE TO INFORMATION REQUESTED BY MR. WALKER HOWELL REGARDING SAMPLING DATA FOR CPP-55-06 SAMPLING & ANALYSIS DATA PACKAGE ERD-161-91 00
06-DEC-90 EARLE, O. K. STRONTIUM-90 IN BOREHOLE CPP-55-06 OKE-21-90 00
19-NOV-90 EARLE, O. K. STRONTIUM-90 IN BOREHOLE CPP-55-06 OKE-18-90 00
08-JUL-87 WINCO INITIAL ASSESSMENT - CPP-604 RADIOACTIVE WASTE UNLOADING AREA 5384 00
08-JUL-87 POLAND, D. J. INITIAL ASSESSMENT - CPP-20 CPP-604 RADIOACTIVE WASTE UNLOADING AREA 6685 00
14-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA SW AND NW OF VALVE BOX B-4 5396 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CPP CONTAMINATED SOIL TANK FARM AREA BUCKET SPILL 5388 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA NORTH OF CPP-604 5389 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA NEAR VALVE BOX B-9 5394 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA SOUTH OF TANK WM-183 5395 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL FROM LEAK IN LINE FROM CPP WM-181 TO PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR 5380 00
07-OCT-86 POLAND, D. J. INITIAL ASSESSMENT - CPP CONTAMINATED SOIL FROM LEAK IN LINE FROM WM-181 TO PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR 6681 00
16-JAN-76 LOHSE, G. E. ALLIED CHEMICAL CORPORATION OPERATING OCCURRENCE REPORT - WASTE TRANSFER LINE GASKET LEAK 6634 00
17-APR-62 LATCHUM, J. W. REPORT OF THE INVESTIGATING COMMITTEE CHEMICAL PROCESSING PLANT (CPP) WASTE TANK LEAKAGE OF MARCH 17, 1962 (03/17/62) LA-53-62A 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page