Search Within All Documents

for Author WINCO

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
14-OCT-94 WINCO FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 5791 00
05-AUG-94 WINCO TRACK 2 SUMMARY REPORT FOR CPP-23 CPP INJECTION WELL: CPP-37 GRAVEL PIT 1 & PIT 2 & CPP-59 KEROSENE TANK OVERFLOW WEST OF CPP-633, REV.02 5804 00
05-AUG-94 WINCO TRACK 2 SUMMARY REPORT REFERENCES FOR CPP-23 CPP INJECTION WELL; CPP-37 GRAVEL PIT 1 & PIT 2; & CPP-59 KEROSENE TANK OVERFLOW EAST OF CPP-633, REV.02 5805 00
27-JUN-94 WINCO TRACK 1 DECISION DOCUMENTATION PACKAGE - INVESTIGATION OF CPP-34, SOIL STORAGE AREA IN THE NE CORNER OF ICPP - ACTION DETERMINATION, TRACK 2 TREATABILITY STUDY (TS) IS JUSTIFIED 5756 00
28-FEB-94 WINCO BACKGROUND CONCENTRATIONS OF SELECTED METALS & RADIONUCLIDES IN BIG LOST RIVER ALLUVIUM AT ICPP, REVISION 1 (REV.01) 14143 00
01-DEC-93 WINCO SAMPLING & ANALYSIS PLAN (SAP) FOR THE TRACK 2 CHARACTERIZATION OF ICPP OPERABLE UNIT (OU) 3-09, REV.01 5746 00
01-NOV-93 WINCO TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-11, CPP-621 AREA SPILLS, REV.02 5753 00
28-OCT-93 WINCO DRAFT TRACK 2 SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-09 (CPP-603 AREA), REV.01 5747 00
30-AUG-93 WINCO ACTION MEMORANDUM FOR A REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP), WASTE AREA GROUP 3 (WAG-3), BIN SET #3, INEL, BUTTE COUNTY, IDAHO, REVISION 1 (REV.01) 5518 00
30-AUG-93 WINCO ACTION MEMORANDUM FOR A REMOVAL ACTION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) OU 3-09 CPP-740 SETTLING BASIN, INEL, BUTTE COUNTY, IDAHO, REVISION 1 (REV.01) 5519 00
30-AUG-93 WINCO ACTION MEMORANDUM FOR A REMOVAL ACTION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-12 SITE CPP-81, INEL, BUTTE COUNTY, IDAHO, REV.01 5520 00
28-JUL-93 WINCO QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR CHARACTERIZATION ACTIVITIES AT WASTE AREA GROUP 3 (WAG-3) QAPJP-E-035 01
16-JUL-93 WINCO FINAL TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-08, TANK FARM AREA II, REVISION 3 (REV.03) 5786 00
01-JUN-93 WINCO TRACK 1 DECISION DOCUMENTATION PACKAGE - WAG-3 OU 3-06 CONTINUE TO TRACK 2 SCOPING, REV.02 5304 00
08-MAY-93 WINCO TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-07, TANK FARM AREA I, REVISION 2 (REV.02) 5764 00
05-MAY-93 WINCO TRACK 2 SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-11 - CPP-45 CPP-621 CHEMICAL STORAGE AREA SPILL AND CPP-58 PEW OVERHEAD PIPELINE SPILL, REV.01 5302 00
09-APR-93 WINCO TRACK 1 NO FURTHER ACTION DETERMINATION - CPP-68, ABANDONED GASOLINE TANK CPP-VES-UTI-652, REV.02 5265 00
09-APR-93 WINCO TRACK 1 ACTION DETERMINATION, PROCEED TO SCOPING SESSION TO DETERMINE COURSE OF ACTION - CPP-601 TUNNEL DRAIN LEAK (VT-300), REVISION 2 (REV.02) 5266 00
09-APR-93 WINCO TRACK 1 DECISION DOCUMENTATION PACKAGE - NO FURTHER ACTION DETERMINATION - CPP-63 HEXONE SPILL BY CPP-710 5267 00
09-APR-93 WINCO TRACK 1 INVESTIGATION OF CPP-55 MERCURY CONTAMINATED AREA SOUTH OF CPP T-15 - NO FURTHER ACTION DETERMINATION, REV.02 5270 00
09-APR-93 WINCO TRACK 1 DECISION DOCUMENTATION PACKAGE - CPP-21 SOLID WASTE STORAGE BIN SOUTH OF CPP-601 - NO FURTHER ACTION DETERMINATION, REV.02 5271 00
01-APR-93 WINCO TRACK 2 SUMMARY REPORT, WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-05, OLD SEWAGE TREATMENT PLANT WEST OF CPP-664 (CPP-14), REV.02 5606 00
28-FEB-93 WINCO REFERENCES FOR TRACK 2 SCOPING PACKAGE FOR OPERABLE UNIT (OU) 3-11, CPP-621 CHEMICAL STORAGE AREA ACID SPILLS (DOCUMENT 1) 5762 00
28-FEB-93 WINCO REFERENCES FOR THE TRACK 2 SCOPING PACKAGE FOR OPERABLE UNIT (OU) 3-11, CPP-621 CHEMICAL STORAGE AREA ACID SPILLS (DOCUMENT 2) 5762-A 00
04-JAN-93 WINCO TRACK 1 DECISION DOCUMENTATION PACKAGE - INVESTIGATION OF CPP-23 - ACTION DETERMINATION, PROCEED TO TRACK 2 SCOPING 5343 00
04-JAN-93 WINCO TRACK 1 DECISION DOCUMENTATION PACKAGE - INVESTIGATION OF CPP-59 - ACTION DETERMINATION PROCEED TO TRACK 2 SCOPING 5344 00
01-DEC-92 WINCO TRACK 1 - ABANDONED LINE 1.5 IN. - PLA-776 W. OF BEECH ST. REV.01 5292 00
06-AUG-92 WINCO FIELD IMPLEMENTATION DOCUMENT - OPERABLE UNITS (OU) 3-07, 3-08, AND BACKGROUND SOIL INVESTIGATIONS 5516 00
21-JUL-92 WINCO QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR CHARACTERIZATION ACTIVITIES AT WASTE AREA GROUP 3 (WAG-3) QAPJP-E-035 00
27-MAY-92 WINCO WINCO ENVIRONMENTAL RESTORATION (ER) ADDENDUM TO DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-08 TANK FARM AREA II (DATED 03/31/92) 4697 00
31-MAR-92 WINCO SAMPLING AND ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-08 TANK FARM AREA II IDAHO CHEMICAL PROCESSING PLANT (ICPP), REV.01 5276 00
28-FEB-92 WINCO SEE OKE-75-92 FOR MODIFICATIONS - DRAFT IDAHO CHEMICAL PROCESSING PLANT (ICPP) SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-07 TANK FARM AREA 4413 00
09-SEP-91 WINCO NO ACTION SITE - CPP-76 SEPTIC TANK AND CESSPOOL WEST OF CPP-659 - NO ACTION DETERMINATION PACKAGE 3103 00
09-SEP-91 WINCO NO ACTION SITE - CPP-52 PICKLING SHED EAST OF CPP-631 3576 00
09-SEP-91 WINCO NO ACTION SITE - CPP-70 SEPTIC TANK EAST OF CPP-655 AND CPP-71 SEEPAGE PITS WEST OF CPP-656 3577 00
09-SEP-91 WINCO NO ACTION SITE - CPP-72 CPP-758 CESSPOOL EAST OF CPP-651 3578 00
09-SEP-91 WINCO NO ACTION SITE - CPP-73 LEACHING CESSPOOL EAST OF CPP T-5 3579 00
09-SEP-91 WINCO NO ACTION SITE - CPP-74 SEEPAGE PIT WEST OF CPP-626 3580 00
09-SEP-91 WINCO NO ACTION SITE - CPP-75 SEPTIC TANK AND CESSPOOL WEST OF CPP-603 3581 00
09-SEP-91 WINCO NO ACTION SITE - CPP-77 SEEPAGE PIT AND CESSPOOL NORTH OF CPP-662 3582 00
08-JUL-87 WINCO INITIAL ASSESSMENT - CPP-604 RADIOACTIVE WASTE UNLOADING AREA 5384 00
08-JUL-87 WINCO INITIAL ASSESSMENT - CPP HF STORAGE TANK (YDB-105) & DRY WELL 5403 00
08-JUL-87 WINCO INITIAL ASSESSMENT - LIME PIT AT THE BASE OF THE CPP-601 BERM AND FRENCH DRAIN 5404 00
08-JUL-87 WINCO INITIAL ASSESSMENT - KEROSENE TANK OVERFLOW OF CPP-633 5423 00
08-JUL-87 WINCO INITIAL ASSESSMENT - ABANDONED GASOLINE TANK CPP-VES-UTI-652 5432 00
16-OCT-86 WINCO INITIAL ASSESSMENT - PCB TRANSFORMER YARD (CPP-731) 5414 00
16-OCT-86 WINCO INITIAL ASSESSMENT - PCB STAGING AREA WEST OF CPP-660 5415 00
16-OCT-86 WINCO INITIAL ASSESSMENT - PICKLING SHED EAST OF CPP-631 5416 00
16-OCT-86 WINCO INITIAL ASSESSMENT - PAINT AND PAINT SOLVENT AREA SOUTH OF CPP-697 5417 00
16-OCT-86 WINCO INITIAL ASSESSMENT - DRUM STORAGE AREA WEST OF CPP-660 5418 00
16-OCT-86 WINCO INITIAL ASSESSMENT - MERCURY CONTAMINATED AREA SOUTH OF CPP T-15 5419 00
16-OCT-86 WINCO INITIAL ASSESSMENT - NITRIC ACID CONTAMINATION SOUTH OF CPP-734 5420 00
16-OCT-86 WINCO INITIAL ASSESSMENT - SULFURIC ACID SPILL EAST OF CPP-606 5421 00
16-OCT-86 WINCO INITIAL ASSESSMENT - CPP PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR OVERHEAD PIPELINE SPILLS 5422 00
16-OCT-86 WINCO INITIAL ASSESSMENT - PAINT SHOP AT PRESENT LOCATION OF CPP-645 5424 00
16-OCT-86 WINCO INITIAL ASSESSMENT - PCB SPILL IN CPP-718 TRANSFORMER YARD 5425 00
16-OCT-86 WINCO INITIAL ASSESSMENT - MERCURY CONTAMINATED AREA NEAR CPP TB-4 5426 00
16-OCT-86 WINCO INITIAL ASSESSMENT - HEXONE SPILL BY CPP-710 5427 00
16-OCT-86 WINCO INITIAL ASSESSMENT - HEXONE SPILL BY CPP-660 5428 00
16-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL WEST OF CPP-693 EAST OF DRY FUEL STORAGE AREA 5442 00
15-OCT-86 WINCO INITIAL ASSESSMENT - FIRE TRAINING PITS BETWEEN CPP-602 & CPP-603 5405 00
15-OCT-86 WINCO INITIAL ASSESSMENT - DRAINAGE DITCH WEST OF CPP-637 5406 00
15-OCT-86 WINCO INITIAL ASSESSMENT - GREASE PIT SOUTH OF CPP-637 5407 00
15-OCT-86 WINCO INITIAL ASSESSMENT - GREASE PIT SOUTH OF CPP-608 5408 00
15-OCT-86 WINCO INITIAL ASSESSMENT - CPP-621 CHEMICAL STORAGE AREA SPILLS 5409 00
15-OCT-86 WINCO INITIAL ASSESSMENT - CPP-637 COURTYARD PILOT PLANT RELEASE 5410 00
15-OCT-86 WINCO INITIAL ASSESSMENT - PILOT PLANT STORAGE AREA WEST OF CPP-620 5411 00
15-OCT-86 WINCO INITIAL ASSESSMENT - FRENCH DRAIN SOUTH OF CPP-633 5412 00
15-OCT-86 WINCO INITIAL ASSESSMENT - PCB TRANSFORMER YARD (CPP-705) 5413 00
14-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA SW AND NW OF VALVE BOX B-4 5396 00
14-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN THE TANK FARM AREA NEAR WL-102 NE OF CPP-604 5397 00
14-OCT-86 WINCO INITIAL ASSESSMENT - SOIL STORAGE AREA IN THE NE CORNER OF THE CPP 5398 00
14-OCT-86 WINCO INITIAL ASSESSMENT - CPP-633 DECONTAMINATION SPILL 5399 00
14-OCT-86 WINCO INITIAL ASSESSMENT - TRANSFER LINE LEAK FROM CPP-633 TO WL-102 5400 00
14-OCT-86 WINCO INITIAL ASSESSMENT - CPP GRAVEL PITS #1 AND #2 5401 00
14-OCT-86 WINCO INITIAL ASSESSMENT - FRIABLE TRANSITE ON CPP-601, CPP-603, CPP-603, CPP-604, CPP-605, CPP-606, CPP-640, CPP-644, AND CPP-648 5402 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CPP INJECTION WELL (MAH-FE-304) 5387 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CPP CONTAMINATED SOIL TANK FARM AREA BUCKET SPILL 5388 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA NORTH OF CPP-604 5389 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA FROM STEAM FLUSHING 5390 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA EAST OF CPP-604 5391 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM SOUTH OF WM-181 BY VALVE BOX A-6 5392 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN NORTH & WEST OF THE MAIN STACK (CPP-708) 5393 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA NEAR VALVE BOX B-9 5394 00
13-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA SOUTH OF TANK WM-183 5395 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-01, CONCRETE SETTLING BASIN, VAULT, AND DRY WELLS E. OF CPP-603 5365 00
07-OCT-86 WINCO INITIAL ASSESSMENT - FRENCH DRAIN W. OF CPP-603 5366 00
07-OCT-86 WINCO INITIAL ASSESSMENT - TEMPORARY STORAGE AREA SE OF CPP-603 5367 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL AROUND CPP-603 SETTLING TANK 5368 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL AROUND CPP-603 SETTLING BASIN 5369 00
07-OCT-86 WINCO INITIAL ASSESSMENT - TRENCH E. OF CPP-603 FUEL STORAGE BASIN 5370 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SOIL CONTAMINATION NW OF CPP-642 5371 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-08, CPP-603 BASIN FILTER SYSTEM LINE FAILURE 5372 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SOIL CONTAMINATION NEAR THE NE CORNER OF CPP-603 S. BASIN 5373 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-603 PLASTIC PIPELINE BREAK 5374 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-603 SLUDGE AND WATER RELEASE 5375 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED PAINT CHIPS AND PAD SOUTH OF CPP-603 5376 00
07-OCT-86 WINCO INITIAL ASSESSMENT - PRESSURIZATION OF THE SOLID STORAGE CYCLONE NE OF CPP-633 5377 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SEWAGE TREATMENT PLANT SOUTH OF CPP-664 5378 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SOLVENT BURNER EAST OF CPP-605 5379 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
07-OCT-86 WINCO INITIAL ASSESSMENT - CONTAMINATED SOIL FROM LEAK IN LINE FROM CPP WM-181 TO PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR 5380 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SOIL STORAGE AREA SOUTH OF CPP PEACH BOTTOM FUEL STORAGE AREA 5381 00
07-OCT-86 WINCO INITIAL ASSESSMENT - GAS STORAGE BUILDING 5382 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-603 TO CPP-604 LINE LEAK 5383 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SOLID WASTE STORAGE BIN SOUTH OF CPP-601 5385 00
07-OCT-86 WINCO INITIAL ASSESSMENT - PARTICULATE AIR RELEASE SOUTH OF CPP-603 5386 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP SEWAGE PLANT LAGOONS 5429 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP COAL FIRED STEAM GENERATOR PROJECT (CFSGP) FLY ASH PIT 5430 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP PERCOLATION PONDS #1 AND #2 5431 00
07-OCT-86 WINCO INITIAL ASSESSMENT - ABANDONED LIQUID RADIOACTIVE WASTE STORAGE TANK CPP VES-SFE-20 5433 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SEPTIC TANK EAST OF CPP-655 5434 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SEEPAGE PIT WEST OF CPP-656 5435 00
07-OCT-86 WINCO INITIAL ASSESSMENT - CPP-758 CESSPOOL EAST OF CPP-651 5436 00
07-OCT-86 WINCO INITIAL ASSESSMENT - LEACHING CESSPOOL EAST OF CPP T-5 5437 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SEWAGE PIT WEST OF CPP-626 5438 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SEPTIC TANK WEST OF CPP-603 5439 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SEPTIC TANK AND WEST OF CPP-659 5440 00
07-OCT-86 WINCO INITIAL ASSESSMENT - SEEPAGE PIT AND CESSPOOL NORTH OF CPP-662 5441 00
01-SEP-80 WINCO CHARACTERISTICS OF THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) SANITARY WASTE COLLECTION SYSTEMS 6650 00
01-MAY-80 WINCO MAPS FOR CPP-14 6660 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page