Search Within All Documents

for Author MK-FIC

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
12-JUL-94 MK-FIC DOE-ID LEAD AGENCY ACTION MEMORANDUM FOR THE NON TIME CRITICAL REMOVAL ACTION (NTCRA) OF TNT & RDX CONTAMINATED SOIL - ENGINEERING EVALUATION COST ANALYSIS (EE/CA) IS INCLUDED AS ATTACHMENT A 10.03.2.122.01 02
15-JUN-94 MK-FIC REMEDIAL ACTION (RA) REPORT TRA WARM WASTE POND (WWP) INTERIM ACTION (IA) OU 2-10 (OU 2-13 RECORD PER DOE-ID REQUEST) 02.010.2.1.209.01 01
01-JUN-94 MK-FIC REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PAD-A LIMITED ACTION RWMC OU 7-12 (DRAFT FINAL) 07.012.1.1.101.01 01
01-JUN-94 MK-FIC DOE-ID LEAD AGENCY ACTION MEMORANDUM FOR THE NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT UNEXPLODED ORDNANCE LOCATIONS AT THE INEL 10.03.1.122.01 01
09-MAY-94 MK-FIC REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK - PAD-A LIMITED ACTION RWMC OU 7-12 07.012.0.140.01 03
28-APR-94 MK-FIC ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT UNEXPLODED ORDNANCE LOCATIONS AT INEL 10.003.2.1.201.01 02
22-NOV-93 MK-FIC FINAL REMEDIAL DESIGN (RD) IMPLEMENTING REMEDIAL ACTION (RA) WORK PLAN FOR PBF-08 CORROSIVE WASTE SUMP & PBF-10 EVAPORATION POND REMEDIATION OU 5-13 05.013.1.3.101.01 02
09-NOV-93 MK-FIC DOE, EPA AND IDHW REVIEW COMMENTS AND RESOLUTIONS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REV.01 FOR PBF INTERIM ACTION (IA) OU 5-13 7212 00
10-SEP-93 MK-FIC FINAL REMEDIAL DESIGN (RD) IMPLEMENTING REMEDIAL ACTION (RA) WORK PLAN TRA WARM WASTE POND (WWP) INTERIM ACTION (IA) OU 2-10 02.010.1.1.114.01 01
14-JUN-93 MK-FIC SITE PREPARATION & UTILITIES DESIGN TECHNICAL MEMORANDUM FOR TAN INTERIM ACTION (IA) - OPERABLE UNIT (OU) 1-07A 01.07A.1.3.114.01 01
25-MAY-93 MK-FIC REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK - REMEDIATION OF THE TRA WARM WASTE POND (WWP) OU 2-10 02.10.3.1.302.01 03
05-APR-93 MK-FIC INEL ENVIRONMENTAL RESTORATION PROGRAM (ERP) GROUNDWATER COLLECTION SYSTEM DESIGN TECHNICAL MEMORANDUM WAG-1 OU 1-07A 6531 00
14-MAY-92 MK-FIC WAG-10 ORDNANCE INTERIM ACTION (IA) COST ESTIMATE FOR ALTERNATIVES 2, 3, AND 4 5112 00
12-MAR-92 MK-FIC INTERIM ACTION (IA) PROPOSED PLAN FOR PBF-10 COST ESTIMATE ERP-92-199 00


Send Questions and Comments to: RecordsManagement@icp.doe.gov

Previous Page | Administrative Record Home Page