Return to Administrative Record Home Page

ICP/EXT-04-00525 Rev. 00

ENGINEERING STUDIES REPORT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT

DOCUMENT IMAGE LINKS

PDF files may be large and take a long time to load. Also, the server may be slow during busy times. If you are having problems opening a file, you can save it to your computer first by Right-clicking on the link, then clicking Save Target As or Save Link As. (Be sure that PDFs have a PDF extension.) After the file is saved, open it on your computer to display it.
GIF images are available for access to individual pages.
Document as GIF pages Total Pages
View GIF pages 153
Document as Multipage Sections
(If available)
PDF files require Adobe Acrobat Reader
Pages in Section First Page in Section (if have multiple sections)
Section 1 View File PDF File size: 3261K 153 1

Image file troubleshooting - Look at the status bar (at the bottom of the browser window where the document is loading) and see if it indicates that a document is being loaded. If activity is occurring, you may need to just give it more time. If activity is not occurring or appears to be stuck, then click your browser's Back button and try again. You may need to select Refresh. If this does not help - your best approach is to save the file on your computer and view it from there.

DOCUMENT DETAILS

Title: ENGINEERING STUDIES REPORT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT
Create Date: 29-SEP-04
File Category: AR1.1 BACKGROUND
WAG and OU: Waste Area Group:7 Operable Unit:7-13
WAG and OU: Waste Area Group:7 Operable Unit:7-14
Receiver: NOT SPECIFIED
Sender: SHROPSHIRE, K. L.
Sender: NICKELSON, D. F.
Sender: LANGENWALTER, T. A.
Sender: ANDERSON, E. C.
Sender: BALLS, V. J.
Sender: REED, W. H.
Author: SHROPSHIRE, K. L.
Author: NICKELSON, D. F.
Author: LANGENWALTER, T. A.
Author: ANDERSON, E. C.
Author: BALLS, V. J.
Author: REED, W. H.
Related Doc: EDF-4933 00 : ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT MEASUREMENT AND CONTROLS - ATTACHMENT 12 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: EDF-5028 00 : ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT FOUNDATION GROUTING STUDY - ATTACHMENT 5 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: EDF-5054 00 : ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT FIRE PROTECTION - ATTACHMENT 15 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: EDF-5102 00 : ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT DELIVERY SYSTEM - ATTACHMENT 10 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: EDF-5122 00 : ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ELECTRICAL UTILITIES - ATTACHMENT 13 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: EDF-5135 00 : ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT STORAGE AND MIXING - ATTACHMENT 9 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: EDF-5144 00 : ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT FACILITIES - ATTACHMENT 11 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: EDF-5146 00 : ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT SELECTION BASIS - ATTACHMENT 4 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: EDF-5147 00 : ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUBSURFACE DISPOSAL AREA (SDA) SITE CONDITIONS - ATTACHMENT 6 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: EDF-5150 00 : ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT SYSTEMS - ATTACHMENT 14 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: EDF-5152 00 : ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ENVIRONMENTAL, SAFETY, AND HEALTH (ES&H) - ATTACHMENT 17 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: EDF-5153 00 : ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT HYDRAULIC EXCAVATOR AND DRILL INJECTION RIG - ATTACHMENT 7 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: EDF-5155 00 : ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT OPERATIONS, MAINTENANCE, AND LOGISTICS - ATTACHMENT 8 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: EDF-5162 00 : ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT VEHICLES - ATTACHMENT 16 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: TFR-267 00 : TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (CUSTOMER, PROJECT, AND SYSTEM) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 1 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: TFR-269 00 : TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (SUBSYSTEM) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 2 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00
Related Doc: TFR-280 00 : TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (ASSUMPTIONS) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 3 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00