Return to Administrative Record Home Page

EM-ER-03-136 Rev. 00

TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM AND SUPPORTING DOCUMENTS FOR V-TANKS EARLY REMEDIAL ACTION FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 2 SITES

DOCUMENT IMAGE LINKS

PDF files may be large and take a long time to load. Also, the server may be slow during busy times. If you are having problems opening a file, you can save it to your computer first by Right-clicking on the link, then clicking Save Target As or Save Link As. (Be sure that PDFs have a PDF extension.) After the file is saved, open it on your computer to display it.
GIF images are available for access to individual pages.
Document as GIF pages Total Pages
View GIF pages 2
Document as Multipage Sections
(If available)
PDF files require Adobe Acrobat Reader
Pages in Section First Page in Section (if have multiple sections)
Section 1 View File PDF File Size: 68K 2

Image file troubleshooting - Look at the status bar (at the bottom of the browser window where the document is loading) and see if it indicates that a document is being loaded. If activity is occurring, you may need to just give it more time. If activity is not occurring or appears to be stuck, then click your browser's Back button and try again. You may need to select Refresh. If this does not help - your best approach is to save the file on your computer and view it from there.

DOCUMENT DETAILS

Title: TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM AND SUPPORTING DOCUMENTS FOR V-TANKS EARLY REMEDIAL ACTION FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 2 SITES
Create Date: 27-MAY-03
File Category: PF170.3 RD/RA WORK PLAN
File Category: PF140.3 SAP & PROCEDURES
File Category: PF3.12 PLANS GENERAL
File Category: PF1.4 CORRESPONDENCE
WAG and OU: Waste Area Group:1 Operable Unit:1-10
Receiver: PIERRE, W.
Receiver: NYGARD, D.
Sender: HAIN, K. E.
Author: SHAW, R. M.
Related Doc: DOE/ID-11065 00 : FIELD SAMPLING PLAN (FSP) FOR V-TANKS EARLY REMEDIAL ACTION (RA) AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 - SUPPORTING DOCUMENT FOR THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN (RD/RAWP) AND ADDENDUM
Related Doc: DOE/ID-11075 00 : COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM FOR V-TANKS EARLY REMEDIAL ACTION FOR THE TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10, GROUP 2 SITES
Related Doc: INEEL/EXT-02-01608 00 : WASTE MANAGEMENT PLAN (WMP) FOR V-TANKS EARLY REMEDIAL ACTION (RA) FOR THE TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10, GROUP 2 SITES - SUPPORTING DOCUMENT FOR REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN AND ADDENDU