Document as GIF pages | Total Pages | |
---|---|---|
View GIF pages | 98 | |
Document as Multipage Sections (If available) PDF files require Adobe Acrobat Reader |
Pages in Section | First Page in Section (if have multiple sections) |
Section 1 View File PDF File size: 5314K | 45 | TABLE OF CONTENTS |
Section 2 View File PDF File size: 5103K | 53 | SECTION 4.2.4 - ALTERNATIVE 4 |
Title: | DRAFT ENGINEERING EVALUATION COST ANALYSIS (EC/CA) FOR PBF REACTOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) |
Create Date: | 01-AUG-04 |
File Category: | PF170.10 REMOVAL ACTION |
WAG and OU: | Waste Area Group:5 Operable Unit:5/GEN |
Receiver: | NOT SPECIFIED |
Sender: | PRATT, M. B. |
Author: | PRATT, M. B. |
Related Doc: | EM-ER-04-172 00 : TRANSMITTAL OF DRAFT ENGINEERING EVALUATION COST ANALYSIS (EC/CA) FOR POWER BURST FACILITY (PBF) REACTOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) - ISSUE PAPER INCLUDED |