Return to Administrative Record Home Page

DOE/ID-11059 Rev. 00

CONSTRUCTION COMPLETE REPORT FOR THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-13 CFA-08 SEWAGE PLANT DRAINFIELD (COVER INSTALLATION)

DOCUMENT IMAGE LINKS

PDF files may be large and take a long time to load. Also, the server may be slow during busy times. If you are having problems opening a file, you can save it to your computer first by Right-clicking on the link, then clicking Save Target As or Save Link As. (Be sure that PDFs have a PDF extension.) After the file is saved, open it on your computer to display it.
GIF images are available for access to individual pages.
Document as GIF pages Total Pages
View GIF pages 193
Document as Multipage Sections
(If available)
PDF files require Adobe Acrobat Reader
Pages in Section First Page in Section (if have multiple sections)
Section 1 View File PDF File Size: 1600K 31 TABLE OF CONTENTS
Section 2 View File PDF File Size: 3140K 106 APPENDIX A - PREFINAL INSPECTION CHECKLIST
Section 3 View File PDF File Size: 5324K 32 ATTACHMENT F (APPENDIX A) - PHOTOGRAPHIC RECORD FOR INSPECTION REPORT
Section 4 View File PDF File Size: 235K 6 APPENDIX B - CFA-08 FINAL GRADE DRAWINGS FOR PIT RUN, PEA GRAVEL, COBBLE, AND TOPSOIL
Section 5 View File PDF File Size: 4530K 8 APPENDIX C - PHOTOGRAPHIC RECORD OF CFA-08 SEWAGE PLANT DRAINFIELD COVER INSTALLATION
Section 6 View File PDF File Size: 3035K 10 APPENDIX C CONT'D - PAGE 175

Image file troubleshooting - Look at the status bar (at the bottom of the browser window where the document is loading) and see if it indicates that a document is being loaded. If activity is occurring, you may need to just give it more time. If activity is not occurring or appears to be stuck, then click your browser's Back button and try again. You may need to select Refresh. If this does not help - your best approach is to save the file on your computer and view it from there.

DOCUMENT DETAILS

Title: CONSTRUCTION COMPLETE REPORT FOR THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-13 CFA-08 SEWAGE PLANT DRAINFIELD (COVER INSTALLATION)
Create Date: 03-JUN-03
File Category: PF5.6 REPORTS
WAG and OU: Waste Area Group:4 Operable Unit:4-13
Receiver: NOT SPECIFIED
Sender: SHERWOOD, J. A.
Sender: PREUSSNER, D. H.
Author: LANDIS, J. A.