Return to Administrative Record Home Page

DOE/ID-10783 Rev. 01

LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX B TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) - DOE/ID-10782, REV.01 & DOE/ID-10782, REV.02

DOCUMENT IMAGE LINKS

PDF files may be large and take a long time to load. Also, the server may be slow during busy times. If you are having problems opening a file, you can save it to your computer first by Right-clicking on the link, then clicking Save Target As or Save Link As. (Be sure that PDFs have a PDF extension.) After the file is saved, open it on your computer to display it.
GIF images are available for access to individual pages.
Document as GIF pages Total Pages
View GIF pages 123
Document as Multipage Sections
(If available)
PDF files require Adobe Acrobat Reader
Pages in Section First Page in Section (if have multiple sections)
Section 1 View File PDF File Size: 1477K 18 TABLE OF CONTENTS
Section 2 View File PDF File Size: 1931K 14 2. SITE DESCRIPTION AND BACKGROUND
Section 3 View File PDF File Size: 1725K 10 3. GROUNDWATER SAMPLING & MONITORING DQO'S
Section 4 View File PDF File Size: 1496K 14 4. FIELD ACTIVITIES
Section 5 View File PDF File Size: 1831K 14 7. QA/QC
Section 6 View File PDF File Size: 717K 8 10. WASTE MANAGEMENT
Section 7 View File PDF File Size: 836K 14 APPENDIX A - INTEC AREA AQUIFER WELL CONSTRUCTION SUMMARY
Section 8 View File PDF File Size: 1527K 15 APPENDIX B - SAP TABLES
Section 9 View File PDF File Size: 1637K 16 APPENDIX B CONT'D - SAP TABLES CONT'D (PAGE B-15)

Image file troubleshooting - Look at the status bar (at the bottom of the browser window where the document is loading) and see if it indicates that a document is being loaded. If activity is occurring, you may need to just give it more time. If activity is not occurring or appears to be stuck, then click your browser's Back button and try again. You may need to select Refresh. If this does not help - your best approach is to save the file on your computer and view it from there.

DOCUMENT DETAILS

Title: LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX B TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) - DOE/ID-10782, REV.01 & DOE/ID-10782, REV.02
Create Date: 01-NOV-00
File Category: PF3.12 PLANS GENERAL
File Category: PF170.3 RD/RA WORK PLAN
WAG and OU: Waste Area Group:3 Operable Unit:3-13
Receiver: NOT SPECIFIED
Sender: DOORNBOS, M. H.
Author: ROBERTS, C. J.
Related Doc: DOE/ID-10782 01 : MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA)
Related Doc: DOE/ID-10782 02 : MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - PER EM-ER-206-00 THIS MSIP IS THE RD/RA WORK PLAN FOR GROUP 5