Return to Administrative Record Home Page

DOE/ID-10745 Rev. 01

FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER WELL INSTALLATION

DOCUMENT IMAGE LINKS

PDF files may be large and take a long time to load. Also, the server may be slow during busy times. If you are having problems opening a file, you can save it to your computer first by Right-clicking on the link, then clicking Save Target As or Save Link As. (Be sure that PDFs have a PDF extension.) After the file is saved, open it on your computer to display it.
GIF images are available for access to individual pages.
Document as GIF pages Total Pages
View GIF pages 101
Document as Multipage Sections
(If available)
PDF files require Adobe Acrobat Reader
Pages in Section First Page in Section (if have multiple sections)
Section 1 View File PDF File Size: 6624K 65 TABLE OF CONTENTS
Section 2 View File PDF File Size: 2838K 36 SECTION 5 - SAMPLE CONTROL

Image file troubleshooting - Look at the status bar (at the bottom of the browser window where the document is loading) and see if it indicates that a document is being loaded. If activity is occurring, you may need to just give it more time. If activity is not occurring or appears to be stuck, then click your browser's Back button and try again. You may need to select Refresh. If this does not help - your best approach is to save the file on your computer and view it from there.

DOCUMENT DETAILS

Title: FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER WELL INSTALLATION
Create Date: 17-DEC-02
File Category: PF140.3 SAP & PROCEDURES
WAG and OU: Waste Area Group:3 Operable Unit:3-13
Receiver: NOT SPECIFIED
Sender: DOORNBOS, M. H.
Author: GIANOTTO, D. F.