Return to Administrative Record Home Page

DOE/ID-10676 Rev. 01

OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN

DOCUMENT IMAGE LINKS

PDF files may be large and take a long time to load. Also, the server may be slow during busy times. If you are having problems opening a file, you can save it to your computer first by Right-clicking on the link, then clicking Save Target As or Save Link As. (Be sure that PDFs have a PDF extension.) After the file is saved, open it on your computer to display it.
GIF images are available for access to individual pages.
Document as GIF pages Total Pages
View GIF pages 338
Document as Multipage Sections
(If available)
PDF files require Adobe Acrobat Reader
Pages in Section First Page in Section (if have multiple sections)
Section 1 View File PDF File size: 2332K 32 TABLE OF CONTENTS
Section 2 View File PDF File size: 5466K 18 2. BACKGROUND AND OPERATIONAL HISTORY
Section 3 View File PDF File size: 6453K 26 2. CONT'D - FIGURE 2-10 - VUALT AND DOME OF WM-185, WITH THE CONCRETE BEAMS AND CONCRETE RISERS ON TOP
Section 4 View File PDF File size: 5545K 31 3. EVALUATION OF OU 3-14 CONTRIBUTING SOURCES
Section 5 View File PDF File size: 5334K 21 3. CONT'D - FIGURE 3-18 - CPP-79 - SHALLOW PIPING CONFIGURATION
Section 6 View File PDF File size: 5100K 23 3. CONT'D - FIGURE 3-29 - EXTENT OF 1983 EXCAVATION WITHIN THE CPP-27/33 RELEASE SITES
Section 7 View File PDF File size: 5065K 16 3. CONT'D - FIGURE 3-39 - EASTERN VIEW OF 1982 EXCAVATION NORTH OF CPP-604 SHOWING EXTENT OF EXCAVATION THROUGH CPP-20 & CPP-25 RELEASE SITES
Section 8 View File PDF File size: 5957K 25 3. CONT'D - FIGURE 3-43 - POTENTIALLY ABANDONED SHORING DEVICES REMAINING FROM UPGRADES TO THE TANK FARM
Section 9 View File PDF File size: 5376K 22 4. CONTAMINANT FATE AND TRANSPORT MODELING
Section 10 View File PDF File size: 2905K 40 5. WORKPLAN RATIONALE
Section 11 View File PDF File size: 5590K 84 6. REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) TASKS

Image file troubleshooting - Look at the status bar (at the bottom of the browser window where the document is loading) and see if it indicates that a document is being loaded. If activity is occurring, you may need to just give it more time. If activity is not occurring or appears to be stuck, then click your browser's Back button and try again. You may need to select Refresh. If this does not help - your best approach is to save the file on your computer and view it from there.

DOCUMENT DETAILS

Title: OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN
Create Date: 07-JUN-04
File Category: AR3.3 WORK PLAN
WAG and OU: Waste Area Group:3 Operable Unit:3-14
Receiver: DISTRIBUTION
Sender: DOORNBOS, M. H.
Author: CAHN, L. S.
Related Doc: DOE/ID-10764 01 : TANK FARM SOIL AND GROUNDWATER FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX A TO RI/FS WORK PLAN - DOE/ID-10676, REV.01
Related Doc: EM-ER-04-120 00 : TRANSMITTAL OF FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - REVISION 1 (REV.01)
Related Doc: INEEL/EXT-03-01010 00 : EVALUATION OF FEASIBILITY OF AN EARLY DECISION AND PERMANENT REMEDY FOR TANK FARM SOIL - APPENDIX E TO OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN -DOE/ID-10676, REV.01
Related Doc: INEEL/EXT-2000-00529 01 : TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX B TO RI/FS WORK PLAN - DOE/ID-10676, REV.01
Related Doc: INEEL/EXT-99-00361 01 : WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX C TO RI/FS WORK PLAN - DOE/ID-10676, REV.01