Return to Administrative Record Home Page

DOE/ID-10676 Rev. 00

OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER PHASE I REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN

DOCUMENT IMAGE LINKS

PDF files may be large and take a long time to load. Also, the server may be slow during busy times. If you are having problems opening a file, you can save it to your computer first by Right-clicking on the link, then clicking Save Target As or Save Link As. (Be sure that PDFs have a PDF extension.) After the file is saved, open it on your computer to display it.
GIF images are available for access to individual pages.
Document as GIF pages Total Pages
View GIF pages 481
Document as Multipage Sections
(If available)
PDF files require Adobe Acrobat Reader
Pages in Section First Page in Section (if have multiple sections)
Section 1 View File PDF File Size: 5090K 49 TABLE OF CONTENTS
Section 2 View File PDF File Size: 7211K 28 2. OU 3-14 BACKGROUND & OPERATIONAL HISTORY
Section 3 View File PDF File Size: 3179K 23 2.3 INTEC INJECTION WILL
Section 4 View File PDF File Size: 5470K 52 3. INITIAL OU 3-13 EVALUATION
Section 5 View File PDF File Size: 7108K 59 4. WORKPLAN RATIONALE
Section 6 View File PDF File Size: 7087K 57 5. RI/FS STUDY TASKS
Section 7 View File PDF File Size: 6019K 86 APPENDIX A - TANK FARM VALVE BOX VALVES, PIPING & EQUIPMENT
Section 8 View File PDF File Size: 5988K 91 APPENDIX E-1 - SUPERVISOR'S DAILY LOGBOOK
Section 9 View File PDF File Size: 4629K 36 APPENDIX F - CONSTRUCTION HISTORY OF TANK FARM

Image file troubleshooting - Look at the status bar (at the bottom of the browser window where the document is loading) and see if it indicates that a document is being loaded. If activity is occurring, you may need to just give it more time. If activity is not occurring or appears to be stuck, then click your browser's Back button and try again. You may need to select Refresh. If this does not help - your best approach is to save the file on your computer and view it from there.

DOCUMENT DETAILS

Title: OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER PHASE I REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN
Create Date: 20-DEC-00
File Category: AR3.3 WORK PLAN
WAG and OU: Waste Area Group:3 Operable Unit:3-14
Receiver: DISTRIBUTION
Sender: FORSYTHE, H. S.
Author: FORSYTHE, H. S.
Related Doc: 22899 00 : IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS & RESOLUTIONS FOR DRAFT FINAL OU 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - DOE/ID-10676, REV. D (REV.0D)
Related Doc: DOE/ID-10763 00 : INJECTION WELL FIELD SAMPLING PLAN (FSP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS)
Related Doc: DOE/ID-10764 00 : TANK FARM SOIL FIELD SAMPLING PLAN (FSP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS)
Related Doc: EM-ER-243-00 00 : TRANSMITTAL OF FINAL OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN
Related Doc: INEEL/EXT-2000-00528 00 : INJECTION WELL HEALTH AND SAFETY PLAN (HSP OR HASP) FOR PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS)
Related Doc: INEEL/EXT-2000-00529 00 : TANK FARM SOIL HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS)
Related Doc: INEEL/EXT-99-00361 00 : WASTE MANAGEMENT PLAN (WMP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS)