Return to Administrative Record Home Page

5195 Rev. 00

FINAL WORK PLAN FOR THE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR EXTERIOR INDUSTRIAL WASTE DITCH OPERABLE UNIT (OU) 8-07, NAVAL REACTORS FACILITY (NRF) IDAHO FALLS, IDAHO

DOCUMENT IMAGE LINKS

PDF files may be large and take a long time to load. Also, the server may be slow during busy times. If you are having problems opening a file, you can save it to your computer first by Right-clicking on the link, then clicking Save Target As or Save Link As. (Be sure that PDFs have a PDF extension.) After the file is saved, open it on your computer to display it.
GIF images are available for access to individual pages.
Document as GIF pages Total Pages
View GIF pages 934
Document as Multipage Sections
(If available)
PDF files require Adobe Acrobat Reader
Pages in Section First Page in Section (if have multiple sections)
Section 1 View File PDF File Size: 8139K 148 RI/FS FINAL WORKPLAN EXTERIOR INDUSTRIAL WASTE DITCH OU 8-07 NRF
Section 2 View File PDF File Size: 77K 4 APPENDIX A - COMMUNITY RELATIONS PLAN SUPPLEMENT
Section 3 View File PDF File Size: 2924K 58 APPENDIX B - SAMPLING & ANALYSIS PLAN
Section 4 View File PDF File Size: 2345K 48 APPENDIX B PART B - NRF QUALITY ASSURANCE PROJECT PLAN
Section 5 View File PDF File Size: 779K 20 APPENDIX B PART C - DATA MANAGEMENT PLAN
Section 6 View File PDF File Size: 2377K 55 APPENDIX C - SITE SPECIFIC HEALTH & SAFETY PLAN
Section 7 View File PDF File Size: 8262K 208 QUALITY ASSURANCE PROGRAM PLAN
Section 8 View File PDF File Size: 3695K 97 CHEN-NORTHERN, INC. - QUALITY CONTROL MANUAL
Section 9 View File PDF File Size: 5856K 140 APPENDIX E - STANDARD OPERATING PROCEDURES (SOP) & SAMPLE DATA SHEETS
Section 10 View File PDF File Size: 2914K 86 STANDARD OPERATING PROCEDURE (SOP) NO. SMO-SOP-12.1.4
Section 11 View File PDF File Size: 2628K 50 APPENDIX F - INEL & NRF BACKGROUND & PHYSICAL SETTING
Section 12 View File PDF File Size: 712K 20 APPENDIX G - PRELIMINARY ASSESSMENT & ARAR'S

Image file troubleshooting - Look at the status bar (at the bottom of the browser window where the document is loading) and see if it indicates that a document is being loaded. If activity is occurring, you may need to just give it more time. If activity is not occurring or appears to be stuck, then click your browser's Back button and try again. You may need to select Refresh. If this does not help - your best approach is to save the file on your computer and view it from there.

DOCUMENT DETAILS

Title: FINAL WORK PLAN FOR THE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR EXTERIOR INDUSTRIAL WASTE DITCH OPERABLE UNIT (OU) 8-07, NAVAL REACTORS FACILITY (NRF) IDAHO FALLS, IDAHO
Create Date: 24-SEP-92
File Category: AR3.3 WORK PLAN
WAG and OU: Waste Area Group:8 Operable Unit:8-07
Receiver: NYGARD, D., PIERRE, W.
Sender: NEWBRY, R. D. E.
Author: NEWBRY, R. D. E.
Related Doc: NR-IBO-92/328 00 : TRANSMITTAL OF THE FINAL WORK PLAN FOR THE RI/FS FOR THE NRF INDUSTRIAL WASTE DITCH OU 8-07